Search NASA⌕ Search

SEARCH · Search NASA

Results for “decommissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The TRANSCEND University Consortium: An Overview - 20106

The UK government is committed to nuclear energy having an important role in delivering a secure, low-carbon and affordable energy future. Projections indicate that between now and 2035, ∼14 GW of new nuclear generating capacity may be built. Successful delivery of this strategy recognises the need for research and development, skills development and international collaboration as key enablers. One key area is the decommissioning and clean-up of all civil nuclear licensed sites and the implementation of geological disposal of highly active wastes, with a central component being a joined-up approach to nuclear R and D across government, industry and academia which benefits the UK economy and ensures the security of supply. Essential to public acceptance of this strategy remains a demonstrable ability to safely manage and dispose of waste, with acceptance directly linked to having scientifically robust routes for its safe clean-up and disposal. There therefore remains an ongoing need for further research in the areas of decommissioning, immobilisation and management of nuclear waste, and there is significant government and stakeholder support for such research. Given the needs of both new nuclear power generation and legacy wastes, there is a requirement to develop innovative approaches to waste management and decommissioning. Following on from earlier, highly successful projects supported by UK Research and Innovation's Energy Programme, the work of the TRANSCEND (Transformative Science and Engineering for Nuclear Decommissioning) consortium is part of the response to these needs, providing support to a strong and internationally leading group of researchers in this key technology area. The consortium is a collaboration between 11 universities, supported by 8 key industry partners, with a total funding of UK Pounds 9.5 M from the UK Engineering and Physical Research Council, the universities and key project partners. The research being carried out is multidisciplinary and covers both fundamental and applied topics, with 40 research projects clustered in four technical themes: integrated waste management; site decommissioning and remediation; spent fuels; and nuclear materials. Key aims of the consortium are to extend and further develop a relevant academic skill base in the UK associated with the needs of nuclear waste management and decommissioning, to train the next generation of UK researchers, equipping them with skills and experiences relevant to nuclear waste management and decommissioning issues, and to carry out cutting-edge research that has the potential to provide new and innovative pathways to better management of both legacy and future nuclear wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Beginnings: Optimising Waste and End-state at UK Nuclear Sites to Enable Environmental Permit surrender (the GRR) - 20193

The decommissioning of nuclear sites involves the management of large volumes of radioactive waste, other conventional waste, and the clean-up of land and groundwater contamination. In the UK, the disposal of radioactive waste from nuclear sites is regulated by the Environment Agency (England), Natural Resources Wales (Wales) and the Scottish Environment Protection Agency (Scotland). All three environment agencies seek to make sure that the generation and disposal of radioactive waste is optimised: ensuring impacts to people are 'as low as reasonably achievable' (ALARA). With a large proportion of UK nuclear sites embarking on decommissioning, the environment agencies have collaboratively developed new guidance: the 'Management of radioactive waste from the decommissioning of nuclear sites: Guidance on the Requirements for Release from radioactive substances regulation' (referred to as the GRR)[1]. The environment agencies worked in liaison with the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, and the UK government body responsible, the Nuclear Decommissioning Authority (NDA). Prior to finalising the guidance, a 12 month trial was completed at three of the NDA's nuclear sites, enabling the environment agencies to test their draft GRR guidance against 'real world scenarios' and the challenge of incorporating its requirements into decommissioning plans. Experience gained during the trial was incorporated into the current version of the GRR, published in July 2018. The GRR represents the 'new beginning' of this paper's title because for the first time, the UK environmental regulators have expressed in detail their requirements for surrender of environmental permits for nuclear sites. The GRR provides a framework for a UK nuclear site to plan, assess and justify its management of radioactive waste and deliver through decommissioning, an optimal, environmentally safe and sustainable end-state. This paper will describe the requirements and technical standards within the GRR, the establishment of defensible clean-up criteria and the production of a Waste Management Plan (WMP), supported by a Site-Wide Environmental Safety Case (SWESC). It will describe the experience gleaned by operators and regulators during the trial and it will highlight current work by regulators to implement the new approach proportionately. Finally, this paper will look forward and outline planned amendments to legislation in the UK affecting nuclear sites that should enable the full benefits of the GRR to be realised in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evaluation of Chemical Decontamination for Contaminated Carbon Steel Scrap by Multiphase Treatment Process - 20249

