Search NASA⌕ Search

SEARCH · Search NASA

Results for “first”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Virtual Assistant for First Responders Using Natural Language Understanding and Optical Character Recognition

Commercial deep learning capabilities are available for many applications such as computer vision processing and intelligent chat bots. The Google Cloud Platform product Google Dialogflow provides lifelike conversational artificial intelligence (AI) using machine learning (ML) to generate natural conversations between computers and humans. This ML utilizes natural language understanding (NLU) to recognize a user’s intent and extracts key information into a form of entities. We have developed a user-friendly application through understanding the hazardous material database, first aid safety guidelines and observing the process of first responders who access this information in the field. We created the Trusted and Explainable Artificial Intelligence for Saving Lives (TruePAL) virtual assistant using Dialogflow1 and TensorFlow2 paired with EasyOCR.3 The chatbot supports first responders by providing voice interaction which helps limit additional steps such as browsing through multiple categories when searching for information. Using feedback from our field interviews, the voice interface has been developed to enable the first responder to focus on the immediate emergency. With less distractions, the first responder is able to engage the incident more effectively. The partial hands-free TruePAL chatbot assistant improves the accessibility to the correct guidance by an average of 1.9 seconds compared to the widely used application, NIH WISER, which requires full attention to operate. We combined this intelligent chatbot with a separate visual processing capability to produce hazardous signage analysis and generate the proper guidance for first responders. With the evolving functionality of AI tools, the use of virtual assistants in first responder technology will be an advancement, benefiting the safety of both first responders and civilians.

Chow, Edward↗

Method and apparatus for releasably connecting first and second objects

The apparatus and method are disclosed for releasably connecting first and second objects, where a magnetic end effector may include at least one elongated pin number, a proximal end of which is connected to the first object and the distal end of which may be inserted into a receiving portion in the second object. Latch members are carried by the pin member for radial movement between retracted and expanded positions for releasing and locking, respectively, first and second objects. A plunger member carried by the pin member is axially moveable between first and second positions. In the first plunger position, the latch members are located in the expanded (locked) position and in the second plunger position the latch members are released for movement to retracted or unlocked position. The magnetic end effector is provided for releasable attachment to the first object and for moving the plunger member to the second position, releasing the first object.

Monford, Leo G., Jr.↗

Experimental measurements and analytical analysis related to gas turbine heat transfer. Part 1: Time-averaged heat-flux and surface-pressure measurements on the vanes and blades of the SSME fuel-side turbine and comparison with prediction. Part 2: Phase-resolved surface-pressure and heat-flux measurements on the first blade of the SSME fuel-side turbine

Time averaged Stanton number and surface-pressure distributions are reported for the first-stage vane row, the first stage blade row, and the second stage vane row of the Rocketdyne Space Shuttle Main Engine two-stage fuel-side turbine. Unsteady pressure envelope measurements for the first blade are also reported. These measurements were made at 10 percent, 50 percent, and 90 percent span on both the pressure and suction surfaces of the first stage components. Additional Stanton number measurements were made on the first stage blade platform blade tip, and shroud, and at 50 percent span on the second vane. A shock tube was used as a short duration source of heated and pressurized air to which the turbine was subjected. Platinum thin-film heat flux gages were used to obtain the heat flux measurements, while miniature silicon-diaphragm flush-mounted pressure transducers were used to obtain the pressure measurements. The first stage vane Stanton number distributions are compared with predictions obtained using a version of STAN5 and a quasi-3D Navier-Stokes solution. This same quasi-3D N-S code was also used to obtain predictions for the first blade and the second vane.

Source record↗

First-order inflation

In the original proposal, inflation occurred in the process of a strongly first-order phase transition. This model was soon demonstrated to be fatally flawed. Subsequent models for inflation involved phase transitions that were second-order, or perhaps weakly first-order; some even involved no phase transition at all. Recently the possibility of inflation during a strongly first-order phase transition has been revived. In this talk I will discuss some models for first-order inflation, and emphasize unique signatures that result if inflation is realized in a first-order transition. Before discussing first-order inflation, I will briefly review some of the history of inflation to demonstrate how first-order inflation differs from other models.

