Search NASA⌕ Search

SEARCH · Search NASA

Results for “interplanetary cruise”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The DAWN Project's Transition to Mission Operations: on Its Way to Rendezvous with (4) Vesta and (1) Ceres

Dawn launched on 27 September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The operations team conducted an extensive set of assessments of the engineering subsystems and science instruments during the first 80 days of the mission. A major objective of this period was to thrust for one week with the ion propulsion system to verify flight and ground systems readiness for typical interplanetary operations. Upon successful conclusion of the checkout phase, the interplanetary cruise phase began, most of which will be devoted to thrusting. The flexibility afforded by the use of ion propulsion enabled the project to accommodate a launch postponement of more than 3 months caused by a combination of launch vehicle and tracking system readiness, unfavorable weather, and then conflicts with other launches. Even with the shift in the launch date, all of the science objectives are retained with the same schedule and greater technical margins. This paper describes the conclusion of the development phase of the project, launch operations, and the progress of mission operations.

launch operations↗

Mars Science Laboratory Interplanetary Navigation Analysis

The Mars Science Laboratory (MSL) is a NASA rover mission that will be launched in late 2011 and will land on Mars in August of 2012. This paper describes the analyses performed to validate the navigation system for launch, interplanetary cruise, and approach. MSL will use guidance during its descent into Mars in order to minimize landing dispersions, and therefore will be able to use smaller landing zones that are closer to terrain of high scientific interest. This will require a more accurate delivery of the spacecraft to the atmospheric entry interface, and a late update of the state of the spacecraft at entry. During cruise and approach the spacecraft may perform up to six trajectory correction maneuvers (TCMs), to target to the desired landing site with the required flight path angle at entry. Approach orbit determination covariance analyses have been performed to evaluate the accuracy that can be achieved in delivering the spacecraft to the entry interface point, and to determine how accurately the state of the spacecraft can be predicted to initialize the guidance algorithm. In addition, a sensitivity analysis has been performed to evaluate which factors most contribute to the improvement or degradation of the navigation performance, for both entry flight path angle delivery and entry state knowledge.

orbit determination↗

Dawn Statistical Maneuver Design for Vesta Operations

In July of 2011 the Dawn spacecraft is scheduled to begin orbital operations at Vesta, a large main-belt asteroid. Dawn is a NASA Discovery mission that uses solar-electric low-thrust ion propulsion for both interplanetary cruise and orbital operations. Navigating between the Dawn project's four targeted science orbits at Vesta requires a plan that accounts for uncertainties not only in thrust execution, orbit determination, and other spacecraft forces, but also large uncertainties in characteristics of Vesta - such as the asteroid's gravity field and pole orientation. Accommodating these uncertainties requires strategic use of low-thrust maneuvers reserved for statistical trajectory corrections. This paper describes the placement and evaluation of low-thrust statistical maneuvers during two key phases of the Vesta mission along with a discussion of the tools, constraints, and methods used to plan those maneuvers.

Solar Electric Propulsion↗

Red Dragon: Low-cost Access to the Surface of Mars using Commercial Capabilities

We will discuss the feasibility of using a minimally-modified variant of a SpaceX Dragon capsule as a low-cost, large-capacity, near-term, Mars lander for scientific and human-precursor missions. We have been evaluating such a Red Dragon platform as an option for a Discovery Program mission concept. A Red Dragon lander has the potential to be low cost primarily because it would be derived from a routinely-flying spacecraft. Dragon is being developed to ferry cargo and crew to and from the International Space Station (ISS). The cargo variant is currently undergoing test flights, which will be followed by standard ISS cargo missions and, eventually, crewed flights. The human variant, unlike other Earth-return vehicles, appears to also have most of the capabilities necessary to land on Mars. In particular, it has a set of high-thrust, throttleable, storable bi-propellant Super- Draco engines integrated directly into the capsule which are intended for launch abort and powered landings on Earth. These thrusters suggest the possibility of a parachute-free, fully-propulsive deceleration at Mars from supersonic speeds to the surface. Concepts for large, human-relevant landers (see, e.g., [1]) also often employ supersonic retro-propulsion; Red Dragon's entry, descent, and landing approach would scale to those landers. Further, SpaceX's Falcon Heavy launch vehicle, currently under development and expected to have its first flight in 2013, will be capable of sending Dragon on a trajectory to Mars. We will discuss our motivation for exploring a Red Dragon lander, the primary technical questions which determine its feasibility, and the current results of our analysis. In particular, we will examine entry, descent, and landing (EDL) in detail. We will describe the modifications to Dragon necessary for interplanetary cruise, EDL, and operations on the Martian surface.

