Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployment timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Energy Commissioning Agent/Auditor Online Training Program

The original objective of this project was to create a comprehensive training and deployment program - suitable for in-person delivery in the New York metro region – focused on educating building commissioning authorities and energy auditors. The NJIT Center for Building Knowledge was to have sole responsibility for this curriculum development and deployment plan effort. Very early in the project timeline, however, the scope of the project evolved – with DOE and NETL approval - to become a collaborative effort between NJIT and Portland Energy Conservation, Inc. (PECI). The structure of this collaboration involved PECI taking the lead on developing a comprehensive curriculum program suitable for in-person delivery, and NJIT taking the lead on turning this curriculum into a comprehensive online training program that would complement – and extend the reach of – the in-person curriculum.

Evans, Deane↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Conceptual Framework

This report explores one integrated technical and process concept designed to manage interconnection costs and streamline interconnection timelines to support near-term renewable energy deployment. We describe a new agreement between renewable energy developers and utilities, informed by the technical analysis. The agreement defines the operational parameters for a renewable energy system, with the goal of reducing risk and cost to all parties. This work provides a foundation upon which other states and utilities may build proof of concept. This report is supported by a technical analysis that is detailed in a companion report, "Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis" (McLaren et al. 2022).

14 SOLAR ENERGY↗

Using Advanced Modeling to Accelerate the Scale-Up of Carbon Capture Technologies

Carbon capture and storage (CCS) is one of many approaches that are critical for significantly reducing domestic and global CO2 emissions. The U.S. Department of Energy’s Clean Coal Technology Program Plan envisions 2nd generation CO2 capture technologies ready for demonstration-scale testing around 2020 with the goal of enabling commercial deployment by 2025 [1]. Third generation technologies have a similarly aggressive timeline. A major challenge is that the development and scale-up of new technologies in the energy sector historically takes up to 15 years to move from the laboratory to pre-deployment and another 20 to 30 years for widespread industrial scale deployment. In order to help meet the goals of the DOE carbon capture program, the Carbon Capture Simulation Initiative (CCSI) was launched in early 2011 to develop, demonstrate, and deploy advanced computational tools and validated multi-scale models to reduce the time required to develop and scale up new carbon capture technologies. The CCSI Toolset (1) enables promising concepts to be more quickly identified through rapid computational screening of processes and devices, (2) reduces the time to design and troubleshoot new devices and processes by using optimization techniques to focus development on the best overall process conditions and by using detailed device-scale models to better understand and improve the internal behavior of complex equipment, and (3) provides quantitative predictions of device and process performance during scale up based on rigorously validated smaller scale simulations that take into account model and parameter uncertainty[2]. This article focuses on essential elements related to the development and validation of multi-scale models in order to help minimize risk and maximize learning as new technologies progress from pilot to demonstration scale.

Miller, David↗

Aerodynamic Decelerators for Planetary Exploration: Past, Present, and Future

In this paper, aerodynamic decelerators are defined as textile devices intended to be deployed at Mach numbers below five. Such aerodynamic decelerators include parachutes and inflatable aerodynamic decelerators (often known as ballutes). Aerodynamic decelerators play a key role in the Entry, Descent, and Landing (EDL) of planetary exploration vehicles. Among the functions performed by aerodynamic decelerators for such vehicles are deceleration (often from supersonic to subsonic speeds), minimization of descent rate, providing specific descent rates (so that scientific measurements can be obtained), providing stability (drogue function - either to prevent aeroshell tumbling or to meet instrumentation requirements), effecting further aerodynamic decelerator system deployment (pilot function), providing differences in ballistic coefficients of components to enable separation events, and providing height and timeline to allow for completion of the EDL sequence. Challenging aspects in the development of aerodynamic decelerators for planetary exploration missions include: deployment in the unusual combination of high Mach numbers and low dynamic pressures, deployment in the wake behind a blunt-body entry vehicle, stringent mass and volume constraints, and the requirement for high drag and stability. Furthermore, these aerodynamic decelerators must be qualified for flight without access to the exotic operating environment where they are expected to operate. This paper is an introduction to the development and application of aerodynamic decelerators for robotic planetary exploration missions (including Earth sample return missions) from the earliest work in the 1960s to new ideas and technologies with possible application to future missions. An extensive list of references is provided for additional study.

