Sandia National Laboratories Notification of Class 1 Modifications to Hazardous Waste Permit NM5890110518-1.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
A low-power shock sensing system includes at least one shock sensor physically coupled to a chemical storage tank to be monitored for impacts, and an RF transmitter which is in a low-power idle state in the absence of a triggering signal. The system includes interference circuitry including or activated by the shock sensor, wherein an output of the interface circuitry is coupled to an input of the RF transmitter. The interface circuitry triggers the RF transmitting with the triggering signal to transmit an alarm message to at least one remote location when the sensor senses a shock greater than a predetermined threshold. In one embodiment the shock sensor is a shock switch which provides an open and a closed state, the open state being a low power idle state.
Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query-Based Document Management (QBDM) is a tool that enables content or context searches, either simple or hierarchical, across a variety of databases. The system enables users to specify notification subscriptions where they associate "contexts of interest" and "events of interest" to one or more documents or collection(s) of documents. Based on these subscriptions, users receive notification when the events of interest occur within the contexts of interest for associated document or collection(s) of documents. Users can also associate at least one notification time as part of the notification subscription, with at least one option for the time period of notifications.
A system and method for notifying a process about a creation or removal event of a named data element (NDE) in a coordination namespace distributed memory system. A controller runs methods to: generate a tuple corresponding to data generated by a requesting process, the tuple having a tuple name and data value; and generate a notification indicator in a pending notification list to indicate to one or more processes a notification of the creation or removal event associated with the corresponding tuple. Upon detecting the event performed on the tuple by a second process, the method further searches for NDEs in the distributed memory system having the same tuple name, and in response to determining an existence of an associated pending notification record in a pending notification list of records, notify each corresponding process of the one or more processes indicated in the list of the creation or removal event.
The MPI 2 spec contains error handling and notification mechanisms that have a number of limitations from the point of view of application fault tolerance: (1) The specification makes no demands on MPI to survive failures. Although MPI implementers are encouraged to 'circumscribe the impact of an error, so that normal processing can continue after an error handler was invoked', nothing more is specified in the standard. In particular, the defined MPI error classes are used only to clarify to the user the source of the error and do not describe the MPI functionality that is not available as a result of the error. (2) All errors must somehow be associated with some specific MPI call. As such, (A) It is difficult for MPI to notify users of failures in asynchronous calls, such as an MPI{_}Rsend call, which may return immediately after the message data is sent along the wire but before it is successfully delivered; (B) There is no provision for asynchronous error notification regarding errors that will affect future calls, such as notifying process p of the failure of process q before p tries to communicate with q. (3) There is no description of when error notification will happen relative to the occurrence of the error. In particular, the specification does not state whether an error that would cause MPI functions to return an error code under the MPI{_}ERRORS{_}RETURN error handler would cause a user-defined error handler to be called during the same MPI function or at some earlier or later point in time. (4) Although MPI makes it possible for libraries to define their own error classes and invoke application error handlers, it is not possible for the application to define new error notification patterns either within or across processes. This means that it is not possible for one application process to ask to be informed of errors on other processes or for the application to be informed of specific classes of errors.
A method of providing weather radar images to a user includes obtaining radar image data corresponding to a weather radar image to be displayed. The radar image data is image processed to identify a feature of the weather radar image which is potentially indicative of a hazardous weather condition. The weather radar image is displayed to the user along with a notification of the existence of the feature which is potentially indicative of the hazardous weather condition. Notification can take the form of textual information regarding the feature, including feature type and proximity information. Notification can also take the form of visually highlighting the feature, for example by forming a visual border around the feature. Other forms of notification can also be used.
Signaling completion of a message transfer from an origin node to a target node includes: sending, by an origin DMA engine, an RTS message, the RTS message specifying an application message for transfer to the target node from the origin node; receiving, by the origin DMA engine, a remote get message containing a data descriptor for the message and a completion notification descriptor, the completion notification descriptor specifying a local memory FIFO data transfer operation for transferring data locally on the origin node; inserting, by the origin DMA engine in an injection FIFO buffer, the data descriptor followed by the completion notification descriptor; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that transfer of the message is complete in dependence upon the completion notification descriptor.
