Hood River and Pelton Ladder Evaluation Studies, 2008 Annual Report : October 2007 - September 2008.

This report summarizes the life history and production data collected in the Hood River subbasin during FY 2008. Included is a summary of jack and adult life history data collected at the Powerdale Dam trap on seventeen complete run years of winter steelhead, spring and fall chinook salmon, and coho salmon, and on fifteen complete run years of summer steelhead. Also included are summaries of (1) the hatchery winter steelhead broodstock collection program; (2) hatchery production releases in the Hood River subbasin; (3) subbasin wild summer and winter steelhead smolt production, (4) numbers of hatchery summer and winter steelhead smolts leaving the subbasin; (5) smolt migration timing past Bonneville Dam, (6) wild and hatchery steelhead smolt-to-adult survival rates; (7) wild summer and winter steelhead egg to smolt survival rates; and (8) streamflow at selected locations in the Hood River subbasin. Data will be used in part to (1) evaluate the HRPP relative to its impact on indigenous populations of resident and anadromous salmonids (see Ardren Draft), (2) evaluate the HRPP's progress towards achieving the biological fish objectives defined in the Hood River Subbasin Plan (Coccoli 2004) and the Revised Master Plan for the Hood River Production Program (HDR|FishPro, ODFW, and CTWSRO 2008), (3) refine spawner escapement objectives to more accurately reflect subbasin carrying capacity, and (4) refine estimates of subbasin smolt production capacity to more accurately reflect current and potential subbasin carrying capacity.

13 HYDRO ENERGY↗

Energy-Efficiency & Water Institute Research Facility, Purdue University, (IN)

The renovation of the Schneider Avenue Building to construct two research laboratories within the building is complete. The research laboratories are for the Purdue Calumet Water Institute and the Energy Efficiency and Reliability Center. The Water Institute occupies approximately 1000+ SF of research space plus supporting offices. The Energy-Efficiency Center occupies approximately 1000+ SF that houses the research space. The labs will enhance the Water & Energy Institute’s research capabilities necessary to tackle these issues through the development of practical approaches critical to local government and industry. The addition of these research laboratories to the Purdue University Calumet campus is in both direct support of the University’s Strategic Plan as well as the 2008 Campus Master Plan that identifies a 20% shortage of research space.

54 ENVIRONMENTAL SCIENCES↗

LaRC 20-Year Center Revitalization Plan

LaRC has developed a 20-Year Center Revitalization Plan. The objective of this plan is to assure that the center infrastructure is sustainable for the long-term and that the center will have the essential facilities and laboratories to execute the future NASA mission. The plan was developed by a centerwide team, VITAL, and was approved by the Center Leadership Council (CLC) in March 2012. The revitalization plan will be implemented through the Center Master Planning process.

Mangum, Cathy H.↗

PUEBLO OF ZIA RENEWABLE ENERGY DEVELOPMENT FEASIBILITY STUDY

The Pueblo of Zia will conduct a comprehensive feasibility study for best-use application(s) for development of renewable energy resources on its tribally held TRUST lands (i.e., Trust Lands of Zia Indian Reservation). The feasibility study is essential for determining the technical and economic viability of a future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe. Project Objectives: The feasibility study is essential for determining the technical and economic viability of future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe to: 1. Provide a balanced local renewable power supply for Zia Pueblo, its members, tribal offices, schools and buildings, and businesses on tribal lands 2. Provide a firm power supply for export and commercial market distribution 3. Provide economic development for the Tribe and its members, including job training and creation, each in accordance with the goals and objectives as conveyed by the Pueblo of Zia Tribal Council, Tribal Administration, and outlined in The Pueblo of Zia Comprehensive Plan and Pueblo of Zia — Zia Enterprise Zone Master Plan. A key goal of the study is to analyze the integrated development of solar, geothermal, and wind renewable energy resources at Zia Pueblo, with added potential to combine gas-fired generation to accomplish energy firming. Geothermal offers a base load source of energy, providing power continuously for end users. Wind and solar offer intermediate and peaking sources of energy, which can be harvested throughout the day, with periods of variable but predicable output. Variability will be managed in an integrated manner, using Zia Pueblo's combined renewable resources to generate high-quality power. Tasks are intended to collect, catalog, map, and analyze existing data on Zia Pueblo's renewable energy resource base and then match resource attributes with the most suitable renewable technologies for tribal energy consumption and needs. Also, key impacts on cultural and social values of Zia Pueblo will be addressed. Selected most favorable uses and technologies will be further investigated to determine initial feasibility and market for business development for up to six sites located on tribal land. The anticipated result will be the recommended development of sites that have sufficient background study completed to warrant a business plan, detailed engineering feasibility, and acquisition of project financing. Valuable technical and economic information will accrue from this study that may be applied to scale up or down the various power technology potential on Zia Pueblo for maximum benefit and best area(s) of application, project phasing and potential for future replicability and expansion.

