Search NASA⌕ Search

SEARCH · Search NASA

Results for “large office building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Photographic Mitigation Documentation Related to the Engine Assembly and Disassembly Facility, Area 25, Nevada National Security Site, Nye County, Nevada

This letter report provides documentation in partial fulfillment of the mitigation of adverse effects to the Engine Maintenance Assembly and Disassembly (E-MAD) facility, a major component of the Nuclear Rocket Development Station (NRDS) Historic District located in Area 25 of the Nevada National Security Site (NNSS). Construction of the E-MAD facility began in 1962 for the purpose of disassembling and maintaining nuclear-powered rocket engines. Once the building was complete in 1967, the E-MAD facility remained in continuous operation until the nuclear rocket program was terminated in 1973. The mothballed facility was repurposed in 1977 for spent nuclear fuel handling and packaging activities. By the mid-1980s, all activities at the E-MAD facility had ceased (Reno et al. 2019). This submission is intended to comply with Stipulation III.D.1 of the Memorandum of Agreement DE-GM58-20NA25534 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Corrective Action Activities and Demolition of the Engine Maintenance Assembly and Disassembly Facility and the Test Cell C Historic District, Major Components of the Nuclear Rocket Development Station Historic District Located in Area 25 at the Nevada National Security Site Nye County (hereafter referred to as the MOA). Stipulation III.D.1 states the U.S. Department of Energy (DOE) will submit the existing supplementary collection of the large-format, black-and-white photographic prints taken during the 1996 Historic American Engineering Record (HAER) documentation of the E-MAD facility to the Nuclear Testing Archive (NTA), located on the second floor of the Rogers Building at Desert Research Institute (DRI) in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

Application of a Prize Mechanism to Address Data Utilization Challenges at Utilities

The electric industry sector is facing an “explosion” of data from a variety of sources. Electric sector stakeholders need to define how to capitalize on large datasets, both those they create and those from other sources (like data on weather, buildings, electric vehicles, etc.), to improve reliability and resilience and meet the changing system dynamics from renewable integration. For the electricity sector to fully utilize these vast new datasets, it must undergo a transformation in how it manages data quality, storage, and processing. The U.S. Department of Energy (DOE) Office of Electricity (OE) is committed to accelerating research, development, and demonstration of new technologies and tools within the electricity sector to advance reliability, resilience, and affordable operation of the power system. Through the prize mechanism, OE identified two widespread data-related challenges for utilities—load modeling and data analysis automation—and offered an opportunity for utilities and teams of software engineers to identify additional challenges faced by utilities. After completing one round of the American-Made Digitizing Utilities Prize, OE, the National Renewable Energy Laboratory (NREL) as the prize administrator, and Pacific Northwest National Laboratory (PNNL) as the domain experts have compiled the results and lessons learned to feed into the second round of the prize.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Historical Review of the Safe Transport of Spent Nuclear Fuel

This report meets the requirements of M3 milestone M3SF-21OR020302066 for the Office of Integrated Waste Management (IWM) and is a revision to M3 milestone M3FT-16OR090402028 for the former Nuclear Fuels Storage and Transportation Planning Project (NFST), “Safety Record of SNF Shipments.” The US Department of Energy (DOE) has since established the IWM, which builds on the work begun by NFST, to develop an integrated waste management system for spent nuclear fuel (SNF), including the development of a large-scale transportation system for the safe transport of SNF to storage or disposal facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WPTO Comprehensive References [Poster]

Protecting hydroelectric plants from incidents that adversely impact their cyber-physical systems presents unique challenges due to the plants’ widely dispersed geographic locations and varied configurations as well as the relative nascent nature of the cyberattacks targeting these facilities. To help hydroelectric plants better respond to and mitigate cybersecurity incidents, this Department of Energy Water Power Technologies Office Cyber Comprehensive Reference list is to be used at a hydroelectric plant to quickly go to appropriate sources during the response and recovery of a cyber incident. In addition to this product, there are three other products meant to be distributed to a hydroelectric plant to assist in their cyber incident response and recovery. The first, a report on the processes of building a R&R flip book based on a large set of existing guidance. The second, a handy flip book meant to be distributed to hydroelectric plants to assist them during a cybersecurity incident occurring on a hydroelectic plant. And the third is a correlated alignment of the steps an hydroelectric plant operator would take for both a cyber incident as well as an emergency response process if the event rises to a cyber incident affecting the safe and reliable operations of a hydroelectric plant.