Karcz, John↗

Feasibility of a Dragon-Derived Mars Lander for Scientific and Human-Precursor Missions

A minimally-modified SpaceX Dragon capsule launched on a Falcon Heavy rocket presents the possibility of a new low-cost, high-capacity Mars lander for robotic missions. We have been evaluating such a "Red Dragon" platform as an option for the Icebreaker Discovery Program mission concept. Dragon is currently in service ferrying cargo to and from the International Space Station, and a crew transport version is in development. The upcoming version, unlike other Earth-return vehicles, exhibits most of the capabilities necessary to land on Mars. In particular, it has a set of high-thrust, throttleable, storable bi-propellant "SuperDraco" engines integrated directly into the capsule that are intended for launch abort and powered landings on Earth. These thrusters provide the possibility of a parachute-free, fully-propulsive deceleration at Mars from supersonic speeds to the surface, a descent approach which would also scale well to larger future human landers. We will discuss the motivations for exploring a Red Dragon lander, the current results of our analysis of its feasibility and capabilities, and the implications of the platform for the Icebreaker mission concept. In particular, we will examine entry, descent, and landing (EDL) in detail. We will also describe the modifications to Dragon necessary for interplanetary cruise, EDL, and operations on the Martian surface. Our analysis to date indicates that a Red Dragon lander is feasible and that it would be capable of delivering more than 1000 kg of payload to sites at elevations three kilometers below the Mars Orbiter Laser Altimeter (MOLA) reference, which includes sites throughout most of the northern plains and Hellas.

Karcz, John S.↗

Coordinated Microanalyses of Seven Particles of Probable Interstellar Origin from the Stardust Mission

Stardust, a NASA Discovery-class mission, was the first sample-return mission to return solid samples from beyond the Moon. Stardust was effectively two missions in one spacecraft: it returned the first materials from a known primitive solar system body, the Jupiter-family comet Wild 2; Stardust also returned a collector that was exposed to the contemporary interstellar dust stream for 200 days during the interplanetary cruise. Both collections present severe technical challenges in sample preparation and in analysis. By far the largest collection is the cometary one: approximately 300 micro g of material was returned from Wild 2, mostly consisting of approx. 1 ng particles embedded in aerogel or captured as residues in craters on aluminum foils. Because of their relatively large size, identification of the impacts of cometary particles in the collection media is straightforward. Reliable techniques have been developed for the extraction of these particles from aerogel. Coordinated analyses are also relatively straightforward, often beginning with synchrotron-based x-ray fluorescence (S-XRF), X-ray Absorption Near-Edge Spectoscopy (XANES) and x-ray diffraction (S-XRD) analyses of particles while still embedded in small extracted wedges of aerogel called ``keystones'', followed by ultramicrotomy and TEM, Scanning Transmission X-ray Microscopy (STXM) and ion microprobe analyses (e.g., Ogliore et al., 2010). Impacts in foils can be readily analyzed by SEM-EDX, and TEM analysis after FIB liftout sample preparation. In contrast, the interstellar dust collection is vastly more challenging. The sample size is approximately six orders of magnitude smaller in total mass. The largest particles are only a few pg in mass, of which there may be only approx.10 in the entire collection. The technical challenges, however, are matched by the scientific importance of the collection. We formed a consortium carry out the Stardust Interstellar Preliminary Examination (ISPE) to carry out an assessment of this collection, partly in order to characterize the collection in sufficient detail so that future investigators could make well-informed sample requests. The ISPE is the sixth PE on extraterrestrial collections carried out with NASA support. Some of the basic questions that we asked were: how many impacts are there in the collector, and what fraction of them have characteristics consistent with extraterrestrial materials? What is the elemental composition of the rock-forming elements? Is there crystalline material? Are there organics? Here we present coordinated microanalyses of particles captured in aerogel, using S-FTIR, S-XRF, STXM, S-XRD; and coordinated microanalyses of residues in aluminum foil, using SEMEDX, Auger spectroscopy, STEM, and ion microprobe. We discuss a novel approach that we employed for identification of tracks in aerogel, and new sample preparation techniques developed during the ISPE. We have identified seven particles - three in aerogel and four in foils - that are most consistent with an interstellar origin. The seven particles exhibit a large diversity in elemental composition. Dynamical evidence, supported supported by laboratory simulations of interstellar dust impacts in aerogel and foils, and numerical modeling of interstellar dust propagation in the heliosphere, suggests that at least some of the particles have high optical cross-section, perhaps due to an aggregate structure. However, the observations are most consistent with a variety of morphologies

