Search NASA⌕ Search

SEARCH · Search NASA

Results for “design for disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Investigation of acoustic emission coupling techniques

A three-phase research program was initiated by NASA in 1983 to investigate the use of acoustic monitoring techniques to detect incipient failure in turbopump bearings. Two prototype acoustic coupler probes were designed and evaluated, and four units of the final probe design were fabricated. Success in this program could lead to development of an on-board monitor which could detect bearing damage in flight and reduce or eliminate the need for disassembly after each flight. This final report reviews the accomplishments of the first two phases and presents the results of fabrication and testing completed in the final phase of the research program.

Jolly, W. D.↗

Fiber Optic Sensing Monitors Strain and Reduces Costs

In applications where stress on a structure may vary widely and have an unknown impact on integrity, a common engineering strategy has been overbuilding to ensure a sufficiently robust design. While this may be appropriate in applications where weight concerns are not paramount, space applications demand a bare minimum of mass, given astronomical per-pound launch costs. For decades, the preferred solution was the tactic of disassembly and investigation between flights. Knowing there must be a better way, Dr. Mark Froggatt, of Langley Research Center, explored alternate means of monitoring stresses and damage to the space shuttle. While a tear-it-apart-and-have-a-look strategy was effective, it was also a costly and time consuming process that risked further stresses through the very act of disassembly and reassembly. An alternate way of monitoring the condition of parts under the enormous stresses of space flight was needed. Froggatt and his colleagues at Langley built an early-warning device to provide detailed information about even minuscule cracks and deformations by etching a group of tiny lines, or grating, on a fiber optic cable five-thousandths of an inch thick with ultraviolet light. By then gluing the fiber to the side of a part, such as a fuel tank, and shining a laser beam down its length, reflected light indicated which gratings were under stress. Inferring this data from measurements in light rather than in bonded gauges saved additional weight. Various shuttle components now employ the ultrasonic dynamic vector stress sensor (UDVSS), allowing stress detection by measuring light beamed from a built-in mini-laser. By measuring changes in dynamic directional stress occurring in a material or structure, and including phase-locked loop, synchronous amplifier, and contact probe, the UDVSS proved especially useful among manufacturers of aerospace and automotive structures for stress testing and design evaluation. Engineers could ensure safety in airplanes and spaceships with a narrower, not overbuilt, margin of safety. For this development, in 1997, Discover Magazine named Froggatt a winner in the "Eighth Annual Awards for Technological Innovation" from more than 4,000 entries.

Source record↗

A Focus on Cryogenic Engineering for the Primordial Inflation Polarization Explorer (PIPER) Mission

Cryogenic engineering involves design and modification of equipment that is used under boiling point of nitrogen which is 77 K. The focus of this paper will be on the design of hardware for cryogenic use and a retrofit that was done to the main laboratory cryostat used to test flight components for the Primordial Inflation Polarization Explorer balloon-borne mission. Data from prior tests showed that there was a superfluid helium leak and a total disassemble of the cryostat was conducted in order to localize and fix the leak. To improve efficiency new fill tubes and clamps with modifications were added to the helium tank. Upon removal of the tank, corrosion was found on the flange face that connects to the helium cold plate and therefore had to be fully replaced and copper plated to prevent future corrosion. Indium seals were also replaced for the four fill tubes, a helium level sensor, and the nitrogen and helium tanks. Four additional shielded twisted pairs of cryogenic wire and a wire harness for the Superconducting Quantum Interference Devices (SQUIDs) were added. Finally, there was also design work done for multiple pieces that went inside the cryostat and a separate probe used to test the SQUIDs. Upon successful completion of the cryostat upgrade, tests were run to check the effectiveness and stability of the upgrades. The post-retrofit tests showed minor leaks were still present and due to this, superfluidity has still not been attained. As such there could still be a possibility of a superfluid leak appearing in the future. Regardless, the copper plating on the helium tank has elongated the need to service it by three to five years.

