Search NASA⌕ Search

SEARCH · Search NASA

Results for “loading simulations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Facility and test support equipment for the manned thermal vacuum tests of the Apollo Soyuz docking module

In order to accommodate manned thermal-vacuum testing of the Apollo-Soyuz docking module (ASDM), modifications to the facility, cleanliness and access control, and special test equipment were required. Facility modifications discussed briefly include: the addition of an oxygen supply system; the modification of manlock (ML) piping for cleaning and access controls; the addition of a nitrogen diluent system; the removal of manlock internal lights and the addition of external lights as well as fusing all power circuits over 10 watts; the removal/containment of flammable materials; the upgrading of a ML fire suppression system; and the addition of a garment donning station for cleanliness control. Special test equipment discussed include: an access tunnel for crew ingress/egress; a support device for the docking module (DM) and simulators; a command module thermal simulator; a DM infrared (IR) simulator; a docking system IR simulator; a metabolic heat load simulator; and a television camera simulator.

Pearson, O. L.↗

Recommendations Emerging from an Analysis of NASA's Deep Space Communications Capacity

During 2016-2017, NASA’s Space Communications and Navigation (SCaN) Office chartered a study of Deep Space Network (DSN) communications capacity relative to projected future-mission demand over the next 30 years. In this paper, we briefly describe the methodology used to analyze capacity vs. demand over such a broad timeframe, summarize key findings emerging from the analysis, and discuss the associated recommendations. Performing the analysis entailed: identifying key factors shaping the anticipated future mission set, identifying several alternative future mission set scenarios consistent with these factors, and then analyzing each mission set scenario in terms of required antenna capacity, downlink and uplink capabilities, and spectrum as a function of time. On the basis of these aggregate requirements, DSN loading simulations were then conducted that examined how well each of the postulated mission sets could load up onto the the DSN’s “in-plan” architecture. To the extent that capacity shortfalls emerged during these baseline simulations, architectural solutions to the shortfalls were then postulated and tested via additional simulations. In general, the trend analyses and baseline loading simulations indicated a significant progression in challenges over the next three decades. In the current decade, the DSN appeared to be operating very close to capacity. The first human exploration mission and its secondary payload launch opportunities for cubesats traveling beyond GEO contributed to this loading. As a consequence, the main challenge appeared to be managing peak assetcontention periods. In the next decade, the DSN continued to operate close to capacity but also began transitioning to more frequent human mission support. Upgrading for, and operating, a human-rated system while continuing to meet robotic mission customer requirements emerged as the key challenge. In the 2030’s and beyond, simulations suggested a need for fundamentally new capability and capacity. The high data rates and long link distances characteristic of human Mars exploration drove requirements far beyond what is currently “in plan.” The key challenge then became determining the most cost-effective combination of RF and optical assets for communicating with the postulated human Mars assets while still providing for the needs of all the other missions across the solar system. Various link budget, visibility, and loading analyses ultimately suggested that the human Mars exploration demands of the 2030’s could best be addressed with two cross-linked RF-optical areostationary relays (or an areostationary relay and deep space habitat) providing a dual “trunk link” to an array of 2-to-3 additional 34m beam waveguide antennas and an ~8.5m optical antenna at each DSN Complex. The dual “trunk link” would enable the same amount of total data return to Earth as a single trunk link at twice the data rate, but with only half the required array size on the ground, assuming use of Multiple Spacecraft Per Antenna (MSPA) techniques. MSPA techniques, including a Multiple Uplink Per Antenna (MUPA) technique currently under investigation, also showed promise for reducing asset contention in the decades prior to human Mars exploration.