Juan R Cruz↗

State-Level Comparison of Processes and Timelines for Distributed Photovoltaic Interconnection in the United States

This report presents results from an analysis of distributed photovoltaic (PV) interconnection and deployment processes in the United States. Using data from more than 30,000 residential (up to 10 kilowatts) and small commercial (10-50 kilowatts) PV systems, installed from 2012 to 2014, we assess the range in project completion timelines nationally (across 87 utilities in 16 states) and in five states with active solar markets (Arizona, California, New Jersey, New York, and Colorado).

14 SOLAR ENERGY↗

A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

Numerous automated and semi-automated planning & scheduling systems have been developed for space applications. Most of these systems are model-based in that they encode domain knowledge necessary to predict spacecraft state and resources based on initial conditions and a proposed activity plan. The spacecraft state and resources as often modeled as a series of timelines, with a timeline or set of timelines to represent a state or resource key in the operations of the spacecraft. In this paper, we first describe a basic timeline representation that can represent a set of state, resource, timing, and transition constraints. We describe a number of planning and scheduling systems designed for space applications (and in many cases deployed for use of ongoing missions) and describe how they do and do not map onto this timeline model.

Chien, Steve A.↗

NASA's In-Space Manufacturing Project: Development of a Multimaterial, Multiprocess Fabrication Laboratory for the International Space Station

NASA's long term goal is to send humans to Mars. Over the next two decades, NASA will work with private industry to develop and demonstrate the technologies and capabilities needed to support exploration of the red planet by humans and ensure their safe return to earth. To accomplish this goal, NASA is employing a capability driven approach to its human spaceflight strategy. This approach will develop a suite of evolving capabilities which provide specific functions to solve exploration challenges. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing project, its past and current activities, and how technologies under development will ultimately culminate in a multimaterial, multiprocess fabrication laboratory ('FabLab') to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit may result in a loss of mission in transit to Mars. In order to have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The paper will discuss the phased approach to FabLab development, desired capabilities, and requirements for the hardware. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the FabLab will be tested on ISS, the system is ultimately intended for use in a deep space habitat or transit vehicle.

Prater, T.↗

A Conceptual Design Study for an Unmanned, Reusable Cargo Lunar Lander

Motivated by the aggressive timeline of NASA’s Artemis Program, the feasibility of evolving a mid-sized, reusable and refuelable cargo lunar lander technology demonstrator into the descent element of the three- stage human lander was assessed with the goal of forming synergies between both acquisition programs. Requirements for such a concept are that it must be deployed on commercial launch vehicles that are expected to enter into service consistent with Artemis’ timeline. In order to assess this concept’s feasibility, a physics-based analysis of alternatives was conducted where mission and vehicle architectures are traded side-by-side. Mission trades considered include the impacts of traveling to near-rectilinear halo orbit quickly versus slowly; vehicle trades include fuel and oxidizer tank configurations, number of engines, and propellant combinations, as well as several technology options, e.g. reduced and zero boil-off strategies. Results and discussions are presented to facilitate the consideration of this concept. lunar lander, systems analysis, multidisciplinary design and analysis, space systems, analysis of alternatives,

Robertson, Bradford↗

NASA's In-Space Manufacturing Project: A Roadmap for a Multimaterial Fabrication Laboratory in Space

