Search NASA⌕ Search

SEARCH · Search NASA

Results for “lunar policy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Engineering, construction, and operations in space - III: Space '92; Proceedings of the 3rd International Conference, Denver, CO, May 31-June 4, 1992. Vols. 1 & 2

The present volume on engineering, construction, and operations in space discusses surface structures on the moon and Mars, surface equipment, construction, and transportation on the moon and Mars, in situ materials use and processing, and space energy. Attention is given to such orbital structures as LEO and the space station, space mining and excavation, space materials, space automation and robotics, and space life support systems. Topics addressed include lunar-based astronomy, space systems integration, terrestrial support for space functions, and space education. Also discussed are space plans, policy, and history, space science and engineering, geoengineering and space exploration, and the construction and development of a human habitat on Mars.

Space life support systems↗

Launching Science: Science Opportunities Provided by NASA's Constellation System

In 2004 NASA began implementation of the first phases of a new space exploration policy. This implementation effort included the development of a new human-carrying spacecraft, known as Orion; the Altair lunar lander; and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System (described in Chapter 5 of this report). The Altair lunar lander, which is in the very preliminary concept stage, is not discussed in detail in the report. In 2007 NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System. To do so, the NRC established the Committee on Science Opportunities Enabled by NASA's Constellation System. In general, the committee interpreted "Constellation-enabled" broadly, to include not only mission concepts that required Constellation, but also those that could be significantly enhanced by Constellation. The committee intends this report to be a general overview of the topic of science missions that might be enabled by Constellation, a sort of textbook introduction to the subject. The mission concepts that are reviewed in this report should serve as general examples of kinds of missions, and the committee s evaluation should not be construed as an endorsement of the specific teams that developed the mission concepts or of their proposals. Additionally, NASA has a well-developed process for establishing scientific priorities by asking the NRC to conduct a "decadal survey" for a particular discipline. Any scientific mission that eventually uses the Constellation System will have to be properly evaluated by means of this decadal survey process. The committee was impressed with the scientific potential of many of the proposals that it evaluated. However, the committee notes that the Constellation System has been justified by NASA and selected in order to enable human exploration beyond low Earth orbit.not to enable science missions. Virtually all of the science mission concepts that could take advantage of Constellation s unique capabilities are likely to be prohibitively expensive. Several times in the past NASA has begun ambitious space science missions that ultimately proved too expensive for the agency to pursue. Examples include the Voyager-Mars mission and the Prometheus program and its Jupiter Icy Moons Orbiter spacecraft (both examples are discussed in Chapter 1). Finding: The scientific missions reviewed by the committee as appropriate for launch on an Ares V vehicle fall, with few exceptions, into the "flagship" class of missions. The preliminary cost estimates, based on mission concepts that at this time are not very detailed, indicate that the costs of many of the missions analyzed will be above $5 billion (in current dollars). The Ares V costs are not included in these estimates. All of the costs discussed in this report are presented in current-year (2008) dollars, not accounting for potential inflation that could occur between now and the decade in which these missions might be pursued. In general, preliminary cost estimates for proposed missions are, for many reasons, significantly lower than the final costs. Given the large cost estimates for many of the missions assessed in this report, the potentially large impacts on NASA's budget by many of these missions are readily apparent.

Source record↗

A Summary of NASA Architecture Studies Utilizing Fission Surface Power Technology

Beginning with the Exploration Systems Architecture Study in 2005, NASA has conducted various mission architecture studies to evaluate implementation options for the U.S. Space Policy. Several of the studies examined the use of Fission Surface Power (FSP) systems for human missions to the lunar and Martian surface. This paper summarizes the FSP concepts developed under four different NASA-sponsored architecture studies: Lunar Architecture Team, Mars Architecture Team, Lunar Surface Systems/Constellation Architecture Team, and International Architecture Working Group-Power Function Team.

Mason, Lee S.↗

Progress in High Power Free-Piston Stirling Convertor Development

The U.S. Space Exploration Policy has established a vision for human exploration of the moon and Mars. One option for power for future outposts on the lunar and Martian surfaces is a nuclear reactor coupled with a free-piston Stirling convertor at a power level of 30-40 kWe. A 25 kW convertor was developed in the 1990s under the SP-100 program. This system consisted of two 12.5 kWe engines connected at their hot ends and mounted in tandem to cancel vibration. Recently, NASA began a new project with Auburn University to develop a 5 kWe, single convertor for use in such a possible lunar power system. Goals of this development program include a specific power in excess of 140 We/kg at the convertor level, lifetime in excess of five years and a control system that will safely manage the convertors in case of an emergency. Foster-Miller, Inc. is developing the 5 kWe Stirling Convertor Assembly. The characteristics of the design along with progress in developing the system will be described.