Rosas, Rogelio↗

A Single-Lap Joint Adhesive Bonding Optimization Method Using Gradient and Genetic Algorithms

A natural process for any engineer, scientist, educator, etc. is to seek the most efficient method for accomplishing a given task. In the case of structural design, an area that has a significant impact on the structural efficiency is joint design. Unless the structure is machined from a solid block of material, the individual components which compose the overall structure must be joined together. The method for joining a structure varies depending on the applied loads, material, assembly and disassembly requirements, service life, environment, etc. Using both metallic and fiber reinforced plastic materials limits the user to two methods or a combination of these methods for joining the components into one structure. The first is mechanical fastening and the second is adhesive bonding. Mechanical fastening is by far the most popular joining technique; however, in terms of structural efficiency, adhesive bonding provides a superior joint since the load is distributed uniformly across the joint. The purpose of this paper is to develop a method for optimizing single-lap joint adhesive bonded structures using both gradient and genetic algorithms and comparing the solution process for each method. The goal of the single-lap joint optimization is to find the most efficient structure that meets the imposed requirements while still remaining as lightweight, economical, and reliable as possible. For the single-lap joint, an optimum joint is determined by minimizing the weight of the overall joint based on constraints from adhesive strengths as well as empirically derived rules. The analytical solution of the sin-le-lap joint is determined using the classical Goland-Reissner technique for case 2 type adhesive joints. Joint weight minimization is achieved using a commercially available routine, Design Optimization Tool (DOT), for the gradient solution while an author developed method is used for the genetic algorithm solution. Results illustrate the critical design variables as a function of adhesive properties and convergences of different joints based on the two optimization methods.

Smeltzer, Stanley S., III↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Study to define an approach for developing a computer-based system capable of automatic, unattended assembly/disassembly of spacecraft, phase 1

The initial set of requirements for additional studies necessary to implement a space-borne, computer-based work system capable of achieving assembly, disassembly, repair, or maintenance in space were developed. The specific functions required of a work system to perform repair and maintenance were discussed. Tasks and relevant technologies were identified and delineated. The interaction of spacecraft design and technology options, including a consideration of the strategic issues of repair versus retrieval-replacement or destruction by removal were considered along with the design tradeoffs for accomplishing each of the options. A concept system design and its accompanying experiment or test plan were discussed.

Nevins, J. L.↗

Intelligent editor/printer enhancements

Microprocessor support hardware, software, and cross assemblers relating to the Motorola 6800 and 6809 process systems were developed. Pinter controller and intelligent CRT development are discussed. The user's manual, design specifications for the MC6809 version of the intelligent printer controller card, and a 132-character by 64-line intelligent CRT display system using a Motorola 6809 MPU, and a one-line assembler and disassembler are provided.

Woodfill, M. C.↗

Colossal Tooling Design: 3D Simulation for Ergonomic Analysis

The application of high-level 3D simulation software to the design phase of colossal mandrel tooling for composite aerospace fuel tanks was accomplished to discover and resolve safety and human engineering problems. The analyses were conducted to determine safety, ergonomic and human engineering aspects of the disassembly process of the fuel tank composite shell mandrel. Three-dimensional graphics high-level software, incorporating various ergonomic analysis algorithms, was utilized to determine if the process was within safety and health boundaries for the workers carrying out these tasks. In addition, the graphical software was extremely helpful in the identification of material handling equipment and devices for the mandrel tooling assembly/disassembly process.

Hunter, Steve L.↗

Sample Return Container Opening Process Concept for Potential Mars Sample Return

Proposed Mars Sample Return (MSR) missions would require a pristine and secure opening method to ensure sample Contamination Control and backward Planetary Protection. In order to reach the samples, a series of five containers would need to be opened inside of a Mars Returned Sample Handling (MRSH) facility. The process would include opening the Containment Assurance Module (CAM) aboard the Earth Entry Vehicle (EEV), the Secondary Containment Vessel (SCV), Primary Containment Vessel (PCV), and the Orbiting Sample (OS) container, and finally removing and opening the Returned Sample Tube Assemblies (RSTA). Some of these containers can be opened by reversing the mechanical assembly process while others would require destructive means. Several containers are still in a conceptual design phase while others are en route to Mars aboard the M2020 rover. In order to inform the design of the containers that are still in the conceptual stages, a study was performed at each level of the containment assembly. The studies were used to determine the least destructive and most robust methods to disassemble and open the containers while minimizing risk to the samples or the personnel. In addition to the envisioned disassembly and breaching method, contingency plans were made for completing the disassembly if damage to the vehicle and containment system occurred.

