Search NASA⌕ Search

SEARCH · Search NASA

Results for “data loggers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Seismic Survey 2016 Metadata at San Emidio, Nevada

1301 Vertical Component seismic instruments were deployed at San Emidio Geothermal field in Nevada in December 2016. The first record starts at 2016-12-05T02:00:00.000000Z (UTC) and the last record ends at 2016-12-11T14:00:59.998000Z (UTC). Data are stored in individual files in one-minute increments. Data includes seismic station locations, seismic data logger specifications, instrumentation specifications, descriptions of data, a fracture finding summary and the final report for the 2016 WHOLESCALE seismic survey done in San Emidio, Nevada.

15 GEOTHERMAL ENERGY↗

Seismic Survey 2016 Data at San Emidio Nevada

In December 2016, 1301 vertical-component seismic instruments were deployed at the San Emidio Geothermal field in Nevada. The first record starts at 2016-12-05T02:00:00.000000Z (UTC) and the last record ends at 2016-12-11T14:00:59.998000Z (UTC). Data are stored in individual files in one-minute increments in SEGD and MSEED formats. See the metadata in GDR submission (linked below as "Seismic Survey 2016 Metadata at San Emidio Nevada") for details about the seismic station locations, seismic data logger specifications, instrumentation specifications, descriptions of data, a fracture finding summary, and the final report for the 2016 seismic survey done in San Emidio, Nevada.

15 GEOTHERMAL ENERGY↗

Seismic Survey 2016 Data at Crescent Valley, Nevada

In September 2016, 989 vertical-component seismic instruments were deployed for 75 hours at the Crescent Valley greenfield geothermal play area in Nevada. Data were recorded 12/9/16 - 12/15/16. Data are stored in individual files in one-minute increments in SEGD formats. See the metadata in Crescent Valley Station Locations.sp1, Crescent Valley Observer Logs.xls, and the attached Metadata link for details about the seismic station locations, seismic data logger specifications, instrumentation specifications, descriptions of data, a fracture finding summary, and the final report for the 2016 seismic survey done in Crescent Valley, Nevada. Note that no discrete events were identified, and a 1750m x 2250m x 300m PSET volume of acoustic energy was delivered.

15 GEOTHERMAL ENERGY↗

Spatio-Temporal Denoising Graph Autoencoders with Data Augmentation for Missing Photovoltaic Data Imputation

The integration of the global Photovoltaic (PV) market with real time data-loggers has enabled large scale PV data analytical pipelines for power forecasting and long-term reliability assessment of PV fleets. Nevertheless, the performance of PV data analysis heavily depends on the quality of PV timeseries data. This paper proposes a novel Spatio-Temporal Denoising Graph Autoencoder (STD-GAE) framework to impute missing PV Power Data. STDGAE exploits temporal correlation, spatial coherence, and value dependencies from domain knowledge to recover missing data. It is empowered by two modules. (1) To cope with sparse yet various scenarios of missing data, STD-GAE incorporates a domain-knowledge aware data augmentation module that creates plausible variations of missing data patterns. This generalizes STD-GAE to robust imputation over different seasons and environment. (2) STD-GAE nontrivially integrates spatiotemporal graph convolution layers (to recover local missing data by observed “neighboring” PV plants) and denoising autoencoder (to recover corrupted data from augmented counterpart) to improve the accuracy of imputation accuracy at PV fleet level. We have evaluated our proposed model on two realworld PV datasets. Experimental results show that STD-GAE can achieve a gain of 43.14% in imputation accuracy and remains less sensitive to missing rate, different seasons, and missing scenarios, compared with state-of-the-art data imputation methods such as MIDA and LRTC-TNN.