There is a significant growth in the field of decommissioning of nuclear facilities due the fact that for a lot of them their end of life is nearing. In Taiwan, the government plans to steadily reduce the dependence on nuclear power and moves gradually towards a nuclear-free homeland. Therefore, the development of decommissioning technology becomes the significant issue for the next coming years. The decommissioning of a nuclear power plant is a long process and practical work including radiological surveys, decontamination, dismantling, and the subsequent waste management. Chemical decontamination is an important task in the decommissioning of nuclear power plants and is usually performed by circulating the chemical solution in selected systems or full systems in order to reduce dose levels. However, the decontamination of segmented metal parts is also considered to reduce the contamination to such levels that they may be disposed of at a lower classification or be unconditionally released, and it helps to achieve the goal of waste minimization and provide a more economical cost for disposal management. Chemical decontamination technology is used to remove the contaminated oxides deposited on the surface of metals by dissolving them with chemical mechanisms, such as chelation, acidic or alkaline dissolution, redox reaction and so on. Carbon steel is the major material used in systems and pipelines in the nuclear power plant, thus it is also commonly selected as the target to be decontaminated in the decommissioning process. In this study, the effectiveness of chemical decontamination is evaluated by using multiphase treatment process including the reduction and the oxidation steps. In the step of redox reaction, the oxidation state of the substance is very important. Especially metals of some oxidation states show solubility in water, which has a decisive influence on the chemical decontamination. The experiment of decontamination of metal scraps is carried out by the immersion method within a chemical solution. The relative operation parameters such as temperature, pH, and concentration of the chemical solution are recorded to demonstrate the effect of the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of wind turbine blade recycling baselines in the United States

Over the past several years, the wind energy industry has received scrutiny regarding wind turbine blade (WTB) recycling due to the landfilling of WTBs caused by a lack of industrially viable recycling solutions. The amount of WTBs that will need to be recycled is set to increase in the United States as the deployment of wind energy is expected to rapidly grow to meet the nation's energy goals by 2035. While significant progress has been made worldwide, it is still unclear which WTB recycling solutions would be the most cost and energy effective within the United States for the existing fleet of wind turbines. To guide researchers and industry with a clear path forward, a range of options for WTB recycling in the United States are modeled through development of baseline scenarios and the use of formal life cycle assessment (LCA). Model data have been collected through literature review, industry engagement, and expert opinion regarding current end of life practices and considerations surrounding equipment, labor, and logistics. A detailed baseline for WTB decommissioning processes has been developed and used to assess alternative approaches, such as on-site shredding to compare the impacts on greenhouse gas (GHG) emissions. The developed LCA model and baseline scenarios for WTB recycling is used to assess the current WTB decommissioning practices in the United States along with emerging recycling pathways, including cement kiln co-processing and pyrolysis. Initial findings indicate that there are different approaches to decommissioning WTBs in the United States, each of which has unique implications for recycling. In light of this finding, additional results from the modeling will be used to better understand decommissioning practices and assist in making educated decisions on recycling pathways for the future. Throughout the analysis, focus was given to where international efforts might differ from the United States. WTB recycling is occurring worldwide, and different countries have different drivers for creating markets for recycled WTB materials. The contrasts and similarities between the United States and other countries offer insight to areas of opportunity that the United States could investigate and areas that can be readily transferred from existing solutions. By modeling and characterizing the current decommissioning practices and potential recycling solutions for the United States, a clearer vision will be created for pathways forward as to how to handle end of life WTBs to enable more efficient and cost-effective opportunities for material recovery from end-of-life WTBs.

Korey, Matt↗

Recommendations for an Applicant to Calculate Activity Data for Greenhouse Gases Estimates

