Search NASA⌕ Search

SEARCH · Search NASA

Results for “low radioactivity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Measuring Very Low Radiation Doses in PTFE for Nuclear Forensic Enrichment Reconstruction

Every country that has made nuclear weapons has used uranium enrichment. Despite the centrality of this technology to international security, there is still no reliable physical marker of past enrichment that can be used to perform forensic verification of historically produced weapons. We show that the extremely low radioactivity from uranium alpha emissions during enrichment leaves detectable and irreversible calorimetric signatures in the common enrichment gasket material PTFE, allowing for historical reconstruction of past enrichment activities at a sensitivity better than one weapon's quantity of highly enriched uranium. Fast scanning calorimetry also enables the measurement of recrystallization enthalpies of sequentially microtomed slices, confirming the magnitude and the type of radiation exposure while also providing a detection of tampering and a method for analyzing field samples useful for treaty verification. This work opens the door for common items to be turned into precise dosimeters to detect the past presence of radioactivity, nuclear materials, and related activities with high confidence.

Connick, Rachel↗

Quality assurance and quality control of the $26~\text {m}^2$ SiPM production for the DarkSide-20k dark matter experiment

DarkSide-20k is a novel liquid argon dark matter detector currently under construction at the Laboratori Nazionali del Gran Sasso (LNGS) of the Istituto Nazionale di Fisica Nucleare (INFN) that will push the sensitivity for Weakly Interacting Massive Particle (WIMP) detection into the neutrino fog. The core of the apparatus is a dual-phase Time Projection Chamber (TPC), filled with 50 tonnes of low radioactivity underground argon (UAr) acting as the WIMP target. NUV-HD-cryo Silicon Photomultipliers (SiPM)s designed by Fondazione Bruno Kessler (FBK) (Trento, Italy) were selected as the photon sensors covering two $10.5~\text {m}^2$ Optical Planes, one at each end of the TPC, and a total of $5~\text {m}^2$ photosensitive surface for the liquid argon veto detectors. This paper describes the Quality Assurance and Quality Control (QA/QC) plan and procedures accompanying the production of FBK NUV-HD-cryo SiPM wafers manufactured by LFoundry s.r.l. (Avezzano, AQ, Italy). SiPM characteristics are measured at 77 K at the wafer level with a custom-designed probe station. As of March 2025, 1314 of the 1400 production wafers (94% of the total) for DarkSide-20k were tested. The wafer yield is $93.2\pm 2.5$%, which exceeds the 80% specification defined in the original DarkSide-20k production plan.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Analysis of Exposure during Transportation of Waste to the Nevada National Security Site (NNSS) - 20445

Safety is a priority for the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program. This commitment to safety is integrated into requirements and work procedures at DOE sites across the U.S. that generate low-level radioactive waste, mixed low-level radioactive waste, and classified waste that is transported to the Nevada National Security Site (NNSS) for permanent disposal. Generators of this waste are responsible for ensuring it is packaged and transported in a safe and compliant manner. These generators and their contracted commercial carriers must comply with U.S. Department of Transportation (DOT) regulations; the Nevada National Security Site Waste Acceptance Criteria (NNSSWAC); and other applicable federal, state, and local regulations and requirements. This includes packaging and shipping the waste to meet DOT regulatory radiation dose limits to ensure public safety during transportation. NNSS waste generators have a solid safety record for complying with these stringent regulations as demonstrated by the fact that no shipments exceeding DOT dose rate limits were received at the NNSS Area 5 Radioactive Waste Management Complex (RWMC) during FY 2014 through FY 2018. A 2005 study conducted by the Desert Research Institute validated shipments to the NNSS comply with DOT radiation dose limits. In response to recent Nevada stakeholder requests for an updated study, an analysis was conducted to verify and provide evidence that the public continues to be safe from exposure to radioactive waste shipment to the NNSS. Radiation exposure from radioactive waste shipments in transit to the NNSS was evaluated. Three studies were performed: 1. Confirm compliance of waste shipments to the DOT radiation limits using dose rate surveys taken at the generator site and at the disposal site. 2. Estimate the dose to the public from waste shipments using the dosimetry results for disposal site personnel by comparing time of exposure for various individuals/scenarios. 3. Estimate the truck driver dose using the receipt dose rate surveys and time of exposure, and from dosimetry results. Study 1 confirmed compliance with the DOT dose rate limits for a sample of waste shipments (123 of 1,038) received during fiscal year (FY) 2017. Study 2 showed that the average annual radiation equivalent dose for disposal site personnel during FY 2017 was approximately 6.7% [0.415 mSv (41.5 millirem)] of the annual average dose that a person living in the U.S. receives from all sources [6.2 mSv (620 mrem)]. Maximum dose to a member of the public, a person resting/sleeping in an adjacent truck at a rest area to a waste shipment, was 0.0166 mSv (1.66 mrem), which is less than the dose received from a person taking a round trip from the east coast to the west coast of the continental U.S. on an airplane [0.07 mSv (7 mrem) per round trip]. Study 3 showed that the truck driver who made the most shipments of radioactive waste to the NNSS, who drove the most hours (estimated time of exposure 2,520 hours), during FY 2017 had a total dose of 0.15 mSv (15 mrem), which was obtained from their personal dosimeter. The annual dose recorded for disposal site personnel, the dose estimates for the public, and the truck driver dose were all a small percentage of the average radiation dose a person receives from all sources (e.g., background and medical radiation). At these levels, risk should only be described qualitatively. Radiation exposure from radioactive waste shipments to the NNSS were shown to be compliant with the DOT dose rate limits, safe, and very low (i.e., within background levels). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New segmented target for studies of neutron unbound systems

