Search NASA⌕ Search

SEARCH · Search NASA

Results for “formulation team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Colorado (Pueblo) Regional DAC Hub TA-1: Feasibility (Phase 0a) (Final Technical Report)

This project supports the U.S. Department of Energy's (DOE) mission to reduce the environmental and climate impacts of fossil fuels and industrial processes, contributing to the goal of achieving net-zero emissions across the U.S. economy. The primary objective is to conduct a feasibility study for a Regional Direct Air Capture (DAC) Hub in the Southern Colorado region, northeast of Pueblo. The geographic construct of this hub is based on the Denver-Julesburg Basin – a geological area where a significant number of geological storage studies have been conducted (See Figure 1). The project will leverage the work of Project Eos, a CarbonSAFE Phase III study led by the Colorado School of Mines and CarbonAmerica. The DAC Hub aims to capture, store, and/or utilize at least 1,000,000 tonnes of CO 2 from the atmosphere annually. To achieve this, the project team is designing a system with an initial capacity of 100,000 tonnes per year. This feasibility-stage project will formulate the Regional DAC Hub concept and team to conduct the relevant analysis, networking and community stakeholder engagement necessary to advance the project to the design stage.

42 ENGINEERING↗

Remote Concurrent Engineering: A-Team Studies in the Virtual World

NASA Jet Propulsion Laboratory’s (JPL’s)Architecture Team (A-Team) has nearly a decade of experiencein maturing early formulation mission and technology conceptsby combining innovative collaborative engineering methodswith cutting-edge subject matter expertise and advancedanalysis tools in an in-person environment. When COVID-19forced JPL’s workforce to work remotely in March 2020, ATeamhad to quickly pivot from an in-person collaborativeenvironment to a remote working environment.Through introspection, careful planning, and considerablepractice, A-Team was able to develop new operating proceduresto effectively continue early formulation studies in a virtualenvironment. A-Team has held over 57 remote studies in the 10months since the start of mandatory telework at JPL in March2020. In the remote setting, A-Team conducts studies in half-daysessions with clients and subject matter experts (SMEs) viavideoconferencing, shared computer screens, and digitalcollaborative tools.The key lesson is that increased staffing and planning is neededto prepare and successfully run remote A-Team studies. RemoteA-Team studies require careful selection of the appropriatetools for security, accessibility, and usability within theNASA/JPL environment. Knowledge capture methods andtemplates need to be thought out and agreed upon in advance asthere is less room for improvising in a remote format. Variouscommunication channels have to be monitored to allow for teamcoordination while maintaining fruitful participant engagementduring a session. In addition, technical backup for all roleswithin the A-Team have to be identified to allow the study tocontinue even if a team member’s connectivity is temporarilyinterrupted. Finally, careful thought has to be put into methodsand processes to create a collaborative environment in a virtualspace such that a group of experts who are only connected viathe internet can experience the creative spark and flow of a greatcollaborative and innovative study.

Zusack, Steven↗

Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team

Personnel representing several NASA field centers have formulated a "Reference Mission" addressing human exploration of Mars. This report summarizes their work and describes a plan for the first human missions to Mars, using approaches that are technically feasible, have reasonable risks, and have relatively low costs. The architecture for the Mars Reference Mission builds on previous work of the Synthesis Group (1991) and Zubrin's (1991) concepts for the use of propellants derived from the Martian Atmosphere. In defining the Reference Mission, choices have been made. In this report, the rationale for each choice is documented; however, unanticipated technology advances or political decisions might change the choices in the future.

Stephen J Hoffman↗

Exploring Mission Concepts with the JPL Innovation Foundry A-Team

The JPL Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts called the A-Team. The A-Team combines innovative collaborative methods with subject matter expertise and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an A-Team study. Methods are grouped by Concept Maturity Level (CML), from 1 through 3, including idea generation and capture (CML 1), initial feasibility assessment (CML 2), and trade space exploration (CML 3). Methods used for each CML are presented, and the key team roles are described from two points of view: innovative methods and technical expertise. A-Team roles for providing innovative methods include the facilitator, study lead, and assistant study lead. A-Team roles for providing technical expertise include the architect, lead systems engineer, and integration engineer. In addition to these key roles, each A-Team study is uniquely staffed to match the study topic and scope including subject matter experts, scientists, technologists, flight and instrument systems engineers, and program managers as needed. Advanced analysis and collaborative engineering tools (e.g. cost, science traceability, mission design, knowledge capture, study and analysis support infrastructure) are also under development for use in A-Team studies and will be discussed briefly. The A-Team facilities provide a constructive environment for innovative ideas from all aspects of mission formulation to eliminate isolated studies and come together early in the development cycle when they can provide the biggest impact. This paper provides an overview of the A-Team, its study processes, roles, methods, tools and facilities.