In 2009, the U.S. Nuclear Regulatory Commission (NRC) directed the NRC staff to address climate change issues and consider the impacts of the emissions of carbon dioxide (CO 2 ) and other greenhouse gases (GHGs) in its environmental reviews for major licensing actions (NRC 2009b). To implement this direction from the Commission, the staff issued guidance in 2011 and updated guidance in 2014 in Attachment 1 to Interim Staff Guidance COL/ESP-ISG-026 (NRC 2011; NRC 2014). This guidance provides a simpler method than the method described in RG 4.2 Rev. 3, that an applicant can use to meet the plant parameter envelope (PPE) value from the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors (NR GEIS). NRC staff estimated the 97-year lifecycle GHG emissions from a reference 1000 megawatt electrical (MWe) light-water reactor (LWR) for various activities associated with construction, operation (including uranium fuel cycle), and decommissioning of nuclear power plants and presented the results in Appendix H of the NR GEIS. Appendix H of the NR GEIS includes estimates of direct emissions from construction equipment and emergency diesel engines in a nuclear facility and indirect emissions from workforce vehicular traffic, fuel transportation and the uranium fuel cycle. The NR GEIS Section 3.3 extended the estimates in Appendix H for the installation of two 1000 MWe nuclear reactors on the same site. Scaling factors were used to extrapolate the GHG emissions of a reference 1000 MWe reactor to a two-unit nuclear reactor plant (each reactor unit generating 1000 MWe). GHG emission estimates for building, operation, decommissioning and safe storage (SAFSTOR) for a two-unit nuclear reactor plant would be based on the plant’s physical size, and therefore estimates for these source categories were assumed to be twice the value of the reference 1000 MWe reactor. However, GHG emissions from the fuel cycle (including fuel transportation) were scaled upward by a factor of 3, based on plant efficiencies greater than the 80 percent assumption in Appendix H. Table 1 below shows the PPE emissions for two 1000 MWe nuclear reactors as provided in NR GEIS. The total GHG emissions for two 1000 MWe reactors were calculated as 2,534,000 metric tons (MT) of CO 2 equivalent (CO 2 (e)) based on a 97 year GHG life cycle period. The GHG emissions lifetime of 97 years for a reference nuclear reactor includes a 7-year building phase, 40 years of operation, 10 years of active decommissioning, and 40 years of SAFSTOR operations (NRC 2024). Construction equipment and vehicular traffic from workers commute would contribute to the GHG emissions during a 7-year building phase. Uranium fuel cycle, vehicular traffic, fuel and waste transportation, and testing of standby diesel generators would contribute to GHG emissions during the 40-year operations phase. While NRC’s regulations allow up to 60 years of reactor facility decommissioning, Appendix H estimated that most of the GHGs would occur over an estimated 10-year period during which to the licensee would engage in significant demolition and earth-moving activities, as discussed in Supplement 1 to NUREG-0586 (NRC 2002). Vehicular traffic by the workforce during a 40-year SAFSTOR period would additionally contribute GHG emissions. The carbon footprint for a 40-year SAFSTOR period was separately analyzed from the decommissioning activities as provided in Table YYYY-2 of the staff issued guidance in 2011 (NRC 2011).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparing Legacy Waste Management to Advanced Reactor Waste Management

The Nuclear Energy Agency (NEA) and Natural Resources Canada (NRCan) are organizing an international workshop on the implementation of radioactive waste management and decommissioning strategies in small modular reactors (SMRs) and advance reactor technologies. The event will take place in Ottawa, Canada on 7-10 November 2022. The workshop will convene participants from various fields of expertise in the areas of radioactive waste management, decommissioning, nuclear science and development, transportation, as well as young professionals, communication experts and researchers. The goal of the workshop is to devise a guideline document that will serve implementers in understanding key issues in decommissioning and waste management of new reactors from the design perspective, aiding in the licensing process and in future decommissioning and waste management activities. DOE has invested considerably in the innovation of advanced reactors. Interaction in this workshop allows INL and DOE to articulate the importance of looking at the back-end of the fuel cycle for advanced reactors. The back-end of the fuel cycle is important to the success of advanced reactors, and DOE may need to manage this material in the future after it is discharged from reactors. I have been asked to present at the track titled "Operational and Design Optimization Consideration Related to Decommissioning and Radioactive Waste Management for SMRs/Advanced Reactors".

