Search NASA⌕ Search

SEARCH · Search NASA

Results for “outer planet missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Guidance and navigation requirements for unmanned flyby and swingby missions to the outer planets. Volume 2: impulsive high thrust missions, phase A

The impulsive, high thrust missions portion of a study on guidance and navigation requirements for unmanned flyby and swingby missions to the outer planet is presented. The proper balance between groundbased navigational capability, using the deep space network (DSN) alone, and an onboard navigational capability with and without supplemental use of DSN tracking, for unmanned missions to the outer planets of the solar system is defined. A general guidance and navigation requirements program is used to survey parametrically the characteristics associated with three types of navigation systems: (1) totally onboard, (2) totally Earth-based, and (3) a combination of these two.

Source record↗

A Highly Miniaturized Inertial Grade Gyroscope for Space Applications

The evolution of inertial grade gyroscopes for space applications represents well over 50 years of technology development and an investment of hundreds of millions of dollars. The workhorse product which represents the current state-of-the art for commercially available high performance devices is the Litton-Hemishperical Resonator Gyro (HRG) Inertial Measurement Unit (IMU). This product has a performance figure of merit of 0.003 deg/hr bias drift, a volume of 567 cubic inches, weighs 19 pounds, draws about 30 watts and costs over $1 million each. Clearly devices of this magnitude are not conducive to the minimized mass, volume, power, and cost constraints of outer planet missions. An approach to breaking these potential barriers is the use of Microelectromechanical Systems (MEMS) based inertial devices. Although substantially reduced in size, mass power and cost, this approach has produced devices in the tactical performance range of greater than 1 deg/hour bias drift. This level of performance satisfies the preponderance of high market volume requirements such as automotive and tactical munitions but does not meet the limited market quantity requirements for the high precision space based market. Because of the very limited size of the space based market, there is little economic incentive for commercial fabricators of tactical grade devices to address the necessary performance improvements. The Jet Propulsion Laboratory (JPL) in conjunction with Boeing Space Systems (BSS) is addressing this void to satisfy our mutual requirements in this area. The project objective to is to achieve 0.01 deg/hr performance in an IMU which is less than 10 cubic inches in volume, weighs less than 0.5 pounds, draws less than 1 watt and is available in volume production for less than $2500. Reductions of this magnitude will be mission enabling capabilities for a variety of anticipated outer planet mission attributes such as autonomous control and docking, formation flying and robotic outposts. The improved performance will be realized using improved relative precision fabrication, enhanced vibratory drive and sense designs, and statistical data analysis.

Wiberg, D. V.↗

Guidance and navigation requirements for unmanned flyby and swingby missions to the outer planets. Volume 1: Summary report

Unmanned spacecraft missions to the outer planets are of current interest to planetary scientists, and are being studied for the post 1970 time period. Flyby, entry and orbiter missions are all being considered using both direct and planetary swingby trajectory modes. The navigation and guidance requirements for a variety of missions to the outer planets and comets including both the three and four planet Grand Tours, are summarized.

Source record↗

Comparative cost assessment of planetary missions

A study to explore the cost differences resulting from implementing a series of representative solar system exploration missions in either ballistic or low-thrust flight modes is presented. Cost comparisons of missions using a solar electric propulsion delivery systems with ballistic equivalent mission designs were made. The mission set, cost elements, and delivery modes are detailed. Objectives for each of the six mission sets including two asteroid missions, a comet mission, a Mercury mission, and two outer planet missions are given.

Source record↗

6-ft High-Power Electric Propulsion Test Port, EPL Tank 5 Installed

High-power electric propulsion is a critical component of NASA s proposed missions to the outer planets. Mission studies have shown that high-power, high-specific-impulse propulsion systems can deliver 2000 kg of scientific payload to Pluto with trip times on the order of 10 years. Of greater significance is the ability of these propulsion systems to place this science payload in orbit around the planet, rather than making the fast fly-bys associated with traditional chemical propulsion systems. Significant ground test programs are required to develop the new technologies needed for thrusters operating at power levels exceeding 20 kW, an order of magnitude above the state of the art.

Grisnik, Stanley P.↗

Advanced Stirling Technology Development at NASA Glenn Research Center

The NASA Glenn Research Center has been developing advanced energy-conversion technologies for use with both radioisotope power systems and fission surface power systems for many decades. Under NASA's Science Mission Directorate, Planetary Science Theme, Technology Program, Glenn is developing the next generation of advanced Stirling convertors (ASCs) for use in the Department of Energy/Lockheed Martin Advanced Stirling Radioisotope Generator (ASRG). The next-generation power-conversion technologies require high efficiency and high specific power (watts electric per kilogram) to meet future mission requirements to use less of the Department of Energy's plutonium-fueled general-purpose heat source modules and reduce system mass. Important goals include long-life (greater than 14-yr) reliability and scalability so that these systems can be considered for a variety of future applications and missions including outer-planet missions and continual operation on the surface of Mars. This paper provides an update of the history and status of the ASC being developed for Glenn by Sunpower Inc. of Athens, Ohio.

