ParaEMT: An Open Source, Parallelizable, and HPC-Compatible EMT Simulator for Large-Scale IBR-Rich Power Grids
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
As computational capabilities improve, digital twins are becoming vital for evaluating equipment realistically in laboratories. This paper outlines a digital twin architecture for the power grid, employing electromagnetic transient (EMT) simulation alongside real-time simulation of power hardware and hierarchical control systems. EMT simulation occurs on a high-performance computing server for scalability. Additionally, the paper describes a workflow and real-time data streaming software facilitating connectivity among EMT simulation, hierarchical control systems, and power hardware. This software enables automated equipment connectivity in the laboratory for realistic evaluations, aiding in identifying necessary upgrades for both equipment control systems and the power grid.
A generic simulation tool for power grid and general dynamic systems based on semi-analytical solutions (SAS) technology.
In the past decade, natural disasters such as hurricanes have challenged the operation and control of U.S. power grid more. It is crucial to develop proactive strategies to assist grid operators for better emergency response and minimized electricity service interruptions. In this paper, we propose a proactive posturing methodology of power system elements, and formulated a Security-Constrained Optimal Power Flow (SCOPF) that informed by cross-domain hurricane modeling and its potential impacts on the grid elements. Simulation results based on real-world power grid and historical hurricane event validated the applicability of the proposed optimization formulation, and show potential to enable grid operators and planners with interactive cross-domain data analytics in mitigating hurricane impacts.
Here this article proposes a model-based deep reinforcement learning (DRL) method to design emergency control strategies for short-term voltage stability problems in power systems. Recent advances show promising results for model-free DRL-based methods in power systems control problems. But in power systems applications, these model-free methods have certain issues related to training time (clock time) and sample efficiency; both are critical for making state-of-the-art DRL algorithms practically applicable. DRL-agent learns an optimal policy via a trial-and-error method while interacting with the real-world environment. It is also desirable to minimize the direct interaction of the DRL agent with the real-world power grid due to its safety-critical nature. Additionally, the state-of-the-art DRL-based policies are mostly trained using a physics-based grid simulator where dynamic simulation is computationally intensive, lowering the training efficiency. We propose a novel model-based DRL framework where a deep neural network (DNN)-based dynamic surrogate model (SM), instead of a real-world power grid or physics-based simulation, is utilized within the policy learning framework, making the process faster and more sample efficient. However, having stable training in model-based DRL is challenging because of the complex system dynamics of large-scale power systems. We addressed these issues by incorporating imitation learning to have a warm start in policy learning, reward-shaping, and multi-step loss in surrogate model training. Finally, we achieved 97.5% reduction in samples and 87.7% reduction in training time for an application to the IEEE 300-bus test system.
Here, this paper proposed an energy function-embedded quasi-steady-state model for efficient simulation of cascading outages on a power grid while addressing transient stability concerns. Compared to quasi-steady-state models, the proposed model incorporates short-term dynamic simulation and an energy function method to efficiently evaluate the transient stability of a power grid together with outage propagation without transient stability simulation. Cascading outage simulation using the proposed model conducts three steps for each disturbance such as a line outage. First, it performs time-domain simulation for a short term to obtain a post-disturbance trajectory. Second, along the trajectory, the system state with the local maximum potential energy is found and used as the initial point to search for a relevant unstable equilibrium by Newton's method. Third, the transient energy margin is estimated based on this unstable equilibrium to predict an out-of-step condition with generators. The proposed energy function-embedded quasi-steady-state model is tested in terms of its accuracy and time performance on an NPCC 140-bus power system and compared to a quasi-steady-state model embedding transient stability simulation.
Simulation of high-fidelity models of extreme fast charging (XFC) systems and large-area power grids with many XFCs can be time consuming in traditional simulators. Traditional simulators use a single method of discretization for all the components that results in imposing a large computational burden of inverting a large matrix as well as increased computations related to single method of discretization (that is typically a trapezoidal method). To overcome the problem of simulating large-area power grids with many XFCs, in this paper, advanced numerical simulation algorithms are applied for the first time together to reduce the dimension of matrix inversion. Here, the algorithms include numerical stiffness-based segregation, time constant-based segregation, clustering and aggregation on differential algebraic equations (DAEs), and multi-order integration approaches. These algorithms apply multiple discretization algorithms rather than a single discretization algorithm that further reduces the computational burden. The approaches mentioned here have resulted in speed-up of up to 18x in the simulation of a single distribution system with 15 XFCs and of up to 271x in the simulation of a transmission-distribution system with 300 XFCs in multiple distribution feeders with respect to conventional simulators (like power systems computer aided design [PSCAD]).
A deck of slides that present the modeling, and calibration to conduct PHIL test of ultracapacitor energy storage system. The PHIL test has been done while preparing for the black start field demonstration with Idaho Falls Power. Presentation is invited to the 6th International Workshop on Grid Simulator Testing of Wind Turbine Power Trains and Other Renewable Technologies.
