Search NASA⌕ Search

SEARCH · Search NASA

Results for “james webb space telescope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

An Automated SVD for Alignment and Control of James Webb Space Telescope Mirrors

The James Webb Space Telescope (JWST) is a three-mirror anastigmatic telescope. The alignment of the segmented primary and secondary mirrors in the wavefront sensing and control process involves a series of actuators to control the six degrees-of-freedom motion on each surface in addition to the radius of curvature. The control matrix developed from the alignment parameters is over-determined and singular value decomposition (SVD) method is used to solve it in the least square sense. An automated SVD scheme has been developed to identify the most contributing modes in a typical alignment process and reduce the impact of error-prone modes from the control process.

Shiri, Sharam↗

The James Webb Space Telescope Mission

The James Webb Space Telescope (JWST) is a large aperture, cryogenic, infrared-optimized space observatory under development by NASA for launch in 2014. The European and Canadian Space Agencies are mission partners. JWST will find and study the first galaxies that formed in the early universe, peer through dusty clouds to see AGN environments and stars forming planetary systems at high spatial resolution. The breakthrough capabilities of JWST will enable new studies of star formation and evolution in the Milky Way, including the Galactic Center, nearby galaxies, and the early universe. JWST's instruments are designed to work primarily in the infrared range of 1 - 28 microns, with some capability in the visible. JWST will have a segmented primary mirror, approximately 6.5 meters in diameter, and will be diffraction-limited at wavelength of 2 microns (0.1 arcsec resolution). The JWST observatory will be placed in a L2 orbit by an Ariane 5 launch vehicle provided by ESA. The observatory is designed for a 5-year prime science mission, with propellant for 10 years of science operations. The instruments will provide broad- and narrow-band imaging, coronography, and multi-object and integral-field spectroscopy (spectral resolution of 100 to 3,000) across the 1 - 28 micron wavelength range. Science and mission operations will be conducted from the Space Telescope Science Institute in Baltimore, Maryland.

Sonneborn, George↗

Overview of the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is a cryogenic, 6.5 meter diameter space telescope. JWST has a unique architecture, compared to previous space telescopes, that is driven by its science requirements, ia passively cooled cryogenic design, and the need to stow the observatory for launch. JWST's large, segmented mirror meets the requirement for high angular resolution in the infrared coupled with a significant increase in collecting area compared to the Spitzer and Hubble Space telescopes in order to detect the first galaxies. JWST's unique five-layer sunshield allows the telescope and instrument module to passively cool to cryogenic temperatures. JWST will be launched on an Ariane 5, and so both its telescope optics, and the sunshield have to be stowed in order to fit the Ariane 5 fairing. Following launch the sunshield and telescope optics must be deployed, and the primary mirror phased for science operations. In this presentation we will review the design of the observatory and highlight recent progress in the construction of the JWST observatory. In particular, we address recent progress with the telescope optics, sunshield and spacecraft. We will discuss predicted observatory performance in terms of the scientific goals of JWST and address key operational considerations that might bear upon frontier science observations.

Clampin, Mark↗

The James Webb Space Telescope (JWST)

The James Webb Space Telescope (JWST) is a large aperture, cryogenic, infrared-optimized space observatory under construction by NASA for launch later this decade. The European and Canadian Space Agencies are mission partners. JWST will find and study the first galaxies that formed in the early universe and peer through dusty clouds to see star and planet formation at high spatial resolution. The breakthrough capabilities of JWST will enable new studies of star formation and evolution in the Milky Way, including the Galactic Center, nearby galaxies, and the early universe. JWST will have a segmented primary mirror, approximately 6.5 meters in diameter, and will be diffraction-limited at 2 microns. The JWST observatory will be placed in a L2 orbit by an Ariane 5 launch vehicle provided by ESA. The observatory is designed for a 5- year prime science mission, with consumables for 10 years of science operations.

