Search NASA⌕ Search

SEARCH · Search NASA

Results for “predicting intent”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Safety Performance of Airborne Separation: Preliminary Baseline Testing

The Safety Performance of Airborne Separation (SPAS) study is a suite of Monte Carlo simulation experiments designed to analyze and quantify safety behavior of airborne separation. This paper presents results of preliminary baseline testing. The preliminary baseline scenario is designed to be very challenging, consisting of randomized routes in generic high-density airspace in which all aircraft are constrained to the same flight level. Sustained traffic density is varied from approximately 3 to 15 aircraft per 10,000 square miles, approximating up to about 5 times today s traffic density in a typical sector. Research at high traffic densities and at multiple flight levels are planned within the next two years. Basic safety metrics for aircraft separation are collected and analyzed. During the progression of experiments, various errors, uncertainties, delays, and other variables potentially impacting system safety will be incrementally introduced to analyze the effect on safety of the individual factors as well as their interaction and collective effect. In this paper we report the results of the first experiment that addresses the preliminary baseline condition tested over a range of traffic densities. Early results at five times the typical traffic density in today s NAS indicate that, under the assumptions of this study, airborne separation can be safely performed. In addition, we report on initial observations from an exploration of four additional factors tested at a single traffic density: broadcast surveillance signal interference, extent of intent sharing, pilot delay, and wind prediction error.

Consiglio, Maria C.↗

Initiation of Flash Boiling of Multicomponent Miscible Mixtures with Application to Transportation Fuels and Their Surrogates

This paper presents methodologies to predict thermodynamic conditions that initiate flash boiling by spontaneous nucleation of liquids consisting of hundreds of miscible liquids and their lower order surrogate mixtures. The methods are illustrated with a kerosene-based fuel and a seven-component surrogate for it. The predictions are compared to measurements of nucleation temperatures obtained from a pulse-heating technique that rapidly heats a microscale platinum film immersed in a pool of the test fluid. Nucleation temperatures are predicted using a generalized corresponding states principle (GCSP), and a modification of classical nucleation theory that considers the mixture as a pseudo single component fluid (PSCF). The intent is to offer a simple means to predict the initiation of flash boiling that can have important consequences for fuel efficiency in combustion engines. We show that contact angle has a strong effect such that predicted and measured spontaneous nucleation temperatures agree for a given heating rate only if contact angle is accounted for in the theory. For low heating rates (less than 2 × 10 7 K/s), predicted nucleation temperatures, assuming a spherical bubble, are 13% higher than measurements. The gap is closed to about 6% as the heating rate reaches 3 × 10 8 K/s (the highest that could be reached in the experiments) and to less than 1% when the measured nucleation temperature is extrapolated to an asymptotic (zero contact angle) limit. Here, the PSCF method (using mixture properties as mole fraction averages of mixture component properties evaluated at the same reduced temperatures as the mixtures) and the GSCP predict virtually identical nucleation temperatures, while the GCSP method does not require any mixture property values.

42 ENGINEERING↗

Transmission and orbital constraints in space-related programs: Briefing summary

Research was initiated to develop a capability for predicting and analyzing the spectrum/orbital geometry requirements of current and projected U.S. and international space related systems. Essential components of the project include development of a comprehensive space environment data base and computer analysis programs. This capability will provide a resource for evaluating engineering and architectural designs, identifying and analyzing the impact of intentional and unintentional electromagnetic (EM) interference, and predicting probable saturation conditions in spectrum usage and satellite/orbital positions. Assessments of means for accommodating the anticipated growth are also an important part of the study project.

Hiebert, A. I.↗

Flight Demonstration of the Tailored Arrival Manager

A flight demonstration of arrival traffic management automation was conducted in partnership between NASA, FAA and Boeing as an element of the latter’s ecoDemonstrator2020 flight program. For the demonstration, NASA’s prototype Tailored Arrival Manager(TAM) was used to compute efficient trajectory-based solutions to traffic management problems representing those encountered during time-based metering operations today. TAM solutions involving route modifications were uplinked to a Boeing 787 airplane using Controller Pilot Data Link Communications and seamlessly loaded into the airplane’s Flight Management System (FMS). The paper describes the concept and technology behind TAM along with the data exchanges and procedures involved with the demonstration. All TAM solutions were delivered in a timely manner and successfully integrated with the airplane’s FMS, thereby demonstrating the basic feasibility of trajectory-based arrival management using currently available data communications and avionics equipage. Although TAM solutions were not executed during this initial demonstration, a limited study of trajectory prediction accuracy was possible given that the airplane flew uninterrupted, automated descents with known route and speed intent. Analysis revealed that TAM meter-fix arrival time predictions were accurate to within ± 30 seconds for time horizons of 30 minutes or less, which matched closely with FMS predictions acquired through real-time data exchange. Top-of-descent predictions over similar time horizons were found accurate to within ± 5 nautical miles.