Brandhorst, Henry W., Jr.↗

Gas Turbine Energy Conversion Systems for Lunar and Planetary Nuclear Power Plants Including Ground Based Applications Using LiFTR "Liquid Fluoride Thorium Reactor" Technology

The background and motivation for this presentation is the Advanced Nuclear Power named in Energy Policy Act of 2005 (Gen IV Nuclear Systems Initiative), Thorium Energy Independence & Security Act of 2008 (S.3680), Gen IV Candidate Advanced Nuclear Power Plants, and high temperature gas turbine power plants offer large thermal efficiency improvement over steam plants.

Juhasz, Albert J.↗

ECLSS Integration Analysis: Advanced ECLSS Subsystem and Instrumentation Technology Study for the Space Exploration Initiative

In his July 1989 space policy speech, President Bush proposed a long range continuing commitment to space exploration and development. Included in his goals were the establishment of permanent lunar and Mars habitats and the development of extended duration space transportation. In both cases, a major issue is the availability of qualified sensor technologies for use in real-time monitoring and control of integrated physical/chemical/biological (p/c/b) Environmental Control and Life Support Systems (ECLSS). The purpose of this study is to determine the most promising instrumentation technologies for future ECLSS applications. The study approach is as follows: 1. Precursor ECLSS Subsystem Technology Trade Study - A database of existing and advanced Atmosphere Revitalization (AR) and Water Recovery and Management (WRM) ECLSS subsystem technologies was created. A trade study was performed to recommend AR and WRM subsystem technologies for future lunar and Mars mission scenarios. The purpose of this trade study was to begin defining future ECLSS instrumentation requirements as a precursor to determining the instrumentation technologies that will be applicable to future ECLS systems. 2. Instrumentation Survey - An instrumentation database of Chemical, Microbial, Conductivity, Humidity, Flowrate, Pressure, and Temperature sensors was created. Each page of the sensor database report contains information for one type of sensor, including a description of the operating principles, specifications, and the reference(s) from which the information was obtained. This section includes a cursory look at the history of instrumentation on U.S. spacecraft. 3. Results and Recommendations - Instrumentation technologies were recommended for further research and optimization based on a consideration of both of the above sections. A sensor or monitor technology was recommended based on its applicability to future ECLS systems, as defined by the ECLSS Trade Study (1), and on whether its characteristics were considered favorable relative to similar instrumentation technologies (competitors), as determined from the Instrumentation Survey (2). The instrumentation technologies recommended by this study show considerable potential for development and promise significant returns if research efforts are invested.

Source record↗

Constellation Program Life-cycle Cost Analysis Model (LCAM)

The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

Prince, Andy↗

Global change - Geoengineering and space exploration

Geoengineering options and alternatives are proposed for mitigating the effects of global climate change and depletion of the ozone layer. Geoengineering options were discussed by the National Academy of Science Panel on the Policy Implications of Greenhouse Warming. Several of the ideas conveyed in their published report are space-based or depend on space systems for implementation. Among the geoengineering options using space that are discussed include the use of space power systems as an alternative to fossil fuels for generating electricity, the use of lunar He-3 to aid in the development of fusion energy, and the establishment of a lunar power system for solar energy conversion and electric power beaming back to earth. Other geoengineering options are discussed. They include the space-based modulation of hurricane forces and two space-based approaches in dealing with ozone layer depletion. The engineering challenges and policy implementation issues are discussed for these geongineering options.

Jenkins, Lyle M.↗

A Summary of NASA Architecture Studies Utilizing Fission Surface Power Technology

Beginning with the Exploration Systems Architecture Study in 2005, NASA has conducted various mission architecture studies to evaluate implementation options for the U.S. Space Policy (formerly the Vision for Space Exploration). Several of the studies examined the use of Fission Surface Power (FSP) systems for human missions to the lunar and Martian surface. This paper summarizes the FSP concepts developed under four different NASA-sponsored architecture studies: Lunar Architecture Team, Mars Architecture Team, Lunar Surface Systems/Constellation Architecture team, and International Architecture Working Group-Power Function team. The results include a summary of FSP design characteristics, a compilation of mission-compatible FSP configuration options, and an FSP concept-of-operations that is consistent with the overall mission objectives.

