Search NASA⌕ Search

SEARCH · Search NASA

Results for “on orbit validation and verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Systems Integration Processes for NASA's Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable low earth orbit. This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and non-propulsion elements within NASA's Crew Launch Vehicle (CLV). The objective of the CLV is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to Low Earth Orbit (LEO) in support of the lunar and Mars missions. The CLV must successfully provide the capability within cost and schedule with an acceptable risk approach. This paper will describe in detail the systems engineering management processes that will be applied to assure CLV Project success through complete and efficient technical integration. Discussion of specific processes for requirements development and verification, integrated design and analysis, integrated simulation and testing and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The CLV Project is broken logically into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these CLV elements and among the other Constellation projects. Launch vehicle stack integration (CLV to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage will also be discussed. The processes for decomposing requirements to the Elements and ensuring that requirements have been correctly validated, decomposed, allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements will be discussed.

Reuter, James L.↗

Dynamic verification of very large space structures

The dynamic verification of spacecraft relies heavily on ground-based tests. These tests usually simulate flight environments or validate analytical models used in establishing design loads and in designing control algorithms. They also provide security against failures resulting from unanticipated or unmodeled hardware behavior. Future orbital antennas, space stations, and solar power systems are likely to be of sizes difficult to test using current ground test technology. In addition to size, other factors such as low natural frequencies, lightweight construction, and the presence of many structural joints, cause significant sensitivity of the test process to the earth-gravity environment. Yet, accuracy requirements on the verification process will be more stringent because of modern flexible-structure control approaches. This paper describes some of the problems and discusses research on potential solutions. The importance of an integrated ground test, analysis, and flight test program is emphasized. An ongoing research program of this type focusing on a 60-meter, deployable, truss-beam test article is described.

Hanks, B. R.↗

NASA's Optical Program on Ascension Island: Bringing MCAT to Life as the Eugene Stansbery-Meter Class Autonomous Telescope (ES-MCAT)

In June 2015, the construction of the Meter Class Autonomous Telescope was completed and MCAT saw the light of the stars for the first time. In 2017, MCAT was newly dedicated as the Eugene Stansbery-MCAT telescope by NASA's Orbital Debris Program Office (ODPO), in honor of his inspiration and dedication to this newest optical member of the NASA ODPO. Since that time, MCAT has viewed the skies with one engineering camera and two scientific cameras, and the ODPO optical team has begun the process of vetting the entire system. The full system vetting includes verification and validation of: (1) the hardware comprising the system (e.g. the telescopes and its instruments, the dome, weather systems, all-sky camera, FLIR cloud infrared camera, etc.), (2) the custom-written Observatory Control System (OCS) master software designed to autonomously control this complex system of instruments, each with its own control software, and (3) the custom written Orbital Debris Processing software for post-processing the data. ES-MCAT is now capable of autonomous observing to include Geosynchronous survey, TLE (Two-line element) tracking of individual catalogued debris at all orbital regimes (Low-Earth Orbit all the way to Geosynchronous (GEO) orbit), tracking at specified non-sidereal rates, as well as sidereal rates for proper calibration with standard stars. Ultimately, the data will be used for validation of NASA's Orbital Debris Engineering Model, ORDEM, which aids in engineering designs of spacecraft that require knowledge of the orbital debris environment and long-term risks for collisions with Resident Space Objects (RSOs).

Lederer, S. M.↗

Dynamic verification of very large space structures

A research program in spacecraft structures, structural dynamics, and controls verification using a relatively large, flexible beam as a focus is introduced. This research effort addresses fundamental problems applicable to the verification of large, flexible space structures and combines ground tests, flight behavior prediction, and instrumented orbital tests. The program is expected to produce quantitative results for use in improving the validity of ground tests for verifying flight performance analyses.

