Search NASA⌕ Search

SEARCH · Search NASA

Results for “long term planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems, e.g., emergency asset management. Included is an example case study: Hurricane Dolly damaging a synthetic 2000-bus test system during its landing in Southern Texas. We perform statistical analysis of damages and discuss topological effects on the example synthetic grid. Also, we include a cursory evaluation of impacts using simplified operational models. Finally, we discuss how our method can be extended to use even higher-fidelity meteorological data sets and suggest directions for future work.

contingencies↗

Viewgraph description of Penn State's Propulsion Engineering Research Center: Activity highlights and future plans

Viewgraphs are presented that describe the progress and status of Penn State's Propulsion Engineering Research Center. The Center was established in Jul. 1988 by a grant from NASA's University Space Engineering Research Centers Program. After two and one-half years of operation, some 16 faculty are participating, and the Center is supporting 39 graduate students plus 18 undergraduates. In reviewing the Center's status, long-term plans and goals are reviewed and then the present status of the Center and the highlights and accomplishments of the past year are summarized. An overview of plans for the upcoming year are presented.

Merkle, Charles L.↗

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g. manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

Monell, Donald W.↗

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operation). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographical distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across Agency.

Monell, Donald W.↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

data-driven forecasting↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources: Preprint

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

contingencies↗

Real-Time Science Decisioning During High Tempo-High Intensity Mission Operations and the Role of Analogs

Introduction: NASA’s VIPER mission presents a unique operational paradigm within the history of robotic spaceflight. The proximity of the Moon to the Earth and the terrain elements (surface characteristics, light/shadow dynamics, communication links) of the lunar South Polar landing site create unprecedented operational conditions between these two planetary bodies. Apollo era lunar science and exploration included humans in situ to operate instruments and assimilate observational inputs in real-time. Previous lunar orbital missions have worked to operational timescales, e.g., decisional timelines and communication exchanges, that were weeks in length. Mars rover missions have worked to operational timescales, e.g., decisional timelines and communication exchanges between Mars and Earth, that were hours, days, and weeks in length. In the case of the VIPER mission, our operational decisioning for rover driving and instrument commanding will be compressed to minute-scale timeframes. These operational conditions directly impact the manner and speed with which the VIPER Science Team (VST) is required to synthesize and analyze data and produce timely science-driven decisions throughout surface mission operations. The VST shall provide mission enhancing scientific input to guide rover traverse planning and drill site confirmation and selection throughout surface operations. Further, the VST input will be of vital importance to the mission’s ability to maximize science return and to meet broader NASA objectives for future lunar in-situ resource utilization (ISRU)and exploration activities. The VST co-located in the Mission Science Center (MSC) will be responsive to the tactical operational cadence of the Mission Operations Center (MOC) and will provide further strategic and Long-Term Planning (LTP) guidance to the mission. The VIPER Science Operations & Integration(SO&I)team has developed an architecture that is focused on the infusion of science-decisioning into the operational framework and execution cadence of VIPER. NASA analog research has played a significant role in the construction of the VIPER science operations systems. As an example, the SO&I team has led analog missions that have focused on bringing together expertise in the sciences (natural, applied and social) and in operations in service of learning how to build and hold together interdisciplinary work environments and what tools are needed to support high tempo, high intensity integrated decisioning. These experiences have provided an essential foundation of knowledge to the VIPER team. Those analogs that specifically influenced the VIPER science operations construct were identified through a process of comparative analysis to prioritize those that offered relevance in whole or in part, and those that did not. The analog research output that provided extensibility to the VIPER science operations architecture included remote teams of humans and robots in cooperation (synchronous and asynchronous) with simulated earthbound systems, engineering and science teams, and the integrated assembly of tools that supported scientific analysis and data synthesis and provided infrastructure for the remote testing framework. Analogs which included real-time data monitoring, synthesis, visualization and access in a democratized and operationalized manner were of particular interest to the development of the VIPER MSC toolset both in terms of the technology and the processes used to develop the supporting infrastructure. We anticipate that each subsequent mission to the lunar south pole, whether with robots or humans, will be able to optimize science and exploration return by evolving strategies to infuse real-time collaborative science-decisioning. Furthermore, these efforts will result in a foundation for science operations development in support of human-robotic exploration of deep space and Mars. NASA analogs can continue to provide the opportunity to prepare, test and iterate on the operational concepts and tools that will support these ever-expanding space exploration efforts. Our presentation will include an overview of the VIPER Science Operations & Integration development process and specifics on what aspects of analog research have had a significant impact on our work systems.