Team Eureka↗

Advancing the Science of Both Coastal Ocean Biophysics and Atmospheric Pollution Chemistry: A Final Report to the Nasa Earth Science Division by the GEO-CAPE Team

The 2007 Decadal Survey (DS) included the recommendation for the Geostationary Coastal and Air Pollution Events (GEO-CAPE) mission to launch in 2013–2016 to advance the science of both coastal ocean biophysics and atmospheric-pollution chemistry. In 2009 the NASA Earth Science Division (ESD) initiated study activities for GEO-CAPE and 8 other near- to medium-term missions to help determine the readiness of these conceptual missions to begin the formulation phase. In FY15 the GEO-CAPE mission study team completed a white paper summarizing the results of the pre-formulation work accomplished to date: https://geo-cape.larc.nasa.gov/pdf/GEO-CAPE_2009-2015_SummativeWhitePaper.pdf The team was directed to complete a final report in FY18. This document, prepared as an addendum to the FY15 white paper, serves as the GEO-CAPE final report and focuses only on FY16-18 activities and on summarizing the final state.

Geostationary Coastal and Air Pollution Events↗

Design, test, and applications of the Alaska SAR Facility

The key science requirements, the overall design, and the innovative testing approaches that have been used to ensure the functionality of the Alaska SAR Facility (ASF) are described. The facility is to play an important role in the remote sensing applications of Arctic oceanography, geology, glaciology, hydrology, and ecosystem processes. Attention is given to the ASF's three major components: the Receiving Ground Station, the SAR Processing System, and the Archive and Operations System. The ASF hardware configuration and software support, through extensive design and implementaton reviews, were shown to satisfy the initial memorandum of agreement first initiated by NASA for the establishment of a receiving ground station and image processing facility at the University of Alaska Fairbanks, and also to satisfy the science objectives formulated by the prelaunch Science Working team. The testing strategy and techniques used in the implementation of the ASF to assure functionality is outlined. The test structures, approach, and environment are considered.

Berwin, R. W.↗

Progress in Red vs. Green Propellant Operations: ASCENT Load Operations Lessons Learned

The Green Propellant Infusion Mission (GPIM) [1] is a NASA Space Technology Mission Directorate (STMD) effort to establish via demonstration ASCENT propellant (Advanced Space Craft Energetic Non-Toxic propellant, formerly referred to as AF-M315E) ground operations through on –orbit performance. ASCENT was developed by Air Force Research Laboratory (AFRL) as an increased energy density, reduced toxicity and reduced hazard monopropellant formulation relative to hydrazine. The GPIM team was led by Ball Aerospace and Technologies Corporation (BATC) as Program Management and Principal Investigator with AFRL, Aerojet-Rocketdyne (AR), the United States Space Force Space and Missile Systems Center (USSF/SMC), NASA Glenn Research Center (GRC), NASA Goddard Space Flight Center (GSFC), and NASA Kennedy Space Center (KSC) as Co-Investigators. The AFRL co-investigator role in the GPIM program was to develop the Propellant Ground Support Equipment (PGSE), associated Standard Operating Procedures (SOP) and Check Lists (CL), propellant load, propellant specification standard conventions and analysis methods, decontamination and waste disposal practices. This paper will discuss lessons learned in documentation, crew composition and readiness, equipment readiness, propellant readiness and potential improvements in the PGSE design.

Anthony P Zuttarelli↗

Molten Salt vs. Liquid Sodium Receiver Selection Using the Analytic Hierarchy Process

An international team led by NREL analyzed the favorability of two alternative liquid receiver designs for a 700+ degrees C receiver under the Gen3 CSP Liquid Pathway project. The competing liquid heat transfer fluids were a ternary chloride salt and liquid-metal sodium. The team applied a facilitated analytic hierarchy process to arrive at a recommended alternative and set a path forward for the project. The AHP criteria were formulated, weighted, and scored by the project leadership team and technical advisory committee consisting of energy industry and CSP experts. The six-month process culminated with a two-day workshop where the sodium alternative was deemed to have both a significantly higher benefit (19.3%) and a lower LCOE (11.4%), with only a slightly higher risk (~3%) than the salt alternative. Consequently, a sodium-receiver design was selected for the Liquid Pathway project, where it will be used to charge a two-tank chloride salt thermal energy storage system.

central receiver↗

Molten Salt vs. Liquid Sodium Receiver Selection Using the Analytic Hierarchy Process