Mason, Lee↗

Update on the Ares V to Support Heavy Lift for U.S. Space Exploration Policy

When NASA's Ares V cargo launch vehicle begins flying late next decade, its capabilities will significantly exceed the 1960s-era Saturn V. It will send more crew and cargo to more places on the lunar surface than Apollo and provide ongoing support to a permanent lunar outpost that will open the Moon to greater exploration, science and adventure than ever before. Moreover, it will restore the United States heavy-lift capability, which can support human and robotic exploration for decades to come. Ares V remains in a pre-design analysis cycle stage pending a planned Authority to Proceed (ATP) in late 2010. Ares V benefits from the decision to draw from heritage hardware and its commonality with the Ares I crew launch vehicle, which completed its preliminary design review (PDR) in September 2008. Most of the work on Ares V to date has been focused on refining the vehicle design through a variety of internal studies. This paper will provide background information on the Ares V evolution, emphasizing the vehicle configuration as it exists today.

Sumrall, John P.↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Space Policy Directive-1 has led to NASA partnerships with commercial entities on procurement which includes the development of the Human Landing System (HLS) [1]. With the goal of delivering human crew to the lunar surface by 2024, system uncertainties become an important obstacle to the maturation of multiple new, driving technologies and mission concepts of the HLS program. As unmitigated uncertainties have previously led to failed development programs, these risks and their impacts must be understood and handled to ensure program success [2]. Sources of uncertainty include novel engine designs and configurations, increased reliance on cryogenic fluid management(CFM), and refueling technologies—which propagate as high-level performance metrics such as overall propellant mass and engine performance. Also, the occurrence of operational uncertainties—e.g. launch conditions or need to abort during the mission—can cause cascading effects on the rest of the mission that are difficult to definitively quantify, and are outside the scope of control. These concrete examples and other occurrences can be categorized as either epistemic or aleatory uncertainties.Epistemic uncertainty arises due to a lack of knowledge and can be alleviated with design and program maturation. Aleatory uncertainty is due to the inherent randomness of the system and cannot be directly reduced, unlike epistemic uncertainty. Robust design and probabilistic methods can compensate for aleatory effects. A taxonomy of uncertainty is referred to for this work [3]. In this paper, a probabilistic methodology to handle uncertainties has been demonstrated on a three-element HLS concept [1, 4], which allows tracking of current best estimates of the concept and assessment of concept design robustness against uncertainties. A sample case has been completed for this abstract, and an expansion on the methodology will be included in the final paper. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. This abstract will cover the basics of the approach used, and further details and justifications will be in the final paper.The mission profile associated with this three-element concept (Fig 1) was modeled as a set of mission events that facilitated mass changes, idles, or spacecraft maneuvers. The mission profile scope starts with each element’s NRHO orbit insertion and aggregation and ends at post-sortie rendezvous with Orion. More detail on the mission profile will be in the final paper. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as the physics framework to model the HLS architecture for applying the probabilistic methodology [5, 6]. Specifically, a parametric representation of the lander, ascent, and transfer elements and the mission profile of each element was established, with vehicle and mission parameters available as inputs to allow for a dynamic model. Each vehicle stage was modeled with high-level performance metrics, using Isp and propellant mass fraction (PMF) to remain parametric. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. These parameters were frozen at their nominal values for the purposes of baselining architecture performance and sizing the vehicle appropriately based on reference documentation [1]. Range estimating—a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities—is traditionally used with Mass Equipment Lists (MELs), but has been adapted with operational parameters as well as vehicle parameters in theDYREQT model to capture mission uncertainty alongside vehicle uncertainty [7, 3]. This method was selected due to its application and insight on a system from a bottom-up perspective, independence from historical rules of thumb, and ability to generate sensitivities based on design decisions and uncertainties. As a sample case for the abstract, the boiloff rates of the vehicle elements and the loiter times during the mission (simulating launch time variations and changing window of opportunities) were used with range estimating to provide preliminary results. To perform the range estimation portion of this methodology (depicted in Fig. 3, further details in final paper), the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the sample set of uncertainty parameters; 5,000 cases via Latin Hypercube Sampling were computed on the DYREQT architecture model. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Range estimating was applied to the surrogates instead of the actual models, which saves computational expense due to the bulk of cases needed for the Monte Carlo simulation as part of range estimating. Uncertainty parameters were sampled independently from triangular distributions using the DoE ranges as ‘min’ and ‘max’, and the nominal value as ‘most likely’. Based engineering intuition, some uncertainty parameters are correlated—e.g. if the main propellant has a high boil-off rate, the oxidizer should follow suit as both are related to CFM technology.While a Monte Carlo simulation samples all inputs as independent, the results would show model correlations; thus, it is efficient to sample the inputs as correlated. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo. A table for the DoE ranges and probability distribution parameters is shown in Table 1, and more details on Correlated Monte Carlo Simulations will be discussed in the final paper. The model’s resulting DoE showed that multivariate polynomial equations fit via least squares method captured its behavior accurately for the sample case. For the Correlated Monte Carlo Simulation, a positive correlation between fuel and oxidizer boiloff rates was used as a demonstration. 10,000 cases were computed with the surrogates and the launched masses for each vehicle element was collated. The results can be displayed in a probability density function (PDF), showing the impact of the uncertainty parameters chosen. Integrating the PDFs will yield a cumulative distribution function (CDF) that shows the cumulative probability of a given value on the x-axis. For the sample case, the elements’ launch mass margin was calculated and represented in as CDFs, as a demonstrated representation of figures of merit for the HLS concept. For the lander and ascent elements, the NRHO mass insertion limit is 16t; the transfer element has a limit of 30t [1]. It can be seen with Figure 2 that this probabilistic methodology can provide insight into mass margin with respect to the uncertainties being modeled. Currently, the results show that the lander (descent) vehicle element has the most restrictive design space; it is the only element to show a 10% probability of negative margin. Further analysis on the Monte Carlo results will show sensitivities for driving constraints and parameters for architecture feasibility, which can lead to establishing potential mission rules.The combination of range estimating with a parametric architecture model for HLS demonstrated the capability of this probabilistic methodology in a sample case. As the HLS development progresses, this methodology has the potential for keeping current best estimates of architecture performance for awarded concepts due to the flexibility in DYREQT’s modeling framework and its parametric nature. Concept maturation and increased epistemic knowledge can be injected into the model probabilistic modeling, and thus continue to track probability of mission success.

