Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A robust synthetic data generation framework for machine learning in high-resolution transmission electron microscopy (HRTEM)

Machine learning techniques are attractive options for developing highly-accurate analysis tools for nanomaterials characterization, including high-resolution transmission electron microscopy (HRTEM). However, successfully implementing such machine learning tools can be difficult due to the challenges in procuring sufficiently large, high-quality training datasets from experiments. In this work, we introduce Construction Zone, a Python package for rapid generation of complex nanoscale atomic structures which enables fast, systematic sampling of realistic nanomaterial structures and can be used as a random structure generator for large, diverse synthetic datasets. Using Construction Zone, we develop an end-to-end machine learning workflow for training neural network models to analyze experimental atomic resolution HRTEM images on the task of nanoparticle image segmentation purely with simulated databases. Further, we study the data curation process to understand how various aspects of the curated simulated data—including simulation fidelity, the distribution of atomic structures, and the distribution of imaging conditions—affect model performance across three benchmark experimental HRTEM image datasets. Using our workflow, we are able to achieve state-of-the-art segmentation performance on these experimental benchmarks and, further, we discuss robust strategies for consistently achieving high performance with machine learning in experimental settings using purely synthetic data. Construction Zone and its documentation are available at https://github.com/lerandc/construction_zone.

36 MATERIALS SCIENCE↗

Shuttle abort landing site emergency medical services

NASA and DOD studies of medical-planning and logistical problems are reviewed as applicable to providing emergency medical care at remote transoceanic abort landing (TAL) sites. Two options are analyzed including a modified surgical response team and a combination physician/medical technician team. The two concepts are examined in terms of cost-effectiveness, specific types of medical support such as blood procurement, and search-and-rescue requirements. It is found that the physician/technician team is more economically efficient, and the description of the concept permits the development of an effective TAL-site astronaut medical-support system. A balance is struck between the competing problems of cost and medical capability by planning for on-scene medical stabilization and air evacuation to DOD tertiary medical centers.

Mckenas, David K.↗

How Local Governments Can Buy Renewable Energy and Support Market Development

This webinar covers strategies local governments can consider to procure renewable energy and support renewable energy market development, including power purchase agreements (PPAs), virtual power purchase agreements (VPPAs), community solar, and more. This webinar also covers how the regulatory landscape impacts the RE purchasing options available to a particular community and highlight case studies from local governments across the U.S. that have successfully implemented these strategies, including Arlington, Virginia and Denver, Colorado. This webinar provides one AICP CM continuing education credit. Who: Chad Laurent, Esq., Principal, Cadmus Group; Jonathan Rogers, Renewable Energy Specialist, Office of Climate Action, Sustainability, Resiliency at the City and County of Denver; John Morrill, Energy Manager, Office of Sustainability & Environmental Management, Arlington County Department of Environmental Services

14 SOLAR ENERGY↗

Non-Power Purchase Agreement (PPA) Options for Financing Solar Deployment at Universities

Financing solar using power purchase agreements (PPAs) has facilitated solar deployment of more than 100 megawatts (MW) at universities--as compared to 50 MW facilitated by financing models not using PPAs. This brochure, which overviews existing financing models and funding mechanisms available for solar procurement, focuses on non-PPA financing models. For more information on solar deployment at universities using PPAs, refer to Using Power Purchase Agreements for Solar Deployment at Universities.

14 SOLAR ENERGY↗

High Tonnage Forest Biomass Production Systems from Southern Pine Energy Plantations

