Search NASASearch

SEARCH · Search NASA

Results for “monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)

Monitoring system and methods for a distributed and recoverable digital control system

A monitoring system and methods are provided for a distributed and recoverable digital control system. The monitoring system generally comprises two independent monitoring planes within the control system. The first monitoring plane is internal to the computing units in the control system, and the second monitoring plane is external to the computing units. The internal first monitoring plane includes two in-line monitors. The first internal monitor is a self-checking, lock-step-processing monitor with integrated rapid recovery capability. The second internal monitor includes one or more reasonableness monitors, which compare actual effector position with commanded effector position. The external second monitor plane includes two monitors. The first external monitor includes a pre-recovery computing monitor, and the second external monitor includes a post recovery computing monitor. Various methods for implementing the monitoring functions are also disclosed.

Stange, Kent

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson

Wilson Corners SWMU 001 2015 Annual Long Term Monitoring Report Kennedy Space Center, Florida

This document presents the findings of the 2015 Long Term Monitoring (LTM) that was completed at the Wilson Corners site, located at the National Aeronautics and Space Administration John F. Kennedy Space Center, Florida. The objectives of the 2015 LTM event were to evaluate the groundwater flow direction and gradient, to monitor the vertical and horizontal extent of the volatile organic compounds (VOCs; including the upgradient and sidegradient extents, which are monitored every five years), and to monitor select locations internal to the dissolved groundwater plume. The 2015 LTM event included several upgradient and sidegradient monitoring wells that are not sampled annually to verify the extent of VOCs in this portion of the site. The December 2015 LTM groundwater sampling event included, depth to groundwater measurements, 40 VOC samples collected using passive diffusion bags, and one VOC sample collected using low-flow techniques. Additionally, monitoring well MW0052DD was overdrilled and abandoned using rotasonic drilling techniques. The following conclusions can be made based on the 2015 LTM results: groundwater flow is generally to the west with northwest and southwest flow components from the water table to approximately 55 feet below land surface (ft BLS); peripheral monitoring wells generally delineate VOCs to groundwater cleanup target levels (GCTLs) except for monitoring wells MW0088, MW0090, MW0095, and NPSHMW0039, which had vinyl chloride (VC) concentrations near the GCTL and MW0062, which had trichloroethene (TCE), cis-1,2-dichloroethenen (cDCE), and VC concentrations above natural attenuation default concentrations (NADCs); VOCs in interior downgradient wells generally fluctuate within historic ranges except for monitoring wells in the north-northwest portion of the site, which have increasing VC concentrations indicating potential plume migration and expansion; Historically, the vertical extents of the VOCs were delineated by monitoring wells screened greater than 60 ft BLS (MW0083 through MW0086, and MW0078). The 2015 LTM results indicate that concentrations of daughter product cDCE is greater than the NADC in MW0078 and that cDCE and VC are greater than NADCs in MW0130. TCE was greater than the GCTL in monitoring well MW130 and not detected above method detection limits (9 micrograms per Liter) in monitoring well MW0078. No GCTL exceedances were identified in monitoring wells MW0083 or MW0086; the dissolved plume footprint appears generally stable, though not fully delineated by monitoring well data in the northeast portion of the site; and 2015 LTM results generally support the existing Conceptual Site Model. Geosyntec recommends modifying the LTM program, collecting a verification sample from monitoring well MW0062, and performing a direct push technology instigation in the northnortheastern portion of the site. A cluster of monitoring wells (MW0132 [2 to 12 ft BLS], MW0133 [15 to 25 ft BLS], and MW0134 [29 to 34 ft BLS]) is proposed to delineate impacts in the northnortheast portion of the site. Geosyntec recommends installation of a vertical extent well in the center of the site (Hot Spot 2 area) post-remediation implementation.

groundwater

High-Performance Monitoring Architecture for Large-Scale Distributed Systems Using Event Filtering