D S S Lim↗

AEDGE: Atomic Experiment for Dark Matter and Gravity Exploration in Space

We propose in this White Paper a concept for a space experiment using cold atoms to search for ultra-light dark matter, and to detect gravitational waves in the frequency range between the most sensitive ranges of LISA and the terrestrial LIGO/Virgo/KAGRA/INDIGO experiments. This interdisciplinary experiment, called Atomic Experiment for Dark Matter and Gravity Exploration (AEDGE), will also complement other planned searches for dark matter, and exploit synergies with other gravitational wave detectors. We give examples of the extended range of sensitivity to ultra-light dark matter offered by AEDGE, and how its gravitational-wave measurements could explore the assembly of super-massive black holes, first-order phase transitions in the early universe and cosmic strings. AEDGE will be based upon technologies now being developed for terrestrial experiments using cold atoms, and will benefit from the space experience obtained with, e.g., LISA and cold atom experiments in microgravity. This paper is based on a submission (v1) in response to the Call for White Papers for the Voyage 2050 long-term plan in the ESA Science Programme. ESA limited the number of White Paper authors to 30. However, in this version (v2) we have welcomed as supporting authors participants in the Workshop on Atomic Experiments for Dark Matter and Gravity Exploration held at CERN: ({\tt https://indico.cern.ch/event/830432/}), as well as other interested scientists, and have incorporated additional material.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Managing a Safe and Successful Multi-User Spaceport

Encouraged by the creation of the Office of Commercial Space Transportation within the U.S. Federal Aviation Administration (FAA) in 1984 and the Commercial Space Act of 1998, the National Aeronautics and Space Administration (NASA) now relies on an extensive network of support from commercial companies and organizations. At NASA's Kennedy Space Center (KSC), this collaboration opens competitive opportunities for launch providers, including repurposing underutilized Shuttle Program resources, constructing new facilities, and utilizing center services and laboratories. The resulting multi-user spaceport fosters diverse activity, though it engenders risk from hazards associated with various spaceflight processing activities. The KSC Safety & Mission Assurance (S&MA) Directorate, in coordination with the center's Spaceport Integration and Center Planning & Development organizations, has developed a novel approach to protect NASA's workforce, critical assets, and the public from hazardous, space-related activity associated with KSC's multi-user spaceport. For NASA KSC S&MA, the transformation to a multi-user spaceport required implementing methods to foster safe and successful commercial activity while resolving challenges involving: Retirement of the Space Shuttle program; Co-location of multiple NASA programs; Relationships between the NASA programs; Complex relationships between NASA programs and commercial partner operations in exclusive-use facilities; Complex relationships between NASA programs and commercial partner operations in shared-use facilities. NASA KSC S&MA challenges were met with long-term planning and solutions involving cooperation with the Spaceport Integration and Services Directorate. This directorate is responsible for managing active commercial partnerships with customer advocacy and services management, providing a dedicated and consistent level of support to a wide array of commercial operations. This paper explores these solutions, their relevance to the current commercial space industry, and the challenges that continue to drive improvement with a focus on areas of safety management and risk assessment that have been crucial in KSC's evolution into a multi-user spaceport. These solutions may be useful to government entities and private companies looking to partner with the commercial space industry.

Range↗

Characterizing the Effects of Chronic 2G Centrifugation on the Rat Skeletal System

During weightlessness, the skeletal system of astronauts is negatively affected by decreased calcium absorption and bone mass loss. Therefore, it is necessary to counteract these changes for long-term skeletal health during space flights. Our long-term plan is to assess artificial gravity (AG) as a possible solution to mitigate these changes. In this study, we aim to determine the skeletal acclimation to chronic centrifugation. We hypothesize that a 2G hypergravity environment causes an anabolic response in growing male rats. Specifically, we predict chronic 2G to increase tissue mineral density, bone volume fraction of the cancellous tissue and to increase overall bone strength. Systemically, we predict that bone formation markers (i.e., osteocalcin) are elevated and resorption markers (i.e., tartrate resistant acid phosphatase) are decreased or unchanged from controls. The experiment has three groups, each with an n8: chronic 2g, cage control (housed on the centrifuge, but not spun), and a vivarium control (normal rat caging). Pre-pubescent, male Long-Evans rats were used to assess our hypothesis. This group was subject to 90 days of 2G via centrifugation performed at the Chronic Acceleration Research Unit (CARU) at University of California Davis. After 90 days, animals were euthanized and tissues collected. Blood was drawn via cardiac puncture and the right leg collected for structural (via microcomputed tomography) and strength quantification. Understanding how counteract these skeletal changes will have major impacts for both the space-faring astronauts and the people living on Earth.