Fan, Yangxin↗

Vadose zone monitoring at the radioactive waste management sites at the Nevada national security site - 15294

Two lysimeter facilities continuously monitor the vadose zone at the radioactive waste disposal sites at the Nevada National Security Site. The time-series data collected at these facilities support the performance assessments of the radioactive waste disposal sites, the closure cover designs, and the long-term monitoring decisions for these sites. The Weighing Lysimeter Facility at the Area 5 Radioactive Waste Management Site (RWMS) consists of a bare-soil weighing lysimeter and a vegetated weighing lysimeter. The upper surfaces of both weighing lysimeters are exposed to precipitation. The Drainage Lysimeter Facility at the Area 3 RWMS includes bare-soil lysimeters that receive precipitation or precipitation supplemented with irrigation equal to double precipitation and vegetated lysimeters that have the same upper boundary conditions as the bare-soil lysimeters. Lysimeter sensors are connected to data-loggers that are accessed remotely for data acquisition. Lysimeter water balance measurements show the arid climate and native vegetation at the NNSS provide a natural sustainable system to effectively prevent transport of contaminants from the RWMSs through the vadose zone to groundwater. Transport by infiltration and percolation of present day precipitation at the RWMSs is prevented. The native desert vegetation is adapted to extract moisture from very dry soils and maintains negative matric potentials at the base of the root zone effectively buffering the deep vadose zone from episodic precipitation events at the surface. The very negative matric potential at the base of the root zone effectively intercepts all infiltration from precipitation and draws moisture upward from the vadose zone below the root zone. This system is sustainable because it does not rely on engineered features and mimics the stable landscapes and no groundwater recharge of the current condition surrounding the RWMSs. The system depends on establishing native vegetation in the covers above the waste cells and a stable climate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WHOLESCALE: Seismic Survey Metadata from San Emidio Nevada 2021

This is a collection of metadata from the 2021 seismic survey at the San Emidio geothermal field in Nevada. In April and May 2021, 37 tri-axial short period seismographs were deployed in a 1.8km diameter cluster centered on 40.367278 deg N, 119.409019 deg W. The first data record started at 2021-04-06T07:09:10Z UTC and the last record ended 2021-05-11T02:58:52Z UTC. The 37 stations included 29 SmartSolo IGU-16HR 3C all-in-one 5 Hz seismographs and 8 DataCube seismographs with 4.5 Hz HGS HG-6(B coil) tri-axial geophones. The raw format (level 0) data includes 353 GB of 500 sps SmartSolo data in native DLD format, 113 GB of 400 sps DataCube data in native DataCube format, and 3.4 GB of GPS data collected during the RTK GPS survey. The SAC data (level 1) files include 564 GB of hourly SAC files. The experiment was designed to monitor seismic activity before, during, and after the planned three-day plant maintenance shutdown April 19-21, 2021. The pumping stopped at 2021/04/19 12:51:45 UTC and resumed about 2021/04/21 21:00:00 UTC. The raw and processed data are in an associated GDR submission, linked below. The metadata here includes files containing experiment details, station locations, seismic data logger specifications, instrumentation specifications, and descriptions of data. Also included are data and metadata from a 2016 seismic survey at the same site.

15 GEOTHERMAL ENERGY↗

Application of a dedicated micro-processor for automatic data acquisition of load strain and acoustic-emission data

This paper describes an automatic system for acquisition, logging and analysis of stress, strain and acoustic emission data. The complete system is a combination of several standard items of equipment and a newly developed intelligent data logger which has the capability to send data directly to a large scale computer for reduction and plotting. The data logging and all interfacing with peripheral equipment are accomplished using digital electronics. The heart of the system is a four-bit microprocessor and digital cassette tape unit. The system, which is controlled by instructions from a cathode ray tube terminal, has the capability to transmit data from the cassette unit to a large computer via a time sharing option. Typical results are presented for acoustic emission count rate and total count curves superimposed on stress-strain diagrams for boron/epoxy advanced composites.

