Search NASA⌕ Search

SEARCH · Search NASA

Results for “moving object detection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

59 records · Page 4

Legacy Survey of Space and Time Data Preview 2: SSSource searchable catalog

We present Rubin Data Preview 2 (DP2), the second data preview from the NDF-DOE Vera C. Rubin Observatory. Data Preview 2 (DP2) comprises coadds, detection catalogs, and ancillary data products; and when fully released will also include single-epoch images and difference images. DP2 is derived from observations acquired by the LSST Science Camera (LSSTCam) on the Simonyi Survey Telescope at the Summit Facility on Cerro Pachón, Chile, primarily during the on-sky commissioning campaign between 2025-04-16 and 2025-09-21, supplemented by observations taken between 2025-10-25 and 2026-01-06 that overlap the commissioning footprint. The DP2 footprint comprises the Science Validation wide-area survey, five Deep Drilling Fields, and a number of targeted small-field regions, including Trifid and Lagoon, Prawn, M49, and New Horizons, all observed as part of the Rubin First Look campaign. Each field was imaged in up to six broad photometric bands, ugrizy, and coadded to produce deep imaging covering an estimated 3,000 deg2. The addition of single-visit-only areas expands the total DP2 footprint to an estimated 15,000 deg2, with coverage in at least one filter. The median per-visit PSF FWHM across the wide-area survey ranges from 1.17 arcsec in the z band to 1.26 arcsec in g and r bands. The deepest field, reaches estimated coadded 5σ depths of u=26 mag, g=26.8 mag, r=26.3 mag, i=26.1 mag, z=25.3 mag, y=23.9 mag. Based on a roughly five-month primary observing baseline and covering only part of the eventual LSST footprint, DP2's area, depth, and multiband coverage nonetheless support a broad range of early science investigations ahead of LSST Data Release This dataset is a subset of the full data release consisting of a searchable catalog named SSSource. This catalog contains instantaneous physical parameters for moving objects at the time of every observation. This catalog contains 8,136,150 rows with 39 columns.

79 ASTRONOMY AND ASTROPHYSICS↗

Automated Inspection of Criticality Control Overpacks for Surplus Plutonium Disposition: Qualification Update – 25313

In an effort to reduce the amount of nuclear waste in South Carolina, the Department of Energy (DOE) tasked the Savannah River Site (SRS) with diluting and disposing of the amount of plutonium in the state. This process involves the movement and shipment of over 100,000 criticality control overpacks (CCOs) throughout the project lifespan, lending itself to the use of automation to reduce worker radiation exposure and more efficiently utilize human capital. Due to the large scope, this overarching process was broken down into several different “automation projects” to be developed. The first opportunity pursued was the receipt and inspection of empty CCO drums coming into SRS, identified as Automation Project 1 (AP1), and is the focus of this paper. AP1 was developed to unpack incoming CCOs and inspect them for unwanted foreign objects and any damage to the drum or its contents. This process is accomplished by the combination of an automated guided vehicle (AGV) that delivers CCOs to a robotic arm which uses a suite of custom tools to disassemble a CCO, inspect the inside and outside of the CCO and its inner criticality control container (CCC), reassemble the CCC and CCO, and apply a tamper indicating device (TID) to the inspected drum. In past years, the robotic work cell had been developed in a small-scale testing facility for proof-of-concept. This year, major improvements were made to the robotic work cell to perform the process, including integration into the final facility where CCOs will be inspected. Other technical improvements include the implementation of sensor feedback and safety relays into the control system to allow the state of the work cell to be better tracked, and additional development of the TID application process to complete the robotic inspection. Further enhancements were made to the robotic vision processes and robot pathing, as well as development on a computer vision inspection process to detect inspection criteria anomalies in CCOs. In addition to developmental improvements, the work cell underwent a six-month testing period to ensure the project requirements were met. Results of this testing period demonstrate the work cell’s capability to meet project throughput goals at an acceptable level, successfully document the status of each CCO inspected, and reduce the toll on technical operations’ human power by two thirds. At the time of this paper, the work cell is capable of autonomously handling up to eight CCOs with an AGV, delivering CCOs to and from the robot work cell, and having a robotic arm perform a full receipt and inspection procedure on each CCO. Moving forward, repeatability will be improved so that these CCOs can be run back-to-back seamlessly, as well as improving the system to handle more significant edge cases and failure modes.

Spivey, Nicholas↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

Unraveling the Complex Behavior of Mrk 421 with Simultaneous X-Ray and VHE Observations during an Extreme Flaring Activity in 2013 April

Here we report on a multiband variability and correlation study of the TeV blazar Mrk 421 during an exceptional flaring activity observed from 2013 April 11 to 19. The study uses, among others, data from GLAST-AGILE Support Program (GASP) of the Whole Earth Blazar Telescope (WEBT), Swift, Nuclear Spectroscopic Telescope Array (NuSTAR), Fermi Large Area Telescope, Very Energetic Radiation Imaging Telescope Array System (VERITAS), and Major Atmospheric Gamma Imaging Cherenkov (MAGIC). The large blazar activity and the 43 hr of simultaneous NuSTAR and MAGIC/VERITAS observations permitted variability studies on 15 minute time bins over three X-ray bands (3–7 keV, 7–30 keV, and 30–80 keV) and three very-high-energy (VHE; >0.1 TeV) gamma-ray bands (0.2–0.4 TeV, 0.4–0.8 TeV, and >0.8 TeV). We detected substantial flux variations on multi-hour and sub-hour timescales in all of the X-ray and VHE gamma-ray bands. The characteristics of the sub-hour flux variations are essentially energy independent, while the multi-hour flux variations can have a strong dependence on the energy of the X-rays and the VHE gamma-rays. The three VHE bands and the three X-ray bands are positively correlated with no time lag, but the strength and characteristics of the correlation change substantially over time and across energy bands. Our findings favor multi-zone scenarios for explaining the achromatic/chromatic variability of the fast/slow components of the light curves, as well as the changes in the flux–flux correlation on day-long timescales. We interpret these results within a magnetic reconnection scenario, where the multi-hour flux variations are dominated by the combined emission from various plasmoids of different sizes and velocities, while the sub-hour flux variations are dominated by the emission from a single small plasmoid moving across the magnetic reconnection layer.

79 ASTRONOMY AND ASTROPHYSICS↗