Space transportation system and SPAS-01. Payload integration plan
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The human factors design process in developing a shuttle orbiter aft flight deck workstation testbed is described. In developing an operator workstation to control various laboratory telerobots, strong elements of human factors engineering and ergonomics are integrated into the design process. The integration of human factors is performed by incorporating user feedback at key stages in the project life-cycle. An operator centered design approach helps insure the system users are working with the system designer in the design and operation of the system. The design methodology is presented along with the results of the design and the solutions regarding human factors design principles.
The initial ground rules that guided the decision process during the initial stages of the XV-15 tiltrotor aircraft development are reviewed and reevaluated. A full flight-envelope nonlinear simulation mathematical model is outlined, along with the advantages of a multiaircraft program. Direct involvement of government engineers in all aspects of the program is considered to be beneficial, while the ejection-seat test requirement is not. Utilization of existing components - a rotor, transmissions, and engines - is analyzed, and emphasis is placed on integrated system test plans responsible for producing two reliable aircraft through a complete checkout of the aircraft subsystems before the start of the fligth program. Wind-tunnel and fatigue test requirements are presented, and the decision to go with an all mechanical control system design is addressed.
Automatic Photoelectric Telescopes (APT's) allow an astronomer to be removed form the telescope site in both time and space. APT's 'execute' an observation program (a set of observation requests) expressed in an ASCII-based language (ATIS) and collect observation results expressed in this same language. The observation program is currently constructed by a Principal Astronomer from the requests of multiple users; the execution is currently controlled by a simple heuristic dispatch scheduler. Research aimed at improving the use of APT's is being carried out by the Entropy Reduction Engine (ERE) project at NASA Ames. The overall goal of the ERE project is the study and construction of systems that integrate planning, scheduling, and control. This paper discusses the application of some ERE technical results to the improvement of both the scheduling and the operation of APT's.
The topics covered are presented in viewgraph form and include the following: the effect of the Mars environment on systems; the design of models and modeling tools; space environment interaction information dissemination; tools used in the development and validation of models; Space Exploration Initiative planning; and systems integration.
Managing ammonia is often a challenge in both drinking water and wastewater treatment facilities. Ammonia is unregulated in drinking water, but its presence may result in numerous water quality issues in the distribution system such as loss of residual disinfectant, nitrification, and corrosion. Ammonia concentrations need to be managed in wastewater effluent to sustain the health of receiving water bodies. Biological treatment involves the microbiological oxidation of ammonia to nitrate through a two‐step process. While nitrification is common in the environment, and nitrifying bacteria can grow rapidly on filtration media, appropriate conditions, such as the presence of dissolved oxygen and required nutrients, need to be established. This presentation will highlight results from two ongoing research programs - one at NASA's Johnson Space Center, and the other at a drinking water facility in California. Both programs are designed to demonstrate nitrification through biological treatment. The objective of NASA's research is to be able to recycle wastewater to potable water for spaceflight mission. To this end, a biological water processor (BWP) has been integrated with a forward osmosis secondary treatment system (FOST). Bacteria mineralize organic carbon to carbon dioxide as well as ammonia‐nitrogen present in the wastewater to nitrogen gas, through a combination of nitrification and denitrification. The effluent from the BWP system is low in organic contaminants, but high in total dissolved solids. The FOST system, integrated downstream of the BWP, removes dissolved solids through a combination of concentration‐driven forward osmosis and pressure driven reverse osmosis. The integrated system testing planned for this year is expected to produce water that requires only a polishing step to meet potable water requirements for spaceflight. The pilot study in California is being conducted on Golden State Water Company's Yukon wellsthat have hydrogen sulfide odor, color, total organic carbon, bromide, iron and manganese in addition to ammonia. A treatment evaluation, conducted in 2011, recommended the testing of biological oxidation filtration for the removal of ammonia and production of biologically stable water. A 8‐month pilot testing program was conducted to develop and optimize key design and operational variables. Steadystate operational data was collected to demonstrate long‐term performance and inform California Department of Public Health permitting of the full‐scale process. As ammonia continues to present challenges to water and wastewater systems, innovative strategies such as biological treatment can be applied to successfully manage it. This presentation will discuss application of cutting‐age research being conducted by NASA that will bridge existing information gaps, and benefit municipal utilities.