Signaling completion of a message transfer from an origin node to a target node includes: sending, by an origin DMA engine, an RTS message, the RTS message specifying an application message for transfer to the target node from the origin node; receiving, by the origin DMA engine, a remote get message containing a data descriptor for the message and a completion notification descriptor, the completion notification descriptor specifying a local direct put transfer operation for transferring data locally on the origin node; inserting, by the origin DMA engine in an injection FIFO buffer, the data descriptor followed by the completion notification descriptor; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that transfer of the message is complete in dependence upon the completion notification descriptor.
The Lawrence Livermore National Laboratory (LLNL) conducts research and development for the National Nuclear Security Agency (NNSA) and its affiliates. The Polymer AM team at LLNL conducts research and development in 3D printing, specifically direct-ink-write, in accordance with LLNL and NNSA missions. The team is composed of machine operators, chemists, testing engineers, and project engineers across multiple lab spaces with one shared storage area at LLNL. The operations use a variety of different consumables and hardware to conduct research applications for LLNL and NNSA. These items are critical to performing operation tasks; if an item is out of stock, operations associated with the respective item could be suspended for weeks. As such, the Polymer AM team manages an inventory of spare consumables and hardware to ensure these items are always available. However, the current management system, an excel sheet managed by the project engineer group, is not intuitive in providing inventory information despite the high labor utilization needed to maintain the system. As such, the team is looking to improve their inventory management that can send notifications regarding inventory needs, accessible to other team members, provide all relevant information to a specific item, and store historical information for budget and operation planning. The proposed solution is a Computer Maintenance Management System (CMMS): a web-based management software that stores inventory information and provides automated notifications. The system will store information on each item including quantity in stock, technical information, supplier information, costs, lead times, and expiration date. The system has a notifications function that can send notifications to the respective team member’s when an item needs to be counted, item inventory is low, or an item is approaching their expiration date. Information for each item can be tracked over time creating data to be used for budget planning and process improvement purposes. Due to its web-based source, the system can be accessed by the respective team member viewing technical information, quantity, and purchasing information.
Environmental impact assessment (EIA) was first introduced in India based on the Environmental Protection Act (EPA), 1986. But formally it came in to effect, when Ministry of Environment and Forest (MoEF) has passed a major legislative measure under EPA in January 1994 for Environmental Clearance (EC) known as EIA Notification, 1994. Subsequently, EIA processes have been strengthened by MoEF by a series of amendments. The current practice is adhering to EIA Notification, 2006 and its amendments. The pieces of evidence collected and analysis in the present assessment suggest that, despite a sound legislative, administrative and procedural set-up EIA has not yet evolved satisfactorily in India. An appraisal of the EIA system against systematic evaluation criteria, based on discussions with various stakeholders, EIA expert committee members, approval authorities, project proponents, NGOs and consulting professionals, reveals various drawbacks of the EIA system. These mainly include; inadequate capacity of EIA approval authorities, deficiencies in screening and scoping, poor quality EIA reports, inadequate public participation and weak monitoring. Overall, EIA is used presently as a project justification tool rather than as a project planning tool to contribute to achieving sustainable development. While shortcomings are challenging, Government of India is showing a high degree of commitment. The EIA system in the country is undergoing progressive refinements by steadily removing the constraints. The paper identifies opportunities for taking advantage of the current circumstances for strengthening the EIA process. - Highlights: Black-Right-Pointing-Pointer An assessment has been carried out on Environmental Clearance under EIA Notification, 2006, MoEF, Government of India. Black-Right-Pointing-Pointer EIA system is appraised against systematic evaluation criteria proposed by Ahmad and Wood (2002), Wood (2003), Fuller (1999). Black-Right-Pointing-Pointer The analysis reveals reveals various drawbacks of the EIA system. Black-Right-Pointing-Pointer The paper identifies opportunities to enhance the effectiveness of the EIA system in India.