rat↗

GGOS Bureau of Networks and Observations: Network Infrastructure and Related Activities

The GGOS Bureau of Networks and Observations works with the IAG Services (IVS, ILRS, IGS, IDS, IGFS, and PSMSL) to advocate for the expansion and upgrade of space geodesy networks for the maintenance and improvement of the reference frame and other applications, as well as for the integration with other techniques, including absolute gravity and sea level measurements from tide gauges. New sites are being established following the GGOS concept of “core” and co-location sites, and new technologies are being implemented to enhance performance in data yield as well as accuracy. The Bureau continues to meet with organizations to discuss possibilities, including partnerships, for new and expanded participation. The GGOS Network continues to grow as new stations join every year. The Bureau holds meetings frequently, providing the opportunity for representatives from the services to meet and share progress and plans, and to discuss issues of common interest. It also monitors the status and projects the evolution of the network based on information from the current and expected future participants. Of particular interest at the moment is the integration of gravity and tide gauge networks and the forthcoming establishment of the new absolute gravity reference frame. The IAG Committees and Joint Working Groups play an essential role in the Bureau activity. The Standing Committee on Performance Simulations and Architectural Trade-offs (PLATO) uses simulation and analysis techniques to project future network capability and to examine trade-off options. The Committee on Data and Information is working on a strategy for a GGOS metadata system for data products and a more comprehensive long-term plan for an all-inclusive system. The Committee on Satellite Missions is working to enhance communication with the space missions, to advocate for missions that support GGOS goals and to enhance ground systems support. The IERS Working Group on Site Survey and Co-location (also participating in the Bureau) is working to enhance standardization in procedures, outreach and to encourage new survey groups to participate and improve procedures to determine systems’ reference points, a crucial aid in the detection of technique-specific systematic errors. We will give a brief update on the status and projection of the network infrastructure of the next several years, and the progress and plans of the Committees/Working Group in their critical role in enhancing data product quality and accessibility to the users.

Carey Noll↗

Systematic Analysis of Drivers and Barriers of Cross-Sectorial Learning Between Nuclear and Oil and Gas Decommissioning Projects - 20139

Project and megaproject management in the energy sector have historically focused on the planning and delivery of the construction of infrastructure. Therefore, policies are predominantly oriented to support the construction of infrastructure rather than its decommissioning. However, globally, several facilities have reached (or will soon reach) their end-of-life and need to be decommissioned. These facilities span across the energy sector, including nuclear power plants and oil and gas rigs, whose decommissioning present unprecedented techno-socio-economic challenges. Moreover, globally, their decommissioning cost is estimated to reach hundreds of billions of US dollars and this budget keeps increasing, with limited knowledge-transfer across industries to mitigate the spiraling increase of this figure. Cross-sectorial knowledge-transfer is a way to tackle this matter and improve the planning and delivery of decommissioning and waste management projects. The aim of this research is to build a road-map based on cross-sectorial industrial experience, designed to promote the sharing of good practices between projects both within and across industries dealing with major decommissioning and waste management challenges. To reach this aim, the tacit knowledge of senior practitioners on several large scale nuclear and oil and gas decommissioning projects is made explicit by the means of semi-structured interviews, systematically analyzed through directed content analysis. The results of this analysis include a list of good practices that could and should be transferred to nuclear decommissioning projects, including the need to promote the adoption of incentives explicitly linked to the project deliverables, and to develop long-term plans to support smooth transition from operations to decommissioning. Suggestions about how the knowledge-transfer can be promoted within and across organizations are also discussed. In this way, this research provides practical guidance for project managers and policymakers on how to support the planning and delivery of projects with improved performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outcomes of the DOE Workshop on Atmospheric Challenges for the Wind Energy Industry

