Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Enzymatic regeneration of adenosine triphosphate cofactor

Regenerating adenosine triphosphate (ATP) from adenosine diphosphate (ADP) by enzymatic process which utilizes carbamyl phosphate as phosphoryl donor is technique used to regenerate expensive cofactors. Process allows complex enzymatic reactions to be considered as candidates for large-scale continuous processes.

Marshall, D. L.↗

Management of the Galileo attitude and articulation control flight software development

Management concepts are presented for software development for a new technology area, i.e., real-time autonomous, computer-based spacecraft control. Flight computer selection and sizing are done initially to maximize performance within constraints of size, power, and cost. A higher order language is chosen to enhance productivity. Because the computer is embedded in the control systems hardware and is tied to the iterative design process of the spacecraft, the management and configuration control of the software is different from more typical applications. The development process must permit early coding but accept late changes. Margin management must be a continuing process in the development. Validation and verification is a special problem because it is not feasible to test the software in the actual operating environment prior to launch.

Pace, G. D.↗

The Uranian corona as a charge exchange cascade of plasma sheet protons

The paper uses models of magnetic convection and interparticle interactions to examine the collisional interactions between atmospheric neutral hydrogen and magnetospheric charged particles observed by Voyager to be convecting through the Uranian magnetosphere. The e(-)-H collisional ionization process, continually reenergized by compressional heating of the electrons as they drift toward Uranus, produces a cascade of new plasma. This process has been suggested elsewhere as the source of the warm (10 eV at L = 5) plasma and is found in the present study to continue in a cascade to even cooler and more abundant plasma. This newly created plasma consists almost entirely of electrons and protons because He and H2 are nearly absent from the uppermost layers of the atmosphere. If this plasma crosses the dayside magnetopause and mixes with magnetopause boundary layers such as the plasma mantle, there to be swept back along the magnetotail, reincorporated into the magnetotail by the same processes postulated for solar wind plasma entry, and reenergized in the magnetotail current sheet, it would constitute an important source for the hot plasma observed by Voyager.

Herbert, Floyd↗

Plasma separation

This process employs a thermal plasma for the separation and production of oxygen and metals. It is a continuous process that requires no consumables and relies entirely on space resources. The almost complete absence of waste renders it relatively clean. It can be turned on or off without any undesirable side effects or residues. The prime disadvantage is its high power consumption.

Steurer, Wolfgang↗

Lunar Auger Dryer ISRU (LADI) Breadboard Testing and Model Validation

In 2009, the Lunar Reconnaissance Orbiter (LRO)and Lunar Crater Observation and Sensing Satellite(LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR)[1]. Both the 2020 NASA Technology Taxonomy[2] and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shadowed Region(PSR) environmental conditions. A screw conveyor dryer system operating from inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) began development of a similar sub-system for Mars operation in 2017 and fabricated a unique breadboard test stand for validating the feasibility of this concept. This testing was postponed with the redirection of NASA’s mission from Mars to Moon. A JSC led trade study[3] in FY20 formulated a plan to leverage existing hardware to test concept feasibility, developed a lunar auger dryer sizing tool, and identified that both a physical flow and thermal model is required to develop an Engineering Development Unit (EDU) for environmental testing. Beginning in FY21, the Game Changing Development Program (GCDP) funded a three-year technology development project to increase the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) subsystem to TRL 5.

Lunar↗

Lunar Auger Dryer ISRU (LADI) Breadboard Testing and Model Validation

In 2009, the Lunar Reconnaissance Orbiter (LRO)and Lunar Crater Observation and Sensing Satellite(LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR)[1]. Both the 2020 NASA Technology Taxonomy[2] and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shadowed Region(PSR) environmental conditions. A screw conveyor dryer system operating from inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) began development of a similar sub-system for Mars operation in 2017 and fabricated a unique breadboard test stand for validating the feasibility of this concept. This testing was postponed with the redirection of NASA’s mission from Mars to Moon. A JSC led trade study[3] in FY20 formulated a plan to leverage existing hardware to test concept feasibility, developed a lunar auger dryer sizing tool, and identified that both a physical flow and thermal model is required to develop an Engineering Development Unit (EDU) for environmental testing. Beginning in FY21, the Game Changing Development Program (GCDP) funded a three-year technology development project to increase the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) subsystem to TRL 5.