An international team led by NREL analyzed the favorability of two alternative liquid receiver designs for a 700+ degrees C receiver under the Gen3 CSP Liquid Pathway project. The competing liquid heat transfer fluids were a ternary chloride salt and liquid-metal sodium. The team applied a facilitated analytic hierarchy process (AHP) to arrive at a recommended alternative and set a path forward for the project. The AHP criteria were formulated, weighted, and scored by the project leadership team and technical advisory committee consisting of energy industry and CSP experts. The six- month process culminated with a two-day workshop where the sodium alternative was deemed to have both a significantly higher benefit (19.3%) and a lower LCOE (11.4%), with only a slightly higher risk (~3%) than the salt alternative. Consequently, a sodium-receiver design was selected for the Liquid Pathway project, where it will be used to charge a two- tank chloride salt thermal energy storage system.

analytic hierarchy process↗

Molten Salt vs. Liquid Sodium Receiver Selection Using the Analytic Hierarchy Process: Preprint

An international team led by NREL analyzed the favorability of two alternative liquid receiver designs for a 700+ °C receiver under the Gen3 CSP Liquid Pathway project. The competing liquid heat transfer fluids were a ternary chloride salt and liquid-metal sodium. The team applied a facilitated analytic hierarchy process (AHP) to arrive at a recommended alternative and set a path forward for the project. The AHP criteria were formulated, weighted, and scored by the project leadership team and technical advisory committee consisting of energy industry and CSP experts. The six-month process culminated with a two-day workshop where the sodium alternative was deemed to have both a significantly higher benefit (19.3%) and a lower LCOE (11.4%), with only a slightly higher risk (~3%) than the salt alternative. Consequently, a sodium-receiver design was selected for the Liquid Pathway project, where it will be used to charge a two-tank chloride salt thermal energy storage system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Juno Mission Simulation

The Juno spacecraft is planned to launch in August of 2012 and would arrive at Jupiter four years later. The spacecraft would spend more than one year orbiting the planet and investigating the existence of an ice-rock core; determining the amount of global water and ammonia present in the atmosphere, studying convection and deep- wind profiles in the atmosphere; investigating the origin of the Jovian magnetic field, and exploring the polar magnetosphere. Juno mission management is responsible for mission and navigation design, mission operation planning, and ground-data-system development. In order to ensure successful mission management from initial checkout to final de-orbit, it is critical to share a common vision of the entire mission operation phases with the rest of the project teams. Two major challenges are 1) how to develop a shared vision that can be appreciated by all of the project teams of diverse disciplines and expertise, and 2) how to continuously evolve a shared vision as the project lifecycle progresses from formulation phase to operation phase. The Juno mission simulation team addresses these challenges by developing agile and progressive mission models, operation simulations, and real-time visualization products. This paper presents mission simulation visualization network (MSVN) technology that has enabled a comprehensive mission simulation suite (MSVN-Juno) for the Juno project.

space vehicles↗

Risk Management for Human Support Technology Development

NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

jones, Harry↗

Operability on the Europa Clipper Mission: Challenges and Opportunities

Flight and ground system operability has been a focus area on the Europa Clipper Project since early in its formulation phase. This has given the operations team the opportunity to influence the design, with a goal of increasing overall system operability. This paper presents example operability challenges, opportunities, and solutions arising from the pre-Critical Design Review (CDR) system design. The integrated wing assembly design directly couples a scientific instrument (the REASON sounding radar) to the spacecraft’s power source (solar array wing panels). Impacts to mission operations of this design include: increased slew durations; solar array pointing constraints during inner cruise, Europa flybys, and orbit trim maneuvers; and stray light intrusions into the stellar reference units’ keep out zones. The use of CCSDS File Delivery Protocol (CFDP) Class-2 for reliable downlink of the large volume of Europa Clipper science data is described, along with nominal and off-nominal use cases. The effort to improve post-launch spacecraft visibility by adding a third low-gain antenna to the spacecraft is detailed. The design of the bulk data store has necessitated the implementation of accountable data products (ADPs), accountability identifiers (AIDs), and metadata packets to provide end-to-end science data accountability. To streamline and automate the flight rules generation and checking process, a first order and temporal logic-based solution of expressing flight rules without ambiguity, and whose programmatic implementation can be automated, is proposed. The focus on operability has had a positive influence on Europa Clipper design decisions, although cost, schedule, budget, heritage, and other technical concerns have many times outweighed operability concerns. However, experience to date demonstrates that this approach to operability results in more thorough, balanced consideration of the effect of early design trades and decisions on the operations phase of a mission than seen in many previous missions, and provides operations development insight into prioritizing work to go.