air traffic management↗

Flight Demonstration of the Tailored Arrival Manager

A flight demonstration of arrival traffic management automation was conducted in partnership between NASA, FAA and Boeing as an element of the latter’s ecoDemonstrator2020 flight program. For the demonstration, NASA’s prototype Tailored Arrival Manager(TAM) was used to compute efficient trajectory-based solutions to traffic management problems representing those encountered during time-based metering operations today. TAM solutions involving route modifications were uplinked to a Boeing 787 airplane using Controller Pilot Data Link Communications and seamlessly loaded into the airplane’s Flight Management System (FMS). The paper describes the concept and technology behind TAM along with the data exchanges and procedures involved with the demonstration. All TAM solutions were delivered in a timely manner and successfully integrated with the airplane’s FMS, thereby demonstrating the basic feasibility of trajectory-based arrival management using currently available data communications and avionics equipage. Although TAM solutions were not executed during this initial demonstration, a limited study of trajectory prediction accuracy was possible given that the airplane flew uninterrupted, automated descents with known route and speed intent. Analysis revealed that TAM meter-fix arrival time predictions were accurate to within ± 30 seconds for time horizons of 30 minutes or less, which matched closely with FMS predictions acquired through real-time data exchange. Top-of-descent predictions over similar time horizons were found accurate to within ± 5 nautical miles.

Air traffic managment↗

Traffic Prediction for Uncommunicative Aircraft in Terminal Airspace: Development Framework and Performance Evaluations

This paper presents an air traffic prediction algorithm that takes observations of an aircraft and classifies aircraft type, estimates the aircraft's intent to and method of joining an airport traffic pattern, and predicts the aircaft's future trajectory. To develop algorithms that enable autonomous aircraft to safely insert into un-towered traffic patterns, several challenges need to be addressed. These challenges range from traffic detection to sensor fusion to own-ship trajectory replanning. Critical to a trajectory replanning algorithm is information regarding the future behavior of all traffic aircraft in the operational environment. The presented traffic prediction algorithm generates this information using regular measurements of traffic aircraft position and velocity to classify the aircraft by speed-class, estimate how the aircraft will approach the runway, and construct a predicted trajectory to the runway including future positions and velocities at specific times. The predictions of the presented algorithm are the necessary inputs for any downstream traffic pattern sequencing and own-ship trajectory planning routines. The presented algorithm is benchmarked using approximately 300 randomized traffic trajectories, spanning four vehicle weight classes and eight traffic entry types. While the algorithm can process multiple traffic vehicles in the terminal area, there is no prediction of traffic-on-traffic interaction. Each traffic vehicle is processed separately.

John D McMinn↗

Comparison of Performance Predictions for New Low-Thrust Trajectory Tools

Several low thrust trajectory optimization tools have been developed over the last 3% years by the Low Thrust Trajectory Tools development team. This toolset includes both low-medium fidelity and high fidelity tools which allow the analyst to quickly research a wide mission trade space and perform advanced mission design. These tools were tested using a set of reference trajectories that exercised each tool s unique capabilities. This paper compares the performance predictions of the various tools against several of the reference trajectories. The intent is to verify agreement between the high fidelity tools and to quantify the performance prediction differences between tools of different fidelity levels.

Polsgrove, Tara↗

An architecture for intelligent interfaces - Outline of an approach to supporting operators of complex systems

The conceptual design of a comprehensive support system for operators of complex systems is presented. Key functions within the support system architecture include information management, error monitoring, and adaptive aiding. One of the central knowledge bases underlying this functionality is an operator model that involves a 'matrix' of algorithmic and symbolic models for assessing and predicting an operator's activities, awareness resources, intentions, and performance. Functional block diagrams are presented for the overall architecture as well as the key elements within this architecture. A variety of difficult design issues are discussed and ongoing efforts aimed at resolving these issues are noted.