Managing ammonia is often a challenge in both drinking water and wastewater treatment facilities. Ammonia is unregulated in drinking water, but its presence may result in numerous water quality issues in the distribution system such as loss of residual disinfectant, nitrification, and corrosion. Ammonia concentrations need to be managed in wastewater effluent to sustain the health of receiving water bodies. Biological treatment involves the microbiological oxidation of ammonia to nitrate through a two‐step process. While nitrification is common in the environment, and nitrifying bacteria can grow rapidly on filtration media, appropriate conditions, such as the presence of dissolved oxygen and required nutrients, need to be established. This presentation will highlight results from two ongoing research programs - one at NASA's Johnson Space Center, and the other at a drinking water facility in California. Both programs are designed to demonstrate nitrification through biological treatment. The objective of NASA's research is to be able to recycle wastewater to potable water for spaceflight missions. To this end, a biological water processor (BWP) has been integrated with a forward osmosis secondary treatment system (FOST). Bacteria mineralize organic carbon to carbon dioxide as well as ammonia‐nitrogen present in the wastewater to nitrogen gas, through a combination of nitrification and denitrification. The effluent from the BWP system is low in organic contaminants, but high in total dissolved solids. The FOST system, integrated downstream of the BWP, removes dissolved solids through a combination of concentration‐driven forward osmosis and pressure driven reverse osmosis. The integrated system testing planned for this year is expected to produce water that requires only a polishing step to meet potable water requirements for spaceflight. The pilot study in California is being conducted on Golden State Water Company's Yukon wells that have hydrogen sulfide odor, color, total organic carbon, bromide, iron and manganese in addition to ammonia. A treatment evaluation, conducted in 2011, recommended the testing of biological oxidation filtration for the removal of ammonia and production of biologically stable water. An 8‐month pilot testing program was conducted to develop and optimize key design and operational variables. Steadystate operational data was collected to demonstrate long‐term performance and inform California Department of Public Health permitting of the full‐scale process. As ammonia continues to present challenges to water and wastewater systems, innovative strategies such as biological treatment can be applied to successfully manage it. This presentation will discuss application of cutting‐age research being conducted by NASA that will bridge existing information gaps, and benefit municipal utilities.
The key objectives of the NASA ASP are to: Improve mobility, capacity efficiency and access of the airspace system. Improve collaboration, predictability, and flexibility for the airspace users. Enable accurate modeling and simulation of air transportation systems. Accommodate operations of all classes of aircraft. Maintain system safety and environmental protection. In support of these program objectives, the major goal of the NextGen-SAIE Project is to enable the transition of key capacity and efficiency improvements to the NAS. Since many aspects of the NAS are unique to specific airport or airspace environments, demand on various parts of the NAS is not expected to increase equally as system demand grows. SAIE will provide systems level analysis of the NAS characteristics, constraints, and demands such that a suite of capacity-increasing concepts and technologies for system solutions are enabled and facilitated. The technical objectives in support of this goal are the following: Integration, evaluation, and transition of more mature concepts and technologies in an environment that faithfully emulates real-world complexities. Interoperability research and analysis of ASP technologies across ATM functions is performed to facilitate integration and take ASP concepts and technologies to higher Technology Readiness Level (TRL). Analyses are conducted on the program s concepts to identify the system benefits or impacts. System level analysis is conducted to increase understanding of the characteristics and constraints of airspace system and its domains.
System-level autonomy refers to autonomously meeting the crosscutting needs of a system through awareness and coordinated control spanning the system's breadth of capabilities. In contrast to function-level autonomy, which focuses on capabilities required to achieve a specific function such as surface navigation or image recognition, system-level autonomy addresses the needs to coordinate and manage activities and resources, and estimate the state, across subsystems. This paper describes demonstrations that were conducted on a spacecraft workstation testbed. The autonomy was provided by system-level planning and execution integrated with system-level estimators of orbit knowledge and spacecraft hardware health. These components are embedded in a system-level framework defining how goals are formed and executed, which elements exist, and how control authority is distributed among components. The planning and execution system at the heart of the framework has the capability to schedule, execute and monitor completion of tasks, as well as plan around unexpected events including new science opportunities and anomalies. The planning and scheduling system is the Multi-mission EXECutive (MEXEC), supported by the system-level health state estimator Model-Based Off-Nominal State Identification and Detection (MONSID), and Autonomous Navigation (AutoNav) algorithms, which determine the orbital system state based on optical observation of other targets. These components are applicable to many kinds of missions on different platforms. These demonstrations were elaborations of earlier experiments conducted on the ASTERIA (Arcsecond Space Telescope Enabling Research In Astrophysics) CubeSat, described in a companion submission [1]. The spacecraft’s extended mission served as an in-flight test platform, during which some individual autonomous capabilities were flown successfully. The autonomy experiments described here were performed on the ASTERIA workstation testbed.