The Community Coordinated Modeling Center (CCMC) provides a variety of services to the space science community. The mission for the CCMC's Space Weather Forecasting team is to address the space weather needs of NASA's robotic mission by conducting customized space weather services to NASA end-users. The team leverages CCMC tools/resources, carries out prototyping activities for the next generation space weather tools and follows communications/interactions with the users. We provide space weather forecasts, notifications, analysis and also education. This presentation will describe the team's concepts of operations, notification processes, anomaly analysis, and the tools used for space weather forecasting. The tools include a system that are completely open and available to the public's use like the Integrated Space Weather Analysis (iSWA) tool and the Database of Notifications, Knowledge and Information (DONKI). We will also discuss the education and training activities and how events like solar eclipses are important for the improvement and validation of different space weather models.
The Transportation – Security, Tracking and Reporting (T-STAR) System was developed by NNSA NA-21 Office of Radiological Security (ORS) to provide a transportation security system for use during transport of Category 1 and Category 2 radiological material to provide detection and tracking capability for shipments. While many off the shelf systems provide asset tracking of the conveyance, few offer detection of a breach into the cargo compartment or the removal of cargo from the conveyance. Systems that do offer such capability need to be permanently installed on the conveyance, requiring drilling of holes and running of cables throughout the conveyance itself. This means that dedicated shipping containers or vehicles are required, and this is not sustainable in many countries where ORS is building capacity for the security of radioactive materials in use, storage, and in transport. T-STAR is leveraging various ORNL technologies for improved communications capability and reduced power requirements; the multimode communications module developed by the Unmanned Aerial Systems group and the low power and extensible Authenticatable Container Tracking System (ACTS) tag developed for the US Department of Energy’s Packaging Certification Program provide a small footprint tracking system which can be installed quickly as needed. T-STAR uses a cellular and an Iridium modem to communicate configuration and alert information to a server used to monitor the shipment and incorporates a Z-wave © wireless security system allowing various intrusion detection sensors to be located in the conveyance. The Z-wave sensors are readily available, inexpensive, and power efficient, making them replaceable and low maintenance. The server software be configured as a standalone system installed on a light duty computer hosted by the competent authority, carrier, or response agency, or hosted as part of an Amazon Cloud Server (AWS) accessible via a secure login. The server has two functions, first is to handle messages to/from the T-STAR field unit, second is to host the user interface which can be accessed using a web browser on desktop or mobile device. The user interface implements roles to determine the level of access to shipment information, define geo-fences, and configure notifications. The user interface also supports multiple languages for display as well as notifications by using a simple lookup file which can be modified by the host country to ensure translations are correct and meaningful to responders receiving notifications and alerts. This paper will detail the overarching T-STAR capabilities, architecture and components, and provide insights on how it is deployed, used, and monitored during transportation of radioactive material.
An event detection unit (EDU) for detecting an explosive event is provided. The EDU includes different types of sensors for measuring characteristics of an explosive event. The EDU includes an event notification component. The EDU also includes a processor that receives a measurement from the sensors and generates a combined non-event probability and a combined event probability based on that measurement that indicates a likelihood that an explosive event has not occurred or has occurred. The processor determines whether an explosive event has occurred based on the non-event probabilities and event probabilities. When an explosive event has been determined to occur, the processor directs the event notification component to output a notification that an explosive event has occurred.
This paper describes the efforts by the Office of Environmental Management (EM) to address need for being prepared to handle hazardous material (HAZMAT) transportation emergencies. Effective notification and reporting requirements are being implemented within EM to identify emergencies, assure appropriate notifications are made, and to assist in preparedness activities with the state, tribal, and local jurisdictions. In conclusion: The Office of Environmental Management will continue to address the preparedness issues from jurisdictions along its transportation corridors. This will be accomplished by providing planning information to the states and tribes on upcoming shipments, providing notification of a transportation incident to assure response assets are available, and continuing to offer the technical assistance and support of the Transportation Emergency Preparedness Program. (authors)