Kolb, Edward W.↗

Ares I First Stage Propulsion System Status

With the retirement of the Space Shuttle inevitable, the US is faced with the need to loft a reliable cost-effective, technologically viable solution to bring the nation s fleet of spacecraft back up to industry standard. It must not only support the International Space Station (ISS), it must also be capable of supporting human exploration beyond low Earth orbit (LEO). NASA created the Constellation Program to develop a new fleet including the launch vehicles, the spacecraft, and the mission architecture to meet those objectives. The Ares First Stage Team is tasked with developing a propulsion system capable of safely, dependably and repeatedly lofting that new fleet. To minimize technical risks and development costs, the Solid Rocket Boosters (SRBs) of Shuttle were used as a starting point in the design and production of a new first stage element. While the first stage will provide the foundation, the structural backbone, power, and control for launch, the new propulsive element will also provide a greater total impulse to loft a safer, more powerful, fleet of space flight vehicles. Substantial design and system upgrades were required to meet the mass and trajectory requisites of the new fleet. Noteworthy innovations and design features include new forward structures, new propellant grain geometry, a new internal insulation system, and a state-of-the art avionics system. Additional advances were in materials and composite structures development, case bond liners, and thermal protection systems. Significant progress has been made in the design, development and testing of the propulsion and avionics systems for the new first stage element. Challenges, such as those anticipated with thrust oscillation, have been better characterized, and are being effectively mitigated. The test firing of the first development motor (DM-1) was a success that validated much of the engineering development to date. Substantive data has been collected and analyzed, allowing the Ares First Stage team to move forward, fine-tune the design, and advance to production of the second development motor (DM-2), which is now in fabrication. This paper will provide an overview of the design, development, challenges, and progress on the production of the new Ares First Stage propulsion system

Priskos, Alex S.↗

The First Flight Decision for New Human Spacecraft Vehicles - A General Approach

Determining when it is safe to fly a crew on a launch vehicle/spacecraft for the first time, especially when the test flight is a part of the overall system certification process, has long been a challenge for program decision makers. The decision on first flight is ultimately the judgment of the program and agency management in conjunction with the design and operations team. To aid in this decision process, a NASA team undertook the task to develop a generic framework for evaluating whether any given program or commercial provider has sufficiently complete and balanced plans in place to allow crewmembers to safely fly on human spaceflight systems for the first time. It was the team s goal to establish a generic framework that could easily be applied to any new system, although the system design and intended mission would require specific assessment. Historical data shows that there are multiple approaches that have been successful in first flight with crew. These approaches have always been tailored to the specific system design, mission objectives, and launch environment. Because specific approaches may vary significantly between different system designs and situations, prescriptive instructions or thorough checklists cannot be provided ahead of time. There are, however, certain general approaches that should be applied in thinking through the decision for first flight. This paper addresses some of the most important factors to consider when developing a new system or evaluating an existing system for whether or not it is safe to fly humans to/from space. In the simplest terms, it is time to fly crew for the first time when it is safe to do so and the benefit of the crewed flight is greater than the residual risk. This is rarely a straight-forward decision. The paper describes the need for experience, sound judgment, close involvement of the technical and management teams, and established decision processes. In addition, the underlying level of confidence the manager has in making the decision will also be discussed. By applying the outlined thought processes and approaches to a specific design, test program and mission objectives, a project team will be better able to focus the debate and discussion on critical areas for consideration and added scrutiny -- allowing decision makers to adequately address the first crewed flight decision.