Shaltens, Richard K.↗

Low Cost Atmospheric Probe Missions to the Outer Planets

Outer planet probe missions are part of the on-going Mission and Technology Roadmap effort to define the framework for the future NASA Solar System Exploration program...A baseline mission/system design is described to which the technology needs can be related.

atmospheric↗

Thermionic reactor electric propulsion system requirements.

Results of mission analysis, system analysis and mission engineering studies to find a single nuclear electric propulsion (NEP) system which would be applicable for a broad range of unmanned outer planet missions. The NEP system studied uses an in-core nuclear thermionic reactor as the electric power source and mercury bombardment ion engines for propulsion. Many requirements, which are imposed on the NEP system by the mission, were determined from the studies in the process of trying to find a single NEP system for many missions. It is concluded that a single thermionic reactor NEP system could be useful for a broad range of unmanned outer planet missions. The thermionic reactor NEP system should have a power level in the range from 70 to 120 kWe, a system specific weight of approximately 30 kg/kWe, and a full power output capability of 20,000 hr.

Mondt, J. F.↗

Dust Hazard Management in the Outer Solar System

Most robotic missions to the outer solar system must grapple with the hazards posed by the dusty rings of the gas giants. Early assessments of these hazards led simply to ring avoidance due to insufficient data and high uncertainties on the dust population present in such rings. Recent approaches, principal among them the Cassini dust hazard management strategy, provide useful results from detailed modeling of spacecraft vulnerabilities and dust hazard regions, which along with the range of mission trajectories are used to to assess the risks posed by each passage through a zone of potential hazard. This paper shows the general approach used to implement the analysis for Cassini, with recommendations for future outer planet missions.

mission hazards↗

Outer planets exploration - A mission strategy for the 1980's

This paper presents a mission strategy for exploring the outer planets in the 1980s. The strategy is based on the anticipated findings of the 1977 Voyager Jupiter/Saturn Mission, and the 1982 Jupiter Orbiter Probe (JOP) Mission, recently approved as a new project start, beginning in October 1977. The JOP Mission then becomes a principal element in the strategy presented here. Characteristics (launch energy, trajectory parameters, etc.) of other mission opportunities to the outer planets in the 1980s are developed and presented. The need for and benefits from advanced propulsion systems, which can enable the more difficult missions to the outer planets, also are cited. The overall mission strategy, including a description of the options, is evolved in consideration of scientific rationale and return, and technical and programmatic coupling factors.

Moore, J. W.↗

Heatshield for Extreme Entry Environment Technology (Heeet) and 3D Woven TPS Readiness for Outer Planet Probe Missions

Recent mission studies have shown entry at Uranus or at Neptune will require 3-D Woven TPS, either the two-layer HEEET or the single layer 3MDCP, with 3MDCP being more mass efficient. The 3MDCP capability being developed to support MSR EES is sufficient for the Ice Giants if the probe size is 1.25 m or less. [The Uranus Orbiter Probe (UOP) Flagship study for the Decadal used a 1.26m diameter probe.] For larger diameters, dual layer HEEET is easily scalable and is already at TRL 6. It is possible to develop a seam approach that would allow the use of 3MDCP; the resultant mass savings could warrant such a development. Ames is already working on a concept towards this. If aerocapture becomes part of the mission design for Uranus, delivery of the probe from orbit will be easier. Whether or not the probe is delivered from orbit, 3-D Woven (HEEET or 3MDCP) is the only TPS qualified to enable Ice Giant in situ probes. In addition to UOP, Saturn probe mission concepts will be enabled by 3-D Woven, either HEEET or 3MDCP. Launch periods for the UOP flagship or a Saturn probe mission in the early to mid 2030s requires the community to ensure that the 3D woven capability does not atrophy. Currently other than MSR EES, no other mission requires 3-D wovens, and the manufacturing for MSR will be completed by 2023. A gap in production of 5 or more years requires careful monitoring of the industrial base. In addition, manufacturing of 3-D woven TPS, from procurement and weaving to molding and infusion, is a minimum 2-year activity. In response to the threat of atrophy and the time critical and intensive nature of restarting weaving, advocacy from OPAG to NASA SMD for a sustainability effort would ensure in situ exploration of the outer planets in the decades to come.

M Gasch↗