Signorelli, Joel↗

Operability on the Europa Clipper Mission: Challenges and Opportunities

Flight and ground system operability has been a focus area on the Europa Clipper Project since early in its formulation phase. This has given the operations team the opportunity to influence the design, with a goal of increasing overall system operability. This paper presents example operability challenges, opportunities, and solutions arising from the Critical Design Review (CDR) system design. The integrated wing assembly design directly couples a scientific instrument (the REASON sounding radar) to the spacecraft’s power source (solar array wing panels). Impacts to mission operations of this design include: increased slew durations; solar array pointing constraints during inner cruise, Europa flybys, and orbit trim maneuvers; and stray light intrusions into the stellar reference units’ keep out zones. The use of CCSDS File Delivery Protocol (CFDP) Class-2 for reliable downlink of the large volume of Europa Clipper science data is described, along with nominal and off-nominal use cases. The effort to improve post-launch spacecraft visibility by adding a third low-gain antenna to the spacecraft is detailed. The design of the bulk data store has necessitated the implementation of accountable data products (ADPs), accountability identifiers (AIDs), and metadata packets to provide end-to-end science data accountability. To streamline and automate the flight rules generation and checking process, a first order and temporal logic-based solution of expressing flight rules without ambiguity, and whose programmatic implementation can be automated, is proposed. The focus on operability has had a positive influence on Europa Clipper design decisions, although cost, schedule, budget, heritage, and other technical concerns have many times outweighed operability concerns. However, experience to date demonstrates that this approach to operability results in more thorough, balanced consideration of the effect of early design trades and decisions on the operations phase of a mission than seen in many previous missions, and provides operations development insight into prioritizing work to go.

Kumar, Meghana↗

Atmospheric Risk Assessment for the Mars Science Laboratory Entry, Descent, and Landing System

In 2012, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems, by delivering the largest and most capable rover to date to the surface of Mars. As with previous Mars landers, atmospheric conditions during entry, descent, and landing directly impact the performance of MSL's EDL system. While the vehicle's novel guided entry system allows it to "fly out" a range of atmospheric uncertainties, its trajectory through the atmosphere creates a variety of atmospheric sensitivities not present on previous Mars entry systems and landers. Given the mission's stringent landing capability requirements, understanding the atmosphere state and spacecraft sensitivities takes on heightened importance. MSL's guided entry trajectory differs significantly from recent Mars landers and includes events that generate different atmospheric sensitivities than past missions. The existence of these sensitivities and general advancement in the state of Mars atmospheric knowledge has led the MSL team to employ new atmosphere modeling techniques in addition to past practices. A joint EDL engineering and Mars atmosphere science and modeling team has been created to identify the key system sensitivities, gather available atmospheric data sets, develop relevant atmosphere models, and formulate methods to integrate atmosphere information into EDL performance assessments. The team consists of EDL engineers, project science staff, and Mars atmospheric scientists from a variety of institutions. This paper provides an overview of the system performance sensitivities that have driven the atmosphere modeling approach, discusses the atmosphere data sets and models employed by the team as a result of the identified sensitivities, and introduces the tools used to translate atmospheric knowledge into quantitative EDL performance assessments.

EDL↗

NASA's Centennial Challenge for 3D-Printed Habitat: Phase II Outcomes and Phase III Competition Overview

The 3D-Printed Habitat Challenge is part of NASA's Centennial Challenges Program. NASA's Centennial Challenges seek to accelerate innovation in aerospace technology development through public competitions. The 3D-Printed Habitat Challenge, launched in 2015, is part of the Centennial Challenges portfolio and focuses on habitat design and development of large-scale additive construction systems capable of fabricating structures from in situ materials and/or mission recyclables. The challenge is a partnership between NASA, Caterpillar (primary sponsor), Bechtel, Brick and Mortar Ventures, and Bradley University. Phase I of the challenge was an architectural concept competition in which participants generated conceptual renderings of habitats on Mars which could be constructed using locally available resources. Phase II asked teams to develop the printing systems and material formulations needed to translate these designs into reality. Work under the phase II competition, which concluded in August 2017 with a head to head competition at Caterpillar's Edward Demonstration Facility in Peoria, Illinois, is discussed, including the key technology development outcomes resulting from this portion of the competition. The phase III competition consists of both virtual and construction subcompetitions. Virtual construction asks teams to render high fidelity architectural models of a habitat and all the accompanying information required for construction of the pressure retaining and load bearing portions of the structure. In construction phase III, teams are asked to scale up their printing systems to produce a 1/3 scale habitat on-site at Caterpillar. The levels of the phase III construction competition (which include printing of a foundation and printing and hydrostatic testing of a habitat element) are discussed. Phase III construction also has an increased focus on autonomy, as these systems are envisioned for robotic precursor missions which would buildup infrastructure prior to the arrival of crew. Results of the phase III competition through July 2017 (which includes virtual construction level 1) are discussed. This Centennial Challenge enables an assessment of the scaleability and efficacy of various processes, material systems, and designs for planetary construction. There are also near-term terrestrial applications, from disaster response to affordable housing and infrastructure refurbishment, for these technologies.

