Search NASA⌕ Search

SEARCH · Search NASA

Results for “probabilistic risk assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

System risk quantification and decision making support using functional modeling and dynamic Bayesian network

Risk-informed decision-making requires a probabilistic assessment of the likelihood of success of control action, given the system status. This paper presents a systematic state transition modeling approach integrating dynamic probabilistic risk assessment with a decision-making process using a dynamic Bayesian network (DBN) coupled with functional modeling. A functional model designed with multilevel flow modeling (MFM) technique was used to build a system state structure inferred by energy, mass, and information flow so that one can verify the developed model with respect to system functionality. The MFM model represents the causal relationship among the nodes, which captures the structure of process parameters and control units. Each node may have multiple possible states, and the DBN structured by the MFM model represents the time-domain transitions among the defined states. Furthermore, the MFM-DBN integrated state transition modeling is a white-box approach that allows one to draw the system's risk profile by updating the system states and supports the decisions probabilistically with physical inference. An example of a simple heating system has been used to illustrate this process, including decision-making support based on quantitative risk profile. For demonstrating its applicability to a complex system operational decision making, a case study of station blackout accident scenario leading to the seal loss of coolant accident in a nuclear power plant is presented. The proposed approach effectively provided the risk profile along time for each option so that the operators can make the best decision, which minimizes the plant risk.

42 ENGINEERING↗

Plan for Development and Application of Risk Assessment Approach for Transportation Package Approval of an MNPP for Domestic Highway Shipment

For nuclear reactors, Probabilistic Risk Assessment (PRA) has been conducted since the 1970s [e.g., see WASH-1400 (NRC 1975), NUREG-1150 (NRC 1990), and NUREG-1935 (Chang et al. 2012)]. PRA has also been used to assess a dry cask storage system at a nuclear power plant [see NUREG-1864 (NRC 2007)]. PRA techniques have also been applied to the transportation of spent nuclear fuel, most notably in NUREG/CR-4829 (Fischer et al. 1987), NUREG/CR-6672 (Sprung et al. 2000), and NUREG-2125 (NRC 2014). Additional guidance is provided in International Atomic Energy Agency (IAEA) IAEA-TECDOC-1346 (2003). Transportation PRA was also used in the evaluations of transportation impacts in reports such as the Repository Final Environmental Impact Statement (DOE 2002) and the Repository Final Supplemental Environmental Impact Statement (DOE 2008).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Physics-Informed Machine Learning-Aided System Space Discretization

Decision-making is the process of identifying and choosing alternatives based on an agreed-upon set of metrics and preferences established by the decision-maker. There are options to be considered during the decision-making process and each option offers a different trajectory and associated success profile in moving from a given system state to the desired system state. The decision-making process typically involves uncertainties associated with the current component and system states. In this sense, probabilistic risk assessment (PRA) can be an analytical method and tool for accomplishing the probabilistic aspect of the decision-making process. Dynamic PRA is an evolution of conventional PRA methodology in which driving forces on modeled plant elements and the element behaviors are explicitly modeled over time. In the recent past, risk assessment methodologies have evolved to address risk issues in a continuously evolving environment and a novel probabilistic dynamics framework in continuous time and state-space discretization forms has been proposed. While state-space discretization has shown its strength in both consequence and causal reasoning modes, several challenges, including the computational requirement and physically meaningful system state identification, exist. Conventional system space discretization has usually been done by either the equal width discretization method or a data-driven method. Those methods naturally possess challenges coming from the physical understanding of discretized system space (i.e., system state) and the trajectory moving from a given system state to another system state. The purpose of this paper is to present a physics-based and data-driven system state discretization method such that one can justify what the discretized system space implies and understand the state trajectory from the viewpoint of operational actions.

Kim, Junyung↗

Causal CCF Parameter Estimations 2020

This report documents the quantitative results of the causal common-cause failure (CCF) parameter estimations for the failure cause groups “component,” “design,” “environment,” “human,” and “other,” based on CCF data through 2020 in the U.S. Nuclear Regulatory Commission (NRC) CCF database: https://rads.inl.gov/Pages/CCF.aspx. This report utilizes the same data period (2006–2020) and CCF templates as INL/EXT-21-62940, Revision 1, CCF Parameter Estimations, 2020 Update. The 2015 causal CCF prior distributions for the specific failure cause groups (instead of the 2015 generic CCF prior distributions) were used in this report to estimate the associated causal CCF parameters. All the 2015 causal CCF prior distributions and generic CCF prior distributions were developed in INL/EXT-21-43723, Developing Generic Prior Distributions for Common Cause Failure Alpha Factors and Causal Alpha Factors, using CCF data from 1997 to 2015. These quantitative results were developed to support the causal alpha factor model and should be used as appropriate in probabilistic risk assessment (PRA) studies such as the NRC Significance Determination Process for commercial nuclear power plants in the United States.

