Report on Internship Project: Risk-Informed Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plants (NPPs) in USA are facing premature closures due to financial difficulties. A significant contributing factor in the NPP electricity generation cost is Operational and Maintenance (O&M) cost. This research aims to reduce O&M cost by developing a framework which creates flexibility in NPP maintenance program. This framework relies on FLEX portable equipment to reduce NPP risk and to substitute and/or backup fixed equipment in different NPP operation modes. Probabilistic Risk Assessment (PRA) methodology is used to quantify the change of plant risk to justify the framework's applicability. The framework enables plant managers to shift maintenance workload from refueling outage period into online maintenance programs. As a result, it is expected to increase NPP capacity factor while also reducing the risk of unexpected outage. These results are expected to increase NPP electricity generation revenue and decrease O&M costs while complying to existing nuclear safety regulations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Matilda v1.0: An R package for probabilistic climate projections using a reduced complexity climate model

A primary advantage to using reduced complexity climate models (RCMs) has been their ability to quickly conduct probabilistic climate projections, a key component of uncertainty quantification in many impact studies and multisector systems. Providing frameworks for such analyses has been a target of several RCMs used in studies of the future co-evolution of the human and Earth systems. In this paper, we present Matilda, an open-science R software package that facilitates probabilistic climate projection analysis, implemented here using the Hector simple climate model in a seamless and easily applied framework. The primary goal of Matilda is to provide the user with a turn-key method to build parameter sets from literature-based prior distributions, run Hector iteratively to produce perturbed parameter ensembles (PPEs), weight ensembles for realism against observed historical climate data, and compute probabilistic projections for different climate variables. This workflow gives the user the ability to explore viable parameter space and propagate uncertainty to model ensembles with just a few lines of code. The package provides significant freedom to select different scoring criteria and algorithms to weight ensemble members, as well as the flexibility to implement custom criteria. Additionally, the architecture of the package simplifies the process of building and analyzing PPEs without requiring significant programming expertise, to accommodate diverse use cases. We present a case study that provides illustrative results of a probabilistic analysis of mean global surface temperature as an example of the software application.

54 ENVIRONMENTAL SCIENCES↗

Scaling Input Distributions for Probabilistic Models - 19472

It is important to address scaling issues when building models to support risk-based decisions for radioactive waste disposal sites. Currently, probabilistic risk assessment and probabilistic performance assessment models are run for multiple realizations where each realization uses one value from each input distribution over the entire modeled time. The input distributions represent the current state of knowledge in the mean of the input variable over the spatial region of interest and over the time period of the model run. This paper focuses on the time factor in input distribution scaling because it presents more serious conceptual and distributional challenges than the spatial factor. One of the challenges in temporal scaling is the effect of non-linearity on propagation of distribution uncertainty through to uncertainty in results. Radioactive waste disposal models tend to have both linear and non-linear components in their models. Dose assessment calculations are typically represented by linear models, while contaminant transport models have linear and non-linear components. In principle, temporal scaling of input parameter distributions for a linear model is straightforward, but scaling of input distributions for non-linear models is not. This paper uses examples to investigate the effects of input distribution temporal scaling on simple linear and non-linear models. Different scaling scenarios were investigated by comparing three analysis tools: analytical mathematical representations, statistical software programming, and GoldSim Monte Carlo simulation software. R statistical software is an open source statistical programming language often used for statistical analyses and graphical representation of data. GoldSim is a robust probabilistic dynamic modeling platform used in performance assessment modeling of radioactive waste sites. A simple linear model, a quadratic model and a multiplicative model were the cases explored for each of these tools. For the three analysis tools considered and with each of the scaling cases, 1,000 realizations were implemented from distributions of the random variables of interest. This is a sufficient number of realizations for simple models to capture the model space. An annual temporal resolution of a 100-year simulation period was chosen for all models and analysis tools. The effects of temporal scaling were demonstrated by investigating two different options for time scaling. Option 1 was set up so that the input distributions represented the expected value on an annual time scale, and a new value from that distribution was chosen every year (at every time step which equaled a year) for 100 years. In Option 2, the input distributions were scaled to represent the expected mean value of the input variable over the 100 years of simulation, and one value from that distribution was chosen for the entire elapsed time. Results show agreement across the three analysis tools. As expected, the linear models have identical results for the two different scaling Options, and the non-linear models diverge in the results for different time scale implementation. The implications of this work point to the need for careful consideration of input distribution temporal scaling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying AI/ML Techniques to U.S. Nuclear Operating Experience Program

