Search NASA⌕ Search

SEARCH · Search NASA

Results for “operation phases”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Mars Reconnaissance Orbiter Operational Aerobraking Phase Assessment

The Mars Reconnaissance Orbiter (MRO) was inserted into orbit around Mars on March 10, 2005. After a brief delay, it began the process of aerobraking - using the atmospheric drag on the vehicle to reduce orbital period. The aerobraking phase lasted approximately 5 months (April 4 to August 30, 2006), during which teams from the Jet Propulsion Laboratory, Lockheed Martin Space Systems Corporation, and NASA Langley Research Center worked together to monitor and maneuver the spacecraft such that thermal margin on the solar arrays was maintained while schedule margin was upheld to provide a final local mean solar time (LMST) at ascending node of 3:00pm on the final aerobraking orbit. This paper will focus on the contribution of the flight mechanics team at NASA Langley Research Center (LaRC) during the aerobraking phase of the MRO mission.

Prince, Jill L.↗

General Overview of the ODC Elimination Effort of the RSRM Program

The purpose of the ODC Elimination Program of the Space Shuttle RSRM Program is to eliminate the usage of 1, 1, 1 trichloroethane (TCA) in all RSRM (Reusable Solid Rocket Motor) manufacturing processes. This program consists of the following phases and objectives: Phase 0 - Convert to greaseless shipping of metal components. Phase 1 - Eliminate TCA vapor degreasing and usage in propellant cleaning operations. Phase 2 - Eliminate TCA usage for hand cleaning operations. Each phase reduces peak TCA consumption (about 1.4 million pounds in 1989) by about 29, 61, and 10 percent, respectively. Phase 0 was completed in 1992, Phase 1 in 1997, and Phase 2 is in progress (about 75% complete). TCA replacement objectives are accomplished by are a series of subscale, full-scale, and static testing outlined by the NASA-funded, ODC Elimination Program.

Evans, Kurt↗

Curiosity: the Mars Science Laboratory Project

The Curiosity rover landed successfully in Gale Crater, Mars on August 5, 2012. This event was a dramatic high point in the decade long effort to design, build, test and fly the most sophisticated scientific vehicle ever sent to Mars. The real achievements of the mission have only just begun, however, as Curiosity is now searching for signs that Mars once possessed habitable environments. The Mars Science Laboratory Project has been one of the most ambitious and challenging planetary projects that NASA has undertaken. It started in the successful aftermath of the 2003 Mars Exploration Rover project and was designed to take significant steps forward in both engineering and scientific capabilities. This included a new landing system capable of emplacing a large mobile vehicle over a wide range of potential landing sites, advanced sample acquisition and handling capabilities that can retrieve samples from both rocks and soil, and a high reliability avionics suite that is designed to permit long duration surface operations. It also includes a set of ten sophisticated scientific instruments that will investigate both the geological context of the landing site plus analyze samples to understand the chemical & organic composition of rocks & soil found there. The Gale Crater site has been specifically selected as a promising location where ancient habitable environments may have existed and for which evidence may be preserved. Curiosity will spend a minimum of one Mars year (about two Earth years) looking for this evidence. This paper will report on the progress of the mission over the first few months of surface operations, plus look retrospectively at lessons learned during both the development and cruise operations phase of the mission..

project formulation↗

Maintaining an expert system for the Hubble Space Telescope ground support

The transformation portion of the Hubble Space Telescope (HST) Proposal Entry Processor System converts astronomer-oriented description of a scientific observing program into a detailed description of the parameters needed for planning and scheduling. The transformation system is one of a very few rulebased expert systems that has ever entered an operational phase. The day to day operations of the system and its rulebase are no longer the responsibility of the original developer. As a result, software engineering properties of the rulebased approach become more important. Maintenance issues associated with the coupling of rules within a rulebased system are discussed and a method is offered for partitioning a rulebase so that the amount of knowledge needed to modify the rulebase is minimized. This method is also used to develop a measure of the coupling strength of the rulebase.