Human space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS) provides a unique opportunity for NASA to partner with private industry for development and demonstration of the technologies needed to support exploration initiatives. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing (ISM) project, its past and current activities (2014-2017), and how technologies under development will ultimately culminate in a multimaterial fabrication laboratory ("ISM FabLab") to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit, through a resupply launch or a return to earth, may instead result in a loss of mission while in transit to Mars. To have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The presentation provides a broad overview of ISM projects activities culminating with the Fabrication Laboratory for ISS. In 2017, the in-space manufacturing project issued a broad agency announcement for this capability. Requirements of the Fabrication Laboratory as stated in the solicitation will be discussed. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the current ISM FabLab will be tested on ISS, future systems are eventually intended for use in a deep space habitat or transit vehicle. The work of commercial companies funded under NASA's Small Business Innovative Research Program (SBIR) is also discussed, as these activities, from development of recyclable packaging for ISS to additive manufacturing capabilities for metals and electronics, could also potentially be infused into future exploration capabilities. Key data from ISM projects to date will also be summarized.

Prater, Tracie↗

NASA's In-Space Manufacturing Project: Toward a Multimaterial Fabrication Laboratory for the International Space Station

uman space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS) provides a unique opportunity for NASA to partner with private industry for development and demonstration of the technologies needed to support exploration initiatives. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing (ISM) project, its past and current activities, and how technologies under development will ultimately culminate in a multimaterial fabrication laboratory ("ISM FabLab") to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit, through a resupply launch or a return to earth, may instead result in a loss of mission while in transit to Mars. To have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The paper provides a broad overview of ISM projects activities culminating with the Fabrication Laboratory for ISS. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the current ISM FabLab will be tested on ISS, future systems are eventually intended for use in a deep space habitat or transit vehicle. The work of commercial companies funded under NASA's Small Business Innovative Research Program (SBIR) is also discussed, as these activities, from development of recyclable packaging for ISS to additive manufacturing capabilities for metals and electronics, could also potentially be infused into FabLab exploration capabilities as well.

Prater, Tracie↗

The Feasibility of Direct CO2 Conversion Technologies on Impacting Mid-Century Climate Goals

Recent IPCC modeling suggests that to limit global warming below 2 degrees C, "unprecedented" reductions in CO2 emissions will be required during the 2030-2050 time frame. The direct conversion of CO2 to fuels and chemicals using renewable electricity has garnered interest as one route to draw down emissions with the ability to synthesize products at a significantly lower carbon footprint than conventional methods. However, most direct CO2 conversion pathways are only in the early stages of development and face technical and market hurdles prior to scale-up, bringing into question what role they may play in influencing global CO2 emissions within this critical two-decade window. In this perspective, we highlight low-temperature electrolysis as a promising technology for direct CO2 conversion, including discussion on the products that could most impact global emission levels, and importantly, offer insight into the timeline, required advancements, and specific technical targets needed to successfully scale and deploy these technologies at the commercial level.

chemicals↗

Technical support package: Large, easily deployable structures. NASA Tech Briefs, Fall 1982, volume 7, no. 1

Design and test data for packaging, deploying, and assembling structures for near term space platform systems, were provided by testing light type hardware in the Neutral Buoyancy Simulator. An optimum or near optimum structural configuration for varying degrees of deployment utilizing different levels of EVA and RMS was achieved. The design of joints and connectors and their lock/release mechanisms were refined to improve performance and operational convenience. The incorporation of utilities into structural modules to determine their effects on packaging and deployment was evaluated. By simulation tests, data was obtained for stowage, deployment, and assembly of the final structural system design to determine construction timelines, and evaluate system functioning and techniques.

Source record↗

Overview of the Mars Science Laboratory Parachute Decelerator Subsystem

In 2010 the Mars Science Laboratory (MSL) mission will deliver NASA's largest and most capable rover to the surface of Mars. MSL will explore previously unattainable landing sites due to the implementation of a high precision Entry, Descent, and Landing (EDL) system. The parachute decelerator subsystem (PDS) is an integral prat of the EDL system, providing a mass and volume efficient some of aerodynamic drag to decelerate the entry vehicle from Mach 2 to subsonic speeds prior to final propulsive descent to the sutface. The PDS for MSL is a mortar deployed 19.7m Viking type Disk-Gap-Band (DGB) parachute; chosen to meet the EDL timeline requirements and to utilize the heritage parachute systems from Viking, Mars Pathfinder, Mars Exploration Rover, and Phoenix NASA Mars Lander Programs. The preliminary design of the parachute soft goods including materials selection, stress analysis, fabrication approach, and development testing will be discussed. The preliminary design of mortar deployment system including mortar system sizing and performance predictions, gas generator design, and development mortar testing will also be presented.

