Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Hardware test program for evaluation of baseline range-range rate sensor concept

The baseline range/range rate sensor concept was evaluated. The Interrupted CW (ICW) mode of operation continued with emphasis on establishing the sensitivity of the video portion of the receiver was 7 dB less than the theoretical value. This departs from test results of previous implementations in which achieved sensitivity was within 1.5 to 2 dB of the theoretical value. Several potential causes of this discrepancy in performance were identified and are scheduled for further investigation. Results indicate that a cost savings in both per unit and program costs are realizable by eliminating one of the modes of operation. An acquisition (total program) cost savings of approximately 10% is projected by eliminating the CW mode of operation. The modified R/R sensor would operate in the ICW mode only and would provide coverage from initial acquisition at 12 nmi to within a few hundred feet of the OMV. If the ICW mode only were selected, then an accompanying sensor would be required to provide coverage from a few hundred feet to docking.

Source record↗

Hardware test program for evaluation of baseline range/range rate sensor concept

The test program Phase II effort provides additional design information in terms of range and range rate (R/R) sensor performance when observing and tracking a typical spacecraft target. The target used in the test program was a one-third scale model of the Hubble Space Telescope (HST) available at the MSFC test site where the tests were performed. A modified Bendix millimeter wave radar served as the R/R sensor test bed for evaluation of range and range rate tracking performance, and generation of radar signature characteristics of the spacecraft target. A summary of program test results and conclusions are presented along with detailed description of the Bendix test bed radar with accompaning instrumentation. The MSFC test site and facilities are described. The test procedures used to establish background levels, and the calibration procedures used in the range accuracy tests and RCS (radar cross section) signature measurements, are presented and a condensed version of the daily log kept during the 5 September through 17 September test period is also presented. The test program results are given starting with the RCS signature measurements, then continuing with range measurement accuracy test results and finally the range and range rate tracking accuracy test results.

Pernic, E.↗

Space Hardware Test Effectiveness

A reassessment of the Assurance Processes regarding spacecraft is underway at JPL. Missions are more difficult, funding is constrained, and development guidelines are different. It is necessary to separate the nice-to-do tasks from the required tasks. We need to determine what we are doing, how well we are doing it, and what we should be doing. Tools to be used are reports of flight anomolies, reports of preflight test anomolies, evaluations of flight performance, and studies of the management of risk during development and performance stages and within programmatic realms.

product assurance risk management funding costs an↗

The Space Operations Simulation Center (SOSC) and Closed-Loop Hardware Testing for Orion Rendezvous System Design

The exploration goals of Orion / MPCV Project will require a mature Rendezvous, Proximity Operations and Docking (RPOD) capability. Ground testing autonomous docking with a next-generation sensor such as the Vision Navigation Sensor (VNS) is a critical step along the path of ensuring successful execution of autonomous RPOD for Orion. This paper will discuss the testing rationale, the test configuration, the test limitations and the results obtained from tests that have been performed at the Lockheed Martin Space Operations Simulation Center (SOSC) to evaluate and mature the Orion RPOD system. We will show that these tests have greatly increased the confidence in the maturity of the Orion RPOD design, reduced some of the latent risks and in doing so validated the design philosophy of the Orion RPOD system. This paper is organized as follows: first, the objectives of the test are given. Descriptions of the SOSC facility, and the Orion RPOD system and associated components follow. The details of the test configuration of the components in question are presented prior to discussing preliminary results of the tests. The paper concludes with closing comments.

Milenkovic, Zoran↗

Hardware Testing and Implementation of RapidIO Protocol on the ISAAC iBoard for Use in the NEXUS Testbed

I am assisting the NEXUS (NEXtbUS) and ISAAC (Instrument ShAred Artifact for Computing) teams in achieving a highly reusable, highly configurable FPGA (Field Programmable Gate Array) system which uses a unified, high-speed bus standard. One of my tasks is to verify that all new ISAAC iBoards features are functioning as expected by using my previous builds to test these features and resolving any errors found. My other task is to investigate and implement the RapidIO protocol and to implement it onto the new ISAAC iBoards to be used in the NEXUS testbed. Completing these tasks will demonstrate the potential of both NEXUS and ISAAC technology. This will allow others to see the power in making use of a unified, modular system.

RapidIO Protocol↗

Flight-Tested Hardware Options Currently Available to Support Fruit Fly Science Missions on ISS

The Fruit Fly Lab team at Ames Research Center has developed and flown several versions of hardware to ISS that have been utilized to conduct research using the model organism, Drosophila melanogaster. These sets of hardware vary in complexity and capabilities and can be matched to experiments based on specific aims objectives and considerations for cost, updownmass, and crew time requirements. The team has multiple investigators slated to utilize this hardware on near-term missions to ISS, and is expecting more from future calls for proposals.

