Search NASA⌕ Search

SEARCH · Search NASA

Results for “oversight”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Board on Earth Sciences and Resources and its Activities

The Board will provide oversight of the earth science and resource activities within the National Research Council, provide a review of research and public activities in the solid-earth sciences, and provide analyses and recommendations relevant to the supply, delivery, and associated impacts of and issues related to hydrocarbon, metallic, and non-metallic mineral resources. The Board will monitor the status of the earth sciences, assess the health of the disciplines, and identify research opportunities, and will respond to specific agency requests.

Schiffries, Craig M.↗

Overview of the Landsat-7 Mission

Landsat-7 is scheduled for launch on April 15 from the Western Test Range at Vandenberg Air Force Base, Calif., on a Delta-H expendable launch vehicle. The Landsat 7 satellite consists of a spacecraft bus being provided by Lockheed Martin Missiles and Space (Valley Forge, Pa.) and the Enhanced Thematic Mapper Plus instrument built by Raytheon (formerly Hughes) Santa Barbara Remote Sensing (Santa Barbara, Calif.). The instrument on board Landsat 7 is the Enhanced Thematic Mapper Plus (ETM+). ETM+ improves upon the previous Thematic Mapper (TM) instruments on Landsat's 4 and 5 (Fig. la and lb). It includes the previous 7 spectral bands measuring reflected solar radiation and emitted thermal emissions but, in addition, includes a new 15 in panchromatic (visible-near infrared) band. The spatial resolution of the thermal infrared band has also been improved to 60 m. Both the radiometric precision and accuracy of the sensor are also improved from the previous TM sensors. After being launched into a sun-synchronous polar orbit, the satellite will use on-board propulsion to adjust its orbit to a circular altitude of 438 miles (705 kilometers) crossing the equator at approximately 10 a.m. on its southward track. This orbit will place Landsat 7 along the same ground track as previous Landsat satellites. The orbit will be maintained with periodic adjustments for the life of the mission. A three-axis attitude control subsystem will stabilize the satellite and keep the instrument pointed toward the Earth to within 0.05 degrees. Later this year, plans call for the NASA Earth Observation System (EOS) Terra (AM-1) observatory and the experimental EO-1 mission to closely follow Landsat-7's orbit to support synergistic research and applications from this new suite of terrestrial sensor systems. Landsat is the United States' oldest land-surface observation satellite system, with satellites continuously operating since 1972. Although the program has scored numerous successes in scientific and resource-management applications, Landsat has had a tumultuous history of management and funding changes over its nearly 27-year history. Landsat-7 marks a new direction in the program to reduce the cost of data and increase systematic global coverage for use in global change research as well as commercial and regional applications. With the passage of the Land Remote Sensing Policy Act in 1992, oversight of the Landsat program began to shift from the commercial sector to the federal government. NASA integrated Landsat-7 into its EOS science program in 1994. Landsat-7 is managed and operated jointly by NASA and U.S. Geological Survey (USGS). As a result, the costs of acquiring observations from

Williams, Darrel↗

Testing, Requirements, and Metrics

The criticality of correct, complete, testable requirements is a fundamental tenet of software engineering. Also critical is complete requirements based testing of the final product. Modern tools for managing requirements allow new metrics to be used in support of both of these critical processes. Using these tools, potential problems with the quality of the requirements and the test plan can be identified early in the life cycle. Some of these quality factors include: ambiguous or incomplete requirements, poorly designed requirements databases, excessive or insufficient test cases, and incomplete linkage of tests to requirements. This paper discusses how metrics can be used to evaluate the quality of the requirements and test to avoid problems later. Requirements management and requirements based testing have always been critical in the implementation of high quality software systems. Recently, automated tools have become available to support requirements management. At NASA's Goddard Space Flight Center (GSFC), automated requirements management tools are being used on several large projects. The use of these tools opens the door to innovative uses of metrics in characterizing test plan quality and assessing overall testing risks. In support of these projects, the Software Assurance Technology Center (SATC) is working to develop and apply a metrics program that utilizes the information now available through the application of requirements management tools. Metrics based on this information provides real-time insight into the testing of requirements and these metrics assist the Project Quality Office in its testing oversight role. This paper discusses three facets of the SATC's efforts to evaluate the quality of the requirements and test plan early in the life cycle, thus preventing costly errors and time delays later.