Sonneborn, George↗

Status Update on the James Webb Space Telescope Project

The James Webb Space Telescope (JWST) is a large (6.6 m), cold (<50 K), infrared (IR)-optimized space observatory that will be launched in approx.2018. The observatory will have four instruments covering 0.6 to 28 micron, including a multi-object spectrograph, two integral fie ld units, and grisms optimized for exoplanets. I will review JWST's k ey science themes, as well as exciting new ideas from the recent JWST Frontiers Workshop. I will summarize the technical progress and miss ion status. Recent highlights: All mirrors have been fabricated, polished, and gold-coated; the mirror is expected to be diffraction-limite d down to a wavelength of 2 micron. The MIRI instrument just complete d its cryogenic testing. STScI has released exposure time calculators and sensitivity charts to enable scientists to start thinking about how to use JWST for their science.

Rigby, Jane R.↗

Overview of the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is a large aperture, space telescope designed to provide imaging and spectroscopy from 1.0 micron to 28 microns. JWST will be launched to an orbit at L2 aboard an Ariane 5 launcher in 2013. The Goddard Space Flight Center (GSFC) is the lead center for the JWST program and manages the project for NASA. The prime contractor for JWST is Northrop Grumman Aerospace Systems (NGST). JWST is an international partnership with the European Space Agency (ESA), and the Canadian Space Agency (CSA). ESA will contribute the Ariane 5 launch, and a multi-object infrared spectrograph. CSA will contribute the Fine Guidance Sensor (FGS), which includes the Tunable Filter Imager (TFI). The European consortium, in collaboration with the Jet Propulsion Laboratory (JPL), builds the mid-infrared imager (MIRI). In this paper we present an overview of the JWST science program, and discuss recent progress in the development of the observatory.

Clampin, Mark↗

Status Update on the James Webb Space Telescope Project

The James Webb Space Telescope (JWST) is a large (6.6 m), cold <50 K), infrared (IR)-optimized space observatory that will be launched in approx.2018. The observatory will have four instruments covering 0.6 to 28 micron, including a multi-object spectrograph, two integral field units, and grisms optimized for exoplanets. I will review JWST's key science themes, as well as exciting new ideas from the recent JWST Frontiers Workshop. I will summarize the technical progress and mission status. Recent highlights: All mirrors have been fabricated, polished, and gold-coated; the mirror is expected to be diffraction-limited down to a wavelength of 2 microns. The MIRI instrument just completed its cryogenic testing. STScI has released exposure time calculators and sensitivity charts to enable scientists to start thinking about how to use JWST for their science.

Rigby, Jane R.↗

Overview and Status of the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments spanning the wavelength range of 0.6 microns to 28 microns. JWST's primary science goals are to detect and characterize the first galaxies, study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. JWST has a unique design based on the concept of passive cooling by means of a multi-layer sunshield to achieve the telescope's cryogenic operating temperature. Each of the five layers of the sunshield is approximately the size of a tennis court, and made of aluminized kapton. By maintaining an observatory attitude whereby the sunshield keeps the telescope in the shade from the sun's rays, the telescope and science instruments can operate at cryogenic temperature (-40 K). On the sun facing side of the observatory the spacecraft bus houses most of the electronic sub-systems, and provides a platform for the solar array and communications hardware. JWST is sufficiently large that it cannot fit inside .the fairing of its Ariane 5 launcher without being stowed in a more compact configuration, so the ability to deploy its major SUb-systems such as the telescope optics and sunshield after launch are another major feature of the observatory. Development of observatory is making rapid progress as major hardware SUb-systems nearcompletion. Polishing of the JWST telescope mirrors is complete with 18 primary mirror segments, the secondary mirror, tertiary and fine steering mirror all gold coated and through acceptance testing. Engineering test articles of each sunshield membrane layer are underway. The first layer 3 membrane is complete and is undergoing testing to evaluate its tensioned shape for compliance with alignment tolerances. As each major SUb-system is tested, the expected scientific performance of the observatory can be evaluated using test results and integrated system models of the observatory. We will discuss key performance parameters of the observatory, including thermal performance, image quality, sensitivity, and the ability to achieve background-limited observations. The observatory deployment after launch will also be discussed in the context of recent sub-system testing of deployment mechanisms.