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Circular Economy for Solar Photovoltaic System Materials: Drivers, Barriers, Enablers, and U.S. Policy Considerations

As PV capacity increases, owners are also decommissioning older system assets. Estimates based on a 30-year lifetime assumption found that cumulative U.S. end-of-life (EoL) PV modules could total one million metric tons (Mt) by 2030 and up to 10 million Mt by 2050 (Weckend, Wade, and Heath 2016). Beyond maintenance replacements, early retirements that are due to efficiency upgrades and extreme weather, as well as PV deployment beyond earlier expectations, would increase these projections. PV system owners must evaluate equipment management options for used modules and system components retired during maintenance activities, refurbishment, repowering and system decommissioning. PV manufacturers must also evaluate material management options from customer returns, defects, and scrap. Management options for early retired and EoL PV system material include reuse, repair for reuse, recycling-based resource recovery, storage, and disposal. Disposal of PV system material increases the burden on landfill capacity, while reuse, repair for reuse, and recycling-based resource recovery (reuse/repair/recovery) options salvage valuable materials and provide secondary market opportunities and ancillary benefits (Weckend, Wade, and Heath 2016; EPA 2019c; SWEEP 2019). PV system owners may also decide store used modules and components as spares, or in the interim before a reuse or EoL management decision is made. Despite potential secondary market opportunities and the potential benefits associated with the repair/reuse/recovery of PV system material, anecdotal evidence suggests that in the United States decommissioned PV modules are stored, landfilled or otherwise disposed of (Salim et al. 2019; CPUC 2019b; DTSC 2019b; NREL 2019a). Some modules are being disposed of in municipal nonhazardous landfills and federally regulated hazardous treatment, storage, and disposal facilities, and others are being stored in warehouses until economically viable repair/reuse/recycling becomes available (CPUC 2019b; DTSC 2019b; NREL 2019a; Libby and Shaw 2018). As awareness of current practices grows, and the demand for critical PV module material increases, U.S. industry stakeholders, regulators, and policymakers are starting to (1) consider solutions to drive and enable environmentally sustainable materials management decisions and behaviors and (2) identify barriers to a circular economy for PV system materials. Circular economy principles attempt to transition from a "take-make-consume-dispose" linear economic system to a circular system that allows for the long life, and the reuse/repair/recovery of products and materials (Ellen MacArthur Foundation 2020). We begin this report by summarizing the drivers, barriers, and enablers to a circular economy for PV system materials in the United States. We then report on our analysis of federal and state regulatory considerations that may impact the repair/reuse/recovery of PV materials, and potential civil and criminal liabilities associated with noncompliance. We then discuss state policies and initiatives in the United States that expressly address PV system decommissioning and repair/reuse/recovery of PV materials. We conclude by providing case studies of U.S. business models for the repair/reuse/recovery of PV system materials. Our results are based on legal and literature-based research and interviews with solar industry stakeholders, regulators, and policymakers.

14 SOLAR ENERGY↗

Panel Session 4 and 15: Japan Fukushima Daiichi D and D Update and Technological Challenges at Japan Fukushima Daiichi D and D and Update on Nuclear Overview and Development in Japan - Nuclear Fuel Cycle

Sessions 4 and 15 represent a two-part panel series that discusses progress and challenges associated with cleanup at Fukushima. Severe limitations on availability of original panelists from Japan due to strict restrictions put in place to alleviate the spread of coronavirus necessitated changes to both panels. The result was a significantly modified panel for Session 04 (shown above) and the elimination of all panelists for Session 15. The 4 and 15 Panel Sessions provide an overview of activities related to both the progress and challenges of cleanup and decommissioning of the Fukushima Daiichi Nuclear Power Station (NPS) in Japan. Five panelists discussed perspectives of the cleanup following a Tokyo Electric Power Company (TEPCO) video showing the progress on site since the devastating Great East Earthquake and tsunami that caused the explosions at three of the six reactors on the site. Three of the five panelists discussed on-going work being performed for the effort, while the other two provided expert perspectives of on strategic efforts at the site. The panel was attended by over 80 technologists and policy makers spanning the globe and was opened by Dr. Monica Regalbuto of Idaho National Laboratory and a short video provided by TEPCO. The video described changes at the site that spanned the cleanup efforts from stabilizing water intrusion into the contaminated reactor buildings to construction of new administrative facilities. The video explained the processes underway to retrieve spent fuel rods and challenges in retrieval of the compromised fuel debris. The video highlighted working condition improvements that included establishment of rest housing and a small convenience store on the site, and the rollback of protective equipment around the site due to decreases contamination. Panelists with presentations: Revision of 'the Mid-and-Long-Term Road-map towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station' (Paul Dickman); Sharing UK experience at Fukushima Daiichi (Adrian Simper); SRNL Japan (Andrew Fellinger); ABLE's Initiative to Dismantle the Exhaust Stack (Daniel Walter); JAEA R and D in Fukushima (Tokio Fukahori); TEPCO - Overview and Update of the Fukushima Decommissioning Process (Monica Regalbuto); Toshiba's Involvement in the Decommissioning of the Fukushima Daiichi Nuclear Power Plant (Yasuhiro Yuguchi); Remote Dismantling of the Exhaust Stack At Fukushima Dai-ichi NPS (Takashi Okutsu)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Certifying the Performance of Fixative Technologies under Open Air Demolition Activities for D and D - 20096