99 GENERAL AND MISCELLANEOUS↗

Systematic Enterprise Risk Management by Integrating the RISMC Toolkit and Cost-Benefit Analysis (Final Report)

The goal of this research is to theorize and quantify the relationships between safety and the financial performance of nuclear power plants (NPPs). The Socio-Technical Risk Analysis (SoTeRiA) theoretical framework, which connects the social aspects (e.g., safety culture) and structural features (e.g., safety practices) of an organization with organizational safety and financial risks, is used to theorize the direct and indirect relationships between safety and the financial performance of NPPs. An Integrated Enterprise Risk Management (I-ERM) methodological framework is developed to operationalize SoTeRiA to quantify NPP safety and financial performance in a unified platform where their underlying physical degradation mechanisms, coupled with maintenance performance (considering human and organizational factors), are explicitly incorporated to depict the interconnections and dependencies between safety and financial performance. In this study, NPP safety refers to both occupational safety and system safety (estimated from Probabilistic Risk Assessment, PRA), and financial performance refers to the monetary values associated with NPP operation and maintenance (O&M) strategies. This report covers a case study demonstrating the feasibility of the I-ERM methodological framework. More detailed development of one of the I-ERM modules, i.e., Probabilistic Physics-of-Failure (PPoF) analysis, and its connection with other I-ERM modules is demonstrated in a second case study. The outcome of this research will help NPP decision-makers create cost-saving maintenance strategies while maintaining safety by providing cost- and risk-informed recommendations regarding maintenance work processes and operational strategies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Substation Configuration Effect on Substation Reliability

The nation’s electrical grid must be reliable because of its critical role in the economy, defense, and security of the nation. Many common tasks and industrial operations rely on proper electrical power distribution. In the design of new bus systems or evaluation of existing bus systems, the type of bus configuration affects the risk, reliability, maintenance, and cost of the system. This work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA) based sensitivity study on the reliability of substations with differing bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses of varying number of lines. The case variances, methods, and rankings presented can provide a guide for bus configuration for future electrical grid design and analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multicriterion Benefit Evaluation of Deploying New Battery Technology with Increased Capacity at a Generic Nuclear Power

Nuclear power plant (NPP) safety improvements are routinely made by plant licensees and regulators. Examples of plant improvements include accident-tolerant fuel, diverse and flexible coping strategies, passive cooling systems, and increased battery capacity. A combined use of these plant improvements could lead to plant designs with enhanced resilience, allowing NPPs to better cope with both internal and external hazards and keep the plant operating safely, efficiently, and economically. This paper focuses on increased battery capacity and evaluates the potential costs and benefits of deploying batteries with increased capacities at a generic boiling water reactor (BWR) NPP. A multicriterion benefit evaluation methodology is used for the cost-benefit analysis. Ten alternatives for extending battery capacity are developed, including nine alternatives to provide additional direct-current power and one alternative to provide additional alternating-current power. Potential benefits of reducing plant risk are quantified through incorporating the alternatives into loss-of-offsite-power scenarios of the generic BWR probabilistic risk assessment model. Potential costs of implementing the alternatives are qualitatively discussed and ranked. The alternatives are then compared based on their impacts on plant risk and economics.

99 GENERAL AND MISCELLANEOUS↗

Multicriterion Benefit Evaluation of Deploying New Battery Technology with Increased Capacity at a Generic Nuclear Power Plant

This presentation is prepared for the DOE LWRS RISA Pathway Stakeholder Engagement Meeting on October 13-14, 2021. Nuclear power plant (NPP) safety improvements are routinely made by plant licensees and regulators. Examples of plant improvements include accident-tolerant fuel, diverse and flexible coping strategies, passive cooling systems, and increased battery capacity. A combined use of these plant improvements could lead to plant designs with enhanced resilience, allowing NPPs to better cope with both internal and external hazards and keep the plant operating safely, efficiently, and economically. This presentation focuses on increased battery capacity and evaluates the potential costs and benefits of deploying batteries with increased capacities at a generic boiling water reactor (BWR) NPP. A multicriterion benefit evaluation methodology is used for the cost-benefit analysis. Ten alternatives for extending battery capacity are developed, including eight alternatives to provide additional direct-current power and one alternative to provide additional alternating-current power. Potential benefits of reducing plant risk are quantified through incorporating the alternatives into loss-of-offsite-power scenarios of the generic BWR probabilistic risk assessment model. Potential costs of implementing the alternatives are qualitatively discussed and ranked. The alternatives are then compared based on their impacts on plant risk and economics.

