Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost estimate”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Options, Initial Design Requirements, Estimated Costs, Reactor Commitments, and Potential Uses of a Graphite Leadout Type Experiment Supporting Various Commercial HTR Vendors

Multiple commercial High Temperature Reactor (HTR) vendors and nuclear graphite suppliers would benefit by collaborating on a new irradiation capsule(s) that would include graphite grades not included within the AGC Experiment. This new irradiation capsule(s) would provide data to answer vendor graphite licensing issues. Rather than spending money (and especially) time in designing separate irradiation capsules for each designer, the capsule(s) would be used for multiple graphite and composite designs to maximize efficiency and promote multiple HTR designs. However, the primary motivation for assisting vendors with this new irradiation capsule(s) is lack of availability in the existing Material Test Reactors (MTRs). Cost reduction is a secondary goal. A common, collaborative, capsule design can be achieved for graphite and composites due to the similarity of different grades. Irradiation, disassembly, shipping, and PIE costs would be cost-shared by all users. It is anticipated that interest would extend across all DOE campaigns (micro-Rx, SMR, GCR, MSR, etc.) due to the similar requirements for all graphite grades.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Engineering Design of a Post-Combustion CO 2 Capture (PCC) System for Duke Energy’s East Bend Station Using Membrane-Based Technology

The Electric Power Research Institute (EPRI) led a U.S. Department of Energy (DOE) funded study for a membrane-based post-combustion CO 2 capture (PCC) system retrofit to an existing U.S. coal power plant. EPRI teamed with technology suppliers, Membrane Technology and Research (MTR), engineering consultants Nexant, Trimeric Corporation and Bechtel Power Corporation, to develop a first-of-a-kind initial design and cost estimate for a PCC system at Duke Energy’s East Bend Station (EBS) in Kentucky. This project provides a comprehensive overview of the plant design proposed and develops estimated costs to within +/- 30% accuracy for retrofitting the existing EBS coal-fired power plant with the latest MTR’s second-generation Polaris™ membrane technology for CO 2 flue gas removal. The projects primary objective was to develop a design for Duke Energy that will require “minimally invasive surgery” on their existing 600-MWe coal-fired power plant, located on the Ohio River in Boone County, Kentucky. Unlike the current commercially available solvent-based capture systems that require a reliable source of steam to operate, the MTR membrane-based capture system is driven primarily by electric power. This direct, bolt-on approach to retrofitting carbon capture could potentially reduce the impact on the existing power plant, by minimal disruption of the existing facility’s infrastructure and operating procedures. This may also reduce the amount of retrofit downtime before the power plant can resume normal operations. A second objective was to reduce the cost of each ton of captured CO 2 while maintaining the existing 600 MW net output of the East Bend Station. With this aim in mind, various options to provide the necessary auxiliary power for the capture system were evaluated for the site. The full report describes in detail the overall design, layout and components of the entire EBS membrane capture system. The equipment and sizes, the capital cost estimate encompassing both engineering design and construction for the carbon capture process and balance of plant systems is presented. A detailed techno-economic analysis is also undertaken to examine the business case for capture.

01 COAL, LIGNITE, AND PEAT↗

Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $\$$53,100, and the cost of three 80-ampere chargers is estimated at $\$$89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

33 ADVANCED PROPULSION SYSTEMS↗

Economic solution for low carbon process heat: A horizontal, compact high temperature gas reactor

In 2018, nuclear energy generated 55% of United States’ and one third of the world’s carbon free electricity, making nuclear energy a key tool in efforts to mitigate climate change before 2050. However, the current nuclear technology, light water reactors (LWRs), is limited to 300°C, so it cannot be used to decarbonize industrial process heat which accounts for 12% of US greenhouse gas emissions. High temperature gas reactors (HTGRs) can meet the high temperature demand with carbon free nuclear heat. The estimated cost of HTGRs, such as the Next Generation Nuclear Plant (NGNP), are even higher than state-of-the-art LWRs. In this paper, we expanded our nuclear cost estimating tool to include HTGRs and find that the NGNP overnight capital costs were 32% higher than an advanced LWR per unit capacity. The higher cost will naturally result in larger risk to cost overrun as recently experienced by larger LWRs in western nations. With a design-to-build mindset to minimize cost and construction risk, we introduce the horizontal, compact HTGR (HC-HTGR). The reactor core and steam generator are mounted horizontally on rails and in-line with one another, decreasing the size of the reactor building relative to the power capacity four times when compared to traditional HTGRs. The HC-HTGR reduced overnight civil structure costs by 42%, indirect costs by 38%, and total capital costs by 20% from NGNP. We discussed the required engineering of new systems for the HC-HTGR including vessel supports, the reactor cavity cooling system, and steam generator design. Finally, we estimated the fuel and operations costs of the HC-HTGR, and a survey of low-carbon industrial process heat technology showed the HC-HTGR can deliver a highly competitive levelized cost of heat in the range of $6.13–12.48/GJ.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Manufacturing Cost Analysis of Advanced Parabolic Trough Collector