Liu, Yang↗

A 60-meter erectable assembly concept for a control of flexible structures flight experiment

A flight experiment which proposes to use a 60-m deployable/retractable truss beam attached to the Space Shuttle to study dynamic characterization and control of flexible structures is being studied by NASA. The concept requires a relatively complex mechanism for deploying and retracting the truss on-orbit. Development of such a mechanism having a high degree of reliability will be expensive. An alternative method for constructing the truss is discussed requiring no new technology development or complex mechanisms and has already been demonstrated on-orbit. The alternative method proposes an erectable truss beam which can be assembled by two astronauts in EVA. The EVA crew would have to manually assemble the beam from 468 struts and 165 nodes, and install 7 instrumentation platforms with signal and power cabling. The predicted assembly time is 3 hr and 23 min. The structure would also have to be disassembled and restowed following testing, thus 2 EVA days would be required. To allow 25 hr for data collection (probably a bare minimum to accomplish meaningful tests), current Shuttle operations policy dictates a 9-day mission. The design, assembly procedure and issues associated with the alternative concept are discussed.

Watson, Judith J.↗

Geometry and Joint Systems for Lattice-Based Reconfigurable Space Structures

We describe analytical methods for the design of the discrete elements of ultralight lattice structures. This modular, building block strategy allows for relatively simple element manufacturing, as well as relatively simple robotic assembly of low mass density structures on orbit, with potential for disassembly and reassembly into highly varying and large structures. This method also results in a structure that is easily navigable by relatively small mobile robots. The geometry of the cell can allow for high packing efficiency to minimize wasted payload volume while maximizing structural performance and constructability. We describe the effect of geometry choices on the final system mechanical properties, manufacturability of the components, and automated robotic constructability of a final system. Geometry choices considered include building block complexity, symmetry of the unit cell, and effects of vertex, edge, and face connectivity of the unit cell. Mechanical properties considered include strength scaling, modulus scaling, and structural performance of the joint, including proof load, shear load, mass, and loading area; as well as validation and verification opportunities. Manufacturability metrics include cost and time, manufacturing method (COTS versus custom), and tolerances required. Automated constructability metrics include local effects of loads imparted to the structure by the robot and assembly complexity, encompassing the ability of the robot to clamp and number of placement motions needed for assembly.

Ochalek, Megan E.↗

Geometry Systems for Lattice-Based Reconfigurable Space Structures

We describe analytical methods for the design of the discrete elements of ultralight lattice structures. This modular, building block strategy allows for relatively simple element manufacturing, as well as relatively simple robotic assembly of low mass density structures on orbit, with potential for disassembly and reassembly into highly varying and large structures. This method also results in a structure that is easily navigable by relatively small mobile robots. The geometry of the cell can allow for high packing efficiency to minimize wasted payload volume while maximizing structural performance and constructability. We describe the effect of geometry choices on the final system mechanical properties and automated robotic constructability of a final system. Geometric properties considered include number of attachments per voxel, number of attachments per coefficient of volume, and effects of vertex, edge, and face connectivity of the unit cell. Mechanical properties considered include strength scaling, modulus scaling, and packing efficiency of the lattice. Automated constructibility metrics include volume allowance for an end-effector, strut clearance angle for an end-effector, and packing efficiency. These metrics were applied to six lattice unit cell geometries: cube, cuboctahedron, octahedron, octet, rhombic dodecahedron, and truncated octahedron. A case study is presented to determine the most suitable lattice system for a specific set of strength and modulus scaling requirements while optimizing for ease of robotic assembly.

lattice geometry↗

Space Shuttle Orbiter AFT heat shield seal

The evolution of the orbiter aft heat shield seal (AHSS) design, which involved advancing mechanical seal technology in severe thermal environment is discussed. The baseline design, various improvements for engine access, and technical problem solution are presented. It is a structure and mechanism at the three main propulsion system (MPS) engine interfaces to the aft compartment structure. Access to each MPS engine requires disassembly and removal of the AHSS. Each AHSS accommodates the engine movement, is exposed to an extremely high temperature environment, and is part of the venting control of the aft compartment.

