Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployment timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

In‐operando thermal transport characterization of moving particle bed heat exchanger

The project aimed to develop modulated photothermal radiometry (MPR) for conducting in-operando measurements of thermal transport in moving particle bed heat exchangers (MPBE) located at Sandia National Laboratory (SNL). The plan was to initially conduct lab-scale measurements on a 1-meter-long particle channel at UCSD, followed by in- operando measurements at SNL on a 20 kWth MPBE prototype built for this project, and if time permitting, potential final deployment on SNL’s 1 MWth G3P3 MPBE. The first two goals were successfully achieved but due to changes with commissioning timeline of the G3P3 MPBE, in-operando measurements on the G3P3 MPBE could not be conducted. The measurement campaigns have resulted in some promising results and the MPR tool has been handed over to trained SNL personnel for future use. MPR measurements on UCSD’s 1-meter-long particle channel showed a peculiar length dependence of the particle bed thermal conductivity and near-wall thermal resistance. The bed thermal conductivity increased, and the near-wall thermal resistance decreased, with increasing distance from the channel inlet, both eventually reaching a plateau. This was found to be due to hydrostatic pressure screening by the channel walls, known as the “Janssen effect”, and is the first experimental study on its role in granular heat transfer. A 20 kWth small-scale MPBE prototype, the first of its kind with 3 mm particle channels and 2 mm sCO2 plates, was designed and manufactured by Vacuum Process Engineering (VPE) for this project. This MPBE prototype was installed in SNL’s HEX test stand and the MPR tool was integrated into the test stand for in-operando measurements. Several modifications have been made to the MPR setup for facile installation and easy operation at SNL. Measurements with Carbo HSP40/70 particles were conducted with various particle and sCO2 temperatures and flow rates. Further, apart from regular MPBE operation, fault scenarios such as plate warping, particle stagnation, and choking were also detected and MPR showed excellent sensitivity to the detection of such conditions. Through the course of this project, MPR has evolved from a sensitive laboratory technique to a rugged industrial tool with various applications in high temperature measurements and diagnostics.

14 SOLAR ENERGY↗

Patience is a virtue: A data-driven analysis of rooftop solar PV permitting timelines in the United States

© 2020 The Authors Local permitting can ensure the safe installation and operation of rooftop solar photovoltaic (PV) systems. At the same time, burdensome local permitting processes and local variation in requirements may pose challenges to PV deployment. In this article, we explore new data on the durations between key steps in the PV permitting process in the United States. The data suggest that a typical customer can expect to wait around 25–100 days from permit application until an installed system passes inspection. Permit durations vary significantly across jurisdictions, due in part to differences in local permitting policies. However, permit durations vary as significantly within jurisdictions as across them, in part due to significant variation across installers, suggesting that installer strategies and practices play an important role in permitting timelines. Permit durations have declined over time, reflecting progress from permit streamlining policies and jurisdiction learning-by-doing, though durations have stabilized in recent years. The data suggest that typical PV customers still face long and uncertain permitting timelines in the United States.

O'Shaughnessy, E↗

Compressing the Recovery Timeline for an Urban Contamination Event - 19539

This study identified equipment that has the potential to support mitigation activities associated with a radiological or nuclear release in the urban environment. Equipment capabilities, availability, and usefulness was assessed for potential deployment following the initial emergency phase of a response. The study was devised to connect emergency management and homeland security offices at the city, state, and federal agencies and discuss the availability and potential response capabilities of equipment reserves. This project focused on connecting with relevant emergency management and homeland security offices at the city, state, and regional level, including major cities across the United States, and with federal agencies. Within these offices, we consulted with subject matter experts (SMEs) in discussions via workshops, phone conversations, and small meetings. The result was a compilation and assessment of approaches to address realistic contamination scenarios and the types of equipment assets that would or could assist in the response and recovery activities. Recommendations on how current equipment reserves can be best used or modified to improve the resilience of a community during a radiological or nuclear contamination event were documented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The missing correlation between the potential rate impacts of rooftop solar and the timing of state net metering policy revisions

Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states—California and Hawaii—retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY↗

Fast Reactor Materials R&D Update

Presentation detailing Major focus: Deployment of A709 for fast reactor structural applications in the area of Design, Fabrication, Supply Chain, and Adx Rx Operation. Also discuss additional work to support A709 development, High level timeline for Irradiation design data, and processing parameters.

36 MATERIALS SCIENCE↗

The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions

Data supporting the article “The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions” (https://www.nlr.gov/docs/fy25osti/93543.pdf). Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states-California and Hawaii-retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY↗

Applications of explainable artificial intelligence in renewable energy research

Researchers in renewable energy are applying deep learning (DL) to a variety of problems from diverse renewable energy domains, such as biofuels, wind, solar, power systems, buildings, vehicles, and transportation systems. Improvements in accuracy may be demonstrated using DL in laboratory settings. However, the lack of interpretability of DL models poses a practical limitation to their utility in advancing scientific knowledge and in the deployment of DL models in safety-critical energy systems. In this article, we discuss explainable artificial intelligence (XAI) as one pathway toward more interpretable DL models. We explore a brief timeline of U.S. national laboratory interest in XAI, an overview and taxonomy of methods in the field of XAI, and a selection of applications across renewable energy research domains. We conclude by highlighting pivotal areas where XAI can accelerate innovation in artificial intelligence for renewable energy research and other essential future directions.