Department of Energy (DOE) facilities undergoing deactivation and decommissioning (D and D) activities struggle with safety concerns of residual radioactive contamination leftover after gross decontamination efforts have concluded. The positive effects of implementing fixative technologies for decommissioning and maintenance is known across the DOE complex. However, there is no standardized metric in place that quantifies the performance of these technologies such as incombustible fixative platforms that immobilize the contamination in a solid polymer material under normal operating conditions or when exposed to stressors. The primary focus of this research is to provide the empirical data necessary to properly characterize the effects of implementing fixative technologies on mitigating the release of contamination. In addition, this effort has been used to identify and establish uniform testing protocols to quantify operational parameters of fixating platforms and properly credit such systems under a variety of operational conditions and stressors that can arise during open air demolition efforts (e.g. impact, water, thermal, etc.). The established protocols will be provided to the ASTM International E10.03 Subcommittee on Radiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components for the potential of formal standardization. Attributes to be addressed during testing are material compromise from impact stress, thermal stress for incombustible fixative materials, and immobilization factors (how well an immobilizing platform is capable of retaining fixated material during thermal and impact stressors). In developing these test methods, a greater understanding of the material's behavior under anticipated and unanticipated events, such as decommissioning activities and contingency events as outlined in the Basis of Interim Operations (BIO), can be successfully characterized. There are several key components of the experimental methodology that is essential in empirically certifying fixative technologies. A surrogate contaminant with a unique signature has been utilized with the implementation of a uniform contamination process of test coupons that is quantifiable and replicable for direct fixative comparisons. A modular test chamber has also been used to apply the various stressors of interest. Collection of released contamination that includes airborne and resettled contaminant particles and analyzed using mass spectrometry. This research directly supports DOE complex-wide concerns in terms of final disposition of nuclear facilities and the considerations made during their time between ceasing facility operation and final disposition. The results of this effort aims to provide a standardized road map and logical decision flow to better facilitate fixative technologies into D and D activities required to achieve the desired facility end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practices at the End of Photovoltaic System Performance Period

Responsible and cost-effective dissolution of photovoltaic (PV) system hardware at the end of the performance period has emerged as an important business and environmental consideration. Alternatives include extending the performance period and existing contracts for power purchase, lease, and utility interconnect; refurbishing the plant by correcting any deficiencies; repowering the plant with new PV modules and inverters; or decommissioning the plant and removing all the hardware from the site. Often key decisions are made very early in the project development and might require decommissioning by some certain date after the end of a power purchase agreement. To “abandon in place” is not an alternative acceptable to landowners and regulators, so any financial prospectus should include costs associated with decommissioning, even if those costs are deferred by extending operations, refurbishment, or repowering. Decommissioning costs are driven by regulations regarding the handling and disposal of waste, with reuse and recycling of PV modules and other components preferred as a way to reduce both costs and environmental impact. Each alternative is discussed with order-of-magnitude costs, and recommendations are provided considering site-specific details of that situation, such as estimated costs to refurbish or repower, projected revenue from continued operations, and tax considerations.