14 SOLAR ENERGY↗

IDEA Clean Energy Application Center

The DOE Clean Energy Application Centers were launched with a goal of focusing on important aspects of our nation’s energy supply including Efficiency, Reliability and Resiliency. Clean Energy solutions based on Combined Heat & Power (CHP), District Energy and Waste Heat Recovery are at the core of ensuring a reliable and efficient energy infrastructure for campuses, communities, and industry and public enterprises across the country. IDEA members which include colleges and universities, hospitals, airports, downtown utilities as well as manufacturers, suppliers and service providers have long-standing expertise in the planning, design, construction and operations of Clean Energy systems. They represent an established base of successful projects and systems at scale and serve important and critical energy loads. They also offer experience, lessons learned and best practices which are of immense value to the sustained growth of the Clean Energy sector. IDEA has been able to leverage the funds from the project award to raise the visibility, improve the understanding and increase deployment CHP, District Energy and Waste Heat Recovery solutions across the regions of our nation, in collaboration with the regional CEAC’s. On August 30, 2012, President Obama signed an Executive Order to accelerate investments in industrial energy efficiency (EE), including CHP and set a national goal of 40 GW of new CHP installation over the next decade IDEA is pleased to have been able to support this Executive Order in a variety of ways including raising awareness of the goal through educational workshops and Conferences and recognizing the installation of large scale CHP and district energy systems. A supporting key area of collaboration has involved IDEA providing technical assistance on District Energy/CHP project screenings and feasibility to the CEAC’s for multi building, multi-use projects. The award was instrumental in the development of a first-order screening/feasibility tool for these types of community energy projects. The Excel based tool incorporates hourly climate based building loads data to arrive at the composite energy demand for the district and compares the Net Present Value (NPV) of the costs of CHP/DE alternatives. This tool has been used to provide assistance to several projects in the Northeast, Mid-Atlantic, Intermountain and Pacific Regions. The tool was disseminated to the CEACs and supplemented by a Training Webinar and a How to Guide IDEA produced a US Community Energy Development Guide to support mayors, planners, community leaders, real estate developers and economic development officials who are interested in planning more sustainable urban energy infrastructure, creating community energy master plans and implementing CHP/ District Energy systems in cities, communities and towns. IDEA has collected industry data and provided a comprehensive data set containing information on District Energy installations in the US. District energy systems are present in 49 states and theDistrict of Columbia. Of the 597 systems 55% were DE alone while the remainder was some combination of CHP, district heating, and district cooling. District energy systems that do not currently involve electric generation are strong near-term candidates for the adoption of CHP due to the magnitude of their aggregated thermal load. This data has helped inform specific and targeted initiatives including technical assistance provided by the CEAC’s for EPA’s Boiler MACT Compliance by large District Heating System boilers. These outcomes have been greatly enabled by the close coordination and collaboration with DOE CEAC leadership and with the eight regional US DOE Clean Energy Application Centers and the award’s incremental funding has allowed IDEA to leverage our resources to be an effective champion for Clean Energy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Framework for integration of urban planning, strategic environmental assessment and ecological planning for urban sustainability within the context of China