Idaho National Laboratory (INL) has provided technical assistance to the U.S. Nuclear Regulatory Commission (NRC) in reliability and risk analysis including the operating experience (OpE) program since the 1980s. The U.S. nuclear OpE program provides input parameters to the NRC Standardized Plant Analysis Risk models and the industry probabilistic risk assessment (PRA) models. While earlier PRA focuses were on at-power, internal event analysis, the risks from external hazards and during low power shutdown (LPSD) operation could be significant and the needs to develop LPSD PRA and external hazards PRA are on the rise. One issue in developing LPSD PRA is the reasonable estimation of shutdown initiative event (SDIE) frequencies. INL has developed and is maintaining an SDIE database for the NRC. However, this database is based on the reviewing of Licensee Event Reports (LERs), which is believed to be only a subset of “actual” shutdown initiating events occurred in the industry. This paper investigates a new approach to identify and characterize shutdown initiating events from the Institute of Nuclear Power Operations (INPO) industry database using machine learning techniques. The main process in this approach is to find out the relationship between key words in event descriptions and the SDIE categories as in the NRC SDIE database. The relationship can then be applied to the INPO database and search for SDIEs.

99 GENERAL AND MISCELLANEOUS↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Plant-specific Model and Data Analysis using Dynamic Security Modeling and Simulation

The requirements for U.S. nuclear power plants to maintain a large on-site physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an update on the progress in applying a dynamic computational framework that links results from a commercially available force-on-force simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework or MASS-DEF. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report does not contain any plant's sensitive information and/or Safeguards Information. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

$\mathrm{PPT}$-Multicore: performance prediction of Open$\mathrm{MP}$ applications using reuse profiles and analytical modeling

In this report we present PPT-Multicore, an analytical model embedded in the Performance Prediction Toolkit (PPT) to predict parallel applications’ performance running on a multicore processor. PPT-Multicore builds upon our previous work towards a multicore cache model. We extract LLVM basic block labeled memory trace using an architecture-independent LLVM-based instrumentation tool only once in an application’s lifetime. The model uses the memory trace and other parameters from an instrumented sequentially executed binary. We use probabilistic and computationally efficient reuse profiles to predict the cache hit rates and runtimes of OpenMP programs’ parallel sections. We model Intel’s Broadwell, Haswell, and AMD’s Zen2 architectures and validate our framework using different applications from PolyBench and PARSEC benchmark suites. The results show that PPT-Multicore can predict cache hit rates with an overall average error rate of 1.23% while predicting the runtime with an error rate of 9.08%.

97 MATHEMATICS AND COMPUTING↗

Stochastic Optimization with Risk Aversion for Virtual Power Plant Operations: A Rolling Horizon Control

While the concept of aggregating and controlling renewable distributed energy resources (DERs) to provide grid services is not new, increasing policy support of DER market participation has driven research and development in algorithms to pool DERs for economically viable market participation. Sandia National Laboratories recently undertook a three-year research program to create the components of a real-world virtual power plant (VPP) that can simultaneously participate in multiple markets. Our research extends current state-of-the-art rolling horizon control through the application of stochastic programming with risk aversion at various time resolutions. Our rolling horizon control consists of (1) day-ahead optimization to produce an hourly aggregate schedule for the VPP operator and (2) sub-hourly optimization for real-time dispatch of each VPP subresource. Both optimization routines leverage a two-stage stochastic program (SP) with risk aversion, and integrate the most up-to-date forecasts to generate probabilistic scenarios in real operating time. Our results demonstrate the benefits to the VPP operator of constructing a stochastic solution regardless of the weather. In more extreme weather, applying risk optimization strategies can dramatically increase the financial viability of the VPP. As a result, the methodologies presented here can be further tailored for optimal control of any VPP asset fleet and its operational requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Combining RAVEN, RELAP5-3D, and PHISICS for Fuel Cycle and Core Design Analysis for New Cladding Criteria