Lunar↗

The SEL Adapts to Meet Changing Times

Since 1976, the Software Engineering Laboratory (SEL) has been dedicated to understanding and improving the way in which one NASA organization, the Flight Dynamics Division (FDD) at Goddard Space Flight Center, develops, maintains, and manages complex flight dynamics systems. It has done this by developing and refining a continual process improvement approach that allows an organization such as the FDD to fine-tune its process for its particular domain. Experimental software engineering and measurement play a significant role in this approach. The SEL is a partnership of NASA Goddard, its major software contractor, Computer Sciences Corporation (CSC), and the University of Maryland's (LTM) Department of Computer Science. The FDD primarily builds software systems that provide ground-based flight dynamics support for scientific satellites. They fall into two sets: ground systems and simulators. Ground systems are midsize systems that average around 250 thousand source lines of code (KSLOC). Ground system development projects typically last 1 - 2 years. Recent systems have been rehosted to workstations from IBM mainframes, and also contain significant new subsystems written in C and C++. The simulators are smaller systems averaging around 60 KSLOC that provide the test data for the ground systems. Simulator development lasts up to 1 year. Most of the simulators have been built in Ada on workstations. The SEL is responsible for the management and continual improvement of the software engineering processes used on these FDD projects.

Pajerski, Rose S.↗

Simulation of Mechanical Behavior of Agglutinates

Due to lack of "real" lunar soil or even lunar simulant, it is difficult to characterize the interaction between lunar soil (or simulant) with different surfaces that are involved in excavation and processing machinery. One unique feature possessed by lunar soil is the agglutinates produced by repeated high-speed micrometeoroid impacts and subsequent pulverization[l and 2]. The large particles are impacted by micrometeoroids [Fig.l] and pulverized to produce finer particles. This process continues until there are no more "large" particles left on the surface of the moon. Due to high impact speed, the impact melting process fuses fines to make agglutinates such as shown in Fig. 2. We will present a series of simulation results and movies will be shown to indicate brittle behavior of each individual agglutinate and also similar compressibility charts shown by Carrier et al. [3]. Fig. 3 shows our preliminary result of the simulated oedometer tests.

Nakagawa, Masami↗

Pseudomaster equation for the no-count process in a continuous photodetection

The detection of cavity radiation with the detector placed outside the cavity is studied. Each leaked photon has a certain probability of propagating away without being detected. It is viewed as a continuous quantum measurement in which the density matrix is continuously revised according to the readout of the detector. The concept of pseudomaster equation for the no-count process is introduced; its solution leads to the discovery of the superoperator for the same process. It has the potential to become the key equation for continuous measurement process.

Lee, Ching-Tsung↗

Reinventing the International Space Station Payload Integration Processes and Capabilities

The fundamental ISS payload integration philosophy, processes and capabilities were established in the context of how NASA science programs were conducted and executed in the early 1990 s. Today, with the designation of the United States (US) portion of ISS as a National Lab, the ISS payload customer base is growing to include other government agencies, private and commercial research. The fields of research are becoming more diverse expanding from the NASA centric physical, materials and human research sciences to test beds for exploration and technology demonstration, biology and biotechnology, and as an Earth and Space science platform. This new customer base has a broader more diverse set of expectations and requirements for payload design, verification, integration, test, training, and operations. One size fits all processes are not responsive to this broader customer base. To maintain an organization s effectiveness it must listen to its customers, understand their needs, learn from its mistakes, and foster an environment of continual process improvement. The ISS Payloads office is evolving to meet these new customer expectations.

Jones, Rod↗

Parallel processing spacecraft communication system

An uplink controlling assembly speeds data processing using a special parallel codeblock technique. A correct start sequence initiates processing of a frame. Two possible start sequences can be used; and the one which is used determines whether data polarity is inverted or non-inverted. Processing continues until uncorrectable errors are found. The frame ends by intentionally sending a block with an uncorrectable error. Each of the codeblocks in the frame has a channel ID. Each channel ID can be separately processed in parallel. This obviates the problem of waiting for error correction processing. If that channel number is zero, however, it indicates that the frame of data represents a critical command only. That data is handled in a special way, independent of the software. Otherwise, the processed data further handled using special double buffering techniques to avoid problems from overrun. When overrun does occur, the system takes action to lose only the oldest data.

Bolotin, Gary S.↗

The Rhythm of Fairall 9. I. Observing the Spectral Variability With XMM-Newton and NuSTAR

We present a multi-epoch X-ray spectral analysis of the Seyfert 1 galaxy Fairall 9. Our analysis shows that Fairall 9 displays unique spectral variability in that its ratio residuals to a simple absorbed power law in the 0.510 keV band remain constant with time in spite of large variations in flux. This behavior implies an unchanging source geometry and the same emission processes continuously at work at the timescale probed. With the constraints from NuSTAR on the broad-band spectral shape, it is clear that the soft excess in this source is a superposition of two different processes, one being blurred ionized reflection in the innermost parts of the accretion disk, and the other a continuum component such as a spatially distinct Comptonizing region. Alternatively, a more complex primary Comptonization component together with blurred ionized reflection could be responsible.