Westphal, Andrew J.↗

Estimation and Modeling of Enceladus Plume Density Using Attitude Control Data Collected by the Cassini Spacecraft During Low-Altitude Enceladus Flybys

The Cassini spacecraft was launched on 15 October 1997. After an interplanetary cruise of almost seven years, it arrived at Saturn on June 30, 2004. Major science objectives of the Cassini mission include investigations of the configuration and dynamics of Saturn's magnetosphere, the structure and composition of the rings, the characterization of several of Saturn's icy satellites, and Titan's atmosphere constituent abundance

Enceladus↗

Estimation of Enceladus Plume Density Using Cassini Flight Data

The Cassini spacecraft was launched on October 15, 1997 by a Titan 4B launch vehicle. After an interplanetary cruise of almost seven years, it arrived at Saturn on June 30, 2004. In 2005, Cassini completed three flybys of Enceladus, a small, icy satellite of Saturn. Observations made during these flybys confirmed the existence of water vapor plumes in the south polar region of Enceladus. Five additional low-altitude flybys of Enceladus were successfully executed in 2008-9 to better characterize these watery plumes. During some of these Enceladus flybys, the spacecraft attitude was controlled by a set of three reaction wheels. When the disturbance torque imparted on the spacecraft was predicted to exceed the control authority of the reaction wheels, thrusters were used to control the spacecraft attitude. Using telemetry data of reaction wheel rates or thruster on-times collected from four low-altitude Enceladus flybys (in 2008-10), one can reconstruct the time histories of the Enceladus plume jet density. The 1 sigma uncertainty of the estimated density is 5.9-6.7% (depending on the density estimation methodology employed). These plume density estimates could be used to confirm measurements made by other onboard science instruments and to support the modeling of Enceladus plume jets.

Wang, Eric K.↗

Estimation and Modeling of Enceladus Plume Jet Density Using Reaction Wheel Control Data

The Cassini spacecraft was launched on October 15, 1997 by a Titan 4B launch vehicle. After an interplanetary cruise of almost seven years, it arrived at Saturn on June 30, 2004. In 2005, Cassini completed three flybys of Enceladus, a small, icy satellite of Saturn. Observations made during these flybys confirmed the existence of a water vapor plume in the south polar region of Enceladus. Five additional low-altitude flybys of Enceladus were successfully executed in 2008-9 to better characterize these watery plumes. The first of these flybys was the 50-km Enceladus-3 (E3) flyby executed on March 12, 2008. During the E3 flyby, the spacecraft attitude was controlled by a set of three reaction wheels. During the flyby, multiple plume jets imparted disturbance torque on the spacecraft resulting in small but visible attitude control errors. Using the known and unique transfer function between the disturbance torque and the attitude control error, the collected attitude control error telemetry could be used to estimate the disturbance torque. The effectiveness of this methodology is confirmed using the E3 telemetry data. Given good estimates of spacecraft's projected area, center of pressure location, and spacecraft velocity, the time history of the Enceladus plume density is reconstructed accordingly. The 1 sigma uncertainty of the estimated density is 7.7%. Next, we modeled the density due to each plume jet as a function of both the radial and angular distances of the spacecraft from the plume source. We also conjecture that the total plume density experienced by the spacecraft is the sum of the component plume densities. By comparing the time history of the reconstructed E3 plume density with that predicted by the plume model, values of the plume model parameters are determined. Results obtained are compared with those determined by other Cassini science instruments.

Lee, Allan Y.↗

Cassini Maneuver Experience: Ending the Equinox Mission

The Cassini-Huygens spacecraft was launched in 1997 on a mission to observe Saturn and its many moons. After a seven-year interplanetary cruise, it entered a Saturnian orbit for a four-year Prime Mission in 2004 and began a two-year Equinox Mission in 2008. It has been approved for another seven-year mission, the Solstice Mission, starting in October 2010. This paper highlights significant maneuver activities performed from July 2009 to June 2010. We present results for the 45 maneuvers during this time. The successful navigation of the Cassini orbiter can be attributed in part to the accurate maneuver performance, which has greatly exceeded pre-launch expectations.