The Nuclear Regulatory Commission (NRC) has considered revision of 10 CFR 50.46C rule to account for the effects of burn-up rate in future analysis of reactor accident scenarios so that safety margins may evolve with the operation and reloading of the reactor as dynamic limits. In order to find these limiting conditions, both cladding oxidation and maximum temperature must be cast as functions of fuel exposure. It is computationally intensive to run a plant model through a long duration operational transient to the time of fuel reload, and this must be repeated for each reload until the time of the accident scenario. Moreover, fuel reload patterns may differ in many ways so that calculations with many different core configurations must be considered. To perform such new analyses in a reasonable amount of computational time with good accuracy, Idaho National Laboratory (INL) has developed new multi-physics tools by combining existing codes and adding new capabilities. The Parallel Highly Innovative Simulation INL Code System (PHISICS) toolkit for neutronic and reactor physics is coupled with the Reactor Excursion and Leak Analysis Program (RELAP5-3D) for the Loss of Coolant Accident (LOCA) analysis and RAVEN for the Probabilistic Risk Assessment (PRA) and margin characterization analysis. Expansion of code capability was also necessary. For RELAP5-3D to process a single sequence of cores in a continuous run required modification of RELAP5-3D to restart a sequence of input decks, each with a slightly modified neutronics model or thermal-hydraulic flow region and culminating in an accident scenario. A new multi-deck input processing capability was developed and verified for this analysis. In conclusion, the combined RAVEN/PHISICS/RELAP5-3D tool is used to analyze a typical Pressurized Water Reactor (PWR).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Validation of a Probabilistic Risk Assessment Model for a Generic Modular High Temperature Gas-Cooled Reactor

This study looks to develop and validate a probabilistic risk assessment (PRA) model for the modular high temperature gas-cooled reactor (MHTGR) using INL’s Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) software. Validation against a General Atomics design involves matching event and fault trees to historical frequencies, with a goal of under 15% difference. The research aims to deliver a reliable PRA model to assess the safety of MHTGRs for use within high-temperature industrial applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program: Upgrade of EMRALD to a Modern JavaScript-based Framework

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at Idaho National Laboratory for researching the capabilities of dynamic probabilistic risk assessment. It provides a simple interface to represent complex interactions often seen when developing dynamic models. EMRALD can also interface with other applications by modifying inputs, running, and using their results within EMRALD for dynamic and integrated assessment. This report goes over the work performed as part of the Risk-Informed Systems Analysis Pathway under the Light Water Reactor Sustainability program to upgrade the EMRALD software.

97 MATHEMATICS AND COMPUTING↗

Inventory and Probabilistic Function of Natural Hazards in the United States: July 19, 2018 - September 18, 2018

The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) developed a standardized risk assessment process that considers the location-specific vulnerabilities and threats (climate-related as well as human-caused) at a site to generate a ranked list of organizational risks and associated mitigation options for reducing those risks. To support this effort, the Southern Climate Impacts Planning Program (SCIPP), a National Oceanic and Atmospheric (NOAA) Regional Integrated Sciences and Assessments (RISA) team, was selected to provide climate science expertise to develop a comprehensive inventory and probabilistic function of natural hazards (e.g., hurricanes, tornadoes, flooding, and sea level rise) for the entire United States by region. The inventory of climate-related hazards and the associated likelihood scores are incorporated into a companion risk assessment tool enabling standardized comparisons of risk at sites across the country.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

RAVEN User Manual

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by inputs files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused to- ward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN has started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assessment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activates are currently ongoing for coupling RAVEN with soft- ware such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focalizing on the input structure.

97 MATHEMATICS AND COMPUTING↗

Geomechanical Characterization of the Mount Simon Sandstone and Eau Claire Formation of Northern Illinois Basin

The purpose of this paper is to analyze publicly available geomechanical data from two carbon storage sites in the Illinois Basin: the Illinois Basin-Decatur Project (IBDP) in Macon County, IL and the FutureGen2.0 project in Morgan County, IL, cancelled before injection began. This study estimates the magnitudes and directions of the least compressive principal stress gradient using hydraulic fracture-based stress measurement tests, borehole breakouts, and sonic logs in the Eau Claire Formation (primary confining zone) and the Mount Simon Sandstone (targeted reservoir). The range of stresses expected in the underlying Precambrian basement is also investigated. The evaluation of the state of stress is carried out in a probabilistic manner using the State of Stress Analysis Tool (SOSAT) developed under the National Risk Assessment Partnership (NRAP) program. Finally, the paper also provides a discussion on distinctions between fracture initiation pressure, propagation pressure, and fracture closure pressure, given that hydraulic fracture testing results show a significant difference between these three values. The discussion also addresses why the fracture closure pressure should be preferred in injection pressure determinations, a critical point in geological carbon storage projects.