Lee, Carlyn-Ann↗

Comparison of Loads and Aeroacoustics Between Upwind and Downwind Wind Turbine Rotors

This presentation discusses the motivation, preparation, risk mitigation, execution, and results of a full-scale experiment where the rotor of a 1.5 megawatt wind turbine was operated in a downwind configuration. The experiment took place at the National Renewable Energy Laboratory Flatirons Campus in Colorado, USA, and collected conventional loads and power together with acoustic measurements from an array of four microphones. Results from load simulations complement the experiment. Fatigue loads and performance are compared between 410 minutes of downwind operation with 960 minutes of conventional upwind operations. Downwind operations cause an increase in damage equivalent loads in a few load channels. Damage equivalent load of blade root flapwise and edgewise moment and the damage equivalent load of tower base fore aft moment increase between 2% and 20% depending on the wind speed. The comparison in active power is less conclusive, but experimental results show more power in downwind than predicted by simulations. In terms of acoustics, the overall sound pressure levels are similar between upwind and downwind, but downwind worsens the metrics describing amplitude modulation.

aeroacoustics↗

Application of experimental stress analysis techniques to speed ball bearings

The object of the project was to determine experimentally the stress distribution in cylindrically hollow and spherically hollow balls. Ball models several times actual bearing ball size were fabricated. Strain gage rosettes will be mounted on the outside and inside surfaces of the models at specific locations and orientations. The models were subjected to a range of static loads simulating actual ball-race contact loads experienced in high-speed bearings operating at DN values from 2 to 4 million. The strain gages were read, and the principal strains determined for each load setting. Principal stresses were calculated and dimensionless stress coefficients determined to permit the evaluation of stresses in hollow balls of any size and load of geometrically similar configuration.

Nypan, L. J.↗

Ascent structural wind loads for the National Space Transportation System (NSTS)

An aerospace vehicle must withstand the design ascent structural load or be within any flight constraint to safely reach orbit. For the NSTS an assessment for flight readiness is made for each mission. This assessment for ascent loads and performance parameters is stated in terms of launch probability derived from samples of Jimsphere wind profiles. For the day of launch operations an allowance is made for the ascent load variability due to the wind profile variability over a 3.5-hour period. This is the current time period required to obtain a Jimsphere measurement and perform a complete load simulation prior to launch time. The load variability is derived from a sample of 3.5-hour Jimsphere wind profile pairs. It is applied as a conditional percentile value given the wind load at 3.5 hours prior to launch time. Probability models are used for these analyses. Application of the univariate, bivariate and conditional forms of the extreme value (Gumbel) probability distribution to the analysis of extreme wind speeds, wind shears and vehicle loads is described.

Smith, O. E.↗

Composite load spectra for select space propulsion structural components

The work performed to develop composite load spectra (CLS) for the Space Shuttle Main Engine (SSME) using probabilistic methods. The three methods were implemented to be the engine system influence model. RASCAL was chosen to be the principal method as most component load models were implemented with the method. Validation of RASCAL was performed. High accuracy comparable to the Monte Carlo method can be obtained if a large enough bin size is used. Generic probabilistic models were developed and implemented for load calculations using the probabilistic methods discussed above. Each engine mission, either a real fighter or a test, has three mission phases: the engine start transient phase, the steady state phase, and the engine cut off transient phase. Power level and engine operating inlet conditions change during a mission. The load calculation module provides the steady-state and quasi-steady state calculation procedures with duty-cycle-data option. The quasi-steady state procedure is for engine transient phase calculations. In addition, a few generic probabilistic load models were also developed for specific conditions. These include the fixed transient spike model, the poison arrival transient spike model, and the rare event model. These generic probabilistic load models provide sufficient latitude for simulating loads with specific conditions. For SSME components, turbine blades, transfer ducts, LOX post, and the high pressure oxidizer turbopump (HPOTP) discharge duct were selected for application of the CLS program. They include static pressure loads and dynamic pressure loads for all four components, centrifugal force for the turbine blade, temperatures of thermal loads for all four components, and structural vibration loads for the ducts and LOX posts.