The U.S. Department of Energy-funded Mesoscale-to-Microscale Coupling (MMC) project team planned and conducted a virtual Workshop on Atmospheric Challenges for the Wind Energy Industry on October 19 and 20, 2020. The goal of the workshop was to forge a dialog with the community, including industry representatives, on how modeling tools are currently being used, the present active atmospheric modeling research in support of wind energy, and required advancements in capabilities and technology to continue to advance wind energy deployment. The workshop was planned in collaboration with an industry advisory panel that included representatives from wind power plant developers, turbine manufacturers, and companies that provide resource assessment and forecasting services. The format of the workshop included panels from government research sponsors, visionaries from industry, and mixed panels of researchers discussing research status and needs. A shared keynote presentation from the Technical University of Denmark experts anchored the second day of the workshop. An emphasis was placed on understanding the research needs in the offshore environment. In addition, breakout opportunities were provided each day. On the first day, the breakout discussions addressed predesigned questions configured to elicit participants’ thoughts on needed research directions. The second-day breakouts treated three important technical topics through a combination of presentations and group conversations. Each workshop participant chose their breakout preference from among downscaling details, modeling for turbines, and using artificial intelligence for atmospheric modeling. The discussions were robust and productive. The outcomes of the workshop include archiving a series of recommendations from industry and the research community on research directions required to further advance wind energy deployment. Discussions confirmed the need for high-fidelity modeling but that there are specific areas of applicability and other areas where the time and cost of computation is prohibitive. In those cases, the high-fidelity models can inform low-order models that are more practical for real-time or widely deployed applications. Industry must consider the financial cost of performing more expensive modeling approaches, but industry engineers and researchers are using these approaches where there appears to be a return on investment. An emerging type of low-order model is based on machine learning (ML). Participants confirmed that there are many atmospheric phenomena that need to be modeled better, including low-level jets, cold air outbreaks, land-sea induced circulations, diurnal variability, thin stable boundary layers, dynamic changes such as from frontal passage, interaction of wakes and blockage, and more. For the offshore environment, there is wide agreement that some level of ocean-wave-atmospheric coupling is necessary to capture variations in rotor-level winds needed to plan and operate offshore wind plants. Another recurring recommendation is that more observations are needed, particularly for the offshore environment. Those observations should consider the needs for model improvement, both for physically based models and for ML models. Observations must capture atmospheric profiles of variables that are important to understanding and modeling atmospheric and oceanic phenomena that impact boundary layer winds. Models must be validated with data and the uncertainty quantified, particularly those that are sensitive to initial and boundary conditions. Finally, a repeated request was to consider the holistic needs of hybrid plants of wind, solar, and storage resources because those types of plants are likely to be the wave of the future. In addition, industry wishes to understand impacts of the resource under a changing climate for long-term planning.

17 WIND ENERGY↗

National facilities study. Volume 3: Mission and requirements model report

The National Facility Study (NFS) was initiated in 1992 by Daniel S. Goldin, Administrator of NASA as an initiative to develop a comprehensive and integrated long-term plan for future facilities. The resulting, multi-agency NFS consisted of three Task Groups: Aeronautics, Space Operations, and Space Research and Development (R&D) Task Groups. A fourth group, the Engineering and Cost Analysis Task Group, was subsequently added to provide cross-cutting functions, such as assuring consistency in developing an inventory of space facilities. Space facilities decisions require an assessment of current and future needs. Therefore, the two task groups dealing with space developed a consistent model of future space mission programs, operations and R&D. The model is a middle ground baseline constructed for NFS analytical purposes with excursions to cover potential space program strategies. The model includes three major sectors: DOD, civilian government, and commercial space. The model spans the next 30 years because of the long lead times associated with facilities development and usage. This document, Volume 3 of the final NFS report, is organized along the following lines: Executive Summary -- provides a summary view of the 30-year mission forecast and requirements baseline, an overview of excursions from that baseline that were studied, and organization of the report; Introduction -- provides discussions of the methodology used in this analysis; Baseline Model -- provides the mission and requirements model baseline developed for Space Operations and Space R&D analyses; Excursions from the baseline -- reviews the details of variations or 'excursions' that were developed to test the future program projections captured in the baseline; and a Glossary of Acronyms.