Clampin, Mark↗

Cryogenic Photogrammetry and Radiometry for the James Webb Space Telescope Microshutters

The James Webb Space Telescope (JWST) relies on several innovations to complete its five year mission. One vital technology is microshutters, the programmable field selectors that enable the Near Infrared Spectrometer (NIRSpec) to perform multi-object spectroscopy. Mission success depends on acquiring spectra from large numbers of galaxies by positioning shutter slits over faint targets. Precise selection of faint targets requires field selectors that are both high in contrast and stable in position. We have developed test facilities to evaluate microshutter contrast and alignment stability at their 35K operating temperature. These facilities used a novel application of image registration algorithms to obtain non-contact, sub-micron measurements in cryogenic conditions. The cryogenic motion of the shutters was successfully characterized. Optical results also demonstrated that shutter contrast far exceeds the NIRSpec requirements. Our test program has concluded with the delivery of a flight-qualified field selection subsystem to the NIRSpec bench.

Chambers, Victor J.↗

Solar Radiation Pressure Effects on the Orbital Motion at SEL2 for the James Webb Space Telescope

Due to James Webb Space Telescope’s large sunshield, which will always be facing the Sun to protect the observatory’s instruments, Solar Radiation Pressure (SRP) has an important effect on its orbital motion around SEL2. Moreover, SRP is highly dependent on the observatory’s attitude with respect to the Sun observatory line. This paper explores the impact of SRP for different attitude profiles on the size of a reference orbit.

Libration Point Orbit↗

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS↗

Status of the James Webb Space Telescope Mission

The James Webb Space Telescope ( Webb) is the largest space telescope realized to-date, with a 6.5 m segmented primary mirror that must be folded to fit within its Ariane 5 launcher fairing. This infrared telescope is passively cooled using a five-layer sunshield that will keep the optical telescope and its four science instruments in the shade throughout the lifetime of the mission in an L2 orbit. Webb's science instruments include near- and mid­ infrared imagers and spectrometers that cover the spectral range from 0.6-28.5 µm. The Webb mission has a long history with numerous first of its kind technology developments, ground support equipment innovations, and algorithmic characterization advances. This conference proceeding summarizes the technical progress over the past two years, from the Spacecraft Element environmental testing to the Observatory integration and testing, and the final Observatory test plans leading up to launch, on-orbit commissioning, and science operations.

Michael W McElwain↗

Progress in the Fabrication and Testing of Telescope Mirrors for the James Webb Space Telescope

The telescope of the James Webb Space Telescope (JWST) is an f/20, three mirror anastigmat design, passively cooled (40K) in an L2 orbit. The design provides diffraction limited performance (Strehl > or = 0.8) at .=2 m. To fit within the launch vehicle envelope (Arianne V), the 6.6 meter primary mirror and the secondary mirror support structure are folded for launch, then deployed and aligned in space. The primary mirror is composed of 18 individual, 1.3 meter (flat flat) hexagonal segments, each adjustable in seven degrees of freedom (six rigid body + radius of curvature) provided by a set of high precision actuators. The actuated secondary mirror (approx.0.74m) is similarly positioned in six degrees of rigid body motion. The approx..70x.51m, fixed tertiary and approx. 0.17m, flat fine steering mirror complete the telescope mirror complement. The telescope is supported by a composite structure optimized for performance at cryogenic temperatures. All telescope mirrors are made of Be with substantial light-weighting (21 kg for each 1.3M primary segment). Additional Be mounting and supporting structure for the high precision (approx.10nm steps) actuators are attached to the primary segments and secondary mirror. All mirrors undergo a process of thermal stabilization to reduce stress. An extensive series of interferometric measurements guide each step of the polishing process. Final polishing must account for any deformation between the ambient temperature of polishing and the cryogenic, operational temperature. This is accomplished by producing highly precise, cryo deformation target maps of each surface which are incorporated into the final polishing cycle. All flight mirrors have now completed polishing, coating with protected Au and final cryo testing, and the telescope is on track to meet all system requirements. We here review the measured performance of the component mirrors and the predicted performance of the flight telescope.

Bowers, Charles↗

Use of a Pathfinder Optical Telescope Element for James Webb Space Telescope Risk Mitigation

A Pathfmder of the James Webb Space Telescope (JWST) Optical Telescope Element is being developed to check out critical ground support equipment and to rehearse integration and testing procedures. This paper provides a summary of the baseline Pathfmder configuration and architecture, objectives of this effort, limitations of Pathfinder, status of its development, and future plans. Special attention is paid to risks that will be mitigated by Pathfmder.

Feinberg, Lee D.↗

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope, launch, contamination,↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope↗

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