Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Enabling High Performance Reconfigurable Ground Data Processing Systems

The deployment of high data rate instruments onboard satellites with direct broadcast capability demands the implementation of powerful ground data processing systems. Conversely, to enable the widespread usage of direct broadcast data and the generation of subsequent data products, low cost data processing systems must be available. Reconfigurable computers based on Field Programmable Gate Arrays (FPGA) enable the implementation of ground data processing systems that lead to higher performance and lower cost while keeping a high degree of programmability and maintainability. This paper presents the conceptualization of the MODIS Adaptive Level One Accelerator (ALOA), a prototype under construction at NASA's Goddard Space Flight Center. The ALOA is a computer workstation augmented by a reconfigurable computer. The system will calibrate and geographically locate data from the EOS-AM1 MODerate resolution Imaging Spectroradiometer (MODIS) instrument at near real-time data rates.

Hines, Tonjua M.↗

Data Service Provider Cost Estimation Tool

The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.

Fontaine, Kathy↗

IUS/TUG orbital operations and mission support study. Volume 5: Cost estimates

The costing approach, methodology, and rationale utilized for generating cost data for composite IUS and space tug orbital operations are discussed. Summary cost estimates are given along with cost data initially derived for the IUS program and space tug program individually, and cost estimates for each work breakdown structure element.

Source record↗

Values of Recovered Uranium from HALEU Used Nuclear Fuels (Rev. 1)

The value of the recovered uranium (RU) from high assay low-enriched uranium (HALEU) used nuclear fuels was evaluated. Three utilizations of the recovered uranium were considered in this study, which include the cases that RU is used as a fissile material of nuclear fuel, RU is reused in the original advanced reactor after reenrichment, and RU is reused in conventional light water reactors after down-blending. In this study, the RU values were identified by comparing the cost of making a unit mass of fuel with RU versus the fuel cost with the equivalent fresh enriched uranium (EU). A series of bounding analyses for calculating the fuel costs were conducted using several selected reactor types, which include microreactors, advanced thermal reactors, and fast reactors having a burnup of 2 – 165 GWd/t (with residual U-235 content in discharged fuels of 0.8 - 19.6%). This study concludes that RU having a residual U-235 content higher than ~7% would cost less than the fresh EU. The affordability increases as the residual U-235 content in RU increases. For instance, the fuel cost with RU having the residual U-235 content of 19.6% is about 85% cheaper than the fuel cost with the equivalent fresh EU. This study observed that reusing RU after reenrichment in the original microreactor is impractical because the U-235 content in the re-enriched RU fuel would need to be higher than the limit for low-enriched uranium (<20%) to provide the same burnup performance due to parasitic absorption from U-236. It is noted that this study focused on the recovery of uranium only, and the value of other fissile materials (such as Pu) in the used nuclear fuel was not considered even though those are bred significantly in fast reactors. In addition, the impacts of uncertainties in the cost data and the value of RU of TRISO fuels were not evaluated in this study due to the limited information on the cost data uncertainties and the separation cost from TRISO fuels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Study of solid rocket motor for space shuttle booster. Volume 4: Cost

The cost data for solid propellant rocket engines for use with the space shuttle are presented. The data are based on the selected 156 inch parallel and series burn configurations. Summary cost data are provided for the production of the 120 inch and 260 inch configurations. Graphs depicting parametric cost estimating relationships are included.

Source record↗

Astronomy sortie missions definition study. Volume 4: Program development requirements

Program development requirements for the selected Astronomy Sortie Missions concept were generated and are presented in four parts as follows: (1)the gross planning requirements that must be considered in subsequent phases of the project; (2)the schedules and logic networks for the design, development, and operation of the overall project; (3)the supporting research and technology required to support the project; and (4)the work breakdown data, from which cost data will be generated. Data reported in each part includes the appropriate rationale with explanations of the guidelines and assumptions that were used in the analyses and estimates.

Source record↗

Ramjet cost estimating handbook

The subject program was conducted for the purpose of generating cost information on ramjet engines and developing a methodology that could be employed to accurately predict production costs ramjet engines. The methodology addresses many different ramjet types, sizes and production quantities. The methodology determines the cost of individual modules of ramjet assemblies based on similarity of the modules to baseline components that are identified in a cost handbook. (There are typically around 20 basic components of a given ramjet to be costed.) The total cost of the engine is a summation of all the appropriate cost elements. A significant accomplishment of the program was the development of a large cost data base on many different configurations, materials of construction and variations in manufacturing processes. This data base should provide a good foundation on which to build other cost data as it becomes available.

Emmons, H. T.↗

Approach to derivation of SIR-C science requirements for calibration

A study undertaken to determine SIR-C (Shuttle Imaging Radar-C) science requirements for polarimetric calibration is described. A model describing the effect of miscalibration is presented, followed by a description of specific experiments and the resulting requirements levied on the system. The effects of miscalibration on some commonly used measures which can be extracted from SAR (synthetic aperture radar) data are also discussed. It is concluded that polarimetric calibration requirements are strongly application-dependent, and that a compromise must be made to maximize the domain of application of the data without prohibitive cost. Data summarizing SIR-C polarimetric calibration goals are also presented.

