DER-Aware Grid Orchestration and Service Restoration for Enhanced Distribution Resilience
This presentation provides an overview of our work on DER-aware grid orchestration and service restoration.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This presentation provides an overview of our work on DER-aware grid orchestration and service restoration.
Explore the source record for details and available documents.
FAST-DERMS is a controls architecture for secure and transactive management of distributed energy solutions.
Virtual reality (VR) can provide access to restorative environments and sensory stimulation for individuals in isolated, confined, and extreme environments. We developed a nature-based VR intervention featuring three scenes (Garden, Forest, Beach) and examined the effects of multisensory augmentation with location-based olfactory, wind, and thermal stimuli (VR+OWT). Over a two-week period, fifty-one participants were assigned to a no-intervention control, standard audiovisual VR, or augmented VR (VR+OWT) condition. Data collection included weekly assessments of affect, stress, and cognitive performance; post-VR measures of affect, presence, and perceived restorativeness; and open-ended feedback. Both VR and VR+OWT groups produced immediate and sustained reductions in negative affect with no sustained systematic benefits on cognitive performance. The addition of olfactory, wind, and thermal stimuli enhanced presence for some scenes; however, feedback indicated that sensory mismatches and stimulus intensity occasionally detracted from the experience and may have contributed to lower coherence ratings in the VR+OWT group. In contrast, the perceived restorativeness of the VR environment was driven primarily by scene content (Garden vs Forest vs Beach) rather than the level of sensory stimulation. These findings support the potential of virtual nature to promote well-being and underscore the importance of coherence across sensory modalities for multisensory augmentation.
Strategy support to determine the best approach to deploy solar technologies and commercially viable heat pump projects across their existing Rural Energy Partners solar project development support channel.
A battery cell balancing system is operable to utilize a relatively small number of transformers interconnected with a battery having a plurality of battery cells to selectively charge the battery cells. Windings of the transformers are simultaneously driven with a plurality of waveforms whereupon selected battery cells or groups of cells are selected and charged. A transformer drive circuit is operable to selectively vary the waveforms to thereby vary a weighted voltage associated with each of the battery cells.
The rapid growth of distributed energy resources (DERs), especially photovoltaic (PV) systems, has introduced new complexities in maintaining grid reliability, stability, and cost-effective operation. This project addresses these challenges by developing and demonstrating a scalable GridOS Distributed Energy Resource Management System (DERMS) that enables secure, real-time optimization and control of DERs at the distribution feeder level.
A passive continuous variable quantum key distribution scheme, where Alice splits the output of a thermal source into two beams, measures one locally and transmits the other mode to Bob after applying attenuation. A secure key can be established based on measurements of the two beams without the use of a random number generator or an optical modulator.
This paper describes a thrust allocation scheme that minimizes power consumption in an electrified powertrain with Distributed Electric Propulsion. It takes advantage of an observation about component efficiency maps, that efficiency is often highest at high torque/high speed conditions. This optimal approach is demonstrated to satisfy total thrust and net yaw axis torque requirements, making it suitable for utilizing differential thrust for maneuvering.
This paper describes a thrust allocation scheme that minimizes power consumption in an electrified powertrain with Distributed Electric Propulsion. It takes advantage of an observation about component efficiency maps, that efficiency is often highest at high torque/high speed conditions. This optimal approach is demonstrated to satisfy total thrust and net yaw axis torque requirements, making it suitable for utilizing differential thrust for maneuvering.
This paper describes a thrust allocation scheme that minimizes power consumption in an electrified powertrain with Distributed Electric Propulsion. It takes advantage of an observation about component efficiency maps, that efficiency is often highest at high torque/high speed conditions. This optimal approach is demonstrated to satisfy total thrust and net yaw axis torque requirements, making it suitable for utilizing differential thrust for maneuvering.
Inverter-based distributed energy resources (DERs) connected to distribution networks (DNs) can provide fast frequency support, but their reserve deliverability depends on feeder constraints and differs from synchronous primary frequency response (PFR). Existing transmission–distribution coordination studies usually treat reserve generically or neglect feeder-level feasibility, while frequency-security scheduling studies rarely represent distribution feeders explicitly. This paper develops a bi-level day-ahead scheduling framework for integrated transmission–distribution networks that jointly clears energy, transmission-side PFR, and distribution-side fast frequency response (FFR) under exogenous hourly inertia and largest-loss inputs from an external unit commitment (UC) schedule. The transmission problem is modeled with DC-optimal power flow (OPF) and closed-form second-order cone (SOC) frequency-security constraints, whereas each DN is represented by a reserve-aware branch-flow AC-OPF so that scheduled fast reserves remain deliverable during activation. The bi-level problem is reformulated through Karush–Kuhn–Tucker (KKT) conditions into a mixed-integer SOC program, and a penalty term is used to tighten the distribution-network relaxation. In the reduced test system, lower exogenous inertia increased the required primary response from 179.64 MW to 191.08 MW, distribution-side fast response reduced total frequency-response procurement by up to 4.9%, and neglecting distribution constraints overstated the combined distribution-side energy and reserve award by up to 18%. In the expanded study, the largest case was solved in 2.02 s with a 0.00% optimality gap. Time-domain simulations kept the frequency nadir above 59.0 Hz in all tested hours. These results demonstrate the value of fast-response modeling and distribution-feasible reserve delivery in coordinated market clearing.