Sustainable development or sustainability has been highlighted as an essential principle in urban master planning, with increasing recognition that uncontrollable urbanization may well give rise to various issues such as overexploitation of natural resources, ecosystem destruction, environmental pollution and large-scale climate change. Thus, it is deemed necessary to modify the existing urban and regional administrative system so as to cope with the challenges urban planning is being confronted with and realize the purpose of urban sustainability. This paper contributed to proposing a mechanism which helps to make urban planning with full consideration of issues with respect to sustainable development. We suggested that the integration of urban planning, SEA and ecological planning be a multi-win strategy to offset deficiency of each mentioned political tool being individually applied. We also proposed a framework where SEA and ecological planning are fully incorporated into urban planning, which forms a two-way constraint mechanism to ascertain environmental quality of urban planning, although in practice, planning and SEA processes may conditionally be unified. Moreover, as shown in the case study, the integration of the three political tools may be constrained due to slow changes in the contextual factors, in particular the political and cultural dimensions. Currently within the context of China, there may be three major elements which facilitate integration of the three political tools, which are (1) regulatory requirement of PEIA on urban planning, (2) the promotion or strong administrative support from government on eco-district building, and (3) the willingness of urban planners to collaborate with SEA experts or ecologists.

54 ENVIRONMENTAL SCIENCES↗

SU-E-T-337: Dosimetric Study of TMI Using Helical Tomotherapy

Purpose: The purpose of this study is to evaluate the dosimtry of TMI using Helical Tomotherapy (HT). Methods: Whole body CT data sets of 4 patients (median age : range:12–37 years) with 5mm slice thickness were used for planning in HT (TPS version 4.2.3). The contouring of the target and organ at risks (OAR) were delineated ( Oncentra Master Plan v 4.1). Two plans were generated using 5cm and 2.5 cm field widths.The modulation factor and pitch was 3 and 0.3 respectively. Dose to PTV, OARs and the dose homogeneity were evaluated. The doses obtained were compared with the existimg literature. Dose delivery verification was carried out by point dose and 2D array measurements with ion chamber and Arc check dosimetry (Sun NuclearTM) system repectively. The prescribed dose was 14.4 Gy in 8 fractions. Results: The mean PTV volume was 7341.28cc (sd=2353) The dose homogeneity index of PTV was 12.03(sd=2.98) for 2.5cm-FW and 14.61 (sd=1.33) for 5cm-FW.The conformation number for 2.5 and 5 cm plans are 0.6328(sd=0.09) and 0.5915 (sd=0.0376) respectively. The mean dose(Gy) to the OARs were as follows for 2.5cm-FW : eyes, lens, lungs, kidneys, heart, liver,thyroid and testes for are 4.12,1.9,6.61,4.04,4.85,6.06,7.17 and 1.27. The mean dose(Gy) to the OARs were as follows for 5cm-FW :eyes, lens, lungs, kidneys, heart, liver,thyroid and testes for are 4.45,3.14,6.79,4.02,5.01,6.01,10.8 and 1.33. The mean variation of the point dose as compared to the expected dose was within 2% and the gamma analysis was at 91%. Conclusion: It was concluded that 5cm field width plans produces optimal dose volume parameters with deliverable treatment time. From this initial dissymmetric study, it was concluded that the treatment planning and the dose delivery verification was feasible considering the complexity of the TMI.

60 APPLIED LIFE SCIENCES↗

Thermal Energy Corporation Combined Heat and Power Project

To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation's best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission providing top quality medical care and instruction without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power outages. TECO's operation is the largest Chilled Water District Energy System in the United States. The company used DOE's funding to help install a new high efficiency CHP system consisting of a Combustion Turbine and a Heat Recovery Steam Generator. This CHP installation was just part of a larger project undertaken by TECO to ensure that it can continue to meet TMC's growing needs. The complete efficiency overhaul that TECO undertook supported more than 1,000 direct and indirect jobs in manufacturing, engineering, and construction, with approximately 400 of those being jobs directly associated with construction of the combined heat and power plant. This showcase industrial scale CHP project, serving a critical component of the nation's healthcare infrastructure, directly and immediately supported the energy efficiency and job creation goals established by ARRA and DOE. It also provided an unsurpassed model of a district energy CHP application that can be replicated within other energy intensive applications in the industrial, institutional and commercial sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Future aerospace ground test facility requirements for the Arnold Engineering Development Center

Arnold Engineering Development Center (AEDC) was conceived at the close of World War II, when major new developments in flight technology were presaged by new aerodynamic and propulsion concepts. During the past 40 years, AEDC has played a significant part in the development of many aerospace systems. The original plans were extended through the years by some additional facilities, particularly in the area of propulsion testing. AEDC now has undertaken development of a master plan in an attempt to project requirements and to plan for ground test and computational facilities over the coming 20 to 30 years. This report was prepared in response to an AEDC request that the National Research Council (NRC) assemble a committee to prepare guidance for planning and modernizing AEDC facilities for the development and testing of future classes of aerospace systems as envisaged by the U.S. Air Force.