Monitoring is an essential process to observe and improve the reliability and the performance of large-scale distributed (LSD) systems. In an LSD environment, a large number of events is generated by the system components during its execution or interaction with external objects (e.g. users or processes). Monitoring such events is necessary for observing the run-time behavior of LSD systems and providing status information required for debugging, tuning and managing such applications. However, correlated events are generated concurrently and could be distributed in various locations in the applications environment which complicates the management decisions process and thereby makes monitoring LSD systems an intricate task. We propose a scalable high-performance monitoring architecture for LSD systems to detect and classify interesting local and global events and disseminate the monitoring information to the corresponding end- points management applications such as debugging and reactive control tools to improve the application performance and reliability. A large volume of events may be generated due to the extensive demands of the monitoring applications and the high interaction of LSD systems. The monitoring architecture employs a high-performance event filtering mechanism to efficiently process the large volume of event traffic generated by LSD systems and minimize the intrusiveness of the monitoring process by reducing the event traffic flow in the system and distributing the monitoring computation. Our architecture also supports dynamic and flexible reconfiguration of the monitoring mechanism via its Instrumentation and subscription components. As a case study, we show how our monitoring architecture can be utilized to improve the reliability and the performance of the Interactive Remote Instruction (IRI) system which is a large-scale distributed system for collaborative distance learning. The filtering mechanism represents an Intrinsic component integrated with the monitoring architecture to reduce the volume of event traffic flow in the system, and thereby reduce the intrusiveness of the monitoring process. We are developing an event filtering architecture to efficiently process the large volume of event traffic generated by LSD systems (such as distributed interactive applications). This filtering architecture is used to monitor collaborative distance learning application for obtaining debugging and feedback information. Our architecture supports the dynamic (re)configuration and optimization of event filters in large-scale distributed systems. Our work represents a major contribution by (1) survey and evaluating existing event filtering mechanisms In supporting monitoring LSD systems and (2) devising an integrated scalable high- performance architecture of event filtering that spans several kev application domains, presenting techniques to improve the functionality, performance and scalability. This paper describes the primary characteristics and challenges of developing high-performance event filtering for monitoring LSD systems. We survey existing event filtering mechanisms and explain key characteristics for each technique. In addition, we discuss limitations with existing event filtering mechanisms and outline how our architecture will improve key aspects of event filtering.

Maly, K.

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE

GPS Monitor Station Upgrade Program at the Naval Research Laboratory

One of the measurements made by the Global Positioning System (GPS) monitor stations is to measure the continuous pseudo-range of all the passing GPS satellites. The pseudo-range contains GPS and monitor station clock errors as well as GPS satellite navigation errors. Currently the time at the GPS monitor station is obtained from the GPS constellation and has an inherent inaccuracy as a result. Improved timing accuracy at the GPS monitoring stations will improve GPS performance. The US Naval Research Laboratory (NRL) is developing hardware and software for the GPS monitor station upgrade program to improve the monitor station clock accuracy. This upgrade will allow a method independent of the GPS satellite constellation of measuring and correcting monitor station time to US Naval Observatory (USNO) time. THe hardware consists of a high performance atomic cesium frequency standard (CFS) and a computer which is used to ensemble the CFS with the two CFS's currently located at the monitor station by use of a dual-mixer system. The dual-mixer system achieves phase measurements between the high-performance CFS and the existing monitor station CFS's to within 400 femtoseconds. Time transfer between USNO and a given monitor station is achieved via a two way satellite time transfer modem. The computer at the monitor station disciplines the CFS based on a comparison of one pulse per second sent from the master site at USNO. The monitor station computer is also used to perform housekeeping functions, as well as recording the health status of all three CFS's. This information is sent to the USNO through the time transfer modem. Laboratory time synchronization results in the sub nanosecond range have been observed and the ability to maintain the monitor station CFS frequency to within 3.0 x 10 (sup minus 14) of the master site at USNO.

Galysh, Ivan J.

Distributed Wind Monitoring Best Practices

Accessible performance and operational data have been identified as a key enabler for distributed wind energy industry advancement. While utility-scale wind turbines benefit from reliable and continuous supervisory control and data acquisition (SCADA)-based monitoring platforms, monitoring of the U.S. fleet of distributed wind (DW) turbines has been more inconsistent, unreliable, and sometime difficult to access. Without fleet monitoring data, the industry will never understand and thus work to improve turbine under-performance and reliability issues. For the DW industry to scale up, attract investors, and boost credibility, fleetwide monitoring must be robust and reliable, select data must be made accessible to stakeholders, and the data must be in a format useful to users. To help move the industry toward a more standardized, accessible stream of monitoring data, this distributed wind monitoring best practices report attempts to cover topics including key monitoring channels, hardware, communication strategies, and accessibility. Strategic engagement with DW original equipment manufacturers (OEMs), service providers, lab and university researchers, testing organization, certification bodies, end users and solar photovoltaic (PV) monitoring experts has enabled a better understanding of the current state-of-the-art of monitoring and aided in articulating this set of best practices that will guide OEMs toward harmonized monitoring strategies, aimed at a future goal of achieving accessible performance and operational data for the entire fleet of U.S. distributed wind turbines.