Lindenmayer, Kelly↗

Lessons Learned for Planning and Estimating Operations Support Requirements

Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

Newhouse, Marilyn↗

Space systems engineering and risk management - joined at the hip

This paper explores the separate skills and capabilities practiced until now, and the powerful coupling to be achieved, practically and effectively, in implementing a space mission, from inception (pre-phase A) to the end of Operations (phase E). The use of risk assessment techniques in balancing cost risk against performance risk, and the application of the systems engineering team in these trades, is the key to achieving this new implementation paradigm.

systems engineering↗

He II Liquid/Vapor Phase Separator for Large Dynamic Range Operation

A phase separator, which separates helium vapor from liquid superfluid helium (He II), is an indispensable device for space cryogenics. The most recent approach to the Space Infrared Telescope Facility (SIRTF) uses a new design concept in which only the detector package is cold at launch, the remainder of the telescope being subsequently cooled to operating temperature on orbit. Therefore, a large dynamic operational range is required of the cryogen system. This is a report of initial laboratory test results with candidate porous plugs as phase separators. Mass flow rates and pressure and temperature differences across a porous plug were measured in this experiment. Relatively large mass flow rates were observed even at small pressure differences. In the high mass flow rate region, a hysteresis was observed with increases and decreases of the pressure difference. A linear theory is proposed and compared with experimental data to explain several phenomena observed in this system.

Phase Separator, Space Cryogenics↗

Data Management for Mars Exploration Rovers

Data Management for the Mars Exploration Rovers (MER) project is a comprehensive system addressing the needs of development, test, and operations phases of the mission. During development of flight software, including the science software, the data management system can be simulated using any POSIX file system. During testing, the on-board file system can be bit compared with files on the ground to verify proper behavior and end-to-end data flows. During mission operations, end-to-end accountability of data products is supported, from science observation concept to data products within the permanent ground repository. Automated and human-in-the-loop ground tools allow decisions regarding retransmitting, re-prioritizing, and deleting data products to be made using higher level information than is available to a protocol-stack approach such as the CCSDS File Delivery Protocol (CFDP).

Mars missions↗

Charged Particle lunar Environment Experiment (CPLEE)

Research development in the Charged Particle Lunar Environment Experiment (CPLEE) is reported. The CPLEE is ion-electron spectrometer placed on the lunar surface for the purpose of measuring charged particle fluxes impacting the moon from a variety of regions and to study the interactions between space plasmas and the lunar surface. The principal accomplishments reported include: (1) furnishing design specifications for construction of the CPLEE instruments; (2) development of an advanced computer-controlled facility for automated instrument calibration; (3) active participation in the deployment and past-deployment operational phases with regard to data verification and operational mode selection; and (4) publication of research papers, including a study of lunar photoelectrons, a study of plasmas resulting from man-made lunar impart events, a study of magnetotail and magnetosheath particle populations, and a study of solar-flare interplanetary particles.

Reasoner, D. L.↗

Space Station Freedom payload operations from the user's perspective

This report describes the Microgravity Science and Applications Division's (MSAD) operations concept for using the Space Station Freedom (SSF) program ground data systems and services, and the plans for and capabilities of the MSAD remote User Operations Facilities (UOF) from which the MSAD SSF payloads will be operated. Attention is given to the MSAD operational phases, the MSAD UOF concept, and UOF operations teams. MSAD is planning remote payload operations for a number of Spacelab missions which will supply MSAD valuable information for application to the development of UOFs in the SSF era.

Robey, J. L.↗

Propagation experiment of COMETS Ka/Q-band communication link for future satellite cellular system

Mobile/Personal Satellite Communication Systems in L/S-bands are going into the operational phase. In the future, they will be operated in much higher frequency bands, for example in Ka-band, because the available bandwidth in L-band is limited. Systems with large on-board antennas in higher frequencies allow the same configuration as terrestrial cellular radio systems, since the on-board antennas will have many small spot beams. This may be true especially in a low earth orbit system such as Teledesic, which will use Ka-band. The most important parameter of Satellite Cellular may be cell size, that is, a diameter of the spot beam. A system designer needs the local correlation data in a cell and the size of the correlative area. On the other hand, the most significant difficulty of Ka and higher band systems is the countermeasure to rain attenuation. Many-cell systems can manage the limited power of on-board transponders by controlling output power of each beam depending on the rain attenuation of each cell. If the cell size is equal to the correlative area, the system can probably achieve the maximum performance. Propagation data of Ka and higher band obtained in the past shows a long term cumulative feature and link availability, but do not indicate the correlative area. The Japanese COMETS satellite, which will be launched in February 1997, has transponders in Ka and Q-band. The CRL is planning to measure the correlative area using 21 GHz and 44 GHz CW transmissions from the COMETS.