The study of neutron-unbound systems using invariant mass spectroscopy is often performed using low-intensity radioactive ion beams. Low reaction yields can be countered by using thick targets but at the expense of larger uncertainties in the reconstructed invariant mass. In this work, we present a new segmented target designed to address this trade-off. It is composed of three mm thick passive beryllium targets interleaved between four thick position sensitive silicon detectors. In the first experiment to use this new system the half-life of two-neutron unbound was measured to be (stat) (syst) ps, which agrees with a previous measurement made by the MoNA Collaboration.

47 OTHER INSTRUMENTATION↗

System Model Calculations for the Active Trenches of the Low-Level Burial Grounds, Hanford Site, Washington

Two lined trenches (Trench 31 and 34) located within the 200 West Low-Level Burial Ground (LLBG) area of the U.S. Department of Energy’s (DOE) Hanford Site are designated for permanent disposal of low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW). In accordance with DOE O 435.1, Radioactive Waste Management, radioactive waste shall be managed and disposed in a manner that is protective of worker, public health and safety, and the environment. DOE O 435.1 requires a site-specific radiological performance assessment (PA) that includes calculations of potential releases and subsequent doses to members of the public for a period of 1,000 years after closure of a low-level waste (LLW) disposal facility. The purpose of this environmental calculation file (ECF) is to document the various dose calculations performed to support DOE’s LLBG PA. The dose assessments are performed to evaluate the potential exposure of an all-pathway representative person to radionuclide contaminants of potential concern (COPCs) that may be released from the LLBG Trenches 31 and 34 to the point of calculation (POC) located at the outer edge of a 100 m buffer zone surrounding the trench boundary. This ECF uses inputs from other ECFs and their associated model package reports (MPRs) supporting the LLBG PA. The five major objectives of this ECF are to present the results of the following: (1) Deterministic dose assessments for both groundwater and atmospheric exposure scenarios; (2) Radon-222 (Rn-222) flux emanating at the surface from the disposed wastes; (3) Uncertainty analyses of the groundwater pathway annual dose due to uncertainty in input parameters; (4) Sensitivity analyses of the input parameters that could potentially impact the fate and transport of the contaminants and doses; (5) Doses arising from inadvertent intruder exposure scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 36: Hot Topics in US Commercial Low-Level Waste Management

This panel focused on emerging issues in commercial LLW management in the US from the perspective of active members of the Low-Level Radioactive Waste Forum, Inc. State, compact, federal and industry officials shared their views on a variety of timely and significant topics related to low-level radioactive waste management, disposal and related issues. Session no. 36 Co-Chairs, Patricia Holahan and Daniel Shrum, introduced the panelists and provided a summary of the purpose of the session. This Panel Session focused on several current and emerging issues impacting the commercial Low-Level Radioactive Waste (LLRW) management in the US from the perspective of active members of the Low-Level Waste Forum, Inc., States, Compact, as well as Federal and nuclear industries. The panelists provided different perspectives on number of key issues such as: LLW disposal facility status and updates (e.g.; in terms of disposal capacity, plans, and waste acceptance conditions). The panelists also addressed waste disposal rates and potential impacts of ongoing regulatory developments by the NRC and the concerned States. Other timely topics pertaining to the revision of 10CFR Part 61, the Greater-than-Class C (GTCC) and Transuranic (TRU) waste, and Very Low-Level Waste (VLLW) disposal issues were also addressed at this Session. Panelists with presentations: Hot Topics in US Commercial LLW Management (Joe Weismann); Texas LLRW Compact (David Carlson); Texas Low-Level Radioactive Waste Disposal Compact Commission (John Salsman); Barnwell LLRW Disposal Facility (Benjamin Smith, Bill Carver)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Second Quarter Transportation Report - Fiscal Year 2021 - Waste Shipments to and from the Nevada National Security Site, Radioactive Waste Management Complex