Hanks, B. R.↗

Correlation of Amine Swingbed On-Orbit CO2 Performance with a Hardware Independent Predictive Model

The Amine Swingbed Payload is an experimental system deployed on the International Space Station (ISS) that includes a two-bed, vacuum regenerated, amine-based carbon dioxide (CO2) removal subsystem as the principal item under investigation. The aminebased subsystem, also described previously in various publications as CAMRAS 3, was originally designed, fabricated and tested by Hamilton Sundstrand Space Systems International, Inc. (HSSSI) and delivered to NASA in November 2008. The CAMRAS 3 unit was subsequently designed into a flight payload experiment in 2010 and 2011, with flight test integration activities accomplished on-orbit between January 2012 and March 2013. Payload activation was accomplished in May 2013 followed by a 1000 hour experimental period. The experimental nature of the Payload and the interaction with the dynamic ISS environment present unique scientific and engineering challenges, in particular to the verification and validation of the expected Payload CO2 removal performance. A modeling and simulation approach that incorporates principles of chemical reaction engineering has been developed for the amine-based system to predict the dynamic cabin CO2 partial pressure with given inputs of sorbent bed size, process air flow, operating temperature, half-cycle time, CO2 generation rate, cabin volume and the magnitude of vacuum available. Simulation runs using the model to predict ambient CO2 concentrations show good correlation to on-orbit performance measurements and ISS dynamic concentrations for the assumed operating conditions. The dynamic predictive modelling could benefit operational planning to help ensure ISS CO2 concentrations are maintained below prescribed limits and for the Orion vehicle to simulate various operating conditions, scenarios and transients.

Papale, William↗

Ionizing Radiation Environment on the International Space Station: Performance vs. Expectations for Avionics and Material

The role of structural shielding mass in the design, verification, and in-flight performance of International Space Station (ISS), in both the natural and induced orbital ionizing radiation (IR) environments, is reported. Detailed consideration of the effects of both the natural and induced ionizing radiation environment during ISS design, development, and flight operations has produced a safe, efficient manned space platform that is largely immune to deleterious effects of the LEO ionizing radiation environment. The assumption of a small shielding mass for purposes of design and verification has been shown to be a valid worst-case approximation approach to design for reliability, though predicted dependences of single event effect (SEE) effects on latitude, longitude, SEP events, and spacecraft structural shielding mass are not observed. The Figure of Merit (FOM) method over predicts the rate for median shielding masses of about 10g/cm(exp 2) by only a factor of 3, while the Scott Effective Flux Approach (SEFA) method overestimated by about one order of magnitude as expected. The Integral Rectangular Parallelepiped (IRPP), SEFA, and FOM methods for estimating on-orbit (Single Event Upsets) SEU rates all utilize some version of the CREME-96 treatment of energetic particle interaction with structural shielding, which has been shown to underestimate the production of secondary particles in heavily shielded manned spacecraft. The need for more work directed to development of a practical understanding of secondary particle production in massive structural shielding for SEE design and verification is indicated. In contrast, total dose estimates using CAD based shielding mass distributions functions and the Shieldose Code provided a reasonable accurate estimate of accumulated dose in Grays internal to the ISS pressurized elements, albeit as a result of using worst-on-worst case assumptions (500 km altitude x 2) that compensate for ignoring both GCR and secondary particle production in massive structural shielding.

Koontz, Steven L.↗

Preliminary Assessment of Suomi-NPP VIIRS On-orbit Radiometric Performance

The Visible-Infrared Imaging Radiometer Suite (VIIRS) is a key instrument on-board the Suomi National Polar-orbiting Partnership (NPP) spacecraft that was launched on October 28th 2011. VIIRS was designed to provide moderate and imaging resolution of most of the globe twice daily. It is a wide-swath (3,040 km) cross-track scanning radiometer with spatial resolutions of 370.and 740 m at nadir for imaging and moderate bands, respectively. It has 22 spectral bands covering the spectrum between 0.412 11m and 12.01 11m, including 14 reflective solar bands (RSB), 7 thermal emissive bands (TEB), and 1 day-night band (ON B). VIIRS observations are used to generate 22 environmental data products (EORs). This paper will briefly describe NPP VIIRS calibration strategies performed by the independent government team, for the initial on-orbit Intensive Calibration and Validation (ICV) activities. In addition, this paper will provide an early assessment of the sensor on-orbit radiometric performance, such as the sensor signal to noise ratios (SNRs), dual gain transition verification, dynamic range and linearity, reflective bands calibration based on the solar diffuser (SO) and solar diffuser stability monitor (SOSM), and emissive bands calibration based on the on-board blackbody calibration (OBC). A comprehensive set of performance metrics generated during the pre-launch testing program will be compared to VIIRS on-orbit early performance, and a plan for future cal/val activities and performance enhancements will be presented.

