Search NASA⌕ Search

SEARCH · Search NASA

Results for “pressing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

STS-102 Flight Crew Post-Landing Press Conference

Joel Wells, NASA Public Affairs, introduces STS-102 Commander Jim Wetherbee in this post-landing press conference. Commander Wetherbee gives a brief statement about the success of the mission and answers questions from the press.

Source record↗

STS-105 Pre-Launch Press Conference

George Diller, NASA Public Affairs, introduces Bill Gerstenmaier, Deputy Manager of the ISS Program, Dave King, NASA Director of Shuttle Processing, and Judy Konecky, Staff Meteorologist, in this STS-105 press conference. An overview is given of the success of the Expedition 2 crew, the expectations of the Expedition 3 crew, the launch countdown status, and the weather forecast for the Shuttle launch. They then answer questions from the press.

Source record↗

STS-104 Pre-Launch Press Conference

George Diller, NASA Public Affairs, introduces Jim Halsell, Shuttle Program Launch Integration Manager, Dave King, NASA Director of Shuttle Processing, Michael Hawes, Deputy Associate Administrator for ISS, and John Weems, Launch Weather Officer, in this STS-104 press conference. An overview is given of the launch and mission activities, International Space Station activities during the mission, and the weather forecast for the launch. The men then answer questions from the press.

Source record↗

STS-104 Flight Crew Post-Landing Press Conference

Joel Wells, NASA Public Affairs, introduces the STS-104 crew, Commander Steven Lindsey, Pilot Charles Hobaugh, and Mission Specialists Mike Gernhardt, Jim Reilly, and Janet Kavandi, in this post-landing press conference. Commander Lindsey makes a brief statement about the mission and each crewmember's role in the activities. The crew then answers questions from the press.

Source record↗

Apollo 11 Facts [Post Flight Press Conference]

A continuation of 'Apollo 11 Facts: Post Flight Press Conference, Part 1 of 2' (internal ID 2001181405), this video shows Apollo 11 Commander Neil Armstrong, Lunar Module Pilot Edwin Aldrin, Jr., and Command Module Pilot Michael Collins during a post flight press conference, where they describe their experiences on the mission. The astronauts then answer questions from the audience.

Source record↗

Apollo 13 Facts: Press Conference

Flight Director Gene Krantz gives an overview of the Apollo 13 mission as corrections are made in the power down checklist, passive thermal control, and orbital burns after the spacecraft runs into problems. He then answers questions from the press with the help of Tony England, Bill Peters, and Dick Thorson. Footage then shows newspaper headlines 'We're Not Concerned' and 'Getting Ready to Land' as people watch televisions to see if the astronauts landed safely. The press conference section of this video has sound, the headlines section does not.

Source record↗

STS-121: Discovery Post Landing Press Conference

On July 17, 2006 Dean Acosta (NASA Press Secretary), Mike Griffin (Administrator), Bill Gerstenmaier (Associate Administrator of Space Operations), and Mike Leinbach (NASA Launch Director) expressed how proud they were to be a part of the STS-121/ Discovery team. They also explained how flawlessly the mission performed and how it was the best mission ever flown. They proceeded to answer numerous questions from the press.

Source record↗

STS-121: Discovery Post Launch Press Briefing

The briefing begins with Dean Acousta (NASA Press Secretary) introducing Michael Griffin (NASA Administrator), Bill Gerstenmaier (Associate Administrator for Space Operations) Wayne Hale (Space Shuttle Program Manager), John Shannon (Chairman, Mission Management Team, JSC), and Mike Leinbach (NASA Launch Director). The teams effort and dedication paid off in the form of a perfect launch and the weather cooperated. The Mission Management Team no problems during inspection. Debris assessment at 2 min. 47 sec. and 4 min. 50 sec. will be discussed when that information becomes available.The floor was then open for questions from the press.

Source record↗

STS-121: Discovery Entry Flight Director Post Landing Press Conference

Steve Stitch, STS-121 Entry Flight Director, and Wayne Hale, Space Shuttle Program is shown in this post landing press conference. Steve Stitch begins with discussing the following topics: 1) Weather at Kennedy Space Center; 2) Gap filler protrusion; 3) De-orbit burn; 4) Space Shuttle Landing; 5) Global Position Satellite System (GPSS) performance; and 6) Post-landing rain showers. Wayne Hale discusses external tank observations at launch and the goals that were obtained by this flight, which are to deliver 4000 pounds of scientific equipment, increase the crew members to three on the International Space Station (ISS), and repair the ISS. Questions from the press on lessons learned from the Auxiliary Power Unit (APU) leak, and flight readiness reviews are addressed.

Source record↗

Modeling Pore Closure in the Hot Isostatic Pressing of Additively Manufactured Inconel 718 Samples

Additive manufacturing provides opportunity for a new world of possibilities for metallic component design and fabrication; however, as-built part quality is notoriously variable, anisotropic, and degraded by porous defects. To improve quality, parts are commonly post processed using a variety of techniques including hot isostatic pressing (HIP). During HIP, high temperature and pressure is employed to improve microstructure and reduce pore volume by inducing visco-plastic deformation in the metallic substrate. Validated computational capabilities can provide predictions to guide the selection of processing condition, expected pore reduction, and the effects of varying entrapped gas in the pores. This discussion describes a micro-scale finite element structural model developed to predict pore closure due to HIP in as-built additively manufactured Inconel 718 samples produced by the laser powder bed fusion process. The model accounts for plastic deformation, creep, and internal pressure for a single pore. Pores are characterized in physical samples before and after HIP, and model predictions are compared to this measured data.

defect model prediction↗