Search NASA⌕ Search

SEARCH · Search NASA

Results for “electricity planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Electrical load management at the Goldstone DSN Complex

A Power Load Management Plan was deveoped which utilizes the unique power generating capabilities of the stations to reduce the stress on the local utility's reserve capacity and reduce the cost of electrical power at the stations. The plan has greatly reduced the cost of Goldstone electrical power by completely eliminating the use of commercial power during the local utility's high usage periods each day.

Rayburn, J. C.↗

Flight-Test Approach for X-57 Mod II Configuration

The primary objective of the X-57 Mod II test flights is to perform a functional checkout of the research traction battery power and motor systems, perform an airworthiness assessment of the modified vehicle, and to collect baseline performance, stability, and acoustic data for comparisons with later modifications of the X-57 airplane. This paper describes the planned flight operations of the Mod II airplane, the unique considerations and decisions made in operating an electric aircraft, and the development and planning of the research test points necessary to achieve the Mod II flight objectives. Due to the constrained flight time, which resulted from limited capacity of the battery system, careful scripting of flights was required to maximize test time and execute test points efficiently.

James Reynolds↗

Design and Development of a 200-kW Turbo-Electric Distributed Propulsion Testbed

The National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) (Edwards, California) is developing a Hybrid-Electric Integrated Systems Testbed (HEIST) Testbed as part of the HEIST Project, to study power management and transition complexities, modular architectures, and flight control laws for turbo-electric distributed propulsion technologies using representative hardware and piloted simulations. Capabilities are being developed to assess the flight readiness of hybrid electric and distributed electric vehicle architectures. Additionally, NASA will leverage experience gained and assets developed from HEIST to assist in flight-test proposal development, flight-test vehicle design, and evaluation of hybrid electric and distributed electric concept vehicles for flight safety. The HEIST test equipment will include three trailers supporting a distributed electric propulsion wing, a battery system and turbogenerator, dynamometers, and supporting power and communication infrastructure, all connected to the AFRC Core simulation. Plans call for 18 high performance electric motors that will be powered by batteries and the turbogenerator, and commanded by a piloted simulation. Flight control algorithms will be developed on the turbo-electric distributed propulsion system.

distributed↗

Demonstration of Prognostics-Enabled Decision Making Algorithms on a Hardware Mobile Robot Test Platform

Prognostics-enabled Decision Making (PDM) is an emerging research area that aims to integrate prognostic health information and knowledge about the future operating conditions into the process of selecting subsequent actions for the system. Previous work developing and testing PDM algorithms has been done in simulation; this paper describes the effort leading to a successful demonstration of PDM algorithms on a hardware mobile robot platform. The hardware platform, based on the K11 planetary rover prototype, was modified to allow injection of selected fault modes related to the rover’s electrical power subsystem. The PDM algorithms were adapted to the hardware platform, including development of a software module framework, a new route planner, and modifications to increase the algorithms’ robustness to sensor noise and system timing issues. A set of test scenarios was chosen to demonstrate the algorithms’ capabilities. The modifications to run with a hardware platform, the test scenarios, and the test results are described in detail. The results show a successful use of PDM algorithms on a hardware test platform to optimize mission planning in the presence of electrical system faults.

Prognosis↗

The community development workshop, appendix B.

The Community Development Workshop is the name given to a collection of techniques designed to implement participation in the planning process. It is an electric approach, making use of current work in the psychology of groups, mathematical modeling and systems analysis, simulation gaming, and other techniques. An outline is presented for a session of the workshop which indicates some of the psychological techniques employed, i.e. confrontation, synectics, and encounter micro-labs.

Brill, R.↗

Circuit transients due to negative bias arcs on a high-voltage solar array in low Earth orbit

Arcing to negatively biased, exposed solar cell interconnects on solar arrays placed in plasma environments was established. Arcing, however, may cause damaging interference with the operation of electrical power systems in spacecraft planned to be driven with high-voltage solar arrays. An analytical model was developed to estimate the effects of netagive bias arcs on solar array power system performance. Solar cell characteristics, plasma interactions, and power system features are modeled by a linear, lumped element transient circuit, and the time domain equations are solved. Numerical results for solar array common mode and load voltage transients are calculated for typical conditions. Acceptable load transients are found for a range of arc current amplitudes and time constants.