Wilson, G. H.↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: METSAT Phase Locked Oscillator Assembly, P/N 1334360-1, S/N's F03 and F04

Two Flight Model AMSU-A Phase Locked Oscillators (P/N 1348360-1, S/Ns F03 and F04) have been tested per AES Test Procedure AE-26758. The tests included vibration testing, thermal cycle testing, AM/FM Noise testing, and full functional testing. EMI/REO 2 Testing was not performed. (See test data for S/N F01). Both AMSU-A Phase Locked Oscillators satisfactorily passed all performance requirements of the AE-26633 Product specification. During thermal cycling of PLO serial number F03, the oven and data logger momentarily lost power, including a loss of data. The unit did not experience any thermal stress. TAR 003134 describes the corrective action. Prior to testing PLO serial number FO4, power was applied to the unit. (+15v,-15v) the unit did not display the proper phase lock. Upon test equipment check out a connector was found to be defective. TAR 003133 describes the corrective action. After completion of testing of PLO serial number F04 was installed into Receiver Assembly F02. Upon testing F02 Receiver Assembly the unit was found not to phase lock at ambient temperature. Removal of PLO Assembly F04 was required. R2 was the real issue. Solithane was secondary. Troubleshooting revealed excessive solithane on inner PLL Assembly cover inhibiting optimum grounding. Also, R2 was reselected which increased the lock range from -30 C to +60 C. TAR 002737 describes the corrective action.

Pines, D.↗

Disdrometer and Tipping Bucket Rain Gauge Handbook

The Distromet disdrometer model RD-80 and NovaLynx tipping bucket rain gauge model 260-2500E-12 are two devices deployed a few meters apart to measure the character and amount of liquid precipitation. The main purpose of the disdrometer is to measure drop size distribution, which it does over 20 size classes from 0.3 mm to 5.4 mm. The data from both instruments can be used to determine rain rate. The disdrometer results can also be used to infer several properties including drop number density, radar reflectivity, liquid water content, and energy flux. Two coefficients, N0 and Λ, from an exponential fit between drop diameter and drop number density, are routinely calculated. Data are collected once a minute. The instruments make completely different kinds of measurements. Rain that falls on the disdrometer sensor moves a plunger on a vertical axis. The disdrometer transforms the plunger motion into electrical impulses whose strength is proportional to drop diameter. The rain gauge is the conventional tipping bucket type. Each tip collects an amount equivalent to 0.01 in. of water, and each tip is counted by a data acquisition system anchored by a Campbell CR1000 data logger.

54 ENVIRONMENTAL SCIENCES↗

Results of groundwater monitoring and vegetation sampling at Everest, Kansas, in 2009 .