Walkover, L. J.↗

Development of Lead Free Energy Absorber for Space Shuttle Blast Container

The Space Shuttle is connected to the mobile launch platform (MLP) by four aft skirt hold down studs on each solid rocket booster (SRB). Prior to lift-off, the frangible nuts inside the aft skirt blast containers are severed into two nut halves by two pyrotechnic booster cartridges. This action releases the Space Shuttle and allows the hold down studs to eject through the aft skirt bore and then down into the MLP. USBI has been tasked to upgrade the blast container for two specific reasons: (1) To eliminate lead for environmental concerns, and (2) To reduce the chance of nut recontact with the holddown stud. Nut recontact with the stud has been identified as a likely contributor to stud hang-ups. This upgrade will replace the lead liner with a unique open cell aluminum foam material, that has commercial and military uses. The aluminum foam used as an energy absorber is a proven design in many other aerospace/defense applications. Additional benefits of using the open cell, energy absorbent aluminum foam in place of the solid lead liner are: (1) Lead handling / exposure and possible contamination, along with hazardous waste disposal, will be eliminated; (2) Approximately 200 lbs. weight savings will be contributed to each Space Shuttle flight by using aluminum foam instead of lead; (3) The new aluminum liner is designed to catch all shrapnel from frangible nuts, thus virtually eliminating chance of debris exiting the HDP and causing potential damage to the vehicle; (4) Using the lighter aluminum liner instead of lead, allows for easier assembly and disassembly of blast container elements, which also improves safety, operator handling, and the efficiency of operations.

Balles, Donald↗

Geometry Systems for Lattice-Based Reconfigurable Space Structures

We describe analytic methods for the design of the discrete elements of ultralight lattice structures. This modular building block strategy allows for relatively simple element manufacturing as well as relatively simple robotic assembly of low mass-density structures on orbit, with potential for disassembly and reassembly into highly varying and large structures. This method also results in a structure that is easily navigable by relatively small, mobile robots. The geometry of the cell can allow for high packing efficiency to minimize wasted payload volume while maximizing structural performance and constructability. We describe the effect of geometry choices on the mechanical properties and automated robotic constructability of a final system. Geometric properties considered include number of attachments per voxel, number of attachments per coefficient of volume, and effects of vertex, edge, and face connectivity of the unit cell. Mechanical properties considered include strength scaling, modulus scaling, and packing efficiency of the lattice. Automated constructibility metrics include volume allowance for an end-effector, strut clearance angle for an end-effector, and packing efficiency. These metrics were applied to six lattice unit cell geometries: cube, cuboctahedron, octahedron, octet, rhombic dodecahedron, and truncated octahedron. A case study is presented to determine the most suitable lattice system for a specific set of strength and modulus scaling requirements while optimizing for ease of robotic assembly.

digital materials↗

Development of Lead Free Energy Absorber for Space Shuttle Blast Container

The Space Shuttle is connected to the mobile launch platform (MLP) by four aft skirt hold down studs on each solid rocket booster (SRB). Prior to lift-off, the frangible nuts inside the aft skirt blast containers are severed into two nut halves by two pyrotechnic booster cartridges. This action releases the Space Shuttle and allows the hold down studs to eject through the aft skirt bore and then down into the MLP. USBI has been tasked to upgrade the blast container for two specific reasons: (1) To eliminate lead for environmental concerns, and (2) To reduce the chance of nut recontact with the holddown stud. Nut recontact with the stud has been identified as a likely contributor to stud hang-ups. This upgrade will replace the lead liner with a unique open cell aluminum foam material, that has commercial and military uses. The aluminum foam used as an energy absorber is a proven design in many other aerospace/defense applications. Additional benefits of using the open cell, energy absorbent aluminum foam in place of the solid lead liner are: (A) Lead handling/exposure and possible contamination, along with hazardous waste disposal, will be eliminated; (B) Approximately 200 lbs. weight savings will be contributed to each Space Shuttle flight by using aluminum foam instead of lead; (C) The new aluminum liner is designed to catch all shrapnel from frangible nuts, thus virtually eliminating chance of debris exiting the HDP and causing potential damage to the vehicle; and (D) Using the lighter aluminum liner instead of lead, allows for easier assembly and disassembly of blast container elements, which also improves safety, operator handling, and the efficiency of operations.