The subject paper shows promise in leading to a useful system for integrating deliberative planning, plan repair, and execution control in a dynamic environment with real-time constraints. The conditions in which the system described would enable such integration seem to be ones that would apply to significant practical problems for an autonomous rover.
Explore the source record for details and available documents.
We describe a prototype Vehicle System Manager (VSM) for NASA’s Gateway, a human-capable spacecraft that will also be capable of autonomous operations. The VSM consists of an execution system, planner, and fault management system, integrated via an over-arching mission management compo- nent. We describe the VSM architecture and each of its com- ponents. We describe a series of use cases, centered on a spacecraft propulsive operation that can fail at different times, for different reasons, and how the VSM detects and responds to these failures. We show the VSM is capable of detecting faults and loss of capability, and subsequently replanning, in the presence of each failure scenario.
A prototype network planning model for the U.S. Air Traffic control system is described. The model encompasses the dual objectives of managing collision risks and transportation costs where traffic flows can be related to these objectives. The underlying structure is a network graph with nonseparable convex costs; the model is solved efficiently by capitalizing on its intrinsic characteristics. Two specialized algorithms for solving the resulting problems are described: (1) truncated Newton, and (2) simplicial decomposition. The feasibility of the approach is demonstrated using data collected from a control center in the Midwest. Computational results with different computer systems are presented, including a vector supercomputer (CRAY-XMP). The risk/cost model has two primary uses: (1) as a strategic planning tool using aggregate flight information, and (2) as an integrated operational system for forecasting congestion and monitoring (controlling) flow throughout the U.S. In the latter case, access to a supercomputer is required due to the model's enormous size.
Payloads for the Space Transportation System 560 flights, particularly the NASA payloads, are discussed. NASA payloads will make up approximately 50% of total payloads in these flights. Proposed Spacelab experiments are listed and discussed; plans for accommodating commercial user payloads are then outlined, including price schedules.
Experimental computer-aided system evolution to integrate technology plans and evaluate potential resource allocations for mission-oriented technology programs
The verification process and requirements for the ascent guidance interfaces and the ascent integrated guidance, navigation and control system for the space shuttle orbiter are defined as well as portions of supporting systems which directly interface with the system. The ascent phase of verification covers the normal and ATO ascent through the final OMS-2 circularization burn (all of OPS-1), the AOA ascent through the OMS-1 burn, and the RTLS ascent through ET separation (all of MM 601). In addition, OPS translation verification is defined. Verification trees and roadmaps are given.
The Integrated Discipline Requirements are presented, including the following needs: (1) quality data sets, (2) a systematic treatment of problems with present data, (3) a single integrated catalog or master directory, (4) continuity of data formats, (5) a standard geographic and time basis, (6) data delivery in terms of easy rather than immediate accessibility, (7) data archives, and (8) cooperation with user agencies.
Planning of assembly sequences is essential to the manufacturing system design process. Several methodologies have been proposed to represent all the feasible assembly sequences. In this thesis, three algorithms are presented to generate three sets of precedence relations based on all the infeasible assembly tasks, all the infeasible assembly states, and all the feasible assembly sequences, respectively. The equivalence of the resulting sets of precedence relations to the AND/OR graph is established. A new property, the real time property, of a representation of assembly sequences is defined and discussed. A representation of assembly sequences is said to have the real time property, if it is possible to generate the next assembly task by testing locally in the representation, and it will guarantee that the generated assembly task will not lead the assembly sequence to a dead end situation, in which no feasible assembly task can be performed any more. It is shown that the correctness and completeness of one representation can not guarantee the real time property of the representation. It is proven that the directed graph representation and the set of precedence relations based on all the infeasible assembly states have the real time property, while the AND/OR graph representation and the set of precedence relations based on all the infeasible assembly tasks do not have the real time property. Finally in the thesis, the PLEIDEAS system, a PLanning Environment for Integrated DEsign of Assembly Systems, is described and illustrated by an example.