17 WIND ENERGY

Assessment of Condition Monitoring Methods and Technologies for Inservice Inspection and Testing of Nuclear Power Plant Components

This report was prepared for the U.S. Nuclear Regulatory Commission (NRC) to explore the application of advanced technologies toward meeting the current and future regulatory requirements for maintenance and condition monitoring of structures, systems, and components. The advanced technologies considered in this work are advanced sensors and instrumentation, data analytics, machine learning and artificial intelligence (ML/AI), physics-based models, and digital twins (DT). The interest in the application of advanced technologies for condition monitoring in nuclear power plants continues to grow, and current and future licensees are expected to implement advanced technologies as part of their inservice inspection (ISI) and inservice testing (IST) programs. This report delineates the outcomes of an exploratory investigation into the implementation of advanced condition monitoring technologies to address ISI and IST requirements. A thorough review was conducted of the existing regulatory requirements for ISI and IST, along with an analysis of associated industry practices. Additionally, a state-of-the-art assessment was performed on advanced condition monitoring technologies frequently employed in non-nuclear sectors. This research incorporated two nuclear-specific case studies to illustrate the application of these technologies within the current nuclear fleet. The report provides an exhaustive discussion on the technical challenges, considerations, and opportunities associated with the deployment of advanced condition monitoring technologies. The following are key considerations in the application of advanced technologies for the ISI and IST of nuclear power plant components: • Developing adequate verification and validation procedures to confirm the functional and non-functional requirements, • Developing technical capabilities to conduct real-time asset condition monitoring, • Establishing guidance and protocol for modeling and simulation tools to continuously meet regulatory requirements, • Addressing trustworthiness, explainability, and interpretability of ML/AI methods, • Evaluating maintenance activities to maintain an adequate safety margin and avoid undesirable conditions, • Establishing cybersecure condition monitoring programs associated with a computer-based software system, and • Establishing standardized evaluation metrics for advanced condition monitoring programs. Interest in the use of advanced technologies for condition monitoring in ISI and IST programs continues to grow, and the technology is expected to experience rapid and wide industry adoption in the near future. Adoption of advanced technologies for condition monitoring could have novel and unique impacts on regulatory activities associated with ISI and IST programs. The NRC is continuing to explore the regulatory aspects of advanced technologies as part of ISI and IST programs by pursuing additional research in this technical area.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

Maintaining the Health of Software Monitors

Software health management (SWHM) techniques complement the rigorous verification and validation processes that are applied to safety-critical systems prior to their deployment. These techniques are used to monitor deployed software in its execution environment, serving as the last line of defense against the effects of a critical fault. SWHM monitors use information from the specification and implementation of the monitored software to detect violations, predict possible failures, and help the system recover from faults. Changes to the monitored software, such as adding new functionality or fixing defects, therefore, have the potential to impact the correctness of both the monitored software and the SWHM monitor. In this work, we describe how the results of a software change impact analysis technique, Directed Incremental Symbolic Execution (DiSE), can be applied to monitored software to identify the potential impact of the changes on the SWHM monitor software. The results of DiSE can then be used by other analysis techniques, e.g., testing, debugging, to help preserve and improve the integrity of the SWHM monitor as the monitored software evolves.

Runtime Monitor

Heart Rhythm Monitoring in the Constellation Lunar and Launch/Landing EVA Suit: Recommendations from an Expert Panel