galaxies: active↗

ICE/ISEE plasma wave data analysis

The interval reported on, from Jan. 1990 to Dec. 1991, has been one of continued processing and archiving of ICE plasma wave (pw) data and transition from analysis of ISEE 3 and ICE cometary data to ICE data taken along its cruise trajectory, where coronal mass ejections are the focus of attention. We have continued to examine with great interest the last year of ISEE 3's precomet phase, when it spent considerable time far downwind from Earth, recording conditions upstream, downstream, and across the very weak, distant flank bow shock. Among other motivations was the apparent similarity of some shock and post shock structures to the signatures of the bow wave surrounding comet Giacobini-Zinner, whose ICE-phase data was revisited. While pursuing detailed, second-order scientific inquiries still pending from the late ISEE 3 recordings, we have also sought to position ourselves for study of CME's by instituting a data processing format new to the ISEE 3/ICE pw detector. Processed detector output has always been summarized and archived in 24-hour segments, with all pw channels individually plotted and stacked one above the next down in frequency, with each channel calibrated separately to keep all data patterns equally visible in the plots, regardless of gross differences in energy content at the various frequencies. Since CME's, with their preceding and following solar wind plasmas, can take more than one day to pass by the spacecraft, a more condensed synoptic view of the pw data is required to identify, let alone assess, CME characteristics than has been afforded by the traditional routines. This requirement is addressed in a major new processing initiative in the past two years. Besides our own ongoing and fresh investigations, we have cooperated, within our resources, with studies conducted extramurally by distant colleagues irrespective of the phase of the ISEE 3/ICE mission under scrutiny. The remainder of this report summarizes our processing activities, our investigations, both internal and cooperative, our scientific results, and our publication activity.

Greenstadt, E. W.↗

Braiding And Wrapping Tape To Make A Composite Vessel

Braiding and forming combined in one-step process. In process, continuous plus or minus 45 degrees bias braided tape fabricated. Braiding done on site, and braided tape immediately wound on male mandrel in shinglelike configuration to make fabric preform. Subsequently, preform impregnated with matrix resin. Improved process does not produce stitches. Expected to yield consistent quality, to involve less handling of fabric, to produce less scrap, and thus to cost less.

Freitas, Glenn↗

The NASA Continuous Risk Management Process

As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics are established and monitored as tools for risk tracking. Also a trigger or threshold should be set on the metric data that indicates when an action is needed. Results of this tracking are usually evaluated and reported in a relevant format at weekly or monthly meetings. Choosing controls is the subsequent step, which involves the effects of the tracking. The three basic controls are: close, continue tracking, and re- plan. Finally communicate & document is the last step, but occurs throughout the process. It is vital that main risks, plans, changes, and progress are known by everyone in the project. A good way to keep everyone updated and inform other projects of common issues is by thoroughly documenting project risks. NASA sees value in risk management and believes that projects have greater probability or success by using the NASA Continuous Risk Management Process.

Pokorny, Frank M.↗

Fabrication of OSOS cells by neutral ion beam sputtering

Oxide semiconductor on silicon (OSOS) solar cells have been fabricated from various indium tin oxide (In2O3)x(SnO2)1-x compositions sputtered onto p-type single crystal silicon substrates with a neutralized argon ion beam. High temperature processing or annealing was not required. The highest efficiency was achieved with x = 0.91 and was 12 percent. The cells are environmentally rugged, chemically stable, and show promise for still higher efficiencies. Moreover, the ion beam sputtering fabrication technique is amenable to low cost, continuous processing.

Burk, D. E.↗

Earthdata Search Client: Usability Review Process, Results, and Implemented Changes, Using Earthdata Search Client as a Case Study

User experience and visual design are greatly improved when usability testing is performed on a periodic basis. Design decisions should be tested by real users so that application owners can understand the effectiveness of each decision and identify areas for improvement. It is important that applications be tested not just once, but as a part of a continuing process that looks to build upon previous tests. NASA's Earthdata Search Client has undergone a usability study to ensure its users' needs are being met and that users understand how to use the tool efficiently and effectively. This poster will highlight the process followed for usability study, the results of the study, and what has been implemented in light of the results to improve the application's interface.

design↗

Key Result Areas and Critical Success Factors

Measuring government agency performance is a relatively hot topic, yet the process continues to be problematic to implement. Identifying goals and objectives and determining the right measures is the subject of much literature and discussion, but according to the General Accounting Office (see below), there has been little success in the actual use of performance metrics. Fortunately, there is a logical thought process that can serve to facilitate the identification and implementation of appropriate measures.

Shepherd, Christena C.↗