14 SOLAR ENERGY↗

A Circular Economy for Lithium-Ion Batteries Used in Mobile and Stationary Energy Storage: Drivers, Barriers, Enablers, and U.S. Policy Considerations

As large-format battery energy storage (BES) capacity increases in the United States, so will the volume of spent lithium-ion batteries (LiBs) (Bade 2019). Estimates based on a 10-year lifetime assumption found that the volume of LiBs that have reached the end of their utility for electric vehicle (EV) applications could total two million units (four million metric tons) annually by 2040 in the United States (Richa et al. 2014; Ai and Borucki 2018). Although there is currently no publicly available decommissioning or end-of-life (EoL) projection for stationary BES systems, the U.S. energy storage market is expected to grow from an annual deployment of 523 megawatts in 2013 to 7.3 gigawatts in 2025 (Wood MacKenzie and ESA 2020; Wesoff 2020). Despite potential secondary market opportunities and the potential benefits associated with the reuse/recovery of LiB material, anecdotal evidence suggests that in the United States most decommissioned LiBs from EVs are landfilled or otherwise disposed of (Steward et al. 2019; Salim et al. 2019; CPUC 2019; DTSC 2019d; NREL 2019b; Jacoby 2019; DOE 2019). The reuse of large-format LiBs is not at commercial scale and to date consists of only a handful of U.S.-led pilot projects. Similarly, less than 5% of LiBs from EVs are sent to recycling facilities in the United States (Steward et al. 2019; Jacoby 2019; America Made 2019; Patel 2017). As awareness of current practices grows, and the demand for critical LiB materials increases, U.S. industry stakeholders, regulators, and policymakers are starting to (1) consider solutions to drive and enable environmentally sustainable materials management decisions and behaviors and (2) identify barriers to a circular economy for LiBs (Figure 1). Circular economy principles (Figure 1) attempt to transition from a “take-make-consume-dispose” linear economic system to a circular system that allows for the long life, high performance, and the reuse/recovery of products and materials (Ellen MacArthur Foundation 2016). We begin this report by summarizing drivers, barriers, and enablers to a circular economy for LiBs used in mobile and stationary BES systems in the United States. We then report on our analysis of federal and state regulatory considerations that may impact the reuse/recovery and disposal of LiBs, and potential civil and criminal liabilities associated with noncompliance. We conclude by highlighting state policies and initiatives in the United States that expressly address reuse/recovery and disposal of large-format LiBs. Our results are based on legal and literature-based research and interviews with mobile and stationary BES industry stakeholders, regulators, and policymakers. While this report addresses stationary BES, as well as mobile BES, much of the information and experience with LiB decommissioning and EoL material management is derived from the increasing management of spent EV LiBs in the United States.

25 ENERGY STORAGE↗

A Systematic Review and Integrated Approach to Modeling of Aging Utility Scale PV Systems

The growing deployment of utility-scale photovoltaic (PV) systems has increased the importance of techno-economic modeling operational photovoltaic (PV) systems for predicting energy yield, optimizing asset management, and informing financial decisions. Through a systematic review of literature and current industry practices, we review the different common modeling practices of a system's configuration and age, performance and degradation, operation and maintenance (O&M), while also focusing on specific considerations for repowering, revamping, and decommissioning. Building on the synthesis, we develop a structured framework for techno-economic modeling of operating PV systems that integrate performance and degradation analysis, a decommissioning and repowering cost model that estimates the system's end-of-life costs to reduce uncertainty quantifications and improve consistency across the sector. This research contributes to improved modeling methodologies and potentially to reduced financial performance requirements by providing practitioners with input resources and practical approaches to estimate performance, degradation, and costs associated with continued operation, revamping, repowering, or decommissioning decisions.

14 SOLAR ENERGY↗

Verification of Reactor Activation Modelling with Physical Characterization Data and the Impact on Long Term Assessments - 20303