In April 2008, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) conducted groundwater sampling for the analysis of volatile organic compounds (VOCs) in the existing network of monitoring points at Everest, Kansas (Argonne 2008). The objective of the 2008 investigation was to monitor the distribution of carbon tetrachloride contamination in groundwater previously identified in CCC/USDA site characterization and groundwater sampling studies at Everest in 2000-2006 (Argonne 2001, 2003, 2006a,b). The work at Everest is being undertaken on behalf of the CCC/USDA by Argonne National Laboratory, under the oversight of the Kansas Department of Health and Environment (KDHE). The findings of the 2008 investigation were as follows: (1) Measurements of groundwater levels obtained manually and through the use of automatic recorders demonstrated a consistent pattern of groundwater flow - and inferred contaminant migration - to the north-northwest from the former CCC/USDA facility toward the Nigh property, and then west-southwest from the Nigh property toward the intermittent creek that lies west of the former CCC/USDA facility and the Nigh property. (2) The range of concentrations and the areal distribution of carbon tetrachloride identified in the groundwater at Everest in April 2008 were generally consistent with previous results. The results of the 2008 sampling (reflecting the period from 2006 to 2008) and the earlier investigations at Everest (representing the period from 2000 to 2006) show that no significant downgradient extension of the carbon tetrachloride plume occurred from 2000 to 2008. (3) The slow contaminant migration indicated by the monitoring data is qualitatively consistent with the low groundwater flow rates in the Everest aquifer unit estimated previously on the basis of site-specific hydraulic testing (Argonne 2006a,b). (4) The April 2008 and earlier sampling results demonstrate that the limits of the plume have been effectively, identified by the existing network of monitoring points and have not changed significantly during the CCC/USDA investigation program. The carbon tetrachloride distribution within the plume has continued to evolve, however, with relatively constant or apparently decreasing contaminant levels at most sampling locations. In response to these findings, the KDHE requested that the CCC/USDA develop a plan for annual monitoring of the groundwater and surface water at Everest, to facilitate continued tracking of the carbon tetrachloride plume at this site (KDHE 2009a). A recommendation for annual sampling (for analyses of VOCs) of 16 existing groundwater monitoring points within and near the identified contaminant migration pathway and surface water sampling at 5 locations along the intermittent creek west (downgradient) of the identified plume was presented by the CCC/USDA (Appendix A) and approved by the KDHE (2009b) for implementation. The monitoring wells will be sampled according to the low-flow procedure, and sample preservation, shipping, and analysis activities will be consistent with previous work at Everest. The annual sampling will continue until identified conditions at the site indicate a technical justification for a change. This report summarizes the results of sampling and monitoring activities conducted at the Everest site since completion of the April 2008 groundwater sampling event (Argonne 2008). The investigations performed during the current review period (May 2008 to October 2009) were as follows: (1) With one exception, the KDHE-approved groundwater and surface water monitoring points were sampled on April 24-27, 2009. In this event, well PT1 was inadvertently sampled instead of the adjacent well MW04. This investigation represents the first groundwater and surface water sampling event performed under the current plan for annual monitoring approved by the KDHE. (2) Ongoing monitoring of the groundwater levels at Everest is performed with KDHE approval. The levels in selected monitoring wells are recorded continuously, by using downhole pressure sensors equipped with automatic data loggers, and periodically are also measured manually. Groundwater level data were recovered during the current review period on September 19, 2008, and on March 25, April 25-27, and October 20, 2009. (3) Argonne experience has demonstrated that the sampling and analysis (for VOCs) of native vegetation, and particularly tree tissues, often provides a sensitive indicator of possible carbon tetrachloride contamination in the surface water or shallow groundwater within the plant rooting zone. With the approval of the CCC/USDA, on August 28, 2009, samples of tree branch tissues were therefore collected for analyses at 18 locations along the intermittent creek west (downgradient) of the former CCC/USDA facility and the Nigh property.

54 ENVIRONMENTAL SCIENCES↗

FSA field test

The 12 continental remote sites were decommissioned. Testing was consolidated into a five-site network consisting of the four Southern California sites and a new Florida site. 16 kW of new state-of-the-art modules were deployed at the five sites. Testing of the old modules continued at the Goldstone site but as a low-priority item. Array testing of modules is considered. Additional new testing capabilities were added. A battery-powered array data logger is discussed. A final set of failure and degradation data was obtained from the modules.

Jaffe, P.↗

Sensor Data Management, Validation, Correction, and Provenance for Building Technologies

Oak Ridge National Laboratory (ORNL) conducts research on technologies that use a wide range of sensors to develop and characterize building energy performance. The management of high-resolution sensor data, analysis, and tracing lineage of such activities is challenging. Missing or corrupt data due to sensor failure, fouling, drifting, calibration error, or data logger failure is another issue. This paper focuses on sensor data management, validation, correction, and provenance to combat these issues, ensuring complete and accurate sensor datasets for building technologies applications and research. The design and development of two integrated software products are discussed: Sensor Data Validation and Correction (SensorDVC) and the Provenance Data Management System (ProvDMS) platform.

Data management↗

CT and Geophysical Data of Clinton Sandstone Cores from Ohio

Collection of computed tomography and multi-sensor core logger data of 12 wells in Ohio that intersect the Clinton Sandstone formation. This data is described along with well information in a technical report series document: Paronish, T.; Holleran, A.; Pohl, M.; Crandall, D.; Jarvis, K.; Workman, S.; Drosche, J.; McKisic, T.; Collins, C.; Thomas, M.; McDonald, J. Computed Tomography Scanning and Geophysical Measurements of the Clinton Sandstone in Ohio; DOE.NETL-2025.4949; NETL Technical Report Series; U.S. Department of Energy, National Energy Technology Laboratory, Morgantown, WV, 2025; p 68. https://doi.org/10.2172/2589262