Ballard, Christopher G.↗

Estimation and Modeling of Enceladus Plume Jet Density Using Reaction Wheel Control Data

The Cassini spacecraft was launched on October 15, 1997 by a Titan 4B launch vehicle. After an interplanetary cruise of almost seven years, it arrived at Saturn on June 30, 2004. In 2005, Cassini completed three flybys of Enceladus, a small, icy satellite of Saturn. Observations made during these flybys confirmed the existence of a water vapor plume in the south polar region of Enceladus. Five additional low-altitude flybys of Enceladus were successfully executed in 2008-9 to better characterize these watery plumes. The first of these flybys was the 50-km Enceladus-3 (E3) flyby executed on March 12, 2008. During the E3 flyby, the spacecraft attitude was controlled by a set of three reaction wheels. During the flyby, multiple plume jets imparted disturbance torque on the spacecraft resulting in small but visible attitude control errors. Using the known and unique transfer function between the disturbance torque and the attitude control error, the collected attitude control error telemetry could be used to estimate the disturbance torque. The effectiveness of this methodology is confirmed using the E3 telemetry data. Given good estimates of spacecraft's projected area, center of pressure location, and spacecraft velocity, the time history of the Enceladus plume density is reconstructed accordingly. The 1-sigma uncertainty of the estimated density is 7.7%. Next, we modeled the density due to each plume jet as a function of both the radial and angular distances of the spacecraft from the plume source. We also conjecture that the total plume density experienced by the spacecraft is the sum of the component plume densities. By comparing the time history of the reconstructed E3 plume density with that predicted by the plume model, values of the plume model parameters are determined. Results obtained are compared with those determined by other Cassini science instruments.

Lee, Allan Y.↗

Telecommunications Relay Support of the Mars Phoenix Lander Mission

The Phoenix Lander, first of NASA's Mars Scout missions, arrived at the Red Planet on May 25, 2008. From the moment the lander separated from its interplanetary cruise stage shortly before entry, the spacecraft could no longer communicate directly with Earth, and was instead entirely dependent on UHF relay communications via an international network of orbiting Mars spacecraft, including NASA's 2001 Mars Odyssey (ODY) and Mars Reconnaissance Orbiter (MRO) spacecraft, as well as ESA's Mars Express (MEX) spacecraft. All three orbiters captured critical event telemetry and/or tracking data during Phoenix Entry, Descent and Landing. During the Phoenix surface mission, ODY and MRO provided command and telemetry services, far surpassing the original data return requirements. The availability of MEX as a backup relay asset enhanced the robustness of the surface relay plan. In addition to telecommunications services, Doppler tracking observables acquired on the UHF link yielded an accurate position for the Phoenix landing site.

Edwards, Charles D., Jr.↗

The Second Year of Dawn Mission Operations: Mars Gravity Assist and Onward to Vesta

Dawn launched in September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The mission is enabled by an ion propulsion system, which will be operated for the majority of the interplanetary cruise. Following 10.5 months of thrusting that concluded in October 2008, the spacecraft began a period of optimal coast that ended in June 2009. A Mars gravity assist in February 2009 provided an effective deltav of 2.6 km/s. The mission flexibility afforded by the use of ion propulsion provided relatively simple targeting at Mars. Additional engineering activities were conducted during the coast period after Mars, including loading new software into the spacecraft's central computer. This paper describe the progress of the mission, including the approach to Mars, the encounter itself, special activities conducted prior to the resumption of ion thrusting, and the continuation toward Vesta.

Rayman, Marc D.↗

Mars Reconnaissance Orbiter Aerobraking Navigation Operation

After a seven-month interplanetary cruise, the Mars Reconnaissance Orbiter arrived at Mars and executed a 1.0 km/s Mars Orbit Insertion (MOI) maneuver. The post-MOI orbit was highly elliptical with a 35 hour, 428 km x 45000 km altitude orbit. To establish a useful science orbit, the navigation team used an aerobraking technique to guide the spacecraft into a 2-hour, 255 km x 320 km altitude orbit. This paper details the aerobraking navigation operation strategy and flight results. It also describes the aerobraking key requirements and navigation challenges.