Dubois, Pascale↗

Utilizing Expert Knowledge in Estimating Future STS Costs

A method of estimating the costs of future space transportation systems (STSs) involves classical activity-based cost (ABC) modeling combined with systematic utilization of the knowledge and opinions of experts to extend the process-flow knowledge of existing systems to systems that involve new materials and/or new architectures. The expert knowledge is particularly helpful in filling gaps that arise in computational models of processes because of inconsistencies in historical cost data. Heretofore, the costs of planned STSs have been estimated following a "top-down" approach that tends to force the architectures of new systems to incorporate process flows like those of the space shuttles. In this ABC-based method, one makes assumptions about the processes, but otherwise follows a "bottoms up" approach that does not force the new system architecture to incorporate a space-shuttle-like process flow. Prototype software has been developed to implement this method. Through further development of software, it should be possible to extend the method beyond the space program to almost any setting in which there is a need to estimate the costs of a new system and to extend the applicable knowledge base in order to make the estimate.

Fortner, David B.↗

A cost and community perspective on the barriers to microbiome data reuse

Microbiome research is becoming a mature field with a wealth of data amassed from diverse ecosystems, yet the ability to fully leverage multi-omics data for reuse remains challenging. To provide a view into researchers’ behavior and attitudes towards data reuse, we surveyed over 700 microbiome researchers to evaluate data sharing and reuse challenges. We found that many researchers are impeded by difficulties with metadata records, challenges with processing and bioinformatics, and problems with data repository submissions. We also explored the cost constraints of data reuse at each step of the data reuse process to better understand “pain points” and to provide a more quantitative perspective from sixteen active researchers. The bioinformatics and data processing step was estimated to be the most time consuming, which aligns with some of the most frequently reported challenges from the community survey. From these two approaches, we present evidence-based recommendations for how to address data sharing and reuse challenges with concrete actions for future work.

59 BASIC BIOLOGICAL SCIENCES↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

Can developing countries leapfrog the centralized electrification paradigm?

Due to the rapidly decreasing costs of small renewable electricity generation 'systems, centralized power systems are no longer a necessary condition of universal access to modern energy services. Developing countries, where centralized electricity infrastructures are less developed, may be able to adopt these new technologies more quickly. We first review the costs of grid extension and distributed solar home systems (SHSs) as reported by a number of different studies. We then present a general analytic framework for analyzing the choice between extending the grid and implementing distributed solar home systems. Drawing upon reported grid expansion cost data for three specific regions, we demonstrate this framework by determining the electricity consumption levels at which the costs of provision through centralized and decentralized approaches are equivalent in these regions. We then calculate SHS capital costs that are necessary for these technologies provide each of five tiers of energy access, as defined by the United Nations Sustainable Energy for All initiative. Our results suggest that solar home systems can play an important role in achieving universal access to basic energy services. The extent of this role depends on three primary factors: SHS costs, grid expansion costs, and centralized generation costs. Given current technology costs, centralized systems will still be required to enable higher levels of consumption; however, cost reduction trends have the potential to disrupt this paradigm. By looking ahead rather than replicating older infrastructure styles, developing countries can leapfrog to a more distributed electricity service model. (C) 2016 International Energy Initiative. Published by Elsevier Inc. All rights reserved.

distributed electrification↗

DEVELOPMENT AND APPLICATION OF RISK ANALYSIS TOOLKIT FOR PLANT RESOURCE OPTIMIZATION

This paper presents the development of methods and tools that are being designed to optimize plant operations (e.g., maintenance/replacement schedules and optimal maintenance postures for plant components) in a manner that is more cost effective than current approaches and makes better use of available component health and cost data. These methods include both data- and model-based optimization methods. Model-based optimization methods directly include reliability and cost models to determine an optimal plant operational strategy. We consider gradient-based and evolutionary (based on genetic algorithms) optimization methods. The second class of methods target more specific use cases (e.g., project schedule optimization) and are not based on reliability models directly, but they require specific component reliability and cost data. This class of methods is based on variants of the knapsack problem with an aim to determine an optimal project schedule that maximizes the overall NPV. This paper also presents multi-objective methods designed to identify an optimal maintenance posture based on a Pareto frontier analysis. Rather than dictating the “right” tradeoff (i.e., identify the absolute best posture), we show how it is possible to perform a trade space exploration approach (i.e., identify value and costs of several postures and let the analysis account for desired value and cost metrics). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space. For all these methods we present detailed applicative examples that show their validity from a decision-making perspective.

97 - MATHEMATICS AND COMPUTING↗

Life sciences payload definition and integration study. Volume 4: Appendix, costs, and data management requirements of the dedicated 30-day laboratory

The results of the updated 30-day life sciences dedicated laboratory scheduling and costing activities are documented, and the 'low cost' methodology used to establish individual equipment item costs is explained in terms of its allowances for equipment that is commerical off-the-shelf, modified commercial, and laboratory prototype; a method which significantly lowers program costs. The costs generated include estimates for non-recurring development, recurring production, and recurring operations costs. A cost for a biomedical emphasis laboratory and a Delta cost to provide a bioscience and technology laboratory were also generated. All cost reported are commensurate with the design and schedule definitions available.

Source record↗

Coal gasification systems engineering and analysis. Volume 1: Executive summary

Feasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.

Source record↗

A cost effective data management subsystem for the LST

The paper outlines the approach used in developing DMS (Data Management Subsystem) alternatives for the LST (Large Space Telescope) and in selecting the concept considered to be the most cost effective means of implementing the LST DMS requirements. Two candidate DMS concepts are discussed: a functionally integrated and a functionally separated one. For the single vehicle LST program, separation of the DMS functions best provides high reliability, operations flexibility, minimal interface complexity, and the least complex software development and verification task. The use of available hardware and NASA standard components is stressed.

Dougherty, J. A.↗