Prater, T. J.↗

Development of Low-Cost, High-Performance, Easy-To-Apply, Non-Flammable, Inorganic Phase Change Material (PCM) Technology (Project Final Report)

This report describes a 45-months long research program focused on the development of novel, easy-to-apply, non-flammable, and high-performance inorganic phase change materials (PCMs) for building and industrial applications. The University of Massachusetts Lowell (UML) formed a world-class team consisting of researchers form InsolCorp (only N. American manufacturer of inorganic PCM systems for building applications), and a group of industrial advisors, to develop a universal/multipurpose, simple-to-manufacture and cost-effective PCM technology. The project team expects that the results of this work will spur in the future the adoption of thermal storage materials – a key building energy saving technology as identified by DOE BTO – for a variety of building envelope applications. The main goal of this project was to demonstrate a suite of low-cost, multipurpose, and durable inorganic PCM formulations with phase transition temperatures encompassing typical building applications (between +5 o C and +55 o C). The first objective was to design, fabricate, and experimentally validate a performance of inexpensive, durable, highly efficient, non-flammable, and easy to manufacture PCMs. To allow a variety of building applications, the project team focused on formulations that exhibit repeatable phase transitions between +5 o C and +55 o C. To follow the DOE BTO cost efficiency target without compromising thermal performance, our work was based on inorganic compounds (mostly salt hydrates) and their blends, which represent a fraction of the cost of most of organic PCMs with about twice as high density as well as significantly higher thermal conductivity and phase change enthalpy. The second objective was to develop easy-to-manufacture and -install packaging/encapsulation designs that are 1) a superior barrier to current state-of-the-art macro-packaging, which significantly reduces the risk of loss of hydration water and PCM leak, and 2) optimal in enhancing the heat exchange rates with the surroundings and within the PCM core to ensure complete charging/discharging of the entire PCM within the product. Finally, the project’s intend was to scale-up the fabrication process to demonstrate installation on system-scale applications, and to validate the performance under field conditions. This work aimed at developing low-cost, high-energy storage, and reliable latent heat storage technology for building applications. This development was realized by formulating and integrating the following two technology components: 1) inorganic salt hydrate based PCMs that have high latent enthalpies and are low-cost and durable, and 2) PCM encapsulation (packaging) technology that maximizes PCM concentration and enhances heat transport characteristics in the product and with the external environment/materials. High thermal storage capacity, low cost and fire resistance are key to the building market entry for PCM technology. Therefore, the project’s focus was on salt-hydrate-based formulations which satisfy all these criteria. Packaging and/or encapsulation of PCM is a key processing step. The project team recognized that a low-cost and simple-to-manufacture salt hydrate-based PCM technology holds the best chance to be successful in the building construction market, a market which is traditionally extremely sensitive to cost and where commodity thermal insulations are the benchmark for envelope-related energy saving measures. That is why, in this project, the main intention was to minimize the production cost and maximize the product energy storage density without sacrificing the PCM performance. It was achieved through: 1. Minimizing the non-PCM components (plastics, additives, packaging/encapsulation materials, etc.) because they are significantly more expensive than salt hydrates, 2. Using highly thermally conductive and lightweight PCM carrier (packaging material) to facilitate more complete phase cycling, and 3. Optimizing the thickness and minimizing air spaces in product design (such as in pouched PCM). For this purpose, our approach was to enable an easy system design, including selection of the PCM operating temperatures, optimizing the necessary heat storage capacity (by stacking together several layers of PCM products), and if needed, a synchronized usage of PCM products of different temperatures. A specially designed, robust, highly thermally conducting and highly impermeable packaging (to retain salt hydrate water during phase transition cycles) was designed and tested to increase the overall system thermal performance and durability. All PCM products developed during this project were tested in both lab scale and in full scale field conditions. It is expected that, after further developments and commercialization, the developed PCM technologies may be also applied in space conditioning, energy storage technologies, and heat transfer applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