Source record↗

A scalable planning framework of energy storage systems under frequency dynamics constraints

As the penetration of renewables increases in power systems, the declining system inertia can cause frequency stability issues. Battery energy storage systems (BESSs) respond fast and therefore can relieve the low inertia difficulty but need to be appropriately sized considering the associated cost. This paper presents a novel stochastic optimization model for economically planning BESS capacity while considering the spatial–temporal correlation of wind generation and generator outages under frequency stability constraints, which include the rate-of-change of frequency (RoCoF), frequency nadir (FN), and quasi-steady-state (QSS) frequency. A set of new FN constraints that can be easily linearized is developed. To account for renewable uncertainties, a realistic uncertainty modeling approach, Random Field, is adopted to generate wind generation scenarios by considering both spatial and temporal evolutions of wind speed profiles. The ESS sizing is formulated as a mixed-integer linear programming problem and solved by using a scalable decomposition-and-coordination approach, Surrogate Absolute Value Lagrangian Relaxation (SAVLR). To further improve the scalability and reduce computational burdens, a rolling-horizon-based update is developed and incorporated into SAVLR for providing a practical solution to the long-term planning of very large-scale power systems. Finally, a modified IEEE 118-bus system and the Polish system are used to validate the effectiveness and scalability of the model and solution methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Evolving Role of Extreme Weather Events in the U.S. Power System with High Levels of Variable Renewable Energy

As weather-dependent renewable generation grows, it is important for power system planning to understand the broad trends and correlations between weather, renewable resources, and load. The traditional planning, performed by utilities and system operators, includes the study of system resource adequacy during peak load periods in the summer and winter to ensure the generation and transmission system is appropriate to meet load. But in a power grid with a high penetration of variable renewable energy (i.e., wind and solar), periods of high risk to system resource adequacy may no longer correspond only to hours of peak load. In particular, high shares of variable renewable energy, even when well-forecasted to inform system operations, can further complicate the stress extreme weather events already place on the grid. They also may lead to changes to the types of weather conditions that are most problematic to system operations and resource adequacy due to widespread and extended deficits of wind and solar generation. Accordingly, the focus of reliability assessments in long-term planning studies may need to evolve in the coming years to more fully incorporate weather events that lead to these deficits. This report seeks to identify these new weather events and understand the characteristics of the events that lead to system risk of future systems with higher penetrations variable renewable energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electrifying Transit: A Guidebook for Implementing Battery Electric Buses

This guidebook is organized to give transit decision-makers and relevant stakeholders an overview of BEB facts, data, and considerations important for planning their implementation in a variety of jurisdictions. First, the benefits and barriers for BEB are identified. Second, BEB basics in terms of the major components, including a) the bus, b) the battery, and c) the numerous charging options. BEB introduces new, high demand loads as the buses are charging and thus have a number of interactions with the electricity grid and the utility, which are explored third. Operation and maintenance of BEBs are considered fourth as BEBs should not be operated and maintained in the same approach as diesel buses. Fifth, the costs of BEB prices are summarized – and the choices of bus and battery are explored in how they impact BEB prices. Funding and financing options that support BEBs and their charging stations are also explored. Safety is a key consideration for BEBs and the guidebook touches upon codes and standards, hazards, and emergencies. The final section examines project execution, bringing together information from all the other sections so that long-term planning, route analysis, and fleet and infrastructure planning can be considered in the preparation of BEB deployment, and then deployment can be evaluated on a regular basis. A final conclusion revisits the information covered in the guidebook.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Importance of Standardizing Analytical Characterization Methodology for Improved Reliability of the Nanomedicine Literature

Understanding the interaction between biological structures and nanoscale technologies, dubbed the nano-bio interface, is required for successful development of safe and efficient nanomedicine products. The lack of a universal reporting system and decentralized methodologies for nanomaterial characterization have resulted in a low degree of reliability and reproducibility in the nanomedicine literature. As such, there is a strong need to establish a characterization system to support the reproducibility of nanoscience data particularly for studies seeking clinical translation. Here, we discuss the existing key standards for addressing robust characterization of nanomaterials based on their intended use in medical devices or as pharmaceuticals. We also discuss the challenges surrounding implementation of such standard protocols and their implication for translation of nanotechnology into clinical practice. We, however, emphasize that practical implementation of standard protocols in experimental laboratories requires long-term planning through integration of stakeholders including institutions and funding agencies.

77 NANOSCIENCE AND NANOTECHNOLOGY↗