Kirchner, Mark E.↗

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗

Center Planning and Development Student Engineer

This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

engineering↗

Kennedy Space Center Spaceport Analysis

Until the Shuttle Atlantis' final landing on July 21, 2011, Kennedy Space Center (KSC) served as NASA's main spaceport, which is a launch and landing facility for rockets and spacecraft that are attempting to enter orbit. Many of the facilities at KSC were created to assist the Shuttle Program. One of the most important and used facilities is the Shuttle Landing Facility (SLF), This was the main landing area for the return of the shuttle after her mission in space. · However, the SLF has also been used for a number of other projects including straight-line testing by Gibbs Racing, weather data collection by NOAA, and an airfield for the KSC helicopters. This runway is three miles long with control tower at midfield and a fire department located at the end in care of an emergency. This facility, which was part of the great space race, will continue to be used for historical events as Kennedy begins to commercialize its facilities. KSC continues to be an important spaceport to the government, and it will transform into an important spaceport for the commercial industry as well. During my internship at KSC's Center Planning and Development Directorate, I had the opportunity to be a part of the negotiation team working on the agreement for Space Florida to control the Shuttle Landing Facility. This gave me the opportunity to learn about all the changes that are occurring here at Kennedy Space Center. Through various meetings, I discovered the Master Plan and its focus is to transform the existing facilities that were primarily used for the Shuttle Program, to support government operations and commercial flights in the future. This. idea is also in a new strategic business plan and completion of a space industry market analysis. All of these different documentations were brought to my attention and I. saw how they came together in the discussions of transitioning the SLF to a commercial operator, Space Florida. After attending meetings and partaking in discussions for the SLF Agreement, I formed the idea of a Spaceport Analysis as my over internship project. As previously stated, I had the opportunity to sit in on the market analysis meetings and read through the analysis itself. I suggested the creation of a Strengths Weaknesses Opportunities Threats (SWOT) analysis, which allows an individual to see an overview of the company's strengths and weaknesses alongside any industry opportunities and threats. After discussions with the lead writer of the new strategic business plan and getting approval, I took the action upon myself and created the Kennedy Space Center SWOT Analysis.

Wary, Samantha A.↗

Center Planning and Development Student Engineer at KSC

This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

Engineer↗

Finding of No Adverse Effect for the Façade Alteration of Building 23-117, Administration Building, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to update the façade of Building 23-117 in the town of Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15256), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada. The purpose of the undertaking is to incorporate Building 23-117 into the new Mercury campus in accordance with the master plan for the modernization of Mercury. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-117 was built in 1982 as the architect-engineer Administration Building1 for Holmes & Narver, a government contractor who helped design and engineer the town of Mercury and other areas on the NNSS from its inception until the termination of their contract in 1990. The building continued to be used by subsequent government contractors and is currently still in use by MSTS. The town of Mercury and the immediate surrounding area have been formally determined eligible for listing in the National Register of Historic Places (National Register, NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992. Building 23-117 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al.) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). It is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and is subject to the stipulations of the Mercury PA. The NNSA/NFO requested that Desert Research Institute (DRI), cultural resource subject matter experts, analyze the effects of the proposed project on historic properties in the Area of Potential Effect (APE) and make a recommended finding for the undertaking in accordance with Section 106 of the NHPA and the Mercury PA. The purpose of this letter report is to submit documentation related to the mitigation of the façade alteration of Building 23-117 (Nevada State Historic Preservation Office [SHPO] Resource No. B15256) in the Mercury Historic District (MHD, SHPO Resource No. D230). This submission is intended to comply with the stipulations in the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

Developing a holistic strategy for integrated waste management within municipal planning: Challenges, policies, solutions and perspectives for Hellenic municipalities in the zero-waste, low-cost direction