Schaible, Dawn M.↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

First Cloud-to-Ground Lightning Timing Study

NASA's LSP, GSDO and other programs use the probability of cloud-to-ground (CG) lightning occurrence issued by the 45th Weather Squadron (45 WS) in their daily and weekly lightning probability forecasts. These organizations use this information when planning potentially hazardous outdoor activities, such as working with fuels, or rolling a vehicle to a launch pad, or whenever personnel will work outside and would be at-risk from lightning. These organizations would benefit greatly if the 45 WS could provide more accurate timing of the first CG lightning strike of the day. The Applied Meteorology Unit (AMU) has made significant improvements in forecasting the probability of lightning for the day, but forecasting the time of the first CG lightning with confidence has remained a challenge. To address this issue, the 45 WS requested the AMU to determine if flow regimes, wind speed categories, or a combination of the two could be used to forecast the timing of the first strike of the day in the Kennedy Space Center (KSC)/Cape Canaveral Air Force Station (CCAFS) lightning warning circles. The data was stratified by various sea breeze flow regimes and speed categories in the surface to 5,000-ft layer. The surface to 5,000-ft layer was selected since that is the layer the 45 WS uses to predict the behavior of sea breeze fronts, which are the dominant influence on the occurrence of first lightning in Florida during the warm season. Due to small data sample sizes after stratification, the AMU could not determine a statistical relationship between flow regimes or speed categories and the time of the first CG strike.. As expected, although the amount and timing of lightning activity varies by time of day based on the flow regimes and speed categories, there are extended tails of low lightning activity making it difficult to specify times when the threat of the first lightning flash can be avoided. However, the AMU developed a graphical user interface with input from the 45 WS that allows forecasters to visualize the climatological frequencies of the timing of the first lightning strike. This tool should contribute directly to the 45 WS goal of improving lightning timing capability for its NASA, US Air Force and commercial customers.

statistical analysis↗

Comparison of plasma start-up with high Z and low Z first wall in WEST

The choice of first wall material is of paramount importance for the plasma start-up conditions in ITER and future fusion power plants. In this context, the present work focuses on the correlations between first wall impurity sources and total radiated power during plasma start-up in the tungsten (W) Environment in Steady-state Tokamak (WEST). The objective is to highlight experimental indications for a preferable combination of start-up plasma scenario and first wall materials. Until 2019, WEST featured a full high Z first wall with all limiters exposing only W surfaces to the plasma. To study the impact of a low Z first wall in WEST, boron nitride tiles were installed in the central part of the inner and outer limiters in 2020. Although visible spectroscopy and bolometry measurements show respectively a strong weakening of the WI line intensity on the limiters and a reduction of radiated power after the changeover, a degradation occurs with the accumulation of plasma exposure. In addition, the different plasma facing elements of the main chamber do not influence equally the radiated power during start-up. In both high Z and low Z environments, a clear non-linear dependence is found between the start-up radiated power and the outer limiter W impurity source. Since W seems to be the main cause for core radiation, correlation between outer limiter W sources and other impurity sources are investigated. Finally, analysis of the legacy of B powder drops on a number of start-up plasmas suggests that it is less effective at reducing radiated power when the first wall is covered with W.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

CCAT-prime: Designs and status of the first light 280 GHz MKID array and mod-cam receiver

The CCAT-prime project's first light array will be deployed in Mod-Cam, a single-module testbed and first light cryostat, on the Fred Young Submillimeter Telescope (FYST) in Chile's high Atacama desert in late 2022. FYST is a six-meter aperture telescope being built on Cerro Chajnantor at an elevation of 5600 meters to observe at millimeter and submillimeter wavelengths. 1 Mod-Cam will pave the way for Prime-Cam, the primary first generation instrument, which will house up to seven instrument modules to simultaneously observe the sky and study a diverse set of science goals from monitoring protostars to probing distant galaxy clusters and characterizing the cosmic microwave background (CMB). At least one feedhorn-coupled array of microwave kinetic inductance detectors (MKIDs) centered on 280 GHz will be included in Mod-Cam at first light, with additional instrument modules to be deployed along with Prime-Cam in stages. The first 280 GHz detector array was fabricated by the Quantum Sensors Group at NIST in Boulder, CO and includes 3,456 polarization- sensitive MKIDs. Current mechanical designs allow for up to three hexagonal arrays to be placed in each single instrument module. We present details on this first light detector array, including mechanical designs and cold readout plans, as well as introducing Mod-Cam as both a testbed and predecessor to Prime-Cam.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Calculation of the First Moment of Energy Using D-T Reactivity Formalisms Under the Maxwell-Boltzmann Distribution (Pt. 1)