The resiliency, reliability and security of the next generation cyber-power smart grid depend upon efficiently leveraging advanced communication and computing technologies. Also, developing real-time data-driven applications is critical to enable wide-area monitoring and control of the cyber-power grid given high-resolution data from Phasor Measurement Units (PMUs). North American Synchrophasor Initiative Network (NASPlnet) provides guidance for PMU data exchanges. With the advancement in networking and grid operation, it is necessary to evaluate the performance of different data flow architectures suggested by NASPInet and analyze the impact on applications. Therefore, we need a cyber-power co-simulation framework that supports very large-scale co-simulation capable of running in parallel, high-performance computing platforms and capturing real-life network behavior. This work presents an end-to-end automated and user-driven cyber-power co-simulation using NS3 to model communication networks, GridPACK to model the power grid, and HELICS as a co-simulation engine. Comparative analysis of latency in synchrophasor networks and a performance evaluation of a power system stabilizer application utilizing PMU data in an IEEE 39 bus test system is presented using this cosimulation testbed.
Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)
Resiliency, reliability, and security of the next-generation smart grid depend upon leveraging advanced communication and computing technologies, integrating them with physical power systems, and developing real-time, fast, data-based applications to help in wide-area monitoring and control of the grid. Using a high sampling data rate from phasor measurement units (PMUs) to develop applications has opened the door to achieving the next-generation grid requirements. The North American Synchrophasor Initiative Network (NASPlnet) was developed in 2007-09 to create a standard and guide for PMU data exchanges. With the advancement in both networking and grid requirements, it is necessary to evaluate the performance of different NASPInet versions and their impact on applications. Therefore, we need a cyber-power cosimulation framework that supports very large-scale co-simulation capable of running in parallel, high-performance computing platforms and capturing real-life network behavior. This work presents a cyber-physical co-simulation testbed using NS3 to model the communication network, GridPACK to model the power grid, and HELICS as a co-simulation engine. Comparative analysis of latency in synchrophasor networks and a performance evaluation of a power system stabilizer application based on PMU data in an Institute of Electrical and Electronics Engineers 39-bus test system is presented using this co-simulation testbed.
The wide-area measurement system (WAMS) is a key enabler of real-time monitoring of power grids. The essential goals of WAMS design are fast and resilient data transfer from phasor measurement units (PMU) to phasor data concentrators (PDC). We propose a scalable two-stage PDC placement technique for minimizing the end-to-end delay while maintaining resiliency. In the prescreening stage, the plausible candidates of PDC configurations are identified based on a graph theory-based multi-median function (MMF). Here, in this article, a computationally efficient meta-heuristic algorithm is used to address scalability. In the candidate selection stage, two different algorithms, namely, Suurballe's and Dijkstra's, are employed to identify the best of those plausible PDC configurations as the final design. This technique not only minimizes the hop paths between PMUs and PDCs, but also ensures network resiliency against single PMU, PDC, or communication link failure by incorporating the roles of PMUs in power grid observability into routing policy. Simulation results on the IEEE 57-bus test power system and the 2000-bus test power system demonstrate the effectiveness and scalability of the proposed technique.
When electrified transit systems make grid aware choices, improved social welfare is achieved by reducing grid stress, reducing system loss, and minimizing power quality issues. Electrifying transit fleet has numerous challenges like non availability of buses during charging, varying charging costs and so on, that are related the electric grid behavior. However, transit systems do not have access to the information about the co-evolution of the grid's power flow and therefore cannot account for the power grid's needs in its day-to-day operation. In this paper we propose a framework of transportation-grid co-simulation, analyzing the spatio-temporal interaction between the transit operations with electric buses and the power distribution grid. Real-world data for a day's traffic from Chattanooga city's transit system is simulated in SUMO and integrated with a realistic distribution grid simulation (using GridLAB-D) to understand the grid impact due to transit electrification. Charging information is obtained from the transportation simulation to feed into grid simulation to assess the impact of charging. We also discuss the impact to the grid with higher degree of transit electrification that further necessitates such an integrated transportation-grid co-simulation to operate the integrated system optimally. Our future work includes extending the platform for optimizing the charging and trip assignment operations.
Large hydropower, connected to the transmission system and typically possessing significant ability to balance grid frequency, has long been central to black start plans in regions where it is present. Small hydropower possesses most of the attributes required for black start but is often connected to distribution or sub-transmission systems and has less ability to balance grid frequency. Integrating energy storage such as batteries or ultracapacitors increases the combined asset’s ability to balance frequency. This asset integration enables a bottom-up grid restoration paradigm in which critical electric loads on the local distribution system can be powered even when the regional transmission system is down. This report presents a field demonstration conducted with Idaho Falls Power that proved this concept. The contribution of energy storage in restoring the small hydro-dominated distribution grid and its operational sensitivity across different control settings are further analyzed using high-fidelity simulations. Readers will learn about technical details on the field demonstration setup, energy storage contribution to black start, detailed simulation steps of islanded distribution grid restoration, and usage of field demonstration measurements for transient model refinements. Collectively this report points to a great opportunity for small hydropower to enhance resilience of local electric grids.