Oudrari, Hassan↗

Prototype test article verification of the Space Station Freedom active thermal control system microgravity performance

To verify the on-orbit operation of the Space Station Freedom (SSF) two-phase external Active Thermal Control System (ATCS), a test and verification program will be performed prior to flight. The first system level test of the ATCS is the Prototype Test Article (PTA) test that will be performed in early 1994. All ATCS loops will be represented by prototypical components and the line sizes and lengths will be representative of the flight system. In this paper, the SSF ATCS and a portion of its verification process are described. The PTA design and the analytical methods that were used to quantify the gravity effects on PTA operation are detailed. Finally, the gravity effects are listed, and the applicability of the 1-g PTA test results to the validation of on-orbit ATCS operation is discussed.

Chen, I. Y.↗

Improvement of the TOPEX and Jason Orbit Time Series: Precision Orbit Determination, Calibration, Validation and Improvement Through the Combined Reduction and Analysis of GPS, SLR, DORIS and Altimeter Data

Orbit error is a major component in the overall error budget of all altimeter satellite missions. Jason-I is no exception and a 1 cm radial orbit accuracy goal has been set, which represents a factor of two improvement over what is currently being achieved for TOPEX/Poseidon (TP). Our current analysis suggests this goal has been met and even improved upon, but the challenge is to be able to continually achieve this high accuracy, verify the performance and characterize and quantify the remaining errors over the lifetime of the mission. The computation, verification and error characterization of such high accuracy orbits requires the reduction and analysis of all available tracking data (GPS, SLR, DORIS and altimeter). Current analysis also indicates the history of TP orbits can be further improved employing new solution strategies developed and tested on Jason-I. Our research focuses on the calibration, validation and improvement of orbit accuracies using all available tracking data including altimetry. We will compute and distribute well centered Jason orbits with an accuracy of better than 1-cm in the radial component. In addition to the orbits themselves, a characterization of the orbit error will be distributed and accumulated as a time series of orbit performance metrics to track anomalies and trends. The long time series of orbit error characterization will enable a better understanding of the remaining orbit errors and its impact on the altimeter data analysis. As part of this research effort we are also significantly improving the current level of TP orbit accuracy, re-computing new high-accuracy TP orbits from the beginning of the TP mission and continuing into the future (as long as TP is healthy). Our funded research effort will result in a complete and consistent time series of improved orbits for both TP and Jason, significantly benefiting the long time series of altimeter data analysis and the TP/Jason dual mission. The resultant high accuracy orbits and the characterization of their error will allow further improvements to the accuracy and overall quality of the altimeter measurement time series making possible further strides in radar altimeter remote sensing.

Luthcke, Scott B.↗

Development Status of the NASA 30-cm Ion Thruster and Power Processor

Xenon ion propulsion systems are being developed by NASA Lewis Research Center and the Jet Propulsion Laboratory to provide flight qualification and validation for planetary and earth-orbital missions. In the ground-test element of this program, light-weight (less than 7 kg), 30 cm diameter ion thrusters have been fabricated, and preliminary design verification tests have been conducted. At 2.3 kW, the thrust, specific impulse, and efficiency were 91 mN, 3300 s, and 0.65, respectively. An engineering model thruster is now undergoing a 2000 h wear-test. A breadboard power processor is being developed to operate from an 80 V to 120 V power bus with inverter switching frequencies of 50 kHz. The power processor design is a pathfinder and uses only three power supplies. The projected specific mass of a flight unit is about 5 kg/kW with an efficiency of 0.92 at the full-power of 2.5 kW. Preliminary integration tests of the neutralizer power supply and the ion thruster have been completed. Fabrication and test of the discharge and beam/accelerator power stages are underway.