In this study, a high-tonnage harvesting system designed specifically to operate efficiently in the expected stand types of a bioenergy scenario was built, deployed, and evaluated in a production setting. Stands on which the system was evaluated exhibited the heavy stocking levels (> 600 stems per acre) and tree size distributions with significant volume in small stems (down to 2” DBH) that were expected in the modified energy plantation silvicultural approach. The harvest system also was designed to be functional in the traditional plantation stands dominating the commercial forestry landscape in the region. The Tigercat 845D feller buncher, which was a prototype machine designed for the high tonnage harvest system, used a boom-mounted prototype DT1802 shear felling head and incorporated a number of options intended to maximize its small-stem productivity, including: a high-speed shear severing system that was cheaper to operate than a saw; a large-pocket felling head that allowed larger accumulations of small stems to be built before expending the time to drop them for the skidder; efficient, low ground pressure, tracked carrier system to decrease the amount of maneuvering, saving time and minimizing soil disturbance; and various energy-saving devices to lower fuel costs and minimize air quality impacts. Overall, the feller buncher represented a quantum advance in small-stem harvesting technology. Extensive testing showed the machine’s production rate to be relatively insensitive to piece size, much less so than comparable traditional equipment. In plantation stands, the feller buncher was able to produce approximately 100 green tons of biomass per productive machine hour (PMH), and in natural stands, it produced nearly 120 green tons per PMH. The ability of the high tonnage feller buncher to maintain high productivity in stands with smaller diameter stems is something that has not been achieved in previous feller buncher designs. The Tigercat 845D feller buncher is now a production machine for Tigercat and is being sold in their current product line. The high-speed felling system was paired with a Tigercat 630D skidder and high-capacity grapple; one that could match the felling productivity when pulling small stems. The harvesting system minimized hourly costs using a single, high-capacity skidder (with a single operator), rather than two smaller ones, which is the traditional practice. The skidder itself can be considered a mid-range size and had an engine no larger than other machines in its class, but it incorporated a very large capacity 25 ft2 grapple. The large grapple is well suited to grabbing and hauling a large bunch of small-diameter trees, as produced by the high tonnage feller buncher. The grapple worked effectively in larger stems as well, but its ability to carry large numbers of small stems meant the average payload did not drop as stand DBH decreased. Tests with the machine indicated its travel speeds were nearly the same as, or perhaps slightly better than, conventionally equipped skidders, but grapple capacity was 75% larger. Productivity and cost per ton of the new skidder were better than conventional skidders for average skid distances of any length greater than 100 feet. Measured skidder productivity was as high as 143 gt/PMH. Its productivity exceeded that of the high-capacity feller buncher for skid distances out to nearly 700 feet, so system productivity could be expected to remain high for stands of a size typical in the southern U.S. The Tigercat 630D skidder is a production machine for Tigercat and the large grapple can now be ordered by customers using it for small diameter trees. When the feller buncher and skidder are analyzed as a two-machine system, overall productivity is fixed at the level of the least productive machine. Results from a set of side-by-side tests in the same density stand with conventional feller bunchers and skidders showed that the high tonnage system produced 97 gt/PMH versus 68 gt/PMH for a comparable conventional system. Machine rate costs for felling and skidding were $2.31/gt and $3.72/gt for the high tonnage, and conventional systems, respectively. However, the most significant result of the project is that the high tonnage system was shown to be relatively insensitive to tree size. This ability to maintain felling and skidding productivity and cost as tree size decreases is a breakthrough in harvesting systems for southern pine plantations. The concept of transpirational drying of woody biomass was tested at an industrial scale at multiple locations during this project. Felled trees were allowed to dry in two scenarios: 1) in bunches where they were felled, and 2) in roadside piles. Although the wood piled in large piles at roadside did experience drying, the wood left in bunches experienced a greater moisture reduction. Drying times of 72 days in the late summer resulted in mean wood moisture content of 26% for skidder bunches and 39% for the large pile at roadside as compared to moisture contents of 55% to 58% for freshly cut trees. An existing whole-tree chipper, Precision 2675, was modified to allow production of chips smaller than the traditional pulp size chip (i.e. “microchips”). Feed rates and knife placements were retained in the new design, while additional pockets were incorporated in the chipper disk to allow the attachment of either four knives for pulp chips or eight knives for microchips. This design facilitated switching between the energy and pulp chip product options at relatively low expense (about ½ day downtime). Chipping of whole-trees into pulp chips and microchips with the Precision 2675 disk chipper resulted in average productivities of 79.5 gt/PMH and 70.7 gt/PMH, respectively. Production rates of the chipper were lower when producing microchips by about 10% relative to producing pulp chips, but rates were similar to those achievable when making clean pulp chips. Particle size analysis for clean pine microchips revealed 26.6% retention on a 13 mm (slightly less than 3/8-inch) round hole screen and 25.9% retention for whole-tree pine microchips. For comparison, clean pine pulp chips had 52.2% retained. Ash content (% dry basis) was 0.54% for clean pine microchips and 0.62% for whole-tree pine microchips. Ash content for clean pine pulp chips was 0.39%. For transpirationally-dried material there was 38.1% retention for whole-tree microchips on a 13mm screen compared to 70.1% for dried clean pulp chips. Ash content was 0.78% and 0.44% respectively for these two chip types. Clean pine microchips stored at roadside had 25.2% retention on a 13 mm screen and 0.50% ash content. For mixed species (pine and hardwood), whole-tree microchips had 25.1% retention on a 13 mm screen compared to 50.6% for whole-tree pulp chips. Ash content was 2.12% and 2.74% respectively for these two chip types. Clean hardwood microchips stored at roadside had 35.0% retention on a 13 mm screen and an ash content of 1.24%. There are two significant advantages to using transpirational drying: reduced transportation costs, and reduced drying costs (capital and operating costs) for the biorefinery. This project evaluated the potential to reduce transportation costs through transpirational drying, and it included a component that tested higher capacity chip trailers (23% larger volume) to be able to transport dry wood with a lower bulk density. For transpirationally-dried chips at 35% MC, the high-capacity trailers achieved loads with a mean payload of 24 tons with maximum payloads of 29 tons. The typical legal payload on this trailer is 28.5 tons. Therefore, the project demonstrated that it is possible to achieve maximum legal payloads on chip trailers with transpirationally dried wood. Assuming that the truck is loaded to the legal payload limit, the transportation costs of chips can be reduced from $15.91/dry ton (dt) for 56% MC wood to $10.77/dt for transpirationally dried wood at 35% MC (for an example 50-mile haul distance at $0.14 per one-way ton-mile). For longer haul distances, these savings in trucking costs become even more significant. These results have demonstrated how significant savings in transportation costs can be achieved through transpirational drying. Also, these results show that it may be possible to increase the procurement radius for a biorefinery by using transpirational drying. Further cost reductions can be realized by the biorefinery when drying costs are reduced. The goal of this study was development of a timber harvesting system as productive in stands optimized for biomass production as it was in stands grown for roundwood markets. If that goal is achieved, a logger can invest in a single suite of equipment and operate efficiently in any future silvicultural regime that might include energy feedstocks as an output. It was the premise of the study that a future biomass market would shift the age distribution and stem size in stands grown for energy downward, and the key strategy in developing a harvest system for that scenario would be creating one with logging costs relatively insensitive to tree size. Our vision for such a system included a felling machine with a large capacity head to minimize time spent building bunches, plus a skidder capable of moving large volumes of small trees. The study proposed building the system and testing it against existing equipment in stands similar to those envisioned as resulting from biomass-optimized silviculture. As stated previously, the new feller buncher and skidder evaluated on their own merits showed their designs were clearly a step in the right direction - their productivity was indeed high and less sensitive to reductions in stem size. Cost projections based on extensive time and production studies of the high tonnage and benchmark operations showed modest advantages in FOB costs of the new system in both ‘average’ and simulated ‘energy’ stands (7.7% and 9.5%, respectively). But it was clear, when coupled into a traditional logging system, the in-woods productivity advantage of the modified equipment was easily overwhelmed by inefficiencies in chipping or trucking. Some additional savings can be achieved by spreading the cost of the feller buncher over multiple chipping operations (another 7.5%), but generally, in stands with average DBH above 6 inches, the in-woods equipment was not limiting productivity, and costs were driven by chipping and transport. Our results were a positive step in lowering delivered cost of trees grown for energy purposes, but they also argue strongly for a more comprehensive approach in solving this issue. The procurement system in its entirety has to be optimized to take full advantage of the productivity gains achieved with the machines and transpirational drying techniques developed in this project. We have to understand the true costs of all logistical options, particularly those of the choice in chipping strategy and in truck allocation, both of which seemed, in this study, to be the greatest source of variability in cost, and often the most expensive operations as well.