This report satisfies the U.S. Department of Energy (DOE) commitment to prepare a quarterly summary of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) in Area 5. This report summarizes the second quarter of fiscal year (FY) 2021 and serves as a quarterly report for the following types of shipments: Low-Level Radioactive Waste (LLW) Mixed Low-Level Radioactive Waste (MLLW) Classified Non-Radioactive (CNR) Waste Classified Non-Radioactive Hazardous (CNRH) Waste

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling and Analysis of the Transport and Disposal of Beryllium Moderator Blocks and Greater than Class C (GTCC) Waste

Radioactive waste in the United states is categorized based on its source, radioactivity, and security risk. The categorization method employed by the Nuclear Regulatory Committee (NRC) for low-level radioactive waste is not currently applied to any waste generated by the Department of Energy (DOE) or disposed of in DOE facilities. As a result, there is a large volume of DOE-generated waste with characteristics similar to the NRC’s “Greater than Class C” (GTCC) waste category which presently do not have a path for long-term disposal. Much of this waste cannot undergo the standard commercial disposition process due to it being categorized as Transuranic (TRU) waste under DOE guidelines, due to elevated concentrations of key fission products. Possible solutions to this dilemma are explored in the Environmental Impact Statement for the “Disposal of Greater-Than-Class-C Low Level Radioactive Wave” (EIS-0375). This paper analyzes several EIS possible paths for disposal for this “orphaned” waste. One example that highlights this categorization issue is the spent beryllium cladding that has been extracted from the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) throughout its operational lifetime. These beryllium blocks surround the reactor’s main chambers and components and serve as neutron moderators. This paper will use this particular waste form to analyze the economic and technological viability of transporting and storing this material under the storage and transportation criteria of the Waste isolation Pilot Plant (WIPP), which was deemed the most feasible disposition path according to the EIS. The example of this waste form used in this paper that highlights this categorization issue is the spent beryllium cladding extracted from Idaho National Laboratory’s (INL) Advanced Test Reactor (ATR). These beryllium blocks surround the reactor’s components and serve as neutron moderators, and thus have accumulated high concentration of high-activity transuranic isotopes. This paper analyzed the viability of transporting and storing this material under the storage and transportation criteria of the five primary disposition paths covered in EIS-0375. An array of calculations was carried out to assess the viability of the various disposition paths for the beryllium shipments as well as other waste shipments that fall within the GTCC category. Modeling with MCNP 6.2 was conducted to determine whether the beryllium blocks could be safely stored and transported within a 72-B cask; the standard shipping container for remote-handled, transuranic waste, while also meeting regulatory limits at various disposition paths. A cost analysis of the transportation and long-term disposal paths mentioned in the EIS was also carried out using available data and information from similar waste shipments. Lastly, a geochemical analysis of the various geological repository discussed in the EIS was also carried out using the Geochemists Workbench Release 14. Long-term disposal of the beryllium blocks at the Waste Isolation Pilot Plant (WIPP) proved to be the most cost-effective long-term disposition option of the ones considered in the EIS. A dose rate calculation at both contact and remote-handling distances indicate that the analyzed beryllium shipments should not exceed the exposure limits at any of the considered locations. Greater-than-class-C waste has been left in a regulatory state of limbo for years, resulting in backlogs of inventory across several research sites in the United States. Due to its high activity and presence of transuranic isotopes, it is imperative to ensure that it remains inaccessible and sequestered both in its short-term interim as well as a long-term geologic time scale. The information and assessments done in the paper could potentially serve as a reference for any future shipments of this waste form at the WIPP facility as well as other disposition paths that may be considered in the future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 14: US NRC - Current and Emerging US NRC Regulatory Topics