Sovey, James S.↗

Inertial Upper Stage (IUS) software analysis

The Inertial Upper Stage (IUS) System, an extension of the Space Transportation System (STS) operating regime to include higher orbits, orbital plane changes, geosynchronous orbits, and interplanetary trajectories is presented. The IUS software design, the IUS software interfaces with other systems, and the cost effectiveness in software verification are described. Tasks of the IUS discussed include: (1) design analysis; (2) validation requirements analysis; (3) interface analysis; and (4) requirements analysis.

Grayson, W. L.↗

Feasibility Study of the Superconducting Gravity Gradiometer (SGG) Flight Test on the European Retrievable Carrier (EURECA)

A study was performed to determine the feasibility of conducting a flight test of the Superconducting Gravity Gradiometer (SGG) Experiment Module on one of the reflights of the European Retrievable Carrier (EURECA). EURECA was developed expressly to accommodate space science experimentation, while providing a high quality microgravity environment. As a retrievable carrier, it offers the ability to recover science experiments after a nominal six months of operations in orbit. The study concluded that the SGG Experiment Module can be accommodated and operated in a EURECA reflight mission. It was determined that such a flight test would enable the verification of the SGG Instrument flight performance and validate the design and operation of the Experiment Module. It was also concluded that a limited amount of scientific data could be obtained on this mission.

Source record↗

Thermal System Verification and Model Validation for NASA's Cryogenic Passively Cooled James Webb Space Telescope

A thorough and unique thermal verification and model validation plan has been developed for NASA s James Webb Space Telescope. The JWST observatory consists of a large deployed aperture optical telescope passively cooled to below 50 Kelvin along with a suite of several instruments passively and actively cooled to below 37 Kelvin and 7 Kelvin, respectively. Passive cooling to these extremely low temperatures is made feasible by the use of a large deployed high efficiency sunshield and an orbit location at the L2 Lagrange point. Another enabling feature is the scale or size of the observatory that allows for large radiator sizes that are compatible with the expected power dissipation of the instruments and large format Mercury Cadmium Telluride (HgCdTe) detector arrays. This passive cooling concept is simple, reliable, and mission enabling when compared to the alternatives of mechanical coolers and stored cryogens. However, these same large scale observatory features, which make passive cooling viable, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone to most space missions thermal verification plan. JWST is simply too large in its deployed configuration to be properly thermal balance tested in the facilities that currently exist. This reality, when combined with a mission thermal concept with little to no flight heritage, has necessitated the need for a unique and alternative approach to thermal system verification and model validation. This paper describes the thermal verification and model validation plan that has been developed for JWST. The plan relies on judicious use of cryogenic and thermal design margin, a completely independent thermal modeling cross check utilizing different analysis teams and software packages, and finally, a comprehensive set of thermal tests that occur at different levels of JWST assembly. After a brief description of the JWST mission and thermal architecture, a detailed description of the three aspects of the thermal verification and model validation plan is presented.

Cleveland, Paul E.↗

Thermal System Verification and Model Validation for NASA's Cryogenic Passively Cooled James Webb Space Telescope (JWST)

A thorough and unique thermal verification and model validation plan has been developed for NASA s James Webb Space Telescope. The JWST observatory consists of a large deployed aperture optical telescope passively cooled to below 50 Kelvin along with a suite of several instruments passively and actively cooled to below 37 Kelvin and 7 Kelvin, respectively. Passive cooling to these extremely low temperatures is made feasible by the use of a large deployed high efficiency sunshield and an orbit location a! !he L2 Lagrange p~in!. Another enabling feature is the scale or size of the observatory that allows for large radiator sizes that are compatible with the expected power dissipation of the instruments and large format Mercury Cadmium Telluride (HgCdTe) detector arrays. This passive cooling concept is simple, reliable, and mission enabling when compared to the alternatives of mechanical coolers and stored cryogens. However, these same large scale observatory features, which make passive cooling viable, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone to most space missions thermal verification plan. JWST is simply too large in its deployed configuration to be properly thermal balance tested in the facilities that currently exist. This reality, when combined with a mission thermal concept with little to no flight heritage, has necessitated the need for a unique and alternative approach to thermal system verification and model validation. This paper describes the thermal verification and model validation plan that has been developed for JWST.