09 BIOMASS FUELS↗

Hardware Implementation and Market Impacts of Grid-Supportive Functions in End-Use Loads

Grid-supportive loads (GSLs) are power electronics-based end-use loads that can provide frequency response and other grid services by autonomously adjusting their output power using local grid measurements. This report provides details on GSL hardware design options and their associated costs and benefits for multiple devices, including EV chargers, refrigerators, and heat pumps. We consider mechanisms to incentivize adoption of GSLs at scale and estimate the quantity of frequency response that can be procured with GSLs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space station data system analysis/architecture study. Task 2: Options development, DR-5. Volume 3: Programmatic options

Task 2 in the Space Station Data System (SSDS) Analysis/Architecture Study is the development of an information base that will support the conduct of trade studies and provide sufficient data to make design/programmatic decisions. This volume identifies the preferred options in the programmatic category and characterizes these options with respect to performance attributes, constraints, costs, and risks. The programmatic category includes methods used to administrate/manage the development, operation and maintenance of the SSDS. The specific areas discussed include standardization/commonality; systems management; and systems development, including hardware procurement, software development and system integration, test and verification.

Source record↗

A programmable heater control circuit for spacecraft

Spacecraft thermal control is accomplished for many components through use of multilayer insulation systems, electrical heaters, and radiator systems. The heaters are commanded to maintain component temperatures within design specifications. The programmable heater control circuit (PHCC) was designed to obtain an effective and efficient means of spacecraft thermal control. The hybrid circuit provides use of control instrumentation as temperature data, available to the spacecraft central data system, reprogramming capability of the local microprocessor during the spacecraft's mission, and the elimination of significant spacecraft wiring. The hybrid integrated circuit has a temperature sensing and conditioning circuit, a microprocessor, and a heater power and control circuit. The device is miniature and housed in a volume which allows physical integration with the component to be controlled. Applications might include alternate battery-powered logic-circuit configurations. A prototype unit with appropriate physical and functional interfaces was procured for testing. The physical functionality and the feasibility of fabrication of the hybrid integrated circuit were successfully verified. The remaining work to develop a flight-qualified device includes fabrication and testing of a Mil-certified part. An option for completing the PHCC flight qualification testing is to enter into a joint venture with industry.

Nguyen, D. D.↗

Drawing 445754 rev5

Drawing 445754 contains the details for fabricating plastic flux wands used in ATR and ATRC. The flux wands are used to position flux wires in fuel elements. The flux wands are basically a tool to position the flux wires. The flux wires are later removed from the flux wands and counted to determine the amount of flux they received. The flux wands come in contact with reactor primary coolant, but do not control the primary coolant (this is in reference to 10 CFR Part 810). Additional wands need to be fabricated. This drawing needs to be sent to a vendor or vendors for procurement of new flux wands as done in the past. LWP-11201 rev 11 (pg. 27) indicates providing information to a vender is not a public release. This drawing does not need to be released to all of the public if that is an option. It just needs to go to a vendors or vendors. A vendor will likely need to see the drawing to determine if they can build the flux wands.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis

In support of the national goal to deploy 30 gigawatts of offshore wind by 2030, DOE’s Wind Energy Technologies Office has published an Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis. Transmission constraints— including both land-based transmission interconnections and offshore transmission—are expected to be one of the central challenges to meeting offshore wind deployment goals. Given current trends in offshore wind development, available technology, and state-level procurement goals, most of the first 30 GW of offshore wind are anticipated to be developed along the East Coast. This report summarizes current publicly available transmission analyses along the Atlantic Coast, as well as gaps in existing analyses. Improving understanding of offshore wind transmission options, establishing coordination and aligning processes among states and regions, and quantifying the long-term impacts of offshore wind transmission options will catalyze offshore wind energy’s growth and ensure adequate transmission and a reliable grid.

17 WIND ENERGY↗

CAD/CAM data management needs, requirements and options

The requirements for a data management system in support of technical or scientific applications and possible courses of action were reviewed. Specific requirements were evolved while working towards higher level integration impacting all phases of the current design process and through examination of commercially marketed systems and related data base research. Arguments are proposed for varied approaches in implementing data base systems ranging from no action necessary to immediate procurement of an existing data base management system.

Lopatka, R. S.↗

Advanced Nuclear Technology. Using Technology for Small Modular Reactor Staff Optimization, Improved Effectiveness, and Cost Containment, 3002007071

Through this grant, the U.S. Department of Energy (DOE) will review several functional areas within a nuclear power plant, including fire protection, operations and operations support, refueling, training, procurement, maintenance, site engineering, and others. Several functional areas need to be examined since there appears to be no single staffing area or approach that alone has the potential for significant staff optimization at new nuclear power plants. Several of the functional areas will require a review of technology options such as automation, remote monitoring, fleet wide monitoring, new and specialized instrumentation, human factors engineering, risk informed analysis and PRAs, component and system condition monitoring and reporting, just in time training, electronic and automated procedures, electronic tools for configuration management and license and design basis information, etc., that may be applied to support optimization. Additionally, the project will require a review key regulatory issues that affect staffing and could be optimized with additional technology input. Opportunities to further optimize staffing levels and staffing functions by selection of design attributes of physical systems and structures need also be identified. A goal of this project is to develop a prioritized assessment of the functional areas, and R&D actions needed for those functional areas, to provide the best optimization