AS↗

Real-Time Monitoring of Fracture Dynamics with a Contrast Agent-Assisted Electromagnetic Method

In collaboration with the Advanced Energy Consortium, our team has previously demonstrated that the placement of electrically active proppants (EAPs) in a hydraulic fracture surveyed by electromagnetic (EM) methods can enhance the imaging of the stimulated reservoir volumes during hydraulic fracturing. That work culminated in constructing a well-characterized EAP-filled fracture anomaly at the Devine field pilot site (DFPS). In subsequent laboratory studies, we observed that the electrical conductivity of our EAP correlates with changes in pressure, salinity, and flow. Thus, we postulated that the EAP could be used as an in-situ sensor for the remote monitoring of these changes in previously EAP-filled fractures. This paper presents our latest field data from the DFPS to demonstrate such correlations at an intermediate pilot scale. We conducted surface-based EM surveys during freshwater (200 ppm) and saltwater (2,500 ppm) slug injections while running surfaced-based EM surveys. Simultaneously, we measured the following: 1) bottomhole pressure and salinity in five monitoring wells; 2) injection rate using high-precision data loggers; 3) distributed acoustic sensors in four monitoring wells; and 4) tiltmeter data on the survey area. We demonstrated that injections into an EAP-filled fracture could be successfully coupled with real-time electric field measurements on the surface, leading to remote monitoring of dynamic changes within the EAP-filled fracture. Furthermore, by comparing the electrical field traces with the bottomhole pressure, flow rate, and salinity, we concluded that the observed electric field in our study is influenced by fracture dilation and flow rate. Salinity effect was observed when saltwater was injected. EM simulations solely based on assumptions of fracture conductivity changes during injection did not reproduce all of the measured electric field magnitudes. Preliminary estimates showed that including streaming potential in our geophysical model may be needed to reduce the simulation mismatch. The methods developed and demonstrated during this study will lead to a better understanding of the extent of fracture networks, formation stress states, fluid leakoff and invasion, characterizations of engineered fracture systems, and other applications where monitoring subsurface flow tracking is deemed important.

02 PETROLEUM↗

NGEE Arctic Tram: Continuous Soil Moisture and Temperature Measurements across Low- and High-Centered Polygonal Ground, Utqiagvik (Barrow), Alaska, 2014-2016

This data set reports the continuous soil moisture and temperature measurements collected from August of 2014 to September of 2016 along the footprint of the NGEE Arctic Tram. Soil moisture and temperature sensors are installed adjacent to the Tram at 8 locations of varying land surface types across the low-centered and high-centered polygonal ground. While the Tram operates seasonally these soil measurements are recorded year around. Two data files (*.csv) are provided: (1) the original output data file from Campbell Scientific CR1000 data logger, and (2) a reorganized and consistently named version of the same data. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

A microprocessor controlled pressure scanning system

A microprocessor-based controller and data logger for pressure scanning systems is described. The microcomputer positions and manages data from as many as four 48-port electro-mechanical pressure scanners. The maximum scanning rate is 80 pressure measurements per second (20 ports per second on each of four scanners). The system features on-line calibration, position-directed data storage, and once-per-scan display in engineering units of data from a selected port. The system is designed to be interfaced to a facility computer through a shared memory. System hardware and software are described. Factors affecting measurement error in this type of system are also discussed.

Anderson, R. C.↗

A microprocessor controlled pressure scanning system

A microprocessor-based controller and data logger for pressure scanning systems is described. The microcomputer positions and manages data from as many as four 48-port electro-mechanical pressure scanners. The maximum scanning rate is 80 pressure measurements per second (20 ports per second on each of four scanners). The system features on-line calibration, position-directed data storage, and once-per-scan display in engineering units of data from a selected port. The system is designed to be interfaced to a facility computer through a shared memory. System hardware and software are described. Factors affecting measurement error in this type of system are also discussed.

Anderson, R. C.↗