The research team performed a detailed bottom-up manufacturing cost estimate for an advanced parabolic trough design - the Solar Dynamics Sunbeam-MT (Sunbeam Mid-Term). This includes all components for manufacturing and assembly in a manufacturing facility (e.g. space frame and arms), and the purchased parts (e.g. mirrors and receiver tubes). Estimates of the construction and assembly activities have been made to then determine an estimated installed cost. Prior analysis has already undertaken detailed bottom-up manufacturing, assembly, and construction analysis for the Ultimate Trough from schlaich bergermann partner (sbp), and this work updates the solar field cost estimates based on a similar aperture area as the SunBeam-MT. For this analysis, the Ultimate Trough is considered the commercial parabolic trough and the Sunbeam-MT as the advanced parabolic trough. For similarity, both the Sunbeam-MT and the Ultimate Trough have been modelled with a solar field with approximately 800,000 square meters (m2) in aperture area - the equivalent of a large CSP plant. The analysis has found a potential installed cost estimate of the Sunbeam-MT could be $120/m2 but must be built at scale to confirm this estimate. Compared to prior analysis, the commercial Ultimate Trough using U.S. conditions, has reduced in installed cost from $178/m2 to $152/m2. Both designs could be even cheaper with Chinese steel.

cost analysis↗

Evaluation of the economic implications of varied pressure drawdown strategies generated using a real-time, rapid predictive, multi-fidelity model for unconventional oil and gas wells

Experience has suggested that pressure maintenance in hydraulically fractured reservoirs via lower, more sustained production drawdowns may offer improved cumulative recovery and overall resource extraction efficiency compared to more rapid drawdown approaches aimed at generating high initial production. However, given the inherent variability of oil and natural gas markets, operators pursue production strategies that maximize profitability over resource extraction efficiency. This study focuses on evaluating the implications of contrasting pressure drawdown strategies on the long-term production and resulting economics for a real, producing unconventional gas well in the Marcellus Shale of the Appalachian Basin using a techno-economic analysis approach. Our research combines elements of well-specific horizontal well design, production forecasting, equipment sizing and capital cost estimation, operating cost estimation, and revenue and tax calculations. Gas production forecast outlook scenarios were generated under varying pressure drawdowns using two approaches: 1) a novel physics-informed machine learning workflow and 2) traditional reservoir simulation. A discounted cash flow model was used to evaluate the resulting economic implications for each drawdown scenario—generating output for exploring the coupled effect of factors like the timing and volume of gas production, prevailing economic and market conditions for natural gas, and overall estimated ultimate recovery on profitability metrics such as internal rate of return and net present value. Results show that there is potential to maximize the cumulative gas produced in the specific case study well by employing a lower pressure drawdown. Conversely, the greatest profitability is achieved using rapid drawdown as signified by a small, specific subset of our outlook scenarios. On an averaging basis, we find that the combinations of highest cumulative producing and most profitable scenarios occur under lower drawdowns with long (>40 years) producing timeframes, but require higher relative gas price and lower discounting considerations. Further, the machine learning predictive outlooking capability proved effective for enabling rapid generation of a multitude of scenario forecasts. As a result, a variety of prominent example cases could be generated to strike the balance of greater productivity and economic return given their associated producing features and economic conditions when compared to similar producing scenarios—critical insight that offers improved decision support for unconventional oil and gas operations.