This panel focused on several current and emerging US Nuclear Regulatory Commission (NRC) regulatory issues impacting the commercial radioactive waste arena in the US. The panelists provided different perspectives on key issues such as the revision of 10 Code of Federal Regulations Part 61 'Licensing Requirements For Land Disposal Of Radioactive Waste', the scoping study on very low-level waste, the consolidated interim storage of spent nuclear fuel and other timely regulatory topics. Panelists with presentations: Overview of NRC Low-Level Radioactive Waste Activities and Initiatives (Patricia Holahan); US Nuclear Power Plant Waste Management - US LLW Disposal Issues (Joe Weismann); Decommissioning Rule (Vern C. Rogers); What is TRU? Definition, Legislation, and Rulemaking (David Carlson); LLRW Regulatory Topics of Interest in Texas (Bobby Janecka); International Low Level Waste Management Practices (Richard McGrath)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research on the thermal history of the moon

Lunar thermal history modelling is used to demonstrate that a realistic computer simulation can be used to predict major and minor element concentrations, thickness of the lunar crust, and intensity of volcanic activity as a function of time. The models which are most consistent with the observations include: (1) a high surface temperature and low interior temperature during the very early lunar history; (2) high near-surface radioactivity and relatively low radioactivity in the interior; and (3) a molten zone formed at or near the surface which gradually migrates downward with time. Lunar magnetic anomaly calculations show that large anomalies measured at some of the landing sites and above some points on the surface cannot be caused by mere basalts but are consistent with valley fillings of Cayley-like material with a remanent magnetization of about 0.0002 emu/gm.

Source record↗

Hanford Site Composite Analysis: Radionuclide Selection for Groundwater Pathway Evaluation

The updated Hanford Site Composite Analysis (CA) (DOE/RL-2019-52, Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020)) provides an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at the Hanford Site following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1-1, Radioactive Waste Management, related to managing low-level waste disposal facilities at the Hanford Site. A key aspect of conducting a CA is selecting the radionuclides to be analyzed. This document describes the selection process for radionuclides to be included in the quantitative analysis.

07 ISOTOPE AND RADIATION SOURCES↗

Selection of Vadose Zone Flow and Transport Properties with Gravel Fraction Corrections for the Hanford Site Composite Analysis and Cumulative Impact Evaluation

This environmental calculation file (ECF) is a compilation of hydrologic and radiological/chemical properties to be used for the updated Hanford Site Composite Analysis (CA) and Cumulative Impact Evaluation (CIE) vadose zone (VZ) modeling. The CA will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at the Hanford Site following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1 Chg 1, Radioactive Waste Management, related to managing low-level waste disposal facilities at the Hanford Site. The CIE evaluates the effects of cleanup decisions regarding groundwater quality in the Hanford Site Central Plateau (DOE/RL-2018-69, Cumulative Impact Evaluation Technical Approach Document). Due to the complexity and large number of waste sites in source operable units (OUs), the computational tools used for the CIE must be capable of representing a range of site conditions and source terms in the VZ while also efficiently computing the impact that cleanup decisions have on the underlying aquifer. Waste-site proximity between and within source OUs has resulted in contaminants commingling in the vadose and saturated zones in complex ways. Plume commingling requires cleanup decisions to be evaluated considering the surrounding waste sites and existing groundwater contamination, therefore demonstrating the need to evaluate cumulative impacts from the VZ to groundwater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Majorana Demonstrator readout electronics system

The M AJORANA D EMONSTRATOR comprises two arrays of high-purity germanium detectors constructed to search for neutrinoless double-beta decay in 76 Ge and other physics beyond the Standard Model. Its readout electronics were designed to have low electronic noise, and radioactive backgrounds were minimized by using low-mass components and low-radioactivity materials near the detectors. This paper provides a description of all components of the M AJORANA D EMONSTRATOR readout electronics, spanning the front-end electronics and internal cabling, back-end electronics, digitizer, and power supplies, along with the grounding scheme. The spectroscopic performance achieved with these readout electronics is also demonstrated.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Tribal Revegetation Project Final Project Report: 92-Acre Area, Area 5 Radioactive Waste Management Complex, Nevada National Security Site, Nevada