13 HYDRO ENERGY↗

High Energy Physics Network Requirements Review (Final Report, July-October 2020)

Throughout 2020, ESnet and the Office of High Energy Physics (HEP) of the DOE SC organized an ESnet requirements review of HEP-supported activities. Preparation for this event included identification of key stakeholders: program and facility management, research groups, technology providers, and a number of external observers. These individuals were asked to prepare formal case study documents about their relationship to the HEP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward. A series of pre-planning meetings better prepared case study authors for this task, along with guidance on how the review would proceed in a virtual fashion.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Added Value for Integrated Marine Energy Data Systems (February 2021)

Launched in 2019, the Portal and Repository for Information on Marine Renewable Energy (PRIMRE) provides centralized access, standardization, community building, and integration of United States (U.S.) databases, tools and codes, and other resources that cover a range of marine energy information. The PRIMRE universe contains a series of Knowledge Hubs that represent data and information on testing of marine energy devices (MHKDR); environmental effects (Tethys); engineering and technical papers (Tethys Engineering); descriptions of marine energy companies and technologies (Marine Energy Projects Database); codes and models (Marine Energy Software); and guidance on testing and measurements (Telesto). Content is added to PRIMRE by applying a set of Guidelines and Best Practices (PRIMRE Guidelines). An aggregate search across the PRIMRE site enables users to find data and information from all the PRIMRE Knowledge Hubs simultaneously, using a single entry-point (PRIMRE Search). In addition to providing access to a range of data and information on marine energy development, testing, and effects, PRIMRE allows for the development of valueadded products and processes that will help move the marine energy industry forward. The PRIMRE team has recently launched two key initiatives in the U.S.-Signature Projects and Lessons Learned. Outputs and outcomes from these two initiatives will be highlighted in this paper. The Signature Projects initiative is intended to bring focus to a selection of ongoing and completed marine energy projects funded by the U.S. Department of Energy's Water Power Technologies Office (WPTO), and to inform the marine energy community of what investigations have been undertaken, what tools are available, and where gaps in information persist. Each Signature Project tags papers, reports, and data from large marine energy research projects, providing easy access and attention to all the output and associated products from each project. The Lessons Learned initiative is intended to ensure that hard-won achievements are recognized and available for those who come later, that missteps and unfortunate outcomes can be prevented in future, and that efficiencies and effective shortcuts can be publicized and used as the marine energy industry moves forward. This initiative builds off the Knowledge Hubs and reaches out to members of the marine energy community, particularly technology developers and researchers, to integrate experience in the development, deployment, assessment, success, challenges while creating this new industry and field of study.

data sharing↗

Putting Our Industry's Data to Work: A Case Study of Large-Scale Data Aggregation: Preprint

With increasing deployment of Advanced Metering Infrastructure (AMI), Building Automation System (BAS) controls, Internet of Things (IoT) network devices, and data-driven evaluation, measurement, and verification studies, the building sector is currently generating a staggering amount of energy-related data. In the right hands, these data sets can contribute to increased comfort and energy savings for building occupants and a more reliable electrical grid; however, due to a combination of factors, including significant privacy concerns, much of the data that are presently generated and stored are not used outside of basic operational applications. In the past year, our team has dedicated over 2,000 person-hours to accessing building energy data for a project funded by the U.S. Department of Energy (DOE) Building Technologies Office. We sought whole-building or end-use (e.g., lighting) timeseries data at the individual-building or equipment level where possible or aggregated information, such as timeseries averages and quartiles by building type (e.g., office, retail, hospital), where sharing individual building information was not an option. We are additionally working with IoT and BAS data sets to derive information important to the project. We have assembled an extensive data set that will enable the development of publicly available end-use load profiles to benefit the U.S. building and electricity industries. Here we present an overview of the data set that we have assembled to date, the motivators and approaches that got us here, and the lessons we learned through our efforts. We also discuss work underway that presents additional options for future data access.