Rouse, W. B.↗

A real-time prediction of UTC

The reference time scale for all scientific and technologic applications on the Earth, the Universal Coordinated Time (UTC), must be as stable, reliable, and accurate as possible. With this in view the BIPM and before it the BIH, have always calculated and then disseminated UTC with a delay of about 80 days. There are three fundamental reasons for doing this: (1) It takes some weeks for data, gathered from some 200 clocks spread world-wide, to be collected and for errors to be eliminated; (2) changes in clock rates can only be measured with high precision well after the fact; and (3) the measurement noise originating in time links, in particular using Loran-C, is smoothed out only when averaging over an extended period. Until mid-1992, the ultimate stability of UTC was reached at averaging times of about 100 days and corresponded to an Allan deviation sigma(sub y)(tau) of about 1,5x10(exp -14) then compared to the best primary clock in the world, the PTB CS2. For several years now, a predicted UTC has been computed by the USNO through an extrapolation of the values as published in deferred time by the BIPM. This is made available through the USNO Series 4, through the USNO Automated Data Service, and through GPS signals. Due to the instability of UTC, the poor predictability of the available clocks, and the intentional SA degradation of GPS signals, the real-time access to this extrapolated UTC has represented the true deferred-time UTC only to within several hundreds of nanoseconds.

Thomas, Claudine↗

A Numerical Simulator for Three-Dimensional Flows Through Vibrating Blade Rows

The three-dimensional, multi-stage, unsteady, turbomachinery analysis, TURBO, has been extended to predict the aeroelastic and aeroacoustic response behaviors of a single blade row operating within a cylindrical annular duct. In particular, a blade vibration capability has been incorporated so that the TURBO analysis can be applied over a solution domain that deforms with a vibratory blade motion. Also, unsteady far-field conditions have been implemented to render the computational boundaries at inlet and exit transparent to outgoing unsteady disturbances. The modified TURBO analysis is applied herein to predict unsteady subsonic and transonic flows. The intent is to partially validate this nonlinear analysis for blade flutter applications, via numerical results for benchmark unsteady flows, and to demonstrate the analysis for a realistic fan rotor. For these purposes, we have considered unsteady subsonic flows through a 3D version of the 10th Standard Cascade, and unsteady transonic flows through the first stage rotor of the NASA Lewis, Rotor 67, two-stage fan.

Chuang, H. Andrew↗

Adaptive Trajectory Prediction Algorithm for Climbing Flights

Aircraft climb trajectories are difficult to predict, and large errors in these predictions reduce the potential operational benefits of some advanced features for NextGen. The algorithm described in this paper improves climb trajectory prediction accuracy by adjusting trajectory predictions based on observed track data. It utilizes rate-of-climb and airspeed measurements derived from position data to dynamically adjust the aircraft weight modeled for trajectory predictions. In simulations with weight uncertainty, the algorithm is able to adapt to within 3 percent of the actual gross weight within two minutes of the initial adaptation. The root-mean-square of altitude errors for five-minute predictions was reduced by 73 percent. Conflict detection performance also improved, with a 15 percent reduction in missed alerts and a 10 percent reduction in false alerts. In a simulation with climb speed capture intent and weight uncertainty, the algorithm improved climb trajectory prediction accuracy by up to 30 percent and conflict detection performance, reducing missed and false alerts by up to 10 percent.

Seperation Assurance↗

Review of V&V Documentation

Consortium for Advance Simulation of Light Water Reactors (CASL) is a Department of Energy Innovation Hub whose mission is the following, "CASL is a collaboration of the nation's leading scientists, institutions, and supercomputers, with an aggressive 10-year mission to confidently predict the performance of existing and next-generation commercial nuclear reactors through comprehensive, science-based modeling and simulation." The CASL program to date has focused on developing the necessary predictive capability. Rightly so, it is characterized by many as a research project. As a matter of intent, the first 6 years of CASL focused on developing and demonstrating the prediction capability of a suite of independent physics codes: MPACT (neutronics), CTH (thermal hydraulics in the core), BISON (fuel performance), and MAMBA (CRUD and boron uptake on fuel rod surfaces) The last 4 years focused on initial attempts to couple the codes and to demonstrate those capabilities through a series of challenge problems aligned to 3 key issues of interest to the nuclear power industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DEPDOSE

DEPDOSE is an open-source computer application which combines the KDEP respiratory tract deposition software with committed equivalent dose coefficient tables from the DC_PAK internal dosimetry package. DEPDOSE allows the user to rapidly produce tables of dose coefficients to workers and members of the public inhaling a precisely defined, user-specified aerosols using the ICRP 60 series methodology. Combined with a plume dispersion modeling system such as QUIC, this makes it possible to predict radiation doses downstream from an accidental or intentional release of radioactive materials. For this work, a radioactive plume was calculated to members of the public downstream from a plausible release of radionuclides into the atmosphere.