Newell, J. F.↗

Validation of new and existing methods for time-domain simulations of turbulence and loads

We seek to obtain a second-by-second match between the simulated and measured structural loads of a utility-scale wind turbine. To obtain the one-to-one load simulations, we start with the furthest upstream component of the modeling chain: the turbulent inflow. We consider new and existing methods to generate constrained-turbulence flow fields. The new method is based on large-eddy simulations (LES) and machine learning (ML). The existing methods include Kaimal-based TurbSim and the superstatistical wind field model. The inflow measurements used to constrain these simulations are obtained with a nacelle-mounted scanning lidar. We compare the flow fields for the different inflow simulation approaches and validate their associated load predictions against measurements collected in the Rotor Aero-dynamics, Aeroelastics, and Wake (RAAW) field campaign. We find that the rotor-position control developed for this study is key in enabling the time match between measurements and simulations. When this control approach is used, the load simulation performance tracks with the inflow simulation fidelity, with LES+ML yielding errors ≤ 4% for the damage-equivalent loads of flapwise bending moment, and tower fore-aft bending moments.

17 WIND ENERGY↗

The composite load spectra project

Probabilistic methods and generic load models capable of simulating the load spectra that are induced in space propulsion system components are being developed. Four engine component types (the transfer ducts, the turbine blades, the liquid oxygen posts and the turbopump oxidizer discharge duct) were selected as representative hardware examples. The composite load spectra that simulate the probabilistic loads for these components are typically used as the input loads for a probabilistic structural analysis. The knowledge-based system approach used for the composite load spectra project provides an ideal environment for incremental development. The intelligent database paradigm employed in developing the expert system provides a smooth coupling between the numerical processing and the symbolic (information) processing. Large volumes of engine load information and engineering data are stored in database format and managed by a database management system. Numerical procedures for probabilistic load simulation and database management functions are controlled by rule modules. Rules were hard-wired as decision trees into rule modules to perform process control tasks. There are modules to retrieve load information and models. There are modules to select loads and models to carry out quick load calculations or make an input file for full duty-cycle time dependent load simulation. The composite load spectra load expert system implemented today is capable of performing intelligent rocket engine load spectra simulation. Further development of the expert system will provide tutorial capability for users to learn from it.

Newell, J. F.↗

Q-IRIS: The Evolution of the IRIS Task-Based Runtime to Enable Classical-Quantum Workflows

Extreme heterogeneity in emerging HPC systems are starting to include quantum accelerators, motivating runtimes that can coordinate between classical and quantum workloads. We present a proof-of-concept hybrid execution framework integrating the IRIS asynchronous task-based runtime with the XACC quantum programming framework via the Quantum Intermediate Representation Execution Engine (QIR-EE). IRIS orchestrates multiple programs written in the quantum intermediate representation (QIR) across heterogeneous backends (including multiple quantum simulators), enabling concurrent execution of classical and quantum tasks. Although not a performance study, we report measurable outcomes through the successful asynchronous scheduling and execution of multiple quantum workloads. To illustrate practical runtime implications, we decompose a four-qubit circuit into smaller subcircuits through a process known as quantum circuit cutting, reducing per-task quantum simulation load and demonstrating how task granularity can improve simulator throughput and reduce queueing behavior -- effects directly relevant to early quantum hardware environments. We conclude by outlining key challenges for scaling hybrid runtimes, including coordinated scheduling, classical-quantum interaction management, and support for diverse backend resources in heterogeneous systems.

Miniskar, Narasinga Rao [ORNL] (ORCID:000000018259↗

Research study on multi-KW-DC distribution system

A detailed definition of the HVDC test facility and the equipment required to implement the test program are provided. The basic elements of the test facility are illustrated, and consist of: the power source, conventional and digital supervision and control equipment, power distribution harness and simulated loads. The regulated dc power supplies provide steady-state power up to 36 KW at 120 VDC. Power for simulated line faults will be obtained from two banks of 90 ampere-hour lead-acid batteries. The relative merits of conventional and multiplexed power control will be demonstrated by the Supervision and Monitor Unit (SMU) and the Automatically Controlled Electrical Systems (ACES) hardware. The distribution harness is supported by a metal duct which is bonded to all component structures and functions as the system ground plane. The load banks contain passive resistance and reactance loads, solid state power controllers and active pulse width modulated loads. The HVDC test facility is designed to simulate a power distribution system for large aerospace vehicles.

Berkery, E. A.↗