Metz, R. N.↗

Augmentation of the space station module power management and distribution breadboard

The space station module power management and distribution (SSM/PMAD) breadboard models power distribution and management, including scheduling, load prioritization, and a fault detection, identification, and recovery (FDIR) system within a Space Station Freedom habitation or laboratory module. This 120 VDC system is capable of distributing up to 30 kW of power among more than 25 loads. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level consists of fast, simple (from a computing standpoint) switchgear that is capable of quickly safing the system. At the next level are local load center processors, (LLP's) which execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. Above the LLP's are three cooperating artificial intelligence (AI) systems which manage load prioritizations, load scheduling, load shedding, and fault recovery and management. Recent upgrades to hardware and modifications to software at both the LLP and AI system levels promise a drastic increase in speed, a significant increase in functionality and reliability, and potential for further examination of advanced automation techniques. The background, SSM/PMAD, interface to the Lewis Research Center test bed, the large autonomous spacecraft electrical power system, and future plans are discussed.

Walls, Bryan↗

Power combining considerations for Prometheus TWTAs

This slide presentation reviws the planning for a nuclear-electric spacecraft. It includes information concerning one considered mission, communications requirements, power combining, four-beam cluster antenna, and amplitude and phase variations.

combining losses↗

Fellowship Presentation

Three major projects were considered this summer -Key Management Systems and Fleet Reduction: What are key management systems and how would they be implemented at SSC (Stennis Space Center)? What are some ways that SSC can work to reduce the number of fleet vehicles? -Property Disposal and Redistribution: How does the property disposal process at SSC compare to the process at MAF (Michoud Assembly Facility)? Are there any ways to improve the property disposal process? -Usage of Electric Vehicles at SSC: How could electric vehicles be implemented at SSC? What infrastructure would be needed to use electric vehicles at SSC? How do other government installations (particularly the VA (Veterans Administration Medical Center) in Biloxi) use electric vehicles? [Added consideration:] Curriculum Plan.

Carrigee, Craig↗

Deriving Deformable Mirror Performance Requirements in Simulation with Experimental Verification

Coronagraph instruments rely on predictable and stable deformable mirror (DM) surface displacement to achieve the contrast required to detect Earth-sized exoplanets orbiting nearby Solar-type stars. Anomalous DM behavior, such as unstable or pinned actuators, can limit contrast in coronagraphs. Simulating how these undesired behaviors affect the performance of a high contrast imaging architecture is important for developing requirements on their associated hardware. Simulating a vortex coronagraph (VC) with two deformable mirrors, this study quantifies how the number of pinned actuators affect the performance of Focal Plane Wavefront Sensing and Control algorithms using both Grid Search Electric Field Conjugation (EFC) and Planned EFC, which uses Beta-Bumping. The simulation also quantifies how various types of voltage noise such as zero-mean Gaussian noise, zero-mean periodic noise, and drift can affect the contrast of a VC during an observation run. A tolerance of a change in the Mean Normalized Intensity of ${1\times10^{-11}}$ is allocated to both types of error. If Planned EFC is used, only 1 pinned actuator on both DMs can be tolerated. If only pure Grid Search EFC is used the DMs cannot have any pinned actuators. For the case of zero-mean Gaussian noise and zero-mean periodic noise, one can tolerate a noise standard deviation of no more than ${\sigma = 0.45 \text{ mV}}$. For drift, we can only tolerate ${\sigma = 0.30 \text{ mV}}$ or less. These results show that the DM electronics and the DM themselves need to be nearly defect free to avoid having more than 1 pinned actuator. The electronics need to be tested for different types of noise statistics and that both the average and standard deviation of the noise should be measured.

Dean L. Palmer↗

Planning and Resource Management in an Intelligent Automated Power Management System

Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

Morris, Robert A.↗

Electrical Power System Architectures for In-House NASA/GSFC Missions

This power point presentation reviews the electrical power system (EPS) architecture used for a few NASA GSFC's missions both current and planned. Included in the presentation are reviews of electric power systems for the Space Technology 5 (ST5) mission, the Solar Dynamics Observatory (SDO) Mission, and the Lunar Reconnaissance Orbiter (LRO). There is a slide that compares the three missions' electrical supply systems.

Yun, Diane D.↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

Advanced planetary studies

Results of planetary advanced studies and planning support are summarized. The scope of analyses includes cost estimation research, planetary mission performance, penetrator advanced studies, Mercury mission transport requirements, definition of super solar electric propulsion/solar sail mission discriminators, and advanced planning activities.

Source record↗