97 MATHEMATICS AND COMPUTING↗

Next Generation Solar Collectors for CSP

The intent of “Next Generation Solar Collectors for CSP” program was to develop key technology elements for collectors in Phase 1 (Budget Period 1), design these elements in Phase 2 (Budget Period 2) and to deploy and test the final collector in Phase 3 (Budget Period 3). 3M and DOE mutually agreed to terminate the program at the end of Budget Period 1, primarily due to timeline issues. However, significant advancements were achieved in developing a next generation reflective material and panel that has the potential to significantly improve the efficiency of CSP systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SolarAPP+ Performance Review: 2021 Data

Accelerating rooftop solar photovoltaic (PV) deployment has strained the capacity of local authorities responsible for permitting, inspection, and interconnection (PII). Given the ongoing expansion of rooftop PV, a growing number of authorities having jurisdiction (AHJs) and utilities are reforming PII processes to reduce delays. AHJs could significantly reduce PII timelines through reforms such as expedited reviews for small-scale systems, online customer portals, and over-the-counter permitting. However, independent reforms do not resolve issues associated with PII variability across AHJs, and many AHJs lack the resources to implement reforms. In response to these challenges, the National Renewable Energy Laboratory (NREL) developed the Solar Automated Permit Processing Plus (SolarAPP+) platform, in collaboration with local governments, code development organizations, and industry stakeholders. This report shows SolarAPP+ performance in 2021 across AHJs.

14 SOLAR ENERGY↗

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY↗

Power Tower Technology Roadmap and cost reduction plan.

Concentrating solar power (CSP) technologies continue to mature and are being deployed worldwide. Power towers will likely play an essential role in the future development of CSP due to their potential to provide dispatchable solar electricity at a low cost. This Power Tower Technology Roadmap has been developed by the U.S. Department of Energy (DOE) to describe the current technology, the improvement opportunities that exist for the technology, and the specific activities needed to reach the DOE programmatic target of providing competitively-priced electricity in the intermediate and baseload power markets by 2020. As a first step in developing this roadmap, a Power Tower Roadmap Workshop that included the tower industry, national laboratories, and DOE was held in March 2010. A number of technology improvement opportunities (TIOs) were identified at this workshop and separated into four categories associated with power tower subsystems: solar collector field, solar receiver, thermal energy storage, and power block/balance of plant. In this roadmap, the TIOs associated with power tower technologies are identified along with their respective impacts on the cost of delivered electricity. In addition, development timelines and estimated budgets to achieve cost reduction goals are presented. The roadmap does not present a single path for achieving these goals, but rather provides a process for evaluating a set of options from which DOE and industry can select to accelerate power tower R&D, cost reductions, and commercial deployment.

14 SOLAR ENERGY↗

Innovation in Radiological Security, Part 1 of 2 – Using a Cloud Solution to Compress the Timely Detection Model

The design and implementation of new security technologies must account for numerous and complex operational challenges. For example, traditionally isolated systems must now survive amid the proliferation of network connectivity and endure the dynamic environments created by organizations tolerating bring-your-own-device policies. When evaluating the cyber, physical, or cyber-physical security of an asset, a common practice in the security industry is to apply the Timely Detection Model (TDM)—a versatile concept that relates the security functions of detection, delay, and response to the progression of an oppositional force’s attack timeline. If implemented correctly, security enhancements can compress the TDM to offer efficiencies to the stakeholders responsible for adjudicating threat scenarios. The efficiencies gained by the response force allow for more effective protection strategies to be realized. One such enhancement, deployed within the radiological security domain—the Sentry-Remote Monitoring System (Sentry-RMS)—is a stand-alone security system that detects, assesses, and communicates priority alarms as a means of thwarting internal and external threats. The SEntry-RMS CommUnications and REsponse (Sentry-SECURE) platform—an optional feature of the Sentry-RMS—is being developed to facilitate more efficient alarm adjudication by site stakeholders and, if necessary, a faster response by law enforcement. This Cloud-hosted platform receives protected information from deployed Sentry-RMS units and relays it to stakeholders that have vested interests in maintaining an elevated level of situational awareness. Operationally, this enables real-time delivery of high-priority alarm and video imagery directly to an identified response stakeholder, such as local law enforcement or site management, via natively developed mobile applications or full platform integration. The Sentry-SECURE platform, as implemented by the U.S. Department of Energy’s Office of Radiological Security, is an example of an innovative security technology that compresses the TDM by (1) enabling a more efficient time to target and (2) better informing a response force’s predetermined tactics, techniques, and procedures. This paper explores the platform’s operational roles, highlights its principal functions, and presents a use case that demonstrates how the platform provides enhanced situational awareness when adjudicating priority alarms.