Nuclear fusion science is an example of a scientific field with a rich history of expert involvement and scientific publications, which together, form an expert-knowledge base. One example of this history is the utilization of published reaction rates from a variety of authors. Investigators for Deuterium-Tritium (D-T) ion fusion can choose from using frequently cited methods: the Bosch and Hale reactivity, thermonuclear reaction rates from Caughlan and Fowler, and the reactivity evaluation from Miley, Towner & Ivich which forms the basis of the Naval Research Lab (NRL) formulary. There are other choices available. Each of the reactivity formulations considered here, are based upon the Maxwell- Boltzmann velocity distribution for D-T fusion ion reactants. Numerical methods for computer codes simulating hot, energetic plasmas, include tabulations of the reactivity, and the first moment of energy. The purpose of this study is to answer the question: what is the first moment of energy, and how has it been formulated? This report is part of a series of reports by the authors on D-T fusion-reaction formalism. The present focus is on defining the mathematical relationship of the first moment of D-T fusion ion kinetic energy, $\langle$E$\rangle$, with the fusion crosssection, fusion reactivity and its derivative with respect to ion-temperature. Three variants of the first moment $\langle$E$\rangle$ are analytically developed and explored: 1) constant cross-section, 2) a normalized first moment, and 3) a particular function of the first moment. Much of the mathematical development is relegated to the Appendices, for a concise presentation of topics and results. A research component of this discussion is our comparison of some of the reactivity and its derivative results between evaluations (1) versus (2) and (3), which the authors have not found in any other publication to date. This investigation is useful for validation, verification (V&V) and uncertainty quantification (UQ) as it compares the work of several authors.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A study of first month space malfunctions

The study examines the first-month space performance of 57 Goddard Space Flight Center spacecraft. It is a sequel to a previous study of first-day space malfunctions of the same 57 spacecraft. A total of 154 malfunctions, of which 88 were classified as failures, have been summarized by year of occurrence, by major subsystem of a spacecraft, by type of defect, and by severity. Of the 57 spacecraft, 45 had one or more failures during the first month in space. However, the mission criticality data show that, of the 154 malfunctions, less than 10 percent would have resulted in major loss (50-100 percent) to the mission, and due to redundancy, only 5 percent did result in major loss to the mission. The data show that more than 50 percent of the first month's failures occurred in the first operational day in space. The data also show that, for the first month in space, the ratio of system-test failures to space failures for various devices ranged from 3 to 1 up to 10 to 1. For six spacecraft programs, the ratios of test to space failures ranged from 2 to 1 up to 8 to 1.

Timmins, A. R.↗

First-order inflation

In the original proposal, inflation occurred in the process of a strongly first-order phase transition. This model was soon demonstrated to be fatally flawed. Subsequent models for inflation involved phase transitions that were second-order, or perhaps weakly first-order; some even involved no phase transition at all. Recently the possibility of inflation during a strongly first-order phase transition has been revived. In this paper, some models for first-order inflation are discussed, and unique signatures that result if inflation is realized in a first-order transition are emphasized. Some of the history of inflation is reviewed to demonstrate how first-order inflation differs from other models.

Kolb, Edward W.↗

Ares I First Stage: Powering Exploration

he mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an in-line, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This presentation provides an overview and update on the design and development of the Ares I First Stage Propulsion system.

Tiller, Bruce K.↗

Ares I-X Overview - The First Chapter in the Next Great Adventure

Ares I-X is the first flight of NASA's new Constellation Program. Ares I-X is a development test flight to provide engineering data to inform the design of the Ares I prior to CDR. Ares I will replace the Space Shuttle which is scheduled for 2010 retirement . Ares I-X is an uncrewed, sub-orbital development flight test . Ares I-X will provide opportunity to test ground facilities and operations at NASA's Kennedy Space Center. Ares I-X is on track for May 2009 launch date. Objectives include: (1) Demonstrate control of a dynamically similar, integrated Ares I/Orion, using Ares I relevant ascent control algorithms; (2) Perform an in-flight separation/staging event between a Ares I-similar First Stage and a representative Upper Stage; (3) Demonstrate assembly and recovery of a new Ares I-like First Stage element at KSC; (4) Demonstrate First Stage separation sequencing, and quantify First Stage atmospheric entry dynamics, and parachute performance; and (5) Characterize magnitude of integrated vehicle roll torque throughout First Stage flight.