de Toledo Camargo, Julia↗

Wattile: Probabilistic Deep Learning-based Forecasting of Building Energy Consumption [SWR-20-94]

Accurate energy forecasting is becoming critical due to many reasons: i ) optimal distributed energy resources operations and dispatch, ii) fault detection and diagnostics, and iii) meeting operational energy efficiency targets. Wattile uses deep learning (DL) for the building's short-term load forecasting application. Two specific types of neural networks called, Long Short Term Memory (LSTM) and Sequence-to-Sequence (S2S) models are used to make predictions. Forecasting models are trained using online historical weather and occupancy indicator data streams from the Intelligent Campus Program's data acquisition systems at the National Renewable Energy Laboratory (NREL) for main meters and sub-meters of multiple building types. These models use probabilistic methods to provide quantile-based forecasts in addition to nominal conditional median predictions of electricity consumption.

Frank, Stephen↗

Mass calibration of the CODEX cluster sample using SPIDERS spectroscopy – I. The richness–mass relation

Abstract We use galaxy dynamical information to calibrate the richness–mass scaling relation of a sample of 428 galaxy clusters that are members of the CODEX sample with redshifts up to z ∼ 0.7. These clusters were X-ray selected using the ROSAT All-Sky Survey (RASS) and then cross-matched to associated systems in the redMaPPer (the red sequence Matched-filter Probabilistic Percolation) catalogue from the Sloan Digital Sky Survey. The spectroscopic sample we analyse was obtained in the SPIDERS program and contains ∼7800 red member galaxies. Adopting NFW mass and galaxy density profiles and a broad range of orbital anisotropy profiles, we use the Jeans equation to calculate halo masses. Modelling the scaling relation as $\lambda \propto \text{A}_{\lambda } {M_{\text{200c}}}^{\text{B}_{\lambda }} ({1+z})^{\gamma _{\lambda }}$, we find the parameter constraints $\text{A}_{\lambda }=38.6^{+3.1}_{-4.1}\pm 3.9$, $\text{B}_{\lambda }=0.99^{+0.06}_{-0.07}\pm 0.04$, and $\gamma _{\lambda }=-1.13^{+0.32}_{-0.34}\pm 0.49$, where we present systematic uncertainties as a second component. We find good agreement with previously published mass trends with the exception of those from stacked weak lensing analyses. We note that although the lensing analyses failed to account for the Eddington bias, this is not enough to explain the differences. We suggest that differences in the levels of contamination between pure redMaPPer and RASS + redMaPPer samples could well contribute to these differences. The redshift trend we measure is more negative than but statistically consistent with previous results. We suggest that our measured redshift trend reflects a change in the cluster galaxy red sequence (RS) fraction with redshift, noting that the trend we measure is consistent with but somewhat stronger than an independently measured redshift trend in the RS fraction. We also examine the impact of a plausible model of correlated scatter in X-ray luminosity and optical richness, showing it has negligible impact on our results.

Capasso, R.↗

Uncertainty Analysis of Consequence Management Data Products

An interlaboratory effort has developed a probabilistic framework to characterize uncertainty in data products that are developed by the US Department of Energy Consequence Management Program in support of the Federal Radiological Monitoring and Assessment Center. The purpose of this paper is to provide an overview of the probability distributions of input variables and the statistical methods used to propagate and quantify the overall uncertainty of the derived response levels that are used as contours on data products due to the uncertainty in input parameters. Uncertainty analysis results are also presented for several study scenarios. This paper includes an example data product to illustrate the potential real-world implications of incorporating uncertainty analysis results into data products that inform protective action decisions. Data product contours that indicate areas where public protection actions may be warranted can be customized to an acceptable level of uncertainty. Finally, the investigators seek feedback from decision makers and the radiological emergency response community to determine how uncertainty information can be used to support the protective action decision-making process and how it can be presented on data products.

61 RADIATION PROTECTION AND DOSIMETRY↗