Currently there are several physiological monitoring requirements for Extravehicular Activity (EVA) in the Human-Systems Interface Requirements (HSIR) document, including continuous heart rhythm monitoring. However, it is not known whether heart rhythm monitoring in the lunar surface space suit is a necessary capability for lunar surface operations or in launch/landing suit the event of a cabin depressurization enroute to or from the moon. Methods: Current US astronaut corps demographic information was provided to an expert panel of cardiovascular medicine experts, including specialists in electrophysiology, exercise physiology, interventional cardiology and arrhythmia. This information included averages for male/female age, body mass index (BMI), blood pressure, cholesterol, inflammatory markers, echocardiogram, ranges for coronary artery calcium (CAC) scores for long duration astronauts, and ranges for heart rate (HR) and metabolic (MET) rates obtained during microgravity and lunar EVA. Results: The panel determined that no uncontrolled hazard was likely to occur in the suit during lunar surface or contingency microgravity ops that would require ECG monitoring in the highly screened US astronaut population. However having the capability for rhythm monitoring inside the vehicle (IVA) was considered critical to manage an astronaut in distress. Discussion: Heart rate (HR) monitoring alone allows effective monitoring of astronaut health and function. Consequently, electrocardiographic (ECG) monitoring capability as a clinical tool is not essential in the lunar or launch/landing space suit. However, the panel considered that rhythm monitoring could be useful in certain clinical situations, it was not considered required for safe operations. Also, lunar vehicles should be required to have ECG monitoring capability with a minimum of 5-lead ECG (derived 12- lead) for IVA medical assessments.

Scheuring, Richard A.

Intersection Monitor for Traffic-Light-Preemption System

The figure shows an intersection monitor that is a key subsystem of an emergency traffic-light-preemption system that could be any of the systems described in the three immediately preceding articles and in Systems Would Preempt Traffic Lights for Emergency Vehicles (NPO-30573), NASA Tech Briefs, Vol. 28, No. 10 (October 2004), page 36. This unit is so named because it is installed at an intersection, where it monitors the phases (in the sense of timing) of the traffic lights. The mode of operation of this monitor is independent of the type of traffic-light-controller hardware or software in use at the intersection. Moreover, the design of the monitor is such that (1) the monitor does not, by itself, affect the operation of the traffic- light controller and (2) in the event of a failure of the monitor, the trafficlight controller continues to function normally (albeit without preemption). The monitor is installed in series with the traffic-light controller at an intersection. The control signals of interest are monitored by use of high-impedance taps on affected control lines. These taps are fully isolated and further protected by high-voltage diodes that prevent any voltages or short circuits that arise within the monitor from affecting the controller. The signals from the taps are processed digitally and cleaned up by use of high-speed logic gates, and the resulting data are passed on to other parts of the traffic-light-preemption intersection subsystem. The data are compared continuously with data from vehicles and used to calculate timing for reliable preemption of the traffic lights. The pedestrian crossing at the intersection is also monitored, and pedestrians are warned not to cross during preemption.