building energy data↗

Added value for integrated marine energy data systems

Launched in 2019, the Portal and Repository for Information on Marine Renewable Energy (PRIMRE) provides centralized access, standardization, community building, and integration of United States (U.S.) databases, tools and codes, and other resources that cover a range of marine energy information. The PRIMRE universe contains a series of Knowledge Hubs that represent data and information on testing of marine energy devices (MHKDR); environmental effects (Tethys); engineering and technical papers (Tethys Engineering); descriptions of marine energy companies and technologies (Marine Energy Projects Database); codes and models (Marine Energy Software); and guidance on testing and measurements (Telesto). Content is added to PRIMRE by applying a set of Guidelines and Best Practices (PRIMRE Guidelines). An aggregate search across the PRIMRE site enables users to find data and information from all the PRIMRE Knowledge Hubs simultaneously, using a single entry-point (PRIMRE Search). In addition to providing access to a range of data and information on marine energy development, testing, and effects, PRIMRE allows for the development of value added products and processes that will help move the marine energy industry forward. The PRIMRE team has recently launched two key initiatives in the U.S.—Signature Projects and Lessons Learned. Outputs and outcomes from these two initiatives will be highlighted in this paper. The Signature Projects initiative is intended to bring focus to a selection of ongoing and completed marine energy projects funded by the U.S. Department of Energy’s Water Power Technologies Office (WPTO), and to inform the marine energy community of what investigations have been undertaken, what tools are available, and where gaps in information persist. Each Signature Project tags papers, reports, and data from large marine energy research projects, providing easy access and attention to all the output and associated products from each project. The Lessons Learned initiative is intended to ensure that hard-won achievements are recognized and available for those who come later, that missteps and unfortunate outcomes can be prevented in future, and that efficiencies and effective shortcuts can be publicized and used as the marine energy industry moves forward. This initiative builds off the Knowledge Hubs and reaches out to members of the marine energy community, particularly technology developers and researchers, to integrate experience in the development, deployment, assessment, success, and challenges while creating this new industry and field of study.

Copping, Andrea E.↗

Added value for integrated marine energy data systems

Launched in 2019, the Portal and Repository for Information on Marine Renewable Energy (PRIMRE) provides centralized access, standardization, community building, and integration of United States (U.S.) databases, tools and codes, and other resources that cover a range of marine energy information. The PRIMRE universe contains a series of Knowledge Hubs that represent data and information on testing of marine energy devices (MHKDR); environmental effects (Tethys); engineering and technical papers (Tethys Engineering); descriptions of marine energy companies and technologies (Marine Energy Projects Database); codes and models (Marine Energy Software); and guidance on testing and measurements (Telesto). Content is added to PRIMRE by applying a set of Guidelines and Best Practices (PRIMRE Guidelines). An aggregate search across the PRIMRE site enables users to find data and information from all the PRIMRE Knowledge Hubs simultaneously, using a single entry-point (PRIMRE Search). In addition to providing access to a range of data and information on marine energy development, testing, and effects, PRIMRE allows for the development of value added products and processes that will help move the marine energy industry forward. The PRIMRE team has recently launched two key initiatives in the U.S.—Signature Projects and Lessons Learned. Outputs and outcomes from these two initiatives will be highlighted in this paper. The Signature Projects initiative is intended to bring focus to a selection of ongoing and completed marine energy projects funded by the U.S. Department of Energy’s Water Power Technologies Office (WPTO), and to inform the marine energy community of what investigations have been undertaken, what tools are available, and where gaps in information persist. Each Signature Project tags papers, reports, and data from large marine energy research projects, providing easy access and attention to all the output and associated products from each project. The Lessons Learned initiative is intended to ensure that hard-won achievements are recognized and available for those who come later, that missteps and unfortunate outcomes can be prevented in future, and that efficiencies and effective shortcuts can be publicized and used as the marine energy industry moves forward. This initiative builds off the Knowledge Hubs and reaches out to members of the marine energy community, particularly technology developers and researchers, to integrate experience in the development, deployment, assessment, success, and challenges while creating this new industry and field of study.

Copping, Andrea E.↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of WELL certification on occupant satisfaction and perceived health, well-being, and productivity: A multi-office pre- versus post-occupancy evaluation

The WELL Building Standard (WELL) is currently one of the most comprehensive building certification programs that aim to enhance the health and well-being of building occupants. However, there is a lack of systematic evaluation of the effectiveness of WELL in achieving its goal. This study investigates the impact of WELL certification on occupant satisfaction with the workplace and occupant perceived health, well-being, and productivity. More than 1300 pre- and post-occupancy survey responses provided by the nearly same cohort of occupants from six companies in North America were quantitatively analyzed. The results showed that transitioning to WELL certified offices from non-WELL certified offices had a positive impact on occupant satisfaction with the workplace and occupant perceived health, well-being, and productivity, with increases in means from pre-to post-occupancy being highly statistically significant. The majority of the studied occupant satisfaction parameters as well as occupant perceived mental health had large effect sizes. While they improved from pre-to post-occupancy, the analysis revealed small effect sizes for occupant perceived physical health and self-assessed productivity. The majority of the effect sizes for the perceived well-being parameters were large and medium. In addition to analyzing the survey responses in aggregate, the responses were examined at the individual company level to confirm the by-company and aggregate findings aligned.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Factors Influencing Building Demand Flexibility