Fruit Fly↗

GFM Inverter Hardware Testing

This presentence provides overview of NREL's testing capabilities and experience with advanced testing of multimegawatt grid-forming inverters.

GFM↗

Thermodynamic performance testing of the orbiter flash evaporator system

System level testing of the space shuttle orbiter's development flash evaporator system (FES) was performed in a thermal vacuum chamber capable of simulating ambient ascent, orbital, and entry temperature and pressure profiles. The test article included the evaporator assembly, high load and topping exhaust duct and nozzle assemblies, and feedwater supply assembly. Steady state and transient heat load, water pressure/temperature and ambient pressure/temperature profiles were imposed by especially designed supporting test hardware. Testing in 1978 verified evaporator and duct heater thermal design, determined FES performance boundaries, and assessed topping evaporator plume characteristics. Testing in 1979 combined the FES with the other systems in the orbiter active thermal control subsystem (ATCS). The FES met or exceeded all nominal and contingency performance requirements during operation with the integrated ATCS. During both tests stability problems were encountered during steady state operations which resulted in subsequent design changes to the water spray nozzle and valve plate assemblies.

Jaax, J. R.↗

In-flight rain damage tests of the shuttle thermal protection system

NASA conducted in-flight rain damage tests of the Shuttle thermal protection system (TPS). Most of the tests were conducted on an F-104 aircraft at the Dryden Flight Research Facility of NASA's Ames Research Center, although some tests were conducted by NOAA on a WP-3D aircraft off the eastern coast of southern Florida. The TPS components tested included LI900 and LI2200 tiles, advanced flexible reusable surface insulation, reinforced carbon-carbon, and an advanced tufi tile. The objective of the test was to define the damage threshold of various thermal protection materials during flight through rain. The test hardware, test technique, and results from both F-104 and WP-3D aircraft are described. Results have shown that damage can occur to the Shuttle TPS during flight in rain.

Meyer, Robert R., Jr.↗

Multiple Hollow Cathode Wear Testing

A hollow cathode-based plasma contactor has been baselined for use on the Space Station to reduce station charging. The plasma contactor provides a low impedance connection to space plasma via a plasma produced by an arc discharge. The hollow cathode of the plasma contactor is a refractory metal tube, through which xenon gas flows, which has a disk-shaped plate with a centered orifice at the downstream end of the tube. Within the cathode, arc attachment occurs primarily on a Type S low work function insert that is next to the orifice plate. This low work function insert is used to reduce cathode operating temperatures and energy requirements and, therefore, achieve increased efficiency and longevity. The operating characteristics and lifetime capabilities of this hollow cathode, however, are greatly reduced by oxygen bearing contaminants in the xenon gas. Furthermore, an optimized activation process, where the cathode is heated prior to ignition by an external heater to drive contaminants such as oxygen and moisture from the insert absorbed during exposure to ambient air, is necessary both for cathode longevity and a simplified power processor. In order to achieve the two year (approximately 17,500 hours) continuous operating lifetime requirement for the plasma contactor, a test program was initiated at NASA Lewis Research Center to demonstrate the extended lifetime capabilities of the hollow cathode. To date, xenon hollow cathodes have demonstrated extended lifetimes with one test having operated in excess of 8000 hours in an ongoing test utilizing contamination control protocols developed by Sarver-Verhey. The objectives of this study were to verify the transportability of the contamination control protocols developed by Sarver-Verhey and to evaluate cathode contamination control procedures, activation processes, and cathode-to-cathode dispersions in operating characteristics with time. These were accomplished by conducting a 2000 hour wear test of four hollow cathodes with different xenon gas purities and activation processes. The following will be presented: a description of the facility and test hardware, testing procedures and operating conditions, a discussion of test results, and conclusions.

Soulas, George C.↗

GOES Type III Loop Heat Pipe Life Test Results

The GOES Type III Loop Heat Pipe (LHP) was built as a life test unit for the loop heat pipes on the GOES N-Q series satellites. This propylene LHP was built by Dynatherm Corporation in 2000 and tested continuously for approximately 14 months. It was then put into storage for 3 years. Following the storage period, the LHP was tested at Swales Aerospace to verify that the loop performance hadn t changed. Most test results were consistent with earlier results. At the conclusion of testing at Swales, the LHP was transferred to NASA/GSFC for continued periodic testing. The LHP has been set up for testing in the Thermal Lab at GSFC since 2006. A group of tests consisting of start-ups, power cycles, and a heat transport limit test have been performed every six to nine months since March 2006. Tests results have shown no change in the loop performance over the five years of testing. This presentation will discuss the test hardware, test set-up, and tests performed. Test results to be presented include sample plots from individual tests, along with conductance measurements for all tests performed.