Bachelder, Aaron

2023 Cleanroom Monitoring for OSIRIS-REx

OSIRIS-REx is an asteroid sample return mission that delivered asteroid regolith from Bennu to Earth on 9/24/2023 [1]. Cleanroom monitoring of OSIRIS-REx Curation facilities has been ongoing since 2021 when construction of the OSIRIS-REx lab at Johnson Space Center (JSC) was completed [2]. The monitoring continues inside of the OSIRIS-REx lab in Houston. Monitoring was also conducted on a temporary cleanroom constructed inside a hangar at the Utah Test and Training Range (UTTR) to initially receive the Sample Return Capsule (SRC) upon its landing there. The following reports on cleanroom monitoring that has taken place in the months leading up to as well as after OSIRIS-REx return. Monitoring techniques used include particle counts, deployment of Si wafer witness plates (Balazs, Inc.) and Al foil witness plates, gas sampling (Balazs, Inc.) and microbiological monitoring. We collected particle counts at both the lab at JSC as well as the temporary cleanroom at UTTR. Particle counts were taken monthly from six locations in the lab at JSC. Particle counts were taken from seven locations at UTTR in July, August, and September. The UTTR cleanroom particle counts were taken daily in the five days leading to OSIRIS-REx return as well as consistently the day of return (every 2 minutes and 15 seconds 7:21 am- 6:27 pm) from one location inside the cleanroom. The particle counts at UTTR consistently stayed well within the ranges of its required ISO 7 equivalent classification (352,000 maximum particles/ m3 ≥ 0.5 μm). Most analysis showed that the particle counts were far below ISO 7 requirements (highest measured count was 61,484 particles/ m3 ≥ 0.5 um). but the elevated instances correlated to exterior hangar doors being open. Particle counts were reduced when keeping exterior hangar doors closed. The particle counts at JSC have stayed consistently within their ISO 5 equivalent classification (3,520 maximum particles/ m3 ≥ 0.5 um). In most instances, the counts are much better except in one instance where the count measured 13,381 particles/ m3 ≥ 0.5 um. The high spike in particle counts in the JSC lab correlated with the air handlers being shut down temporarily the previous day. The particle counts taken in the same location quickly reduced and measured 0 when taken a month later with the air handlers on. We deployed 8-inch semiconductor polished Si wafer witness plates for 24-hour periods inside of the OSIRIS-REx Curation lab at JSC (in July, August, September, and November 2023) and the cleanroom at UTTR (July and September 2023) to test for possible organic and inorganic contaminants. We also deployed these wafers inside of the OSIRIS-REx Touch-and-Go sample Acquisition Mechanism (TAGSAM) glovebox (where Bennu sample processing occurs) and desiccator (Bennu sample storage) at JSC in August 2023. These samples were all sent to Balazs for analysis via Thermal Desorption Gas Chromatography Mass Spectroscopy (TD-GC-MS) to quantify organic compounds and vapor phase decomposition inductively coupled plasma mass spectrometry (VPD-ICP-MS) to quantify inorganic contaminants. We collected air samples using an adsorbent tube connected to a pump for six hours (100 mL/minute) inside of both the JSC lab and the UTTR cleanroom. These samples were taken at JSC in July, August, September, November, and December and at UTTR in July and September. Additionally, a sample was taken just outside of the TAGSAM glovebox airlock door in July. These samples were sent to Balazs for analysis of volatile organics in air. Overall, the OSIRIS-REx lab at JSC and cleanroom at UTTR yielded very low organic and inorganic contaminants (similar results to Genesis lab at JSC which is ISO 4 equivalent) except for boron, which is attributed to the borosilicate glass in the fan filter units. We collected monthly surface and air samples inside the JSC lab to monitor potential microbial contamination. We report the recovery rate for each sampling event, which is defined as the number of samples exhibiting bacterial or fungal growth divided by the total number of samples collected. Since the lab was commissioned in 2021 the median recovery rate is 29%. This recovery rate is consistent with other ISO 5 equivalent labs used to curate astromaterials collections. Increases in recovery rate correspond to construction and/or extra activity in the lab. However, increases in recovery rate do not reliably correlate to increases in particle counts, which highlights the need for a dedicated microbial monitoring program for biologically sensitive collections. We sampled the temporary clean room at UTTR in July, August, and September of 2023 to monitor potential microbial contamination. The recovery rate decreased from 80% in August to 29% in September. However, in all instances, the diversity of bacteria and fungi was higher in the UTTR cleanroom than in the JSC lab. We routinely collected more than twenty different organisms from the UTTR cleanroom. In the JSC lab the median diversity is 2 organisms. Based on these results we hypothesize that microbes from UTTR could be transported back to JSC with the Bennu samples. To mitigate this risk, in September of 2023, we implemented additional cleaning procedures in the JSC lab to reduce the bioburden on surfaces that could come into direct contact with hardware used to process Bennu samples. Since adopting these additional cleaning measures, the median recovery rate has decreased to 14%. We did not observe an increase in fungal or bacterial diversity in the lab in the October sampling. We will continue to monitor this trend closely for the next several months. Supported by NASA under Award NNH09ZDA007O and Contract NNM10AA11C.

Rachel Comstock Funk

Vegetation Monitoring Optimization with Normalized Difference Vegetation Index and Evapotranspiration Using Remote Sensing Measurements and Land Surface Models Over East Africa