The present position paper addresses contemporary waste management options, weaknesses and opportunities faced by Hellenic local authorities. It focuses on state-of-the-art, tested as well as innovative, environmental management tools on a municipal scale and identifies a range of different collaboration schemes between local authorities and related service providers. Currently, a policy implementation gap is still experienced among Hellenic local authorities; it appears that administration at the local level is inadequate to manage and implement many of the general policies proposed; identify, collect, monitor and assess relevant data; and safeguard efficient and effective implementation of MSWM practices in the framework of integrated environmental management as well. This shortfall is partly due to the decentralisation of waste management issues to local authorities without a parallel substantial budgetary and capacity support, thus resulting in local activity remaining often disoriented and isolated from national strategies, therefore yielding significant planning and implementation problems and delays against pressing issues at hand as well as loss or poor use of available funds. This paper develops a systemic approach for MSWM at both the household and the non-household level, summarizes state-of-the-art available tools and compiles a set of guidelines for developing waste management master plans at the municipal level. It aims to provide a framework in the MSWM field for municipalities in Greece as well as other countries facing similar problems under often comparable socioeconomic settings.

54 ENVIRONMENTAL SCIENCES↗

USAID Haiti Training Session #2: Introduction to Engage [Slides]

Welcome to Engage! Engage is a capacity expansion modeling tool supported by the National Renewable Energy Laboratory and based on the Calliope open-source capacity expansion model developed by the ETH Zurich University, maintained at the TU Delft University. Engage is an accessible (free, open-access, web-hosted) and flexible web-based energy system planning application for rapid multiple-energy-form energy system scenario exploration. Its cloud-based, collaborator-sharable data model, intuitive interface and visualization capabilities facilitate collaboration and communication among teams, with experts, and among diverse stakeholder groups exploring energy system implications from district to national-scale models. This training series was developed under USAID to empower Haitian stakeholders to explore modeling scenarios in Engage to develop a Haiti Energy Master Plan. This training series includes a general overview of how Engage works along with tailored exercises that target Haiti's specific energy needs, such as modeling the capacity expansion of the bulk power system, fuel scarcity challenges, the development of microgrids, and the economic viability of transmission strategies. See NREL/PR-7A40-89369 for the French translation of this document.

24 POWER TRANSMISSION AND DISTRIBUTION↗

USAID Haiti Training Session #3: Capacity Expansion [Slides]

Welcome to Engage! Engage is a capacity expansion modeling tool supported by the National Renewable Energy Laboratory and based on the Calliope open-source capacity expansion model developed by the ETH Zurich University, maintained at the TU Delft University. Engage is an accessible (free, open-access, web-hosted) and flexible web-based energy system planning application for rapid multiple-energy-form energy system scenario exploration. Its cloud-based, collaborator-sharable data model, intuitive interface and visualization capabilities facilitate collaboration and communication among teams, with experts, and among diverse stakeholder groups exploring energy system implications from district to national-scale models. This training series was developed under USAID to empower Haitian stakeholders to explore modeling scenarios in Engage to develop a Haiti Energy Master Plan. This training series includes a general overview of how Engage works along with tailored exercises that target Haiti's specific energy needs, such as modeling the capacity expansion of the bulk power system, fuel scarcity challenges, the development of microgrids, and the economic viability of transmission strategies. See NREL/PR-7A40-89365 for the French translation of this document.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Session de formation de l'USAID en Haiti n2: Introduction a l'outil Engage [Slides]

Welcome to Engage! Engage is a capacity expansion modeling tool supported by the National Renewable Energy Laboratory and based on the Calliope open-source capacity expansion model developed by the ETH Zurich University, maintained at the TU Delft University. Engage is an accessible (free, open-access, web-hosted) and flexible web-based energy system planning application for rapid multiple-energy-form energy system scenario exploration. Its cloud-based, collaborator-sharable data model, intuitive interface and visualization capabilities facilitate collaboration and communication among teams, with experts, and among diverse stakeholder groups exploring energy system implications from district to national-scale models. This training series was developed under USAID to empower Haitian stakeholders to explore modeling scenarios in Engage to develop a Haiti Energy Master Plan. This training series includes a general overview of how Engage works along with tailored exercises that target Haiti's specific energy needs, such as modeling the capacity expansion of the bulk power system, fuel scarcity challenges, the development of microgrids, and the economic viability of transmission strategies. See NREL/PR-7A40-88836 for the English translation of this document.

24 POWER TRANSMISSION AND DISTRIBUTION↗