The U.S. Department of Energy’s National Roadmap for Grid-interactive Efficient Buildings (GEB) acknowledged that building demand flexibility (DF) is both an important strategy to decarbonizing the buildings sector and an important resource for meeting the changing needs of the electrical grid such as improving grid reliability. However, understanding the complexity and uncertainties in real building field performance of DF strategies is a large gap hindering stakeholders on both grid and buildings side to make investments on deploying such strategies. The research work in this report intended to advance understanding of the variability and influential factors in building demand flexibility. Adding such knowledge based on lab testing results and measured performance data from real buildings is an important contribution. The report uses standardized metrics and methods to quantify DF performance from field-measured DF datasets of two significant building groups of big-box retail and medium office buildings to present the challenge of building DF variability in multiple dimensions. The report presents findings related to how several key factors influence building demand flexibility from implementing a common, cost-effective DF control strategy (i.e., adjusting zone temperatures). The findings are supported by full-scale lab testing, field data analysis and simulation research. The authors also provided application-oriented recommendations to stakeholders such as building aggregators, utility program design professionals, sophisticated building portfolio owners, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity Lessons Learned from Vehicle to Grid Engagement

As the transportation industry continues to become electrified, introduction of additional digital devices within associated actions such as recharging bring additional potential for cybersecurity attacks. Devices that are designed, implemented, and operated with cybersecurity as a crucial consideration exacerbate these concerns by failing to provide strict boundaries on access to and use of the equipment. Emerging use cases such as Vehicle to Grid (V2G) charging may expand the potential physical effects of a cybersecurity attack by providing indirect access to electrical components of a building microgrid or portions of the larger power grid. This paper serves as an overview of findings and recommendations based on cybersecurity testing performed at a V2G implementation site operated by a member of the Memorandum of Understanding (MOU) to Establish the Vehicle-to-Everything (V2X) Collaboration [1]. The Department of Energy Office of Cybersecurity, Energy Security, and Emergency Response is a signatory of the MOU, and has funded this research paper and associated body of work regarding V2X cybersecurity. Sandia has a large background of previous research focused on Electric Vehicle (EV) cybersecurity, such as reference [2], which includes an overall survey of EV infrastructure cybersecurity and recommendations based on those findings. This report seeks to expand knowledge of EV cybersecurity status and needs by focusing on a specific implementation of V2G charging, and providing recommendations based on the relevant findings. This report serves as a publicly available, sanitized description of applied vulnerability testing on an operational V2G implementation. A more in-depth technical version of the report is provided to the MOU partner, but not available at the time of writing due to inclusion of proprietary information. V2G charging comes with many research problems that must be solved before the technology can securely implemented in sites with unrestricted public access or where cybersecurity attacks could have increased consequences, such as government offices. V2G charging requires many stakeholders such as end users, host sites, equipment vendors, and integrators, which all rely on operational safety and security as well as security and trustworthiness of any associated financial transactions.

33 ADVANCED PROPULSION SYSTEMS↗

Mitigation for roof alterations to building 06-cp-65 at the area 6 control point, nevada national security site, nye county, nevada

Building 06-CP-65 has been determined to be a contributing element to the Area 6 Control Point Historic District (O’Neill et al. 2021; Reed 2022). It contributes to the significance of the historic district under Criterion A as one of the principal buildings that supported timing and firing operations for nuclear testing on the NNSS from 1966 to 1992. As such, the building served as a major warehouse with office space within the district. It was used by both REECo, a long-time general contractor at the NNSS, as well as EG&G, which provided technical support to the national laboratories and the DOD. The building served as an important staging area and electrical power supply point for the NNSS diagnostic trailer fleet and its unique location immediately along Mercury Highway allowed easy accessibility to the forward areas of the NNSS. The building also contributes to the historic district under Criterion C as it is one of the large, unadorned, precast concrete buildings at the Control Point. These types of buildings were the prominent elements of the compound that convey the district’s overall utilitarian, military-industrial character. Building 06-CP-65 retains all aspects of integrity to a high degree and easily conveys its significance as a warehouse that supported Control Point operations. Building 06-CP-65 is not recommended eligible for listing in the NRHP as an individual resource. While it served an important support function as part of the Control Point Historic District, an archival and literature review did not reveal information linking it to any specific test, series of tests, programs, or for any specific role on the NNSS other than as a warehouse (Criterion A). It has no direct association with any important individual (Criterion B). It also is not architecturally significant in its own right beyond reflecting the overall aesthetic of the Control Point Historic District (Criterion C), and it does not have potential to yield information important to the history of nuclear testing beyond what can be learned from historic texts, drawings, and other documents (Criterion D).