Rosenberg, Linda↗

NASA Graduate Student Researchers Program Ronald E. McNair PhD Program

The NASA Ronald E. McNair PHD Program was funded in September 1995. Implementation began during the spring of 1996. The deferment of the actual program initial semester enabled the program to continue support through the fall semester of 1998. This was accomplished by a no-cost extension from August 15, 1998 through December 31, 1998. There were 12 fellows supported by the program in 1996, 15 fellows in 1997, and 15 fellows 1998. Current program capacity is 15 fellows per funding support. Support for the academic outreach component began in spring 1998. The program was named the "Good Enough" Crew Activity (GECA) in honor of Dr. McNair's philosophy of everyone being good enough to achieve anything they want bad enough. The program currently enrolls 65 students from the third through the eight grades. The program is held 12 Saturdays per semester. The time is 9:00 AM to 12:30 PM each Saturday Morning. Program direction and facilitation is jointly administered with the PHD fellows and the Saturday Academy staff. Dr. John Kelly, REM-PHD Principal Investigator serves in a program oversight and leadership capacity. Ms. Sunnie Howard, The NASA REM-PHD Administrative Coordinator serves in an administrative and logistical capacity. Mr. Aaron Hatch, the NASA-AMES Liaison Officer, serve@'in a consultative and curriculum review capacity. The first recognition activity will be held on December 12, 1998, with the students, parents, faculty, PHD fellows, and other local student support services persons. Program outreach efforts are jointly supported by the NASA REM-PHD Program and the National Space Grant College and Fellowship Program. The Ph.D. program reached its first milestone in May 1998. North Carolina A&T State University graduated the first Ph.D. fellows. The first three Ph.D. Alumni were Ronald E. McNair PHD Program Fellows. It is hoped that this is just the beginning of a highly acclaimed doctoral program. The ultimate program success will be recognized when the program begins to graduate 15 fellows per year. The Ph.D. Program is only three and a half years old and the expectations of graduating PH.D's in that timeframe, is a phenomenal accomplishment for any program in the country. Since inception of the NASA REM-PHD program, tuitions and fees have increased. Stipend support was increased to offer the Ph.D. program on a competitive basis. These increases will place allocation restraints on r_ the current level of funding. These issues are being addressed in the proposal and will bear their own merit.

Howard, Sunnie↗

Shuttle Upgrade Using 5-Segment Booster (FSB)

In support of NASA's continuing effort to improve the over-all safety and reliability of the Shuttle system- a 5-segment booster (FSB) has been identified as an approach to satisfy that overall objective. To assess the feasibility of a 5-segment booster approach, NASA issued a feasibility study contract to evaluate the potential of a 5-segment booster to improve the overall capability of the Shuttle system, especially evaluating the potential to increase the system reliability and safety. In order to effectively evaluate the feasibility of the 5-segment concept, a four-member contractor team was established under the direction of NASA Marshall Space Flight Center (MSFC). MSFC provided the overall program oversight and integration as well as program contractual management. The contractor team consisted of Thiokol, Boeing North American Huntington Beach (BNA), Lockheed Martin Michoud Space Systems (LMMSS) and United Space Alliance (USA) and their subcontractor bd Systems (Control Dynamics Division, Huntsville, AL). United Space Alliance included the former members of United Space Booster Incorporated (USBI) who managed the booster element portion of the current Shuttle solid rocket boosters. Thiokol was responsible for the overall integration and coordination of the contractor team across all of the booster elements. They were also responsible for all of the motor modification evaluations. Boeing North American (BNA) was responsible for all systems integration analyses, generation of loads and environments. and performance and abort mode capabilities. Lockheed Martin Michoud Space Systems (LMMSS) was responsible for evaluating the impacts of any changes to the booster on the external tank (ET), and evaluating any design changes on the external tank necessary to accommodate the FSB. USA. including the former USBI contingent. was responsible for evaluating any modifications to facilities at the launch site as well as any booster component design modifications.

