Search NASA⌕ Search

SEARCH · Search NASA

Results for “peristaltic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

57 records · Page 4

CDC Bioreactor Configuration Method for Volume Level Control with Controlled Inlet and Outlet Flow

Environmental Control Life Support Systems and other microbiological biofilm studies often utilize small scale bioreactors. Among these options are the popular BioSurface CDC bioreactors, currently being utilized by Marshall Space Flight Center groups researching the impact of biofilms on life support systems. After a recent experimental regime, it was determined additional equipment could be added to augment the capabilities of the bioreactors. Previous research configurations such as ASTM E3161-21 relied on an outlet stream gravity draining from a side drain port located above sampling coupons. This limited applications to experimental conditions with a controlled inlet and uncontrolled outlet flow. With the introduction of a small single pole single throw (SPST) reed float switch and a peristaltic pump connected to the outlet drain and a chassis controller, the bioreactor is able to maintain a set level. The modification allows additional variables to be tested, including highly adjustable fill and flush cycles, bioreactor volume, draining and filling control. Once the configuration modifications were implemented through the installation of the new equipment, data was collected to ensure the stability of the level measurements. As the level control switch is a float switch, consideration was taken into account for effects of internal stirring speed, along with effects of inlet and outlet flow rate. Data presented in this study will illustrate the stability and effectiveness of the configuration changes in equipment made to the bioreactor. These configuration changes have demonstrated control method to conduct biofilm mitigation techniques for ECLSS hardware research. The controlled level capabilities allow for a constant drip feed flow rate into the bioreactors, a key aspect of the biofilm mitigation testing.

CDC Bioreactor↗

CDC Bioreactor Configuration Method for Volume Level Control with Controlled Inlet and Outlet Flow

Environmental Control Life Support Systems and other microbiological biofilm studies often utilize small scale bioreactors. Among these options are the popular BioSurface CDC bioreactors, currently being utilized by Marshall Space Flight Center groups researching the impact of biofilms on life support systems. After a recent experimental regime, it was determined additional equipment could be added to augment the capabilities of the bioreactors. Previous research configurations such as ASTM E3161-21 relied on an outlet stream gravity draining from a side drain port located above sampling coupons. This limited applications to experimental conditions with a controlled inlet and uncontrolled outlet flow. With the introduction of a small single pole single throw (SPST) reed float switch and a peristaltic pump connected to the outlet drain and a chassis controller, the bioreactor is able to maintain a set level. The modification allows additional variables to be tested, including highly adjustable fill and flush cycles, bioreactor volume, draining and filling control. Once the configuration modifications were implemented through the installation of the new equipment, data was collected to ensure the stability of the level measurements. As the level control switch is a float switch, consideration was taken into account for effects of internal stirring speed, along with effects of inlet and outlet flow rate. Data presented in this study will illustrate the stability and effectiveness of the configuration changes in equipment made to the bioreactor. These configuration changes have demonstrated control method to conduct biofilm mitigation techniques for ECLSS hardware research. The controlled level capabilities allow for a constant drip feed flow rate into the bioreactors, a key aspect of the biofilm mitigation testing.

CDC Bioreactor↗

Inspection Tools for Hanford Tanks and Waste Transport Systems - 20444

Recent integrity issues in the double-shell tanks (DST) at Hanford have motivated the need for developing innovative tools that can provide information regarding the health of the tanks. These issues include the primary linear failure of AY-102 and recent concerns of thinning in the DST secondary liners. Other concerns include erosion or corrosion on transfer lines and processing pipes. In recent years, Florida International University (FIU) has supported DOE-EM by developing tools that can assist in understanding the health of tanks and waste transport system at Hanford. More specifically, FIU has developed a miniature rover that can be deployed through small risers and gain access to refractory slots in the Hanford DSTs. It traverses through the slots on the primary liner upside down via magnets to avoid debris in the slots. Recent modifications include a spring loaded magnetic arm that allows the unit to traverse over large weld seams but does not reduce the overall functionality of the system. The system has also incorporated a control capsule that will sit within the annulus of the tank and improves on issues related to signal and voltage loss over long tether lines. Lastly, the unit is also being augmented with a second module that will include a means to prep the tank surface and obtain a thickness measurement using a dual element ultrasonic sensor. FIU has also developed a 6-inch peristaltic pipe crawler that operates similar to the previous pipe crawlers developed at FIU. This crawler is a marsupial type crawler that will navigate through the 6-inch drain lines, and deploy a small rover at the entrance of the drain slots. This rover will also traverse upside down on the secondary liner and provide information regarding the health of the liner. An initial prototype for the crawler unit has been developed, assembled and tested. The system is pneumatic and consists of three modules - two grippers and one extender. The validation tests are conducted in a mockup of the drain lines and demonstrate the system's ability to navigate through long pipe lengths and elbows. In this paper, a general overview of each of the aforementioned systems is presented along with results from testing and demonstrations that shows the applicability of each system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