Ottenstein, Laura↗

Measurement of the UH-60A Hub Large Rotor Test Apparatus Control System Stiffness

This purpose of this report is to provides details of the measurement of the control system stiffness of the UH-60A rotor hub mounted on the Large Rotor Test Apparatus (UH-60A/LRTA). The UH-60A/LRTA was used in the 40- by 80-Foot Wind Tunnel to complete the full-scale wind tunnel test portion of the NASA / ARMY UH-60A Airloads Program. This report describes the LRTA control system and highlights the differences between the LRTA and UH-60A aircraft. The test hardware, test setup, and test procedures are also described. Sample results are shown, including the azimuthal variation of the measured control system stiffness for three different loadings and two different dynamic actuator settings. Finally, the azimuthal stiffness is converted to fixed system values using multi-blade transformations for input to comprehensive rotorcraft prediction codes.

Large Rotor Test Apparatus↗

Artemis Internal Science Team Update: Hardware and Integrated Testing

The Artemis program will reestablish human presence on the Moon and lead to a new era of scientific discovery and exploration. Led by the National Aeronautics and Space Administration (NASA), the Artemis program is a collaboration of space agencies and companies from around the world. In support of the Artemis program a cross disciplinary effort integrating science, engineering, operations, and human factors is currently being developed to identify methods, facilities, and field locations to test hardware, train astronauts, and evaluate concepts of operations. NASA’s Science Mission Directorate (SMD) and Exploration Systems Development Mission Directorate (ESDMD) established a comprehensive Science Team structure to support the Artemis program. This structure includes 1) an Artemis Internal Science Team (AIST), 2) a Geology Team (GT) with additional Participating Scientists (PS) roles, and 3) Payload Teams (PT) for the inclusion of scientific instruments. The GT, PS and PT will be competitively selected for each mission as part of NASA’s Research Opportunities in Space and Earth Sciences (ROSES) solicitations. The AIST provides multi-mission continuity and has been working closely with Artemis program elements to best integrate science into all aspects of planning and development. This abstract serves to provide an AIST update on science relevant hardware developments and integrated testing efforts that occurred in 2022.

Trevor George Graff↗

Exploration Extravehicular Mobility Unit (xEMU) Chamber B Thermal Vacuum “Suit 2” Pressure Garment System Hardware and Test Design

NASA’s Exploration Extravehicular Mobility Unit (xEMU) is the government reference next-generation space suit design and is engineered to protect astronauts from extreme lunar environmental temperatures. To evaluate the xEMU hardware thermal requirements, the xEMU Testing Team invented, designed, and executed a dual-suit, uncrewed thermal vacuum (TVAC) test at Johnson Space Center’s (JSC) Chamber B. This paper details the test hardware design and test methodology for the “Suit 2” Pressure Garment System (PGS) test article. The uncrewed “Suit 2” PGS test article consisted of a full PGS assembly with simulated Portable Life Support System (PLSS) functionality provided by test equipment, including a ventilation loop and two distinct thermal control loops. This paper will discuss in depth the test hardware design, including internal suit thermal boundary simulation, sensor quantity and placement, test support equipment rigs for gas flow, water flow, and power. Custom hardware designed to add additional penetrations to the suit or provide additional interfaces for sensors will also be discussed. This paper will also address the assembly and integration sequence for the test article. In addition to test hardware design, this paper will provide insights into the test methodology for this test article, including a discussion of thermal steady-state testing, simultaneous dual suit thermal vacuum testing, and hazard mitigation and controls.

xEMU↗

MSAP Hardware Verification: Testing Multi-Mission System Architecture Platform Hardware Using Simulation and Bench Test Equipment

The Multi-Mission System Architecture Platform (MSAP) project aims to develop a system of hardware and software that will provide the core functionality necessary in many JPL missions and can be tailored to accommodate mission-specific requirements. The MSAP flight hardware is being developed in the Verilog hardware description language, allowing developers to simulate their design before releasing it to a field programmable gate array (FPGA). FPGAs can be updated in a matter of minutes, drastically reducing the time and expense required to produce traditional application-specific integrated circuits. Bench test equipment connected to the FPGAs can then probe and run Tcl scripts on the hardware. The Verilog and Tcl code can be reused or modified with each design. These steps are effective in confirming that the design operates according specifications.

Crossin, Kent R.↗