Sauvageau, Donald R.↗

Health Hazard Assessment and Toxicity Clearances in the Army Acquisition Process

The United States Army Materiel Command, Army Acquisition Pollution Prevention Support Office (AAPPSO) is responsible for creating and managing the U.S. Army Wide Acquisition Pollution Prevention Program. They have established Integrated Process Teams (IPTs) within each of the Major Subordinate Commands of the Army Materiel Command. AAPPSO provides centralized integration, coordination, and oversight of the Army Acquisition Pollution Prevention Program (AAPPP) , and the IPTs provide the decentralized execution of the AAPPSO program. AAPPSO issues policy and guidance, provides resources and prioritizes P2 efforts. It is the policy of the (AAPPP) to require United States Army Surgeon General approval of all materials or substances that will be used as an alternative to existing hazardous materials, toxic materials and substances, and ozone-depleting substances. The Army has a formal process established to address this effort. Army Regulation 40-10 requires a Health Hazard Assessment (HHA) during the Acquisition milestones of a new Army system. Army Regulation 40-5 addresses the Toxicity Clearance (TC) process to evaluate new chemicals and materials prior to acceptance as an alternative. U.S. Army Center for Health Promotion and Preventive Medicine is the Army's matrixed medical health organization that performs the HHA and TC mission.

Macko, Joseph A., Jr.↗

MPLM On-Orbit Interface Dynamic Flexibility Modal Test

Now that the International Space Station (ISS) is being constructed, payload developers have to not only verify the Shuttle-to-payload interface, but also the interfaces their payload will have with the ISS. The Multi Purpose Logistic Module (MPLM) being designed and built by Alenia Spazio in Torino, Italy is one such payload. The MPLM is the primary carrier for the ISS Payload Racks, Re-supply Stowage Racks, and the Resupply Stowage Platforms to re-supply the ISS with food, water, experiments, maintenance equipment and etc. During the development of the MPLM there was no requirement for verification of the on-orbit interfaces with the ISS. When this oversight was discovered, all the dynamic test stands had already been disassembled. A method was needed that would not require an extensive testing stand and could be completed in a short amount of time. The residual flexibility testing technique was chosen. The residual flexibility modal testing method consists of measuring the free-free natural frequencies and mode shapes along with the interface frequency response functions (FRF's). Analytically, the residual flexibility method has been investigated in detail by, MacNeal, Martinez, Carne, and Miller, and Rubin, but has not been implemented extensively for model correlation due to difficulties in data acquisition. In recent years improvement of data acquisition equipment has made possible the implementation of the residual flexibility method as in Admire, Tinker, and Ivey, and Klosterman and Lemon. The residual flexibility modal testing technique is applicable to a structure with distinct points (DOF) of contact with its environment, such as the MPLM-to-Station interface through the Common Berthing Mechanism (CBM). The CBM is bolted to a flange on the forward cone of the MPLM. During the fixed base test (to verify Shuttle interfaces) some data was gathered on the forward cone panels. Even though there was some data on the forward cones, an additional modal test was performed to better characterize its behavior. The CBM mounting flange is the only remaining structure of the MPLM that no test data was available. This paper discusses the implementation of the residual flexibility modal testing technique on the CBM flange and the modal test of the forward cone panels.

Bookout, Paul S.↗

Options in Extraterrestrial Sample Handling and Study

This presentation mentions important service functions such as: sample preservation, hazard assessment, and handling. It also discuss how preliminary examination of samples is necessary for sample hazard assessment and for sample allocations. Clean facilities and clean sample handling are required. Conflicts, cross contamination issues will be present and need to be resolved. Extensive experience is available for extraterrestrial samples and must be sought and applied. Extensive experience is available in studies of pathogenicity and must be sought and applied as necessary. Advisory and oversight structures must also be in place

Papanastassiou, Dimitri A.↗

Flight Manifesting Process for NASA Microgravity Payloads

The objective of NASA's Microgravity Research Program is to utilize the low gravity environment of space to explore the nature of physical phenomena that contributes to progress in science and technology on Earth. Under the oversight of NASA Headquarters, the Microgravity Research Program Office (MRPO) at the Marshall Space Flight Center (MSFC) assumes all program management responsibilities associated with Microgravity Research and Space Product Development. One program management responsibility that plays a vital role to the success of the MRPO is the flight manifesting process for MRPO-sponsored payloads. In this paper, the authors will examine the various processes utilized by MRPO personnel in acquiring flight opportunities for MRPO-sponsored payloads.