Smart homes and virtual power plant (VPP) controls are growing fields of research with potential for improved electric power grid operation. A novel testbed for the co-simulation of electric power distribution systems and distributed energy resources (DERs) is employed to evaluate VPP scenarios and propose an optimization procedure. DERs of specific interest include behind-the-meter (BTM) solar photovoltaic (PV) systems as well as heating, ventilation, and air-conditioning (HVAC) systems. The simulation of HVAC systems is enabled by a machine learning procedure that produces ultra-fast models for electric power and indoor temperature of associated buildings that are up to 133 times faster than typical white-box implementations. Hundreds of these models, each with different properties, are randomly populated into a modified IEEE 123-bus test system to represent a typical U.S. community. Advanced VPP controls are developed based on the Consumer Technology Association (CTA) 2045 standard to leverage HVAC systems as generalized energy storage (GES) such that BTM solar PV is better utilized locally and occurrences of distribution system power peaks are reduced, while also maintaining occupant thermal comfort. An optimization is performed to determine the best control settings for targeted peak power and total daily energy increase minimization with example peak load reductions of 25+%.
In this work, the integration of a grid-scale ternary-Pumped Thermal Electricity Storage (t-PTES) with a nuclear power generation to enhance operation flexibility is assessed using physics-based models and digital real time simulation. A part of the electricity from the nuclear power generation is delivered to the grid, and the balance is used to power a heat pump that can be augmented by an auxiliary resistive load element to increase the charging rate of the thermal storage. This increases the thermal potential between hot and cold thermal stores (usually solid materials or molten salts inside large storage tanks). The thermal energy is transformed back into electricity by reversing the heat pump cycle. Different transient scenarios including startup, shutdown, and power change for grid-connected operation are simulated to determine the behavior of the hybrid nuclear-t-PTES system operating under variable loads that constitute a departure from conventional, baseload nuclear plant operation schemes. Ternary refers to the three modes operation: (i) heat pump (including heating coil), (ii) heat engine, and (iii) simultaneous operation of heat pump (including heating coil) and heat engine during changeover from pumping to generation or vice-versa. The controllability of t-PTES in the short timescales as a dynamic load is used to demonstrate operational flexibility of hybrid nuclear plants for flexible operation through advanced load management. The integration of t-PTES into nuclear power systems enhances the system flexibility and is an enabler for high penetration of renewable energy resources.
WEC-Sim is an open-source software for simulating wave energy converters and has been actively developed and applied since its initial release in 2014 to simulate a wide variety of device archetypes. WEC-Sim is developed jointly by the National Renewable Energy Laboratory and Sandia National Laboratories within the MATLAB/SIMULINK environment. A general wave-to-wire model begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of wave energy converters (WEC), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modeling the entire wave-to-wire is difficult and encompasses multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze, and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM)-based frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). With this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Additional WEC-Sim functionalities include pre-built Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems. The developers of WEC-Sim continue to release new versions of the software, at least annually, with the latest release in September 2022. These releases include bug fixes, updates to software documentation, as well as new features to expand WEC-Sim's capabilities to model a wide range of WEC concepts. This publication will highlight the new features added to WEC-Sim between versions 4.1.0 to 5.0.1, which spans a 2-year period from June 2020 to September 2022. New features described here include topics such as continuous integration checks, revised Morison Element and nonlinear hydro implementations, run directly from Simulink (required for hardware-in-the-loop execution), BEMIO updates to import Capytaine BEM hydrodynamics, addition of cable blocks, and new wave visualization features.
WEC-Sim is an open-source software for simulating wave energy converters, which has been actively developed and applied since its initial release in 2014 to simulate a wide variety of device archetypes. WEC-Sim is developed jointly by the National Renewable Energy Laboratory (NREL) and Sandia National Laboratories (Sandia) within the MATLAB/SIMULINK environment. A general wave-to-wire model begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of wave energy converters (WEC), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modeling the entire wave-to-wire is difficult and encompasses multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze, and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM)-based frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). With this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Additional WEC-Sim functionalities include pre-built Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems. The developers of WEC-Sim continue to release new versions of the software, at least annually, with our latest release in September 2022. These releases include bug fixes, updates to software documentation, as well as new features to expand WEC-Sim's capabilities to model a wide range of WEC concepts. This publication will highlight the new features added to WEC-Sim between versions 4.1.0 to 5.0.1 which spans over a two year period from June 2020 to September 2022. New features to be described will include topics such as continuous integration checks, revised Morison Element and nonlinear hydro implementations, run directly from Simulink (required for hardware-in-the-loop execution), BEMIO updates to import Capytaine BEM hydrodynamics, addition of cable blocks, and new wave visualization features.