Abstract The chemistry of electrons in actinide complexes and materials is still poorly understood and represents a serious challenge and opportunity for experiment and theory. The study of the electron density distribution of the ground state of such systems through X‐ray diffraction represents a unique opportunity to quantitatively investigate different chemical bonding interactions at once, but was considered “almost impossible” on heavy‐atom systems, until very recently. Here, we present a combined experimental and theoretical investigation of the electron density distribution in UCl_ 4 crystals and comparison with the previously reported spin density distribution from polarized neutron diffraction. All approaches provide a consistent picture in terms of electron and spin density distribution, and chemical bond characterization. More importantly, the synergy between experiments and quantum‐mechanical calculations allows to highlight the remarkable sensitivity of X‐ray diffraction to electrons in materials.
Conventional tomographic reconstruction typically depends on centralized servers for both data storage and computation, leading to concerns about memory limitations and data privacy. Distributed reconstruction algorithms mitigate these issues by partitioning data across multiple nodes, reducing server load and enhancing privacy. However, these algorithms often encounter challenges related to memory constraints and communication overhead between nodes. In this paper, we introduce a decentralized Alternating Directions Method of Multipliers (ADMM) with configurable quantization. By distributing local objectives across nodes, our approach is highly scalable and can efficiently reconstruct images while adapting to available resources. To overcome communication bottlenecks, we propose two quantization techniques based on K-means clustering and JPEG compression. Numerical experiments with benchmark images illustrate the tradeoffs between communication efficiency, memory use, and reconstruction accuracy.
The increasing penetration of distributed energy resources (DERs) requires better coordination between transmission and distribution (T&D) planning to ensure system security and cost efficiency. However, misaligned planning horizons, computational burdens, and privacy concerns hinder effective coordination, leading to either underutilized resources caused by overinvestments or reliability risks due to underinvestment. To address this challenge, we introduce netload range cost curves (NRCCs), a novel approach for managing long-term DER growth uncertainty through T&D coordination, while preserving existing data-sharing and regulatory structures. NRCCs provide pairs of (i) peak substation netload guarantees and (ii) corresponding distribution upgrade options and costs, enabling their seamless integration into transmission planning workflows. To compute NRCCs efficiently, we develop a transmission-aware distribution network planning (TADNP), which is subsequently integrated to an iterative computation procedure. These NRCCs are then embedded into an NRCC-informed transmission planning model to enable resource-efficient coordination. We illustrate our proposed approach with a case study based on realistic distribution and transmission systems in the San Francisco Bay Area, California. Our results indicate the possibility of dramatic savings in transmission investments by incorporating the proposed NRCC-integrated T&D coordination framework.
Equitable and automated bottoms-up power restoration following an extreme event will be demonstrated at a site in Puerto Rico. To do so, the team will develop enhanced grid situational awareness techniques integrating behind-the-meter (BTM) distributed energy resources (DER) discovery, impedance sweeping based outage boundary detection, and feasible restoration path identification algorithms. Resilience metric will be developed and incorporated along with situational awareness information in a distributed Model Predictive Control (MPC)-based restoration optimization algorithm to control and mobilize grid assets. These algorithms will be validated through power hardware-in-the-loop experiments and ultimately, a site demonstration to show that outage recovery time and total recovered load could be improved by >20% over the baseline.
The space station module power management and distribution (SSM/PMAD) breadboard models power distribution and management, including scheduling, load prioritization, and a fault detection, identification, and recovery (FDIR) system within a Space Station Freedom habitation or laboratory module. This 120 VDC system is capable of distributing up to 30 kW of power among more than 25 loads. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level consists of fast, simple (from a computing standpoint) switchgear that is capable of quickly safing the system. At the next level are local load center processors, (LLP's) which execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. Above the LLP's are three cooperating artificial intelligence (AI) systems which manage load prioritizations, load scheduling, load shedding, and fault recovery and management. Recent upgrades to hardware and modifications to software at both the LLP and AI system levels promise a drastic increase in speed, a significant increase in functionality and reliability, and potential for further examination of advanced automation techniques. The background, SSM/PMAD, interface to the Lewis Research Center test bed, the large autonomous spacecraft electrical power system, and future plans are discussed.
While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.