54 ENVIRONMENTAL SCIENCES↗

Field Performance of Commercial Building Load Flexibility Using Model Predictive Control

Model Predictive Control (MPC) applied to buildings is starting to see some commercial adoption by companies. However, it is hard to estimate if relative energy cost savings are enough to justify the cost of MPC implementation with few reported demonstrations. In small commercial and residential buildings, a one size-fits-all solution can help reduce implementation costs, while in very large buildings or districts the potential energy cost savings magnitude can cover more tailored solutions. This estimation becomes harder for medium to large commercial buildings, where a one-size-fits-all solution cannot be adopted and potential energy cost savings might not be sufficient to cover a tailored solution. Therefore, value propositions in addition to energy efficiency alone can make MPC technology more attractive through additional energy cost savings. One such value proposition is load shifting in response to dynamic electricity prices. On this aspect, MPC is a key technology to unlock building thermal mass for energy flexibility in response to electric grid conditions. This study shows the experimental results of MPC control of an office building in Berkeley, where different dynamic electricity price profiles were used in the MPC objective function to shift the building load and to calculate hypothetical electricity costs. Results show potential 50% cost savings with respect to the existing controller with the dynamic price scenario.

Zanetti, Ettore↗

Methodology and analytical approach to investigate the impact of building temperature setpoint schedules

This work presents a method for generating a large set of stochastically varying temperature setpoint schedules for building performance simulations. It analyses tradeoffs resulting from specific changes to those schedules in terms of three quantities: total electricity consumption per day; maximum hourly electricity consumption per day and predicted percentage dissatisfied (occupant thermal comfort). The method for generating schedules requires a single base schedule as the starting point and, using a few clearly defined parameters, transforms it into a set of schedules that can be used for modelling an existing building stock or for performing parametric studies. Temperature setpoint schedules are generated and simulated for a small office building in a cool-dry climate in three different case studies pertaining to changing temperature setpoint schedules. Tradeoffs between the three output metrics are significant and vary based on the temperature setpoint schedules and the time of the year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Building Operating System Platform

The U.S General Services Administration's (GSA's) Green Proving Ground program, in partnership with the National Renewable Energy Laboratory. completed a large pilot study of an Energy Management Information Systems (EMIS) with Automated System Optimization (ASO). Four test bed facilities, each with different building characteristics and systems, were chosen for the implementation of cloud-based EMIS with ASO. Depending on functionality, this tool can be extremely effective in energy management and energy optimization in buildings. The capabilities evaluated in the pilot ranged from energy savings and energy consumption predictions to evaluations of user acceptance, operability, and ease of installation. This report presents the methodology, lessons learned and best practices, and deployment recommendations for the GSA's portfolio of commercial office space, comprising more than 8,500 properties.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lessons Learned: Summary of Insights From the HERO WEC and Waves to Water Deployments Between 2022 and 2024

In 2020, a team from the National Renewable Energy Laboratory (NREL) partnered with the East Carolina University Coastal Studies Institute to develop a small, modular, wave-powered point absorber desalination prototype. That prototype, known as the hydraulic and electric reverse osmosis wave energy converter (HERO WEC), was intended to de-risk the installation activities planned for the Waves to Water Prize sponsored by the Water Power Technologies Office. The NREL team was given approximately 18 months to design, build, bench test, and deploy the HERO WEC prototype. Since the initial HERO WEC development, it has been used for two in-lab test programs and three ocean deployments. The first in-lab test program focused on ensuring that the overall operation of the device occurred as expected and on validating the operation of safety systems such as pressure relief valves or electrical breakers for load mitigation. The second in-lab test program was the first time the NREL team leveraged NREL’s large-amplitude motion platform to characterize the performance of the HERO WEC. Of the three in-water deployments, the first deployment was effectively an installation and recovery practice with no meaningful wave activity during the time that it was installed. The second deployment was a 2-week effort that enabled both the electric and hydraulic configurations of the device to be in the water for approximately 5 days each. This deployment was also the first time that the team had the opportunity to perform a drivetrain swap on the Coastal Studies Institute research vessel. The third deployment had to be split into two separate installations due to minor damage incurred from the WEC spinning during the initial installation. This report summarizes the deployments, the challenges encountered with each deployment, and the lessons learned for future work.

16 TIDAL AND WAVE POWER↗