DOE OSTI2026
Here, we present a next level design of a compact injector within the LERF vault, which would serve both the 22 GeV CEBAF and the positron program, while being compatible with the electron source required to produce positrons for Ce+BAF. The baseline design of a 3-pass recirculator features a main linac configured with three C-75 cryo-modules, five isochronous return arcs and three straight sections, facilitating electron beam acceleration up to 650 MeV. The Universal Injector offers flexibility of extraction 1-pass and 2-pass energy electrons, as needed for positron production, with a final 3-pass extraction required by the 650 MeV injector for 22 GeV CEBAF. This note provides an overview of the baseline optics design of the Universal Injector complex, including the 8 MeV injector merger and the recirculator racetrack, including individual extraction lines for all three passes. A comprehensive suite of beam dynamics studies to validate the design is under way; starting with the orbit correction scheme, followed by start-to-end tracking with lattice misalignments and magnet errors.
Bogacz, Alex [Thomas Jefferson National Accelerato↗