Hase, Yoshihiro↗

Comparing Pre-Launch Assumptions to In-Flight Navigation Performance of OSIRIS-REx

The Sample Return Capsule (SRC) onboard the NASA Origins, Spectral Inter-pretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx)spacecraft is currently carrying samples of the B-type asteroid Bennu for safe re-turn to Earth at the Utah Test and Training Range on September 24, 2023. These samples were collected during the Touch And Go (TAG) sampling event on October 20, 2020, when the spacecraft contacted the surface for a few seconds at a location less than 1 meter from the target. The unprecedented navigation performance achieved during that event was the culmination of experience gained during two years of cruise and two years of increasingly challenging operation sat Bennu. As we had hoped, the proximity navigation performance at Bennu exceeded pre-launch analysis. This paper will compare the navigation performance through the proximity operation phases to our pre-launch analysis and will quantify how refinements of the small force models governing the spacecraft motion near Bennu considerably improved the down-track state predictions leading up to the successful TAG event. It was evident to the team and to expert peer reviewers during the design phase that exquisite model fidelity and aggressive operational concepts, which challenged and advanced the state of the art for deep space proximity operations, would be required to meet the mission’s objectives. This paper summarizes the superlative achievements of the team in rising to and overcoming these challenges.

Peter G Antresian↗

Space flight experience with the Shuttle Orbiter control system

Experience gained through the Shuttle Orbital Flight Test program has matured the engineering understanding of the Shuttle on-orbit control system. The geneology of the control systems (called digital autopilots, or DAPs, and used by the Shuttle for on-orbit operations) is reviewed, the flight experience gained during the flight test program is examined within the context of preflight analysis and test results, and issues for the operational phase of the Shuttle, including constraints upon both operations and analysis still required to increase confidence in the Shuttle's ability to handle capabilities not experienced during the flight test program are addressed. Two orbital autopilots have resulted from computer memory and time constraints on a flight control system, with many different, flight phase unique requirements. The transition DAP, used for insertion and deorbit, has more active sensors and redundancy but a less complex data processing scheme excluding state estimation with fewer choices of operational mode.

Cox, K. J.↗

Flexible Operation of Natural Gas Power Plants in Texas: Startup and Shutdown Durations and Nitrogen Dioxide Emissions

This dataset provides insights into historical flexible operation of natural gas power plants in Texas, with a focus on startup and shutdown events. The dataset includes tables summarizing startup and shutdown durations as well as nitrogen oxide (NOx) emission factors during these events, and compares these emission factors with those observed during all other operating phases (referred to here as “steady-state operation”). The dataset is derived using the U.S. Environmental Protection Agency (EPA)’s Clean Air Markets Program Data (CAMPD). Historical hourly data from 2015–2024, including electricity generation, heat input, and NOx emission factors, are used for natural gas combined cycle units, combustion turbine units, and steam turbine units in Texas. This work was authored by the National Laboratory of the Rockies, operated by the Alliance for Energy Innovation, LLC, for the U.S Department of Energy (DOE) under contract no. DE-AC36-08GO28308. Funding was provided by the U.S. Department of Energy as part of its Grid Modernization Laboratory Consortium, a strategic partnership between DOE and the national laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation’s grid. The views expressed in the dataset do not necessarily represent the views of the DOE or the U.S. Government.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Program status

The Pilot Climate Data System (PCDS) was designed to support a variety of users that have been arbitrarily categorized into four groups: researchers, data producers, occasional users, and management. The expanding capabilities of the system are attracting the attention of both academic and other scientific institutions worldwide. Highlighted by progress in networking capabilities, hardware acquisitions, software developments, data set additions, and tutorial developments, exciting advances have taken place since the First PCDS Workshop. In the plans for the 1986 fiscal year, recommendations from an ad hoc users' group meeting in May 1985 and from the First PCDS workshop are apparent. This year's plans are listed, along with comments made at the users' group meeting. Although the PCDS is presently considered to be in a developmental phase, plans for making the transition to an operational phase are being implemented.