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on Whiteshell Reactor 1 (WR-1), an organically cooled, heavy water moderated nuclear reactor. WR-1 was safely shut down in 1985, defueled and drained, and has been in a safe Storage with Surveillance (Deferred Decommissioning) state until present day. In support of an Environmental Assessment for proposed in-situ disposal of WR-1, detailed characterization information regarding the reactor core components (calandria, calandria tubes, and pressure tubes) was necessary to provide confidence that the long-term impacts of the facility can be assessed adequately. A simplified estimate of the total activation of core components was completed in 1992 using conservative assumptions, expected reactor configuration and computer models built with WIMS-CRNL, ONEDANT and ORIGEN-S. Due to the simplification, and age of the work, there was considerable doubt that the modelled inventory estimate of the core components was sufficient to support long-term performance modeling of the planned in-situ decommissioning. Additional data would be required to provide this confidence. Several options were considered for characterizing the WR-1 core components, but it was decided to collect only a limited number of samples in an effort to validate the 1992 simplified estimate as bounding. The limited number of samples reduced risks to workers, both radiological and non-radiological, and significantly reduced the costs required to confidently define and bound the radiological inventory of activation products in the core. The results of the sampling were compared to the simplified activation estimation. There was good agreement between the modelled and sampled results, with all major contributors to total activity showing similar relative quantities. The samples were generally lower than predicted by the models, with few exceptions. Notable exceptions included Nb-94, which were higher in the sample results than the model. This was determined to be caused by the use of Niobium containing steel alloys in the stainless steel pressure tube that were not accounted for in the models. The comparison of results provided confidence that the original inventory estimates produced through the simplified model are conservative and bounding, and therefore suitable for use in the long-term assessment of in situ disposal of the WR-1 reactor. This paper provides details of the simplified computer model results, their comparison to results of the sampling, and the changes adopted in the assessment of the in-situ decommissioning of WR-1 as a result. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Artificial Intelligence Application to D and D - 20492

As aging facilities across the DOE complex await decommissioning, there is an ongoing need to understand any changes in the structural conditions. Many of these facilities were built over 50 years ago and, in some cases, these facilities have gone beyond the expected operational lifetime. Many facilities have been placed in a state of 'cold and dark,' sitting unused and awaiting decommissioning. Especially challenging are the aging facilities that provide unique operational/production capabilities to support critical DOE missions and cannot be shut down. In any of these scenarios, the structural integrity of these facilities may become compromised as time passes. It is critical that adequate inspections be performed on a continual basis and that the data collected undergoes sufficient analysis to support timely identification of any new or worsening structural issues as well as prompt needed maintenance and repairs to maintain the facilities in a safe condition. In recent days, Artificial Intelligence (AI) [1] and its application to various domains are growing at fast speed. FIU is performing research in this area and exploring the associated technologies to solve nuclear decommissioning problems. Artificial intelligence refers to the capability of a program to autonomously act, react and adapt to the working environment. AI enables the machine to behave like humans and perform the cognitive functions such as 'learning' and 'problem solving'. AI systems gradually moving from traditional approaches (algorithms and expert systems) towards more efficient and advanced technologies (machine learning [1] and deep learning [2] [3]). AI is the study of algorithms and statistical models that is being used by computers to perform specific tasks without using explicit instructions. FIU is working to develop a pilot-scale infrastructure to implement structural health monitoring using AI technologies with focus on machine learning, deep learning. This research is focused on Computer Vision/Image Classification area of AI applications. This can also be expanded to other areas of AI related to Object Recognition and Character Recognition in images. In addition to utilizing existing data sets, FIU will collect and investigate image and video data using FIU test-bed mockups to monitor structural health of the facility. Resulting data will be processed and analyzed using machine learning/deep learning technologies. The proposed pilot system is intended to serve as a starting point to engage the DOE field sites on related data sets and their decision making needs. It is anticipated that proposed machine learning/deep learning technologies can be effectively employed using anomaly detection to solve EM challenges in surveillance and maintenance of the D and D facilities. FIU will work with research stakeholders to identify applications at various sites and other DOE facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear waste attributes of near-term deployable small modular reactors

The nuclear waste attributes of near-term deployable SMRs were assessed using established nuclear waste metrics, which are the DU mass, SNF mass, volume, activity, decay heat, radiotoxicity, and decommissioning LLW volumes. Metrics normalized per unit electricity generation were compared to a reference large PWR. Three SMRs, VOYGR, Natrium, and Xe-100, were selected because they represent a range of reactor and fuel technologies and are active designs deployable by the decade’s end. The SMR nuclear waste attributes show both some similarities to the PWR and some significant differences caused by reactor-specific design features. The DU mass is equivalent to or slightly higher than the PWR. Back-end waste attributes for SNF disposition vary, but the differences have a limited impact on long-term repository isolation. SMR designs can vary significantly in SNF volume (and thus heat generation density). However, these differences are amenable to design optimization for handling, storage, transportation, and disposal technologies. Nuclear waste attributes from decommissioning vary depending on design and decommissioning technology choices. Given the analysis results in this study and assuming appropriate waste management system and operational optimization, there appear to be no major challenges to managing SMR nuclear wastes compared to the reference PWR.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