Search NASA⌕ Search

SEARCH · Search NASA

Results for “high gradient”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

High Gradient Magnetic Simulation Final Report 2025

Over the course of nearly 2 years, the goal of this project has been to identify methods for the separation of uranium oxide particles from other geologic materials. The primary motivation is to assess methods for enhancing the extraction and throughput of actinide particles from environmental samples, enabling the evaluation of these trace actinides through more traditional methods such as thermal ionization mass spectrometry or secondary ion mass spectrometry.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Directional solidification at ultra-high thermal gradient

A high gradient controlled solidification (HGC) furnace was designed and operated at gradients up to 1800 C/cm to continuously produce aluminum alloys. Rubber '0' rings for the water cooling chamber were eliminated, while still maintaining water cooling directly onto the solidified metal. An HGC unit for high temperature ferrous alloys was also designed. Successful runs were made with cast iron, at thermal gradients up to 500 C/cm.

Flemings, M. C.↗

Comparing the Effectiveness of Low Temperature Bake in EP and BCP Cavities

Electropolishing (EP) and buffered chemical polishing (BCP) are conventional surface preparation techniques for superconducting radiofrequency (SRF) cavities. Both EP and BCP treated SRF cavities display high field Q-slope (HFQS) which degrades performance at high gradients. While high gradient performance in EP cavities can be improved by introducing oxygen via a low temperature bake (LTB) of 120^{°}C by 48 hours, LTB does not consistently remove HFQS in BCP cavities. There is no consensus as to why LTB is not effective on BCP prepared cavities. We examine quench in EP, BCP, EP+LTB, and BCP+LTB treated 1.3 GHz single-cell Nb cavities by studying the heating behavior with field using a temperature mapping system. Cavity performance is correlated to characterizations of surface impurity profile obtained via time of flight secondary ion mass spectrometry studies. We observe a difference in near surface hydrogen concentration following BCP compared to EP that may suggest that the causes of quench in EP and BCP cavities are different.

43 PARTICLE ACCELERATORS↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Towards the First High-Q Treatments for the FCC 800 MHz 5-Cell Elliptical Cavities

Development towards the various realizations of the FCC machine requires optimization of sub-GHz elliptical cavities for high-gradient and high-Q operation, both in pulsed and CW mode, for application in the booster and collider portions. Previous development work validated the proposed 800 MHz 5-cell elliptical RF design, showing reasonable performance after EP treatment. However, the stringent high-Q (3.8e+10) and high-gradient (24 MV/m) goals of the FCC machine cavities will require further development, relying on advanced surface processing techniques developed at 1.3 GHz, such as medium-temperature furnace baking. We describe the development and preparation of 1- and 5- cell 800 MHz cavities for the high-Q program. In parallel, we discuss the design progress and strategies for integrating the 800 MHz cavities into cryomodules to be implemented in both the booster and collider rings.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

High-thermal-gradient Superalloy Crystal Growth

Single, (001)-oriented crystals of PWA 1480 were processed in alumina/silica shell molds in a laboratory high gradient furnace. The furnace employs a graphite resistance heated element, a radiation baffle, and a water cooled radiation trap below the baffle. All crystals were grown in vacuum (10 torr) and all heat transfer was radiative. The element is constructed with a variable cross section that is tapered just above the baffle to maximize heat input and therefore thermal gradient. A maximum alloy temperature of 1600 C was used. A thermal gradient of 130 deg C/cm was recorded at 1370 C just above the solidus of the PWA 1480 alloys. Crystal bars with 14.4 and 17.5 mm diameters were grown in alumina/silica shell molds. Each crystal was started from a 1.6 mm pencil seed at a rate of 76 mm/hr and slowly accelerated to a rate of 200 mm/hr under computer control. Volume percent porosity and average pore size were measured as functions of distance in representative bars. Low cycle fatigue behavior and stress rupture properties were determined.

Pearson, D. D.↗

LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project

LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II.

43 PARTICLE ACCELERATORS↗

C$^3$ Demonstration Research and Development Plan

C$^3$ is an opportunity to realize an e$^+$e$^-$ collider for the study of the Higgs boson at $\sqrt{s} = 250$ GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C$^3$ is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C$^3$ is the main linac. This white paper presents the staged approach towards a facility to demonstrate C$^3$ technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The white paper also includes discussion on the approach for technology industrialization, related HEP R&D activities that are enabled by C$^3$ R&D, infrastructure requirements and siting options.

43 PARTICLE ACCELERATORS↗