Stephanie Y Zhu↗

Current Status of NASA's Heavy Lift Plans

Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of - and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA's most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA's Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA's priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA s most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA s Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA s priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch successfully demonstrated in suborbital flighhe ability to assemble, prepare, launch, control and recover the Ares I configuration and compare performance to computer models. Component tests continue on the J-2X engine, which will put both the Ares I and Ares V upper stages into orbit. In addition, more than 100,000 parts have been manufactured or on the assembly line for the first J-2X powerpack and the first two development engines, with hot fire tests to begin in 2011. This paper will further detail the progress to date on the Ares V and planned activities for the remainder of 2010. In addition, the Ares V team has continued its outreach to potential user communities in science and national security. Through the Constellation Program, NASA has amassed an enormous knowledge base in the design, technologies, and operations of heavy lift launch vehicles that will be a national asset for any future launch vehicle decision. This early phase of the design presents the best opportunity to incorporate where possible the insights and needs of other users.

Creech, Steve↗

Off Earth Landing and Launch Pad Construction – A Critical Technology for Establishing a Long-Term Presence on Extraterrestrial Surfaces

Space Policy Directive 1 has refocused the National Aeronautics and Space Administration (NASA) to lead the return of humans to the Moon for long-term exploration and utilization. A long-term presence on the moon will require numerous lunar landings and launches to build up surface assets, rotate crew, and deliver resources to/from the moon. Interactions between landing/launch plumes and the unprepared surface cause regolith to be eroded and ejected at high velocities from beneath the vehicle. The associated ejecta elevates mission risks by obscuring sensors and human vision during landing; cratering/modifying the surface that the vehicle will land upon; and subjecting the vehicle, surrounding assets, and potentially orbital assets to impacts from high velocity dust particles. A method to mitigate risks stemming from landing/launch plume ejecta is to construct reusable landing/launch pads. A landing/launch pad can provide a known landing/launch surface, minimize ejecta, protect assets from liberated particles, and provide protection in case of a landing/launch anomaly. This presentation will summarize previous work towards construction of off-Earth landing/launch pads and identify key technology gaps. Additionally, this presentation establishes metrics for comparison of pad construction technologies and trades current approaches. The overall objective of this paper is to baseline the state of the art of off-Earth landing/launch pad construction technologies and serve as the starting point for further technical development.

Landing & Launch Pad↗

EFFECT OF STERILIZATION IN SPACECRAFT DESIGN

Modern spacecraft design no longer involves only the Engineering Sciences. To get "the bugs" out of a system must now be taken literally to signify eradication of actual free-living microorganisms. A severe impact of a non-sterilized space vehicle could result in overt, reckless contamination, virtually eliminating a celestial body as a scientific base for the exobiological phases of space exploration. Recognizing the potentially damaging effects of septic launches, the National Aeronautics and Space Administration in December, 1960 authorized spacecraft sterilization and decontamination as National policy, thereby elevating the space effort onto a higher scientific plane. In the NASA directive, the basic reasons for sterilization were established, viz., "to preserve clues to the origin of life and of the universe, which may be hidden beneath the lunar strata or under the atmospheres of strange planets, to prevent inadvertent seeding of extraterrestrial surfaces by earth-life cultures, and to protect the earth from mutual contamination." In light of the foregoing, spacecraft sterilization should be regarded as the most significant single mission as well as design requirement of planetary space exploration --- especially if our objectives are primarily scientific.