Matisak, Brian↗

Evaluation Of The NASA Quality Surveillance System Pilot In Meeting Requirements For Contractor Surveillance Under Performance Based Contracting

The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

Schmahl, Karen E.↗

A Draft Protocol for Detecting Possible Biohazards in Martian Samples Returned to Earth

In preparation for missions to Mars that will involve the return of samples, it is necessary to prepare for the safe receiving, handling, testing, distributing, and archiving of martian materials here on Earth. Previous groups and committees have studied selected aspects of sample return activities, but a specific protocol for handling and testing of returned -=1 samples from Mars remained to be developed. To refine the requirements for Mars sample hazard testing and to develop criteria for the subsequent release of sample materials from precautionary containment, NASA Planetary Protection Officer, working in collaboration with CNES, convened a series of workshops to produce a Protocol by which returned martian sample materials could be assessed for biological hazards and examined for evidence of life (extant or extinct), while safeguarding the samples from possible terrestrial contamination. The Draft Protocol was then reviewed by an Oversight and Review Committee formed specifically for that purpose and composed of senior scientists. In order to preserve the scientific value of returned martian samples under safe conditions, while avoiding false indications of life within the samples, the Sample Receiving Facility (SRF) is required to allow handling and processing of the Mars samples to prevent their terrestrial contamination while maintaining strict biological containment. It is anticipated that samples will be able to be shipped among appropriate containment facilities wherever necessary, under procedures developed in cooperation with international appropriate institutions. The SRF will need to provide different types of laboratory environments for carrying out, beyond sample description and curation, the various aspects of the protocol: Physical/Chemical analysis, Life Detection testing, and Biohazard testing. The main principle of these tests will be described and the criteria for release will be discussed, as well as the requirements for the SRF and its personnel.

Viso, M.↗

Mission Engineering of a Rapid Cycle Spacecraft Logistics Fleet

The requirement for logistics re-supply of the International Space Station has provided a unique opportunity for engineering the implementation of NASA's first dedicated pressurized logistics carrier fleet. The NASA fleet is comprised of three Multi-Purpose Logistics Modules (MPLM) provided to NASA by the Italian Space Agency in return for operations time aboard the International Space Station. Marshall Space Flight Center was responsible for oversight of the hardware development from preliminary design through acceptance of the third flight unit, and currently manages the flight hardware sustaining engineering and mission engineering activities. The actual MPLM Mission began prior to NASA acceptance of the first flight unit in 1999 and will continue until the de-commission of the International Space Station that is planned for 20xx. Mission engineering of the MPLM program requires a broad focus on three distinct yet inter-related operations processes: pre-flight, flight operations, and post-flight turn-around. Within each primary area exist several complex subsets of distinct and inter-related activities. Pre-flight processing includes the evaluation of carrier hardware readiness for space flight. This includes integration of payload into the carrier, integration of the carrier into the launch vehicle, and integration of the carrier onto the orbital platform. Flight operations include the actual carrier operations during flight and any required real-time ground support. Post-flight processing includes de-integration of the carrier hardware from the launch vehicle, de-integration of the payload, and preparation for returning the carrier to pre-flight staging. Typical space operations are engineered around the requirements and objectives of a dedicated mission on a dedicated operational platform (i.e. Launch or Orbiting Vehicle). The MPLM, however, has expanded this envelope by requiring operations with both vehicles during flight as well as pre-launch and post-landing operations. These unique requirements combined with a success-oriented schedule of four flights within a ten-month period have provided numerous opportunities for understanding and improving operations processes. Furthermore, it has increased the knowledge base of future Payload Carrier and Launch Vehicle hardware and requirement developments. Discussion of the process flows and target areas for process improvement are provided in the subject paper. Special emphasis is also placed on supplying guidelines for hardware development. The combination of process knowledge and hardware development knowledge will provide a comprehensive overview for future vehicle developments as related to integration and transportation of payloads.