Smith, P.↗

Testing Mars 2020 Flight Software and Hardware in the Surface System Development Environment

The Mars 2020 (M2020) Perseverance Rover is NASA's most advanced planetary rover mission to date. It includes a novel Sample Caching Subsystem (SCS) which will collect rock cores for possible future return to Earth, as well as an improved mobility system with enhanced autonomous navigation which will enable it to traverse faster and farther than prior rovers. The development of both systems required extensive flight software and flight hardware testing. To support this testing, we developed the Surface System Development Environment (SSDEV) and used it for a wide variety of testing. SSDEV is a bundled subset of M2020 Flight Software which runs on commercially available Linux computers and can be combined with multiple backend options for simulation and hardware control. The SSDEV architecture enabled our teams to perform much more testing of flight software and flight hardware than would have otherwise been possible. As a secondary benefit, the SSDEV-based test campaigns also helped our teams enter the operations phase of the mission with greater readiness of operations products and tools. In this paper, we summarize the motivation for SSDEV, provide an overview of the SSDEV architecture, list several examples of how SSDEV was used, and summarize lessons learned. SSDEV is not a substitute for integrated testing with flight-like avionics, but it enabled substantially more testing than would have otherwise been possible and also provided some unique benefits. We recommend architectures like SSDEV to future projects that need to perform extensive hardware and software testing using a limited set of flight-like avionics.

Wai, Dennis↗

Practical Application of PRA as an Integrated Design Tool for Space Systems

This paper presents the application of the first comprehensive Probabilistic Risk Assessment (PRA) during the design phase of a joint NASA/NOAA weather satellite program, Geostationary Operational Environmental Satellite Series R (GOES-R). GOES-R is the next generation weather satellite primarily to help understand the weather and help save human lives. PRA has been used at NASA for Human Space Flight for many years. PRA was initially adopted and implemented in the operational phase of manned space flight programs and more recently for the next generation human space systems. Since its first use at NASA, PRA has become recognized throughout the Agency as a method of assessing complex mission risks as part of an overall approach to assuring safety and mission success throughout project lifecycles. PRA is now included as a requirement during the design phase of both NASA next generation manned space vehicles as well as for high priority robotic missions. The influence of PRA on GOES-R design and operation concepts are discussed in detail. The GOES-R PRA is unique at NASA for its early implementation. It also represents a pioneering effort to integrate risks from both Spacecraft (SC) and Ground Segment (GS) to fully assess the probability of achieving mission objectives. PRA analysts were actively involved in system engineering and design engineering to ensure that a comprehensive set of technical risks were correctly identified and properly understood from a design and operations perspective. The analysis included an assessment of SC hardware and software, SC fault management system, GS hardware and software, common cause failures, human error, natural hazards, solar weather and infrastructure (such as network and telecommunications failures, fire). PRA findings directly resulted in design changes to reduce SC risk from micro-meteoroids. PRA results also led to design changes in several SC subsystems, e.g. propulsion, guidance, navigation and control (GNC), communications, mechanisms, and command and data handling (C&DH). The fault tree approach assisted in the development of the fault management system design. Human error analysis, which examined human response to failure, indicated areas where automation could reduce the overall probability of gaps in operation by half. In addition, the PRA brought to light many potential root causes of system disruptions, including earthquakes, inclement weather, solar storms, blackouts and other extreme conditions not considered in the typical reliability and availability analyses. Ultimately the PRA served to identify potential failures that, when mitigated, resulted in a more robust design, as well as to influence the program's concept of operations. The early and active integration of PRA with system and design engineering provided a well-managed approach for risk assessment that increased reliability and availability, optimized lifecyc1e costs, and unified the SC and GS developments.

Kalia, Prince↗