Entry, Descent, and Landing (EDL)↗

Learning from the Pandemic: the Future of Meetings in HEP and Beyond

The COVID-19 pandemic has by-and-large prevented in-person meetings since March 2020. While the increasing deployment of effective vaccines around the world is a very positive development, the timeline and pathway to "normality" is uncertain and the "new normal" we will settle into is anyone's guess. Particle physics, like many other scientific fields, has more than a year of experience in holding virtual meetings, workshops, and conferences. A great deal of experimentation and innovation to explore how to execute these meetings effectively has occurred. Therefore, it is an appropriate time to take stock of what we as a community learned from running virtual meetings and discuss possible strategies for the future. Continuing to develop effective strategies for meetings with a virtual component is likely to be important for reducing the carbon footprint of our research activities, while also enabling greater diversity and inclusion for participation. This report summarizes a virtual two-day workshop on Virtual Meetings held May 5-6, 2021 which brought together experts from both inside and outside of high-energy physics to share their experiences and practices with organizing and executing virtual workshops, and to develop possible strategies for future meetings as we begin to emerge from the COVID-19 pandemic. This report outlines some of the practices and tools that have worked well which we hope will serve as a valuable resource for future virtual meeting organizers in all scientific fields.

Neubauer, Mark S.↗

Transportation Energy Futures Series: Vehicle Technology Deployment Pathways: An Examination of Timing and Investment Constraints

Scenarios of new vehicle technology deployment serve various purposes; some will seek to establish plausibility. This report proposes two reality checks for scenarios: (1) implications of manufacturing constraints on timing of vehicle deployment and (2) investment decisions required to bring new vehicle technologies to market. An estimated timeline of 12 to more than 22 years from initial market introduction to saturation is supported by historical examples and based on the product development process. Researchers also consider the series of investment decisions to develop and build the vehicles and their associated fueling infrastructure. A proposed decision tree analysis structure could be used to systematically examine investors' decisions and the potential outcomes, including consideration of cash flow and return on investment. This method requires data or assumptions about capital cost, variable cost, revenue, timing, and probability of success/failure, and would result in a detailed consideration of the value proposition of large investments and long lead times. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency effort to pinpoint underexplored strategies for abating GHGs and reducing petroleum dependence related to transportation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transportation Energy Futures Series: Vehicle Technology Deployment Pathways: An Examination of Timing and Investment Constraints

Scenarios of new vehicle technology deployment serve various purposes; some will seek to establish plausibility. This report proposes two reality checks for scenarios: (1) implications of manufacturing constraints on timing of vehicle deployment and (2) investment decisions required to bring new vehicle technologies to market. An estimated timeline of 12 to more than 22 years from initial market introduction to saturation is supported by historical examples and based on the product development process. Researchers also consider the series of investment decisions to develop and build the vehicles and their associated fueling infrastructure. A proposed decision tree analysis structure could be used to systematically examine investors' decisions and the potential outcomes, including consideration of cash flow and return on investment. This method requires data or assumptions about capital cost, variable cost, revenue, timing, and probability of success/failure, and would result in a detailed consideration of the value proposition of large investments and long lead times. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency effort to pinpoint underexplored strategies for abating GHGs and reducing petroleum dependence related to transportation.

33 ADVANCED PROPULSION SYSTEMS↗

Latest Strategic Surface Metering System and Progress Status in CLT

This presentation provides description of the field evaluation of surface metering deployed by NASA in Charlotte International Airport (CLT) that began with a more tactical decision timeline and progressively expanded toward more strategic timelines. This will include an update on the latest status of the ongoing research and lessons learned.

surface metering↗