Leahy, Bart↗

Constellation's First Flight Test: Ares I-X

On October 28, 2009, NASA launched Ares I-X, the first flight test of the Constellation Program that will send human beings to the Moon and beyond. This successful test is the culmination of a three-and-a-half-year, multi-center effort to design, build, and fly the first demonstration vehicle of the Ares I crew launch vehicle, the successor vehicle to the Space Shuttle. The suborbital mission was designed to evaluate the atmospheric flight characteristics of a vehicle dynamically similar to Ares I; perform a first stage separation and evaluate its effects; characterize and control roll torque; stack, fly, and recover a solid-motor first stage testing the Ares I parachutes; characterize ground, flight, and reentry environments; and develop and execute new ground hardware and procedures. Built from existing flight and new simulator hardware, Ares I-X integrated a Shuttle-heritage four-segment solid rocket booster for first stage propulsion, a spacer segment to simulate a five-segment booster, Peacekeeper axial engines for roll control, and Atlas V avionics, as well as simulators for the upper stage, crew module, and launch abort system. The mission leveraged existing logistical and ground support equipment while also developing new ones to accommodate the first in-line rocket for flying astronauts since the Saturn IB last flew from Kennedy Space Center (KSC) in 1975. This paper will describe the development and integration of the various vehicle and ground elements, from conception to stacking in KSC s Vehicle Assembly Building; hardware performance prior to, during, and after the launch; and preliminary lessons and data gathered from the flight. While the Constellation Program is currently under review, Ares I-X has and will continue to provide vital lessons for NASA personnel in taking a vehicle concept from design to flight.

Davis, Stephan R.↗

Protecting Astronaut Health at First Entry into Vehicles Visiting the international Space Station: Insights from Whole-Module Offgas Testing

NASA has accumulated considerable experience in offgas testing of whole modules prior to their docking with the International Space Station (ISS). Since 1998, the Space Toxicology Office has performed offgas testing of the Lab module, both MPLM modules, US Airlock, Node 1, Node 2, Node 3, ATV1, HTV1, and three commercial vehicles. The goal of these tests is twofold: first, to protect the crew from adverse health effects of accumulated volatile pollutants when they first enter the module on orbit, and secondly, to determine the additional pollutant load that the ISS air revitalization systems must handle. In order to predict the amount of accumulated pollutants, the module is sealed for at least 1/5th the worst‐case time interval that could occur between the last clean air purge and final hatch closure on the ground and the crew's first entry on orbit. This time can range from a few days to a few months. Typically, triplicate samples are taken at pre‐planned times throughout the test. Samples are then analyzed by gas chromatography and mass spectrometry, and the rate of accumulation of pollutants is then extrapolated over time. The analytical values are indexed against 7‐day spacecraft maximum allowable concentrations (SMACs) to provide a prediction of the total toxicity value (T‐value) at the time of first entry. This T‐value and the toxicological effects of specific pollutants that contribute most to the overall toxicity are then used to guide first entry operations. Finally, results are compared to first entry samples collected on orbit to determine the predictive ability of the ground‐based offgas test.

Meyers, Valerie↗

NASA's Space Launch System: Momentum Builds Toward First Launch

NASA's Space Launch System (SLS) is gaining momentum toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. It will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017. Its first crewed flight follows in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. The SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015. In the NASA project life cycle process, SLS has completed 50 percent of its major milestones toward first flight. Every SLS element manufactured development hardware for testing over the past year. Accomplishments during 2013/2014 included manufacture of core stage test articles, preparations for qualification testing the solid rocket boosters and the RS-25 main engines, and shipment of the first flight hardware in preparation for the Exploration Flight Test-1 (EFT-1) in 2014. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd A.↗