Holladay, Jon↗

Evaluation of the NASA Quality Surveillance System Pilot in Meeting Requirements for Contractor Surveillance Under Performance Based Contracting

The use of performance-based contracting at Kennedy Space Center has necessitated a shift from intrusive oversight of contractor activities to an insight surveillance role. This paper describes the results of a pilot implementation of the NASA Quality Surveillance System (NQSS) in the Space Shuttle Main Engines Processing Facility. The NQSS is a system to sample contractor activities using documented procedures, specifications, drawings and observations of work in progress to answer the question "Is the contractor doing what they said they would do?" The concepts of the NQSS are shown to be effective in providing assurance of contractor quality. Many of the concepts proven in the pilot are being considered for incorporation into an overall KSC Quality Surveillance System.

Schmahl, Karen E.↗

Reflection Grating Array Associated with the Reflection Grating Spectrometer Developed by the Space Research Organization of the Netherlands for the X-ray Multi-Mirror Mission (XMM)

The University of California, Berkeley (UCB) served as the Principal Investigator institution for the United States participation in the development of the Reflection Grating Spectrometer (RGS) which included the design, development, fabrication, and testing of the Reflection Grating Assembly (RGA). UCB was assisted in this role by the Lawrence Livermore National Laboratory and Columbia University who provided the primary facilities, materials, services and personnel necessary to complete the development. UC Berkeley's Dr. Steven Kahn provided the technical and scientific oversight for the design. development and testing of the RGA units by monitoring the performance of the units at various stages in their development. Dr. Kahn was also the primary contact with the Space Research Organization of the Netherlands (SRON) and represented the RGA development at all SRON and European Space Agency (ESA) reviews of the RGA status. In accordance with the contract, the team designed and developed novel optical technology to meet the unique requirements of the RGS. The ESA XMM-Newton Mission carries two identical Reflection Grating Spectrometers (RGS) behind two of its three nested sets of Wolter I type mirrors. The instrument allows high-resolution measurements in the soft X-ray range (6 to 38 angstroms or 2.1 to 0.3 keV) with a maximum effective area of about 140 sq cm at 15 angstroms. Its design is optimized for the detection of the K-shell transitions of carbon, nitrogen, oxygen, neon, magnesium, and silicon. as well as the L shell transitions of iron. The RGA itself consists of two units. A structure for each unit was designed to hold up to 220 gratings. In its final configuration, one unit holds 182 gratings and the second hold 181 gratings.

Kahn, Steven M.↗

A Virtual Mission Operations Center - Collaborative Environment

Development of technologies that enable significant reductions in the cost of space mission operations is critical if constellations, formations, federations and sensor webs, are to be economically feasible. One approach to cost reduction is to infuse automation technologies into mission operations centers so that fewer personnel are needed for mission support. But missions are more culturally and politically adverse to the risks of automation. Reducing the mission risk associated with increased use of automation within a MOC is therefore of great importance. The belief that mission risk increases as more automation is used stems from the fact that there is inherently less direct human oversight to investigate and resolve anomalies in an unattended MOC. The Virtual Missions Operations Center - Collaborative Environment (VMOC-CE) project was launched to address this concern. The goal of the VMOC-CE project is to identify, develop, and infuse technology to enable mission operations between onsite operators and on-call personnel in geographically dispersed locations. VMOC-CE enables missions to more readily adopt automation because off-site operators and engineers can more easily identify, investigate, and resolve anomalies without having to be present in the MOC. The VMOC-CE intent is to have a single access point for all resources used in a collaborative mission operations environment. Team members will be able to interact during spacecraft operations, specifically for resolving anomalies, utilizing a desktop computer and the Internet. Mission operations management can use the VMOC-CE as a tool to participate in and monitor status of anomaly resolution or other mission operations issues. In this paper we present the VMOC-CE project, system capabilities and technologies, operations concept, and results of its pilot in support of the Earth Science Mission Operations System (ESMOS).