Balles, Donald↗

Development of Lead Free Energy Absorber for Space Shuttle Blast Container

The Space Shuttle vehicle (SSV) is connected to the mobile launch platform (MLP) by four aft skirt hold down studs on each solid rocket booster (SRB). Prior to lift-off, the frangible nuts inside the aft skirt blast containers (BC) are severed into two nut halves by two pyrotechnic booster cartridges. This action releases the SSV and allows the hold down studs to eject through the aft skirt bore and then down into the MLP. USBI has been tasked to upgrade the BC for two specific reasons; 1. to eliminate lead for environmental concerns, and 2. to reduce the chance of nut recontact with the holddown stud. Nut recontact with the stud has been identified as a likely contributor to stud hangups. This upgrade will replace the lead liner with an aluminum foam material. The aluminum foam used as a energy absorber is a proven design in many other aerospace/defense applications. Additional benefits of using the open cell, energy absorbent aluminum foam in place of the solid lead liner are: A. Lead handling/ exposure, and possible contamination, along with hazardous waste disposal will be eliminated; B. Approximately 200 lbs. weight savings will be contributed to each Space Shuttle flight by using aluminum foam over lead; C. The new aluminum liner is designed to catch all shrapnel from frangible nuts thus virtually eliminating chance of foreign object debris (FOD) exiting the HDP, and causing potential damage to the vehicle; D. Potential of using the lighter aluminum liner over lead, allows for easier assembly and disassembly of blast container elements, also allowing for improvements in safety, operator handling, and efficiency of operations. Six BC firing tests will be required to determine if the new liner material will perform in a way to decrease the chance of stud hangups and enhance the ability of the BC to retain blast debris. Testing will be performed at the Kennedy Space Center (KSC) facility known as the Launch Equipment Test Facility (LETF), and will simulate the SRB hold- down post, with actual BC hardware and pyrotechnics assembled, and then test fired. Initial testing was performed in 1997 using a frangible nut in a static drop test over lead and aluminum foam sheet materials. The aluminum foam showed a dramatic improvement of energy absorption over the lead liner material. Proof-of-Principle testing at the KSC-LETF commenced in May, 1998, and is expected to be completed by June, 1998.

Ingram, T.↗

Flight set 360T004 (STS-30)

The performance of 360T004, Forth Flight, Redesigned Solid Rocket Motors (RSRM) is assessed in respect to joint sealing issues as seen from post-test inspection of the seals and sealing surfaces. The factory joint disassembly inspections for this flight set were omitted. The decision was based on the rational that there is sufficient information in the present data base, and this would give H-7 refurbishment operations faster turn around time for this set of hardware. The factory joint disassembly inspections will resume for 360H005, Fifth Flight, through 360L007, Seventh Flight, due to a new grease application being in effect during the assembly process. The left hand nozzle was forced into the snubbed position upon splash down. This required unique tooling to be manufactured to perform the disassembly of the internal nozzle joints. This was completed on February 5 and 6, 1990 at the H-5 Clearfield, Utah facility. The RSRM consisting of capture feature, field joints with the J-joint insulation configuration is illustrated. The nozzle-to-case joint design, which includes 100, 7/8-inch radial bolts in conjunction with a wiper O-ring and modified insulation design is also illustrated, as is the ignition system seals and a cross section of the igniter. The configuration of all internal nozzle joints is shown.

Nelsen, Lowell V.↗