The majority of people in East Africa rely on the agro-pastoral system for their livelihood, which is highly vulnerable to droughts and flooding. Agro-pastoral droughts are endemic to the region and are considered the main natural hazard that contributes to food insecurity. Drought begins with rainfall deficit, gradually leading to soil moisture deficit, higher land surface temperature, and finally impacts to vegetation growth. Therefore, monitoring vegetation conditions is essential in understanding the progression of drought, potential effects on food security, and providing early warning information needed for drought mitigation decisions. Because vegetation processes couple the land and atmosphere, monitoring of vegetation conditions requires consideration of both water provision and demand. While there is consensus in using either the Normalized Difference Vegetation Index (NDVI) or evapotranspiration(ET) for vegetation monitoring, a comprehensive assessment optimizing the use of both has not yet been done. Moreover, the evaluation methods for understanding the relationships between NDVI and ET for vegetation monitoring are also limited. Taking these gaps into account we have developed a framework to optimize vegetation monitoring using both NDVI and ET by identifying where they perform the best by using triple collocation and cross-correlation methods. We estimated the random error structure in Moderate Resolution Imaging Spectroradiometer (MODIS) NDVI; ET from the Operational Simplified Surface Energy Balance (SSEBop) model; and ET from land surface models (LSMs). LSM ET and SSEBop ET have been found to be better indicators for vegetation monitoring during extreme drought events, while NDVI could provide better information on vegetation condition during wetter than normal conditions. The random error structures of these variables suggest that LSM ET is most likely to provide important information for vegetation monitoring over low and high ends of the vegetation fraction areas. Over moderate vegetative areas, any of these variables could provide important vegetation information for drought characterization and food security assessments. While this study provides a framework for optimizing vegetation monitoring for drought and food security assessments over East Africa, the framework can be adopted to optimize vegetation monitoring over any other drought and food insecure region of the world.

triple collocation

Role of NDE and In-Situ Process Monitoring in Managing Risk of AM Space Hardware

The recently published NASA-STD-6030 defines the Additive Manufacturing (AM) Requirements for Spaceflight Systems. Key aspects of the certification approach include the development of a qualified material process (QMP) and material characterization determined by part classification. Nondestructive evaluation (NDE) of the full surface and volume is required for all part classifications except those with negligible risk. NASA is exploring the use of in-process monitoring data to improve risk posture and supplement post-build inspection for complex parts. Currently, the most challenging obstacle to overcome is linking the indications in the monitoring data to the physics of the process and the final material state of the finished part. NASA is undertaking studies to understand and quantify this relationship for various monitoring methods. The desired goal is to develop a protocol to establish this correlation for any monitoring method. Once this correlation is known, the critical defect size can be linked to a representative indication in the monitoring data, and the capability of the monitoring system can be tested using the 90/95 probability of detection requirement for NDE methods. This would enable the use of in-process monitoring as a defect screening activity for AM part certification. Many high-criticality components built with AM have high complexity and therefore limited inspectability, so using in-process monitoring can help address this certification gap. The use of adaptive, closed-loop monitoring systems that alter the locked process will require a new approach to the QMP.

additive manufacturing

Role of NDE and In-Situ Process Monitoring in Managing Risk of AM Space Hardware

The recently published NASA-STD-6030 defines the Additive Manufacturing (AM) Requirements for Spaceflight Systems. Key aspects of the certification approach include the development of a qualified material process (QMP) and material characterization determined by part classification. Nondestructive evaluation (NDE) of the full surface and volume is required for all part classifications except those with negligible risk. NASA is exploring the use of in-process monitoring data to improve risk posture and supplement post-build inspection for complex parts. Currently, the most challenging obstacle to overcome is linking the indications in the monitoring data to the physics of the process and the final material state of the finished part. NASA is undertaking studies to understand and quantify this relationship for various monitoring methods. The desired goal is to develop a protocol to establish this correlation for any monitoring method. Once this correlation is known, the critical defect size can be linked to a representative indication in the monitoring data, and the capability of the monitoring system can be tested using the 90/95 probability of detection requirement for NDE methods. This would enable the use of in-process monitoring as a defect screening activity for AM part certification. Many high-criticality components built with AM have high complexity and therefore limited inspectability, so using in-process monitoring can help address this certification gap. The use of adaptive, closed-loop monitoring systems that alter the locked process will require a new approach to the QMP.

advanced manufacturing

General Services Administration Reclamation Yard Solid Waste Management Unit 010: 2022 Groundwater Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the groundwater monitoring activities that occurred in September and October 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consist of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume were tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. Groundwater monitoring for VOCs in the Chlorinated VOC Plume area was discontinued following the December 2021 annual monitoring event. Annual groundwater monitoring for underground injection control (UIC) parameters continues for both the PCB/VOA Plume and the Chlorinated VOC Plume areas. The activities presented in this report include one field event: September and October 2022, which includes sitewide semi-annual water level measurements of 55 monitoring wells, redevelopment of all monitoring wells listed in the sampling plan, and groundwater sampling of 28 monitoring wells. The sampling and analysis demonstrated that the PCB/VOA plume is not expanding and is significantly reduced compared to before a 2018 source removal interim measure. Recommendations are made for the 2023 groundwater monitoring program.

groundwater