Sentry-RMS, Timely Detection Model, Sentry-SECURE↗

Agentic workflow enables the recovery of critical materials from complex feedstocks via selective precipitation

We present a multi-agentic workflow for critical materials recovery that deploys a series of AI agents and automated instruments to recover critical materials from produced water and magnet leachates. This approach achieves selective precipitation from real-world feedstocks using simple chemicals, accelerating the development of efficient, adaptable, and scalable separations to a timeline of days, rather than months and years.

Ritchhart, Andrew J.↗

Thermal Energy Storage Selection for Near Term Nuclear Integration

Thermal energy storage (TES) integration with existing and future light water reactors (LWRs) has the capability to increase the deployment options and uses for the large amounts of heat produced in nuclear reactor cores. The present method of exclusively producing electricity has become less economical with increases in renewable energy penetration leading to times of low or negative electricity prices. Some response to this new grid reality has been to begin load following nuclear reactors, an unideal choice due to the relatively small modular cost of producing nuclear energy compared to the revenue that could be received by using all of the heat produced. To support research in this area, Idaho National Laboratory (INL) has joined with Utah Associated Municipal Power Systems (UAMPS) on the Carbon Free Power Project (CFPP) to contract the Joint Use Modular Plant (JUMP). CFPP is planned to be a 12-module NuScale operating site built on INL property, with the first module dedicated to JUMP for research, development, and demonstration purposes. The JUMP module coming online around the beginning of fiscal year 2027 in the current project timeline. One primary goal of JUMP is to demonstrate TES integrated with an operating LWR in a real-world environment. TES integration will allow for the demonstration of nuclear power’s capability to participate in grid load following without reactor cycling, process heat integration, and electrical ancillary market opportunities. The goal of this research is to support both SMR deployment opportunities as well as support LWR retrofit capabilities. In a discussion limited to load following or energy arbitration, “charging” and “discharging” can be simply defined. TES charging refers to time when energy is removed from the nuclear reactor power conversion cycle and directed to be stored in the TES storage medium resulting in less available energy available for grid output. Discharging refers to the process of releasing energy stored in the TES medium and having an increase in grid. This paper quantifies energy storage technologies for use with nuclear reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

RAVIS: Resource Forecast and Ramp Visualization for Situational Awareness - An Introduction to the Open-Source Tool and Use Cases

The Resource Forecast and Ramp Visualization for Situational Awareness (RAVIS) is an open-source tool for visualizing variable renewable resource forecasts and ramp alerts for significant up/down ramps in renewable resource and the consequent net-load. The modular dashboard of RAVIS contains configurable panes for viewing- probabilistic time series forecasts, ramp event alerts on the look-ahead timeline, spatially resolved resource sites and forecasts, and system simulation and market clearing data such as transmission lines utilization, nodal prices and available generation flexibility. RAVIS uses a technology suite that is assembled to provide optimum visualization facility while maintaining a wide pool of potential deployment and client environments. The tool is designed to take advantage of web application technologies, open source visualization libraries and tooling. Utilizing this technology will enable deployment in any environment, using any operating system, and is scalable to much higher spatial and temporal scales of visualization. As a prototype of the tool and demonstrating a use case of variable renewable integration, RAVIS currently integrates site-specific solar power forecasts in the California Independent System Operator (CAISO) and Mid-continent ISO (MISO) footprint from the IBM WattSun forecasting platform, and also superimposes market simulation data for CAISO footprint from as in-house NREL market clearing tool. The tool has the ability to alert the viewer for excessive up or down ramps for both individual solar sites as well as regionally aggregated net-load ramps, and alerts can also be qualified with respect to available flexible generation. This report will provide an introduction to the RAVIS tool, and summarize the above mentioned capabilities, typical use cases and possible extensions of the tool. The RAVIS development team believes there are likely to be high economic and reliability benefits of integrating probabilistic forecasts of variable renewables into control center visualizations and improved ramp events situational awareness for system operators and forecasting teams in the ISOs and electric utilities in comparison with their business as usual practices.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Large-scale Multiphysics Simulations of Small Modular Reactors Operating in Natural Circulation

Thanks to the advancements in high-performance computing, advanced modeling and simulation have become crucial in driving the development and deployment of next-generation nuclear reactors, such as small modular reactors (SMRs). SMRs offer the promise of cost-effective baseload electricity production and improved safety, while addressing some of the challenges associated with large reactor designs, such as high capital costs and extended construction timelines. As part of the Exascale Computing Project, the large-scale multiphysics simulation of an entire SMR primary system has been achieved by combining computational fluid dynamics and neutronics. In addition to the successful demonstration of full-core SMR simulations, the current study integrated the impact of natural circulation into the system. Natural circulation is the primary mechanism driving coolant circulation in SMRs. The mass flow rate in the core depends on the core power, and a numerical model has been developed to predict it. The pressure drop caused by the helical coil steam generator was also accounted for by developing a pressure drop correlation based on high-fidelity large eddy simulation results, further improving prediction accuracy. In conclusion, the results of the study demonstrate that the implemented natural circulation model is effective in predicting the responses of SMR full-core multiphysics simulations.

ECP↗