Klumpp, John↗

Fuel Spray Mixing and Wall Interaction

All future high-efficiency engines will have fuel directly sprayed into the engine cylinder. Engine developers agree that a major barrier to the rapid development and design of these high-efficiency, clean engines is the lack of accurate fuel spray computational fluid dynamics (CFD) models. The spray injection process largely determines the fuel–air mixture processes in the engine, which subsequently drive combustion and emissions in both direct-injection gasoline and diesel systems, particularly at cold-start conditions when aftertreatment is ineffective. Engines must be tolerant to a range of fuels, and there must be an understanding of how specific fuel properties affect the spray mixing and evaporation processes to intentionally create better fuels and better injectors. More predictive spray combustion models will enable rapid design and optimization of future high-efficiency engines, providing more affordable vehicles and saving fuel.

33 ADVANCED PROPULSION SYSTEMS↗

ANOPP programming and documentation standards document

Standards defining the requirements for preparing software for the Aircraft Noise Prediction Program (ANOPP) were given. It is the intent of these standards to provide definition, design, coding, and documentation criteria for the achievement of a unity among ANOPP products. These standards apply to all of ANOPP's standard software system. The standards encompass philosophy as well as techniques and conventions.

Source record↗

Experimental Investigation of a High Pressure Ratio Aspirated Fan Stage

The experimental investigation of an aspirated fan stage designed to achieve a pressure ratio of 3.4:1 at 1500 ft/sec is presented in this paper. The low-energy viscous flow is aspirated from diffusion-limiting locations on the blades and flowpath surfaces of the stage, enabling a very high pressure ratio to be achieved in a single stage. The fan stage performance was mapped at various operating speeds from choke to stall in a compressor facility at fully simulated engine conditions. The experimentally determined stage performance, in terms of pressure ratio and corresponding inlet mass flow rate, was found to be in good agreement with the three-dimensional viscous computational prediction, and in turn close to the design intent. Stage pressure ratios exceeding 3:1 were achieved at design speed, with an aspiration flow fraction of 3.5 percent of the stage inlet mass flow. The experimental performance of the stage at various operating conditions, including detailed flowfield measurements, are presented and discussed in the context of the computational analyses. The sensitivity of the stage performance and operability to reduced aspiration flow rates at design and off design conditions are also discussed.

Merchant, Ali↗

A Turn-Projected State-Based Conflict Resolution Algorithm

State-based conflict detection and resolution (CD&R) algorithms detect conflicts and resolve them on the basis on current state information without the use of additional intent information from aircraft flight plans. Therefore, the prediction of the trajectory of aircraft is based solely upon the position and velocity vectors of the traffic aircraft. Most CD&R algorithms project the traffic state using only the current state vectors. However, the past state vectors can be used to make a better prediction of the future trajectory of the traffic aircraft. This paper explores the idea of using past state vectors to detect traffic turns and resolve conflicts caused by these turns using a non-linear projection of the traffic state. A new algorithm based on this idea is presented and validated using a fast-time simulator developed for this study.

Butler, Ricky W.↗

Modeling of Substitutional Site Preference in Ordered Intermetallic Alloys

We investigate the site substitution scheme of specific alloying elements in ordered compounds and the dependence of site occupancy on compound stoichiometry, alloy concentration. This basic knowledge, and the interactions with other alloying additions are necessary in order to predict and understand the effect of various alloying schemes on the physical properties of a material, its response to various temperature treatments, and the resulting mechanical properties. Many theoretical methods can provide useful but limited insight in this area, since most techniques suffer from constraints in the type of elements and the crystallographic structures that can be modeled. With this in mind, the Bozzolo-Ferrante-Smith (BFS) method for alloys was designed to overcome these limitations, with the intent of providing an useful tool for the theoretical prediction of fundamental properties and structure of complex systems. After a brief description of the BFS method, its use for the determination of site substitution schemes for individual as well as collective alloying additions to intermetallic systems is described, including results for the concentration dependence of the lattice parameter. Focusing on B2 NiAl, FeAl and CoAl alloys, the energetics of Si, Ti, V, Cr, Fe, Co, Ni, Cu, Zr, Nb, Mo, Ru, Hf, Ta and W alloying additions are surveyed. The effect of single additions as well as the result of two simultaneous additions, discussing the interaction between additions and their influence on site preference schemes is considered. Finally, the BFS analysis is extended to ternary L1(sub 2) (Heusler phase) alloys. A comparison between experimental and theoretical results for the limited number of cases for which experimental data is available is also included.

Bozzolo, Guillermo↗