Nuwu (Southern Paiute), Newe (Western Shoshone), and Nuumu (Owens Valley Paiute) are linguistically related, Numic-speaking peoples who are part of the broader Uto-Aztecan language group. Numic peoples view the land as a holistic, living, sentient being with feelings and purpose. The land is personified with human characteristics and it needs to be experienced to be understood through “learning by doing.” Numic peoples do not support ground disturbing activities within their ancestral lands, including activities tied to the storage of low-level radioactive waste or classified materials on the NNSS, which they view as culturally inappropriate. These deep-rooted ancestral connections are the impetus for reinforcing Numic responsibility for healing disturbed areas by integrating respect and patience with consistent Tribal interaction. Tribal Ecological Knowledge (TEK) is the science of describing Tribal approaches for understanding natural resources. Numic TEK is embedded in traditional teachings learned incrementally over time though experience and it evolves through lessons learned and responses to environmental changes over millennia. Therefore, TEK can broaden and enhance Western scientific knowledge associated with revegetation, especially in highly disturbed areas. The project blended TEK with Western scientific ecological methods to create a vegetative cover within test plots on the 92-Acre Area located at the Radioactive Waste Management Complex (RWMC) located in Area 5 on the Nevada National Security Site (NNSS). The vegetated test plots were systematically created for the Department of Energy (DOE) in tandem with the existing Federal Facilities Agreement and Consent Order (FFACO) with the Nevada Department of Environmental Protection (NDEP). Three previous contractor-lead attempts at revegetation, one targeting full cover revegetation and two targeting test plot revegetation, did not achieve the anticipated results at this location. When presented to the 16 American Indian Tribal nations and affiliated groups with cultural and historical ties to the NNSS, the group appointed a Tribal Revegetation Committee (TRC) that included six expert Tribal knowledge holders to collaborate with an ethnoecologist/cultural anthropologist and two biologists. Project design, planning, seed and outplant selection, spiritual land preparation, and methodology were guided by the TRC and an ethnoecologist/cultural anthropologist from Portland State University (PSU) and biologists from Desert Research Institute (DRI). Using TEK, the TRC recommended a specific seed mixture that contained nine native plant species and three species of outplants. The revegetation effort included preparing and planting thirty 10 m × 10 m (32.8 ft × 32.8 ft) seeded plots, twelve of which also included outplants; and eight 10 m × 100 m (32.8 ft × 328 ft) plots that only received outplants, all atop a waste cell cover. The TRC and the project team creatively adapted TEK with Western scientific methods so that the planned revegetation efforts could occur within the safety and security parameters of the RWMC. Test plots were subjected to one of five soil treatments with varying combinations of straw or mulch applications, soil amendment, and/or outplant planting and one of two watering treatments (watered or unwatered). Planting was divided into two events: one in the fall season and another during the subsequent spring season based on TEK and a corresponding recommendation from the TRC. Monitoring and spiritual management was conducted by the TRC to evaluate plant progress on a monthly basis (in conjunction with the biologist and anthropologist) during each respective growing season for a period of three years after planting. This approach allowed Tribal members the opportunity to conduct traditional blessings and other culturally appropriate activities to restore balance to the land in accordance with Tribal protocols. Following TEK-guided methods, successful plant establishment from seed stock and outplants was observed in many plots. Overall, plots planted in the spring, as recommended by the TRC, showed higher rates of outplant survival and native seedling emergence than those planted in the fall. This finding is significant because it is contrary to the original guidance and previous approaches provided for planting in this region. The TRC believes the frequent co-occurrence of native seedlings near surviving outplants indicates an important symbiotic relationship understood by Tribal communities and overlooked by others. Watered outplants displayed much higher survivability than unwatered plants, even after watering was reduced after the plants were established. Soil amendments and mulch created higher densities of native plants from seed. Many native seedlings showed significant delays in germination, which is considered a normal adaptation to desert climates. Some native plants did not germinate until the third growing year, whereas others germinated during the first growing year, which demonstrates the complexity of the desert environment. Evidence of native insects, reptiles, mammals, and birds, as well as native plants that were not part of the planted species, were noted and considered culturally significant. Despite the presence of non-native plants, native outplants continued to thrive and the incidence of native plant germination from seed increased over time. These successful revegetation results where previous efforts were unsuccessful reinforce the importance of integrating regionally appropriate, TEK-guided methodology with Western science to achieve positive results and the necessity of integrating Tribal involvement in all stages of the revegetation effort. Expanded approaches coupled with Tribal knowledge and tools from Western science addressed a complex problem tied to revegetating atop a low-level radioactive waste cell. The level of Tribal participation serves as a progressive model for building collaborative relationships and addressing ecological challenges on the NNSS.

54 ENVIRONMENTAL SCIENCES↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