Medina, Barbara↗

Ultra-efficient Engine Diameter Study

Engine fan diameter and Bypass Ratio (BPR) optimization studies have been conducted since the beginning of the turbofan age with the recognition that reducing the engine core jet velocity and increasing fan mass flow rate generally increases propulsive efficiency. However, performance tradeoffs limit the amount of fan flow achievable without reducing airplane efficiency. This study identifies the optimum engine fan diameter and BPR, given the advanced Ultra-Efficient Engine Technology (UEET) powerplant efficiencies, for use on an advanced subsonic airframe. Engine diameter studies have historically focused on specific engine size options, and were limited by existing technology and transportation infrastructure (e.g., ability to fit bare engines through aircraft doors and into cargo holds). This study is unique in defining the optimum fan diameter and drivers for future 2015 (UEET) powerplants while not limiting engine fan diameter by external constraints. This report follows on to a study identifying the system integration issues of UEET engines. This Engine Diameter study was managed by Boeing Phantom Works, Seattle, Washington through the NASA Glenn Revolutionary Aero Space Engine Research (RASER) contract under task order 10. Boeing Phantom Works, Huntington Beach, completed the engine/airplane sizing optimization, while the Boeing Commercial Airplane group (BCA) provided design oversight. A separate subcontract to support the overall project was issued to Tuskegee University.

Daggett, David L.↗

Journal of Air Transportation, Volume 8, No. 2

The mission of the Journal of Air Transportation (JAT) is to provide the global community immediate key resource information in all areas of air transportation. This journal contains articles on the following:Fuel Consumption Modeling of a Transport Category Aircraft: A FlightOperationsQualityAssurance (F0QA) Analysis;Demand for Air Travel in the United States: Bottom-Up Econometric Estimation and Implications for Forecasts by Origin and Destination Pairs;Blind Flying on the Beam: Aeronautical Communication, Navigation and Surveillance: Its Origins and the Politics of Technology: Part I1 Political Oversight and Promotion;Blind Flying on the Beam: Aeronautical Communication, Navigation and Surveillance: Its Origins and the Politics of Technology: Part 111: Emerging Technologies;Ethics Education in University Aviation Management Programs in the US: Part Two B-Statistical Analysis of Current Practice;Integrating Human Factors into the Human-computer Interface: and How Best to Display Meteorological Information for Critical Aviation Decision-making and Performance.

Bowen, Brent↗

The Joint Agency Commercial Imagery Evaluation Team and Product Characterization Approach

The Joint Agency Commercial Imagery Evaluation (JACIE) team is a collaborative interagency group focused on the characterization of commercial remote sensing data products. The team members - the National Aeronautics and Space Administration (NASA), the National Imagery and Mapping Agency (NIMA), and the U.S. Geological Survey (USGS) - each have a vested interest in the purchase and use of commercial imagery to support government research and operational applications. For both research and applications, commercial products must be well characterized for precision, accuracy, and repeatability. Since commercial systems are built and operated with no government insight or oversight, the JACIE team provides an independent product characterization of delivered image and image-derived end products. End product characterization differs from the systems calibration approach that is typically used with government systems, where detailed system design information is available. The product characterization approach addresses three primary areas of product performance: geopositional accuracy, image quality, and radiometric accuracy. The JACIE team utilizes well-characterized test sites to support characterization activities. To characterize geopositional accuracy, the team utilizes sites containing several "photo-identifiable" targets and compares their precisely known locations with those defined by the commercial image product. In the area of image quality, spatial response is characterized using edge targets and pulse targets to measure edge response and to estimate image modulation transfer function. Additionally, imagery is also characterized using the National Imagery Interpretability Rating Scale, a means of quantifying the ability to identify certain targets (e.g., rail-cars, airplanes) within an image product. Radiometric accuracy is characterized using reflectance-based vicarious calibration methods at several uniform sites. Each JACIE agency performs an aspect of product characterization based on its area of expertise, thus minimizing duplication of effort. The JACIE team collaborated to perform comprehensive characterization of products from Space Imaging Inc.'s IKONOS satellite and from DigitalGlobe's QuickBird satellite and is currently characterizing products from OrbImage s OrbView-3. JACIE assessments have resulted in several improvements to commercial image product quality and have enhanced working relationships between government and industry. Assessment results are presented at an annual JACIE High Spatial Resolution Commercial Imagery Workshop.

Zanoni, Vicki↗