Parrish, Keith↗

GPS and Galileo Developments on Board the International Space Station With the Space Communications and Navigation (SCaN) Testbed

The Space Communications and Navigation (SCaN) is a facility developed by NASA and hosted on board the International Space Station (ISS) on an external truss since 2013.It has the objective of testing navigation and communication experimentations with a Software Defined Radio (SDR) approach, which permits software updates for testing new experimentations.NASA has developed the Space Telecommunications Radio System (STRS) architecture standard for SDRs used in space and ground-based platforms to provide commonality among radio developments to provide enhanced capability. The hardware is equipped with both L band front-end radios and the NASA space network communicates with it using S-band, Ku-band and Ka-band links.In May 2016 Qascom started GARISS (GPS and Galileo Receiver for the ISS), an activity of experimentation in collaboration with ESA and NASA that has the objective to develop and validate the acquisition and processing of combined GPS and Galileo signals on board the ISS SCaN testbed. This paper has the objective to present the mission, and provide preliminary details about the challenges in the design, development and verification of the waveform that will be installed on equipment with limited resources. GARISS is also the first attempt to develop a waveform for the ISS as part of an international collaboration between US and Europe. Although the final mission objective is to target dual frequency processing, initial operations will foresee a single frequency processing. Initial results and trade-off between the two options, as well as the final decision will be presented and discussed. The limited resources on board the SCaN with respect to the challenging requirements to acquire and track contemporaneously two satellite navigation systems, with different modulations and data structure, led to the need to assess the possibility of aiding from ground through the S-band. This option would allow assistance to the space receiver in order to provide knowledge of GNSS orbits and reduce the processing on board. Trade off and various options for telemetry and uplink data are presented and discussed. Finally, integration and validation of the waveform are one of the major challenges of GARISS: The Experiment Development System (EDS) and the the Ground Integration Unit (GIU) for VV will be used prior to conducting the experiment on the ISS. The EDS can be used in lab environment and allows prototyping and verification activities with the simulator, but does not include all hardware components. The GIU on the other side is the flight model which replicates the flying equipment, but has limited flexibility for testing.As conclusion, the project is now approaching the Preliminary Design Review (PDR) and indeed only preliminary results are available. This paper is an opportunity to present the GARISS mission as part of an International cooperation between ESA, NASA and Qascom. The preliminary results include GPS and Galileo processing from space signals, the challenges and trade off decisions, the high level STRS architecture and foreseen experimentation campaign. Detailed results from the test campaigns are expected in 2017.

space navigation↗

Control system testing

A three stage process of ground testing of the Space Telescope Pointing Control System is used for verification prior to on-orbit operation. First, development tests are conducted in a laboratory environment using flight/engineering model control sensor and actuators configured with an engineering model of the flight computer and data management system breadboards. These development tests validate the results of computer simulations predicting control system performance. Integration tests bring together flight system elements and software interfaced to a software simulation of vehicle dynamics to confirm closed loop performance. The final ground test phase, flight systems testing, is conducted on the fully assembled Space Telescope, verifies interfaces with the Fine Guidance Sensors and includes a thermal vacuum testing period. During the final test phase, the Point Control System is exercised with the dynamics simulator running in real time.