99 GENERAL AND MISCELLANEOUS↗

CCF Parameter Estimations, 2020 Update

This report documents the quantitative results of the common-cause failure (CCF) data collection effort (which included data through 2020) and summarizes the results of the parameter estimation quantification process performed on CCF data in the U.S. Nuclear Regulatory Commission (NRC) CCF database. This is the 2020 update to NUREG/CR-5497, updating data and parameter estimations for CCFs. This release, CCF Parameter Estimation 2020, reflects the CCF data contained within the CCF database, https://rads.inl.gov/Pages/CCF.aspx, by executing (in August 2021) the CCF query rules in the folder SPAR Rules 2020. The data covers the period from 1/1/2006 to 12/31/2020, the most recent 15-year period in which data are available. The use of the most recent rolling 15-year data in parameter estimation differs from previous updates, in which 1/1/1997 was used as the starting date (e.g., 1/1/1997 to 12/31/2015 for the 2015 update, 1/1/1997 to 12/31/2012 for the 2012 update). The new date range (i.e., the most recent 15-year period), was selected for this CCF update so as to be consistent with the date range chosen for the component reliability parameter estimation, and with the effort to include sufficient data for analysis while simultaneously reflecting the most recent industry performance. These results are appropriate for use in probabilistic risk assessment (PRA) studies, including the Standardized Plant Analysis Risk (SPAR) models of commercial nuclear power plants (NPPs) in the U.S. This update may be referred as: U.S. Nuclear Regulatory Commission, "CCF Parameter Estimations, 2020 Update," https://nrcoe.inl.gov/publicdocs/CCF/ccfparamest2020.pdf, November 2021.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Limitations of traditional tools for beyond design basis external hazard PRA

Probabilistic risk assessment (PRA) is being used increasingly by the nuclear industry for safety during normal operations as well as for the protection against external hazards. Computation of total risk in an external hazard PRA is dependent on hazard assessment, fragility assessment, and systems analysis. A systems analysis for propagation of component fragilities is conducted using event and fault trees. The event and fault trees for an actual power plant can be fairly large in size, which imposes computational challenges. Hence, certain assumptions are employed for computational efficiency. These assumptions typically represent the conditions imposed during the design basis (DB) scenario. The traditional PRA tools based on these assumptions are also widely applied to perform risk assessment in the context of beyond design basis (BDB) scenarios. However, some of these assumptions may not be valid for certain BDB scenarios. In addition, the probability of dependent failures also increases in BDB scenarios due to common cause failures (CCF) which usually results from design modifications, human errors, etc. In this manuscript, a simple and a relatively more complex illustrative examples are used to show the limitation of these assumptions in the numerical quantification of risk for the case of BDB conditions. Case studies with CCF events across multiple fault trees are also presented to illustrate the effect of these assumptions when traditional approach is used in BDB risk assessment. It is shown that the assumptions are valid for the case of DB conditions but may lead to excessively conservative risk estimates in the case of BDB conditions. Finally, a Bayesian network based top-down algorithm is proposed as an alternative tool for accurate numerical quantification of total risk in systems analysis.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Predicting High Energy Arcing Fault Zones of Influence for Aluminum Using an Arc Flash Modeling Approach: Evaluation of a model bias, uncertainty, parameter sensitivity and zone of influence estimation

This report documents the development of an arc flash hazard model to calculate the incident energy and zone of influence from high energy arcing faults involving aluminum. The NRC has identified the potential for (HEAFs) involving aluminum to increase the damage zone beyond what is currently postulated in fire probabilistic risk assessment (PRA) methodologies. To estimate the hazard from HEAFs involving aluminum an arc flash model was developed. Differences between the initial model and nuclear power plant (NPP) fire PRA scenarios were identified. Modification of the initial model established from existing literature and test data was used to minimize these differences. The developed model was evaluated against NRC datasets to understand the model prediction and relative uncertainties. Finally, a range of fire PRA zone of influences (ZOI) were developed based on the developed model, target fragility estimates and update HEAF PRA methodology. The results were developed to support an NRC LIC-504 evaluation in tandem with other modeling efforts. The report documents the effort and provides a reference for any future advancements in arc flash modeling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analyzing Hardware and Software Common Cause Failures in Digital Instrumentation and Control Systems using Dual Error Propagation Method