Long, Stacia M.↗

Pointing Stability Performance of the Cassini Spacecraft

Twelve scientific instruments onboard the Cassini spacecraft depend on the accurate pointing capabilities of the spacecraft to return data critical to the success of the mission and to improving our understanding of Saturn. Throughout the seven year interplanetary cruise to Saturn and the four year prime mission, the control of the Cassini spacecraft is achieved by employing either the Reaction Control System (RCS) composed of a set of eight thrusters or the Reaction Wheel Assembly (RWA) made up of four reaction wheels, only three of which are active at a given time. The operations of Cassini imaging instruments (such as the Narrow Angle Camera) require a high level of spacecraft pointing stability in order to minimize the distortion and smearing of the image during the exposure time. In designing the Cassini attitude control system, a pointing stability performance metric that considered the frequency contents of the disturbance sources was employed. The flight performance of the Cassini pointing stability, achieved with a set of three reaction wheels or RCS thrusters, is summarized in this paper.

Lee, Allan Y.↗

Preparing for Dawn's Mission at Ceres: Challenges and Opportunities in the Exploration of a Dwarf Planet

After escaping from Vesta in 2012, Dawn is continuing its 2.5-year flight to dwarf planet Ceres. Investigating this second destination promises to provide a view of an intriguing world of ice and rock, likely displaying fascinating geology entirely unlike any body yet orbited by a spacecraft. Dawn spends the significant majority of the time thrusting with its ion propulsion system to deliver the 3.6 km/s required to rendezvous with Ceres. Meanwhile, the operations team has developed the sequences that will be used there. Following orbit capture in March 2015, Dawn will fly to a series of four circular polar science orbits. The orbits, ranging from about 13,500 km to 375 km in altitude, are designed to optimize the scientific observations. The overall strategy for exploring Ceres is based strongly on the extremely successful 16 months of Vesta operations, during which Dawn met or exceeded all of its objectives. Nevertheless, the loss of two of the spacecraft's four reaction wheels has necessitated some important changes. Based on a very productive hydrazine conservation campaign in the interplanetary cruise and the development of new hydrazine-efficient methods of operating at Ceres, there is good reason to expect that Dawn will be able to accomplish all of its objectives regardless of the health of the reaction wheels. This paper describes the progress in traveling to Ceres as well as the plans for exploring this giant, icy world.

Vesta↗

A Novel Multi-Spacecraft Interplanetary Global Trajectory Optimization Transcription

As the frontier of space exploration continues to advance, so does the design complexity of future interplanetary missions. One avenue of this increasing complexity includes a class of designs known as ``Distributed Spacecraft Missions"; missions where multiple spacecraft coordinate to perform shared objectives. Current approaches for the global trajectory optimization of these Multi-Vehicle Missions (MVMs) are prone to shortcomings including laborious iterative design, considerable human-in-the-loop effort, treatment of the multi-vehicle problem as multiple separate trajectory optimization subproblems (resulting in suboptimal solutions where the whole is less than the sum of its parts), and poor handling of coordination objectives and constraints. There are only a handful of software platforms in existence capable of fully-automated, rapid, interplanetary mission and systems global optimization including the Parallel Global Multiobjective Optimizer (PaGMO), the Gravity Assisted Low-thrust Local Optimization Program (GALLOP), and the Evolutionary Mission Trajectory Generator (EMTG). However, none of these tools is capable of performing such tasks for MVM designs. The work outlined in this paper lays the groundwork for a technique to begin addressing these shortcomings. We present a fully-automated technique which frames interplanetary MVMs as Multi-Objective, Multi-Agent Hybrid Optimal Control Problems (MOMA HOCP). First, the basic functionality of this technique is validated on the single-vehicle problem of reproducing the Cassini interplanetary cruise.

Napier, Sean W.↗

Design Lessons Learned from Temperature Management of Galileo's Retro-Propulsion Module

Launched in 1989, the Galileo mission added dramatically to our understanding of the Jovian system and our entire solar system1. To make best use of limited resources, the Galileo Orbiter used excess power from its Radioisotope Thermoelectric Generators (RTGs) for temperature management of its Retro-Propulsion Module (RPM). This paper describes operational challenges introduced by this design and how, despite major mission changes through development and flight, they were overcome through a challenging six-year interplanetary cruise to Jupiter. This case study offers lessons for missions planning to couple critical spacecraft subsystems in unconventional ways.

Gounley, Robert↗