Whittler, W. H.↗

Reaction Wheel Disturbance Modeling, Jitter Analysis, and Validation Tests for Solar Dynamics Observatory

The Solar Dynamics Observatory (SDO) aims to study the Sun's influence on the Earth by understanding the source, storage, and release of the solar energy, and the interior structure of the Sun. During science observations, the jitter stability at the instrument focal plane must be maintained to less than a fraction of an arcsecond for two of the SDO instruments. To meet these stringent requirements, a significant amount of analysis and test effort has been devoted to predicting the jitter induced from various disturbance sources. One of the largest disturbance sources onboard is the reaction wheel. This paper presents the SDO approach on reaction wheel disturbance modeling and jitter analysis. It describes the verification and calibration of the disturbance model, and ground tests performed for validating the reaction wheel jitter analysis. To mitigate the reaction wheel disturbance effects, the wheels will be limited to operate at low wheel speeds based on the current analysis. An on-orbit jitter test algorithm is also presented in the paper which will identify the true wheel speed limits in order to ensure that the wheel jitter requirements are met.

Liu,Kuo-Chia↗

Verification Testing and Veg-05 Tomato Crop Production on the International Space Station

Production of fresh, nutritious, and tasty produce for astronauts during spaceflight may provide health-promoting, bioavailable nutrients and enhance the dietary experience as we move into longer-duration missions. Growing and caring for plants may also reduce the psychological stresses associated with spaceflight and enhance connections to Earth. Requirements to consistently grow a diversity of crops under spaceflight environmental conditions remain poorly defined. The VEG-05 experiment is part of a series of experiments with pick-and-eat salad crops to better define best practices for crop production and handling in space. VEG-05 and predecessor experiments VEG-04A and VEG-04B, use the Veggie vegetable production facilities on the International Space Station to grow salad crops under different spectral compositions. In VEG-04A and B, mizuna mustard was cultivated with two different red: blue light treatments, and in VEG-05 we are cultivating ‘Red Robin’ dwarf cherry tomatoes under the same light spectra. Light can impact the growth habit, yield, nutritional composition, microbial levels, and even flavor attributes within crops, and our team will assess these characteristics for this crop during VEG-05. Prior to launch and installation on ISS in late 2022, both a science verification test (SVT), and an experiment verification test (EVT) were conducted at Kennedy Space Center in ISS Environment Simulator Chambers. Science verification testing, and a previous fertilizer test, grew plants in both plant pillows and PONDS (Passive Orbital Nutrient Delivery System) units and tested two different fertilizer treatments in both sets of hardware, with each test under only one of the light conditions. Because of challenges validating the PONDS hardware on ISS, and with good crop production in plant pillows, the EVT moved forward using only plant pillows with the highest fertilizer composition tested during SVT, and two Veggie units were utilized. One Veggie had light settings consisting of equal levels of red: blue light (150 µmol/m2/s for each color) plus green light (30 µmol/m2/s) while the second Veggie had a 90:10 ratio of red: blue light (270 µmol/m2/s red and 30 µmol/m2/s blue) plus green, so each unit provided 330 µmol/m2/s of photosynthetically active radiation to the tomato crops on average. Our original plan, based on prior ground testing, was to grow the crop for 104 days and harvest at 80, 90 and 104 days after initiation. For SVT, under the equal red: blue light treatment, fruit ripening in plant pillows was delayed and fruit were not ripe by day 80, so actual harvest days were days 90, 97, and 104. For EVT we saw fruit ripening earlier, especially in the high red treatment, and so we harvested at days 83, 90, and 99 days after initiation. In SVT we had mostly daily watering, and this led to excess water in plant pillows, which leaked out. This excess water also caused fungus to grow on one leaf and a couple of plant stems. To reduce this excess moisture, we throttled back the watering for EVT, and used the root mat reservoir more frequently. This led to watering only every other day, reducing crew time needed for plant care, however, two wilting events occurred during this EVT, at days 51 and 75. Plants recovered from these wilting events, but these events may have influenced the rate of fruit ripening and flower formation. Regardless, more than 10 fruit were produced from each plant on average, with the high red treatment producing slightly heavier fruit. Microbial testing from fruit during SVT indicated that fruit were safe for consumption with microbial levels below detection limits. VEG-05 flight and ground operations are expected to run between December 2022 and March 2023. This research was co-funded by the Human Research Program and Space Biology (MTL#1075) in the ILSRA 2015 NRA call.

Gioia D. Massa↗