Ranger project↗

Development Status of the CECE Cryogenic Deep Throttling Demonstrator Engine

As one of the first technology development programs awarded by NASA under the U.S. Space Exploration Policy (USSEP), the Pratt & Whitney Rocketdyne (PWR) Deep Throttling, Common Extensible Cryogenic Engine (CECE) program was selected by NASA in November 2004 to begin technology development and demonstration toward a deep throttling, cryogenic engine supporting ongoing trade studies for NASA's Lunar Lander descent stage. The CECE program leverages the maturity and previous investment of a flight-proven hydrogen/oxygen expander cycle engine, the PWR RLI0, to develop and demonstrate an unprecedented combination of reliability, safety, durability, throttlability, and restart capabilities in a high-energy, cryogenic engine. The testbed selected for the deep throttling demonstration phases of this program was a minimally modified RL10 engine, allowing for maximum current production engine commonality and extensibility with minimum program cost. Two series of demonstrator engine tests, the first in April-May 2006 and the second in March-April 2007, have demonstrated in excess of 10:1 throttling of the hydrogen/oxygen expander cycle engine. Both test series have explored a combustion instability ("chug") environment at low throttled power levels. These tests have provided an early demonstration of an enabling cryogenic propulsion concept with invaluable system-level technology data acquisition toward design and development risk mitigation for future CECE Demonstrator engine tests.

Source record↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Crew Vehicle s (MPCV s) first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd A.↗

NASA Tech Briefs, November 2010

Topics covered include: Portable Handheld Optical Window Inspection Device; Salience Assignment for Multiple-Instance Data and Its Application to Crop Yield Prediction; Speech Acquisition and Automatic Speech Recognition for Integrated Spacesuit Audio Systems ; Predicting Long-Range Traversability from Short-Range Stereo-Derived Geometry; Browser-Based Application for Telemetry Monitoring of Robotic Assets; Miniature Low-Noise G-Band I-Q Receiver; Methods of Using a Magnetic Field Response Sensor Within Closed, Electrically Conductive Containers; Differential Resonant Ring YIG Tuned Oscillator; Microfabricated Segmented-Involute-Foil Regenerator for Stirling Engines; Reducing Seal Adhesion in Low Impact Docking Systems; Optimal Flow Control Design; Corrosion-Resistant Container for Molten-Material Processing; Reusable Hot-Wire Cable Cutter; Deployment of a Curved Truss; High-Volume Airborne Fluids Handling Technologies to Fight Wildfires; Modeling of Alkane Oxidation Using Constituents and Species; Fabrication of Lanthanum Telluride 14-1-11 Zintl High-Temperature Thermoelectric Couple; A Computer Model for Analyzing Volatile Removal Assembly; Analysis of Nozzle Jet Plume Effects on Sonic Boom Signature; Optical Sidebands Multiplier; Single Spatial-Mode Room-Temperature-Operated 3.0 to 3.4 micrometer Diode Lasers; Self-Nulling Beam Combiner Using No External Phase Inverter; Portable Dew Point Mass Spectrometry System for Real-Time Gas and Moisture Analysis; Maximum Likelihood Time-of-Arrival Estimation of Optical Pulses via Photon-Counting Photodetectors; Handheld White Light Interferometer for Measuring Defect Depth in Windows; Decomposition Algorithm for Global Reachability on a Time-Varying Graph; Autonomous GN and C for Spacecraft Exploration of Comets and Asteroids; Efficient Web Services Policy Combination; Using CTX Image Features to Predict HiRISE-Equivalent Rock Density; Isolation of the Paenibacillus phoenicis, a Spore-Forming Bacterium; Monolithically Integrated, Mechanically Resilient Carbon-Based Probes for Scanning Probe Microscopy; Cell Radiation Experiment System; Process to Produce Iron Nanoparticle Lunar Dust Simulant Composite; Inversion Method for Early Detection of ARES-1 Case Breach Failure; Use of ILTV Control Laws for LaNCETS Flight Research;and Evaluating Descent and Ascent Trajectories Near Non-Spherical Bodies.

Source record↗