This paper develops a methodology for quantifying software common cause failures (CCFs) in digital instrumentation and control (I&C) systems of nuclear power plants. To support the transition of analog I&C systems to digital in nuclear power plants, probabilistic risk assessment (PRA) techniques are used. The hardware components of the I&C systems have reliability databases that can be used in the PRA studies. However, the failure data for redundant software components of the systems is sparse. Failure of components constitutes a CCF, wherein two or more components or systems fail due to a single shared cause and coupling mechanism. This paper proposes a quantification approach that can simultaneously model hardware and software components, incorporate the CCFs of software systems in the models, and bridge the gap between the failure quantification of models and the development of CCF parametric databases. We demonstrate the dual error propagation method (DEPM) by developing I&C systems failure models for a representative digital reactor trip system. The DEPM models are built to simulate the control and data flows within the systems and can accommodate failure states. By expanding DEPM to software CCFs, we generated alpha factor parameter estimates for each of the modeled error propagation mechanisms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of historic fires to determine most frequent challenging events

The fire probabilistic risk assessment framework for nuclear power plants relies on experimental data to determine expected fire behavior or to validate models to predict fire conditions in the plant. To support reducing the uncertainty in this experimental data, a research effort was conducted to identify the most frequent and challenging fire scenarios using historic fire data from nuclear power plants in the United States. To support this effort, an electronic version of the publicly available Updated Fire Event Database developed by Electric Power Research Institute was produced resulting in data on 2111 fire events, 540 events were labelled as being challenging fires with 74.2% of these challenging fire events being due to eleven selected fire types. In conclusion, of these fire types, electrical and electronic equipment, transient combustibles, and liquid fires were the most frequent of the challenging fires. The fire scenario specifics were characterized for each of the eleven selected types and then related to existing fire experiments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cost- and Risk-Based Seismic Design Optimization of Nuclear Power Plant Safety Systems

Seismic analysis, design, and qualification of systems, structures, and components (SSCs) is a significant contributor to the capital cost of a nuclear power plant. To reduce capital costs of advanced nuclear power plants and make commercial nuclear energy more competitive, innovations are needed in their structural design and construction, and not just in the reactor core and associated systems. Seismic isolation has been identified as an important cost-cutting technology that enables standardization of equipment across various sites. This paper develops and demonstrates a cost- and risk-based seismic design optimization of a representative safety system in a nuclear power plant with the dual goals of minimizing overnight capital cost and meeting safety goals. The design optimization can also include component seismic isolation, in which case, the optimized design includes a set of equipment that needs to be seismically isolated to minimize capital cost. The open-source codes MASTODON and Dakota are used for seismic probabilistic risk assessment and design optimization, respectively. A generic nuclear facility with a safety system comprising SSCs that are common to nuclear power plants is considered for the demonstration of the design optimization and is assumed to be located at the Idaho National Laboratory site. Generic costs and seismic design cost functions are assumed for the SSCs of the safety system. The sum of the costs of the SSCs is minimized in the optimization process, while the risk of failure of the safety system is provided as a constraint. Furthermore, results show that the optimization process reduces capital costs significantly while automatically prioritizing the safety of SSCs that contribute most to the risk of the safety system.

42 ENGINEERING↗

Report on High Energy Arcing Fault Experiments: Experimental Results from Open Box Enclosures

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena. The experiments focus on providing data to better characterize the arc to improve the prediction of arc energy emitted during a HEAF event. An open box experiment allow for direct observation of the arc, which allows diagnostic instrumentation to record the phenomenological data needed for better characterization of the arc energy source term. The data collected supports characterization of the arc and arc jet, enclosure breach, material loss, and electrical properties. These results will be used to better characterizing the hazard for improvements in fire probabilistic risk assessment (PRA) realism. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the NRC, the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA Labs. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setup and execution. The HEAF experiments were performed between August 22, 2020 and September 18, 2020 on near-identical 51 cm (20 in) cube metal boxes suspended from a Unistrut support structure. The three-phase arcing fault was initiated at the ends of the conductors oriented vertically and located at the center of the box. Either aluminum or copper conductors were used for the conductors. The low-voltage experiments used 1 000 volts AC, while the medium-voltage experiments used 6 900 volts AC consistent with other recently completed experiments. Durations of the experiment ranged from 1 s to 5 s with fault currents ranging from 1 kA to 30 kA. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers, radiometers, and slug calorimeters at various locations around the electrical enclosures. The experiments were documented with normal and high-speed videography, infrared imaging and photography.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