42 ENGINEERING↗

Estimation of abatement potentials and costs of air pollution emissions in China

Understanding the air pollution emission abatement potential and associated control cost is a prerequisite to design cost ef?cient control policies. In this study, a linear programming algorithm model, International Control Cost Estimate Tool, was updated with cost data for applications of 56 types of end-of-pipe technologies and ?ve types of renewable energy in 10 major sectors namely power generation, industry combustion, cement pro-duction, iron and steel production, other industry processes, domestic combustion, transportation, solvent use, livestock rearing, and fertilizer use. The updated model was implemented to estimate the abatement potential and marginal cost of multiple pollutants in China. The total maximum abatement potentials of sulfur dioxide (SO2), nitrogen oxides (NOx), primary particulate matter (PM2.5), non-volatile organic compounds (NMVOCs), and ammonia (NH3) in China were estimated to be 19.2, 20.8, 9.1, 17.2 and 8.6 Mt, respectively, which accounted for 89.7%, 89.9%, 94.6%, 74.0%, and 80.2% of their total emissions in 2014, respectively. The associated control cost of such reductions was estimated as 92.5, 469.7, 75.7, 449.0, and 361.8 billion CNY in SO2, NOx, primary PM2.5, NMVOCs and NH3, respectively. Shandong, Jiangsu, Henan, Zhejiang, and Guangdong provinces exhibited large abatement potentials for all pollutants. Provincial disparity analysis shows that high GDP regions tend to have higher reduction potential and total abatement costs. End-of-pipe technologies tended be a cost-ef?cient way to control pollution in industries processes (i.e., cement plants, iron and steel plants, lime production, building ceramic production, glass and brick production), whereas such technologies were less cost- effective in fossil fuel-related sectors (i.e., power plants, industry combustion, domestic combustion, and transportation) compared with renewable energy. The abatement potentials and marginal abatement cost curves developed in this study can further be used as a crucial component in an integrated model to design optimized cost-ef?cient control policies.

Zhang, Fenfen↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Model-free stabilization via Extremum Seeking using a cost neural estimator

In this paper, a fully model-free architecture for vertical stabilization of thermonuclear plasmas in tokamak experimental reactors is presented. For the first time, an Extremum Seeking control algorithm is combined with neural networks to estimate the Lyapunov function to be minimized, resulting in a fully data-driven control architecture. The performance of different neural networks are compared. Specifically, Multilayer Perceptrons and Extreme Learning Machines are considered. The proposed architecture is tested in simulation to show that it can counteract relevant plasma disturbances, resulting in a significant improvement in terms of the achievable operative space compared to the Extremum Seeking algorithm, which still relies on model-based cost estimator.

42 ENGINEERING↗

Balancing CO 2 Pipeline Infrastructure Challenges

Conference presentation at American Association of Petroleum Geologists (AAPG) Carbon Capture, Utilization, and Storage (CCUS) Conference, Houston, Texas, March 28–30, 2022. This study on the pipeline systems revealed challenges that a pipeline system will face: a) pipeline cost estimates and cost drivers, b) cost and hydraulics optimization, and c) temperature effects on the pipeline capacity and maximum injection pressure at an injection well.

01 COAL, LIGNITE, AND PEAT↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Open-source microreactor design models for technoeconomic assessments

Technoeconomic analyses for advanced nuclear technologies are essential for identifying cost drivers which allow for optimizing the technology to achieve better economic performance. Microreactors are emerging as a promising and reliable-energy solution, offering inherent safety, low capital investment, and rapid deployment capabilities. Past studies have conducted technoeconomic analyses for microreactors, but there remains a need for open-source technoeconomic models that can enhance collaboration, transparency, and consistency when performing this type of analysis. The present article introduces an open-source technoeconomic model for microreactors based on bottom-up cost estimation. Since no real cost data for microreactors exists, this model leverages cost data and insights gleaned from the Microreactor Applications, Research, Validation and Evaluation (MARVEL) project. It estimates the first-of-a-kind cost of two microreactor technologies and can also calculate the N th of a kind (NOAK) cost via accounting for learning and mass factory production. The two technologies considered in this paper are the liquid–metal thermal reactor (LTMR) and the gas-cooled microreactor (GCMR). In conclusion, the goal of this study is to demonstrate bottom-up cost estimation of these microreactor technologies and provide the cost estimation models that other users can leverage for various applications such as design optimization and financial planning.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Cost-Benefit Assessment of Krypton and Xenon Recovery from Aqueous Reprocessing

The purpose of this paper is to provide an understanding of the cost-benefit of capturing Kr and Xe from the existing process of aqueous reprocessing of UNF. The study accomplishes this with a market assessment of Xe prices and volumes today, coupled with a cost estimate of Kr and Xe capture out of cryogenic distillation within aqueous reprocessing. The market assessment shows that the average price of Xe is about $\$ $60/L while the average price of Kr is about $\$ $1/L. The assessment also shows that the market structure for Xe is one of oligopoly, in other words, very few suppliers to the Xe market. The assessment shows growing demand for Xe, particularly in medical applications like anesthesia. The cost assessment finds the unit cost of Xe to range from $\$ $71.50/L to $\$ $131.13/L. This range is only slightly above the current range of market prices today, and with growing demand for Xe, prices could reach the range it would take to support extraction of Xe from aqueous reprocessing. On the other hand, the estimated cost range for Kr is $\$ $830.15/L up to $\$ $1,522.52/L, which far exceeds the range of market prices for Kr. However, as the text notes, Kr capture is already part of aqueous reprocessing so these costs are sunk costs (already incurred) whereas the cost estimates for Xe are marginal cost (if Xe is desired, then the cost estimate would result from the Xe capture).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