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

In Situ Cold-Spray Repair of Environmental Mission Infrastructure for Component Life Extension - 19424

Cold spray offers a potential option for performing in situ repair of U.S. Department of Energy (DOE) complex infrastructure critical to the Office of Environmental Management cleanup mission. Application to the DOE complex has the potential to reduce cost, schedule, and safety risk impacts associated with component failures and would negate the need to procure and construct replacement infrastructure. A concept and technical basis are presented for developing remotely deployable cold-spray systems for performing in situ repairs in hazardous environments such as nuclear waste tanks, piping, and process vessels to extend component service life or return critical infrastructure to service. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Informationincludes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studieswith descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

14 SOLAR ENERGY↗

State Policies Provide Critical Support for Renewable Electricity

Growth in renewable energy in the U.S. over the past decade has been propelled by a number of forces, including rising fossil fuel prices, environmental concerns, and policy support at the state and federal levels. In this article, we review and discuss what are arguably the two most important types of state policies for supporting electricity generation from geothermal and other forms of renewable energy: renewables portfolio standards and utility integrated resource planning requirements. Within the Western U.S., where the vast majority of the nation's readily-accessible geothermal resource potential resides, these two types of state policies have been critical to the growth of renewable energy, and both promise to continue to play a fundamental role for the foreseeable future. In its essence, a renewables portfolio standard (RPS) requires utilities and other retail electricity suppliers to produce or purchase a minimum quantity or percentage of their generation supply from renewable resources. RPS purchase obligations generally increase over time, and retail suppliers typically must demonstrate compliance on an annual basis. Mandatory RPS policies are backed by various types of compliance enforcement mechanisms, although most states have incorporated some type of cost-containment provision, such as a cost cap or a cap on retail rate impacts, which could conceivably allow utilities to avoid (full) compliance with their RPS target. Currently, 27 states and the District of Columbia have mandatory RPS requirements. Within the eleven states of the contiguous Western U.S., all but three (Idaho, Utah, and Wyoming) now have a mandatory RPS legislation (Utah has a more-voluntary renewable energy goal), covering almost 80% of retail electricity sales in the region. Although many of these state policies have only recently been established, their impact is already evident: almost 1800 MW of new renewable capacity has been installed in Western states following the implementation of RPS policies. To date, wind energy has been the primary beneficiary of state RPS policies, representing approximately 83% of RPS-driven renewable capacity growth in the West through 2007. Geothermal energy occupies a distant second place, providing 7% of RPS-driven new renewable capacity in the West since the late 1990s, though geothermal's contribution on an energy (MWh) basis is higher. Looking to the future, a sizable quantity of renewable capacity beyond pre-RPS levels will be needed to meet state RPS mandates: about 25,000 MW by 2025 within the Western U.S. Geothermal energy is beginning to provide an increasingly significant contribution, as evidenced by the spate of new projects recently announced to meet state RPS requirements. Most of this activity has been driven by the RPS policies in California and Nevada, where the Geothermal Energy Association has identified 47 new geothermal projects, totaling more than 2,100 MW, in various stages of development. Additional geothermal projects in Arizona, New Mexico, Oregon, and Washington are also under development to meet those states RPS requirements. The other major state policy driver for renewable electricity growth, particularly in the West, is integrated resource planning (IRP). IRP was first formalized as a practice in the 1980s, but the practice was suspended in some states as electricity restructuring efforts began. A renewed interest in IRP has emerged in the past several years, however, with several Western states (California, Montana, and New Mexico) reestablishing IRP and others developing new rules to strengthen their existing processes. In its barest form, IRP simply requires that utilities periodically submit long-term resource procurement plans in which they evaluate alternative strategies for meeting their resource needs over the following ten to twenty years. However, many states have developed specific requirements for the IRP process that directly or indirectly support renewable energy. The most general of these is an explicit requirement that utilities evaluate renewables, and that they do so on an 'equivalent' or 'comparable' basis to conventional supply-side generation options. Many states also require that utilities include various types of risk analyses within their IRP. For example, utilities are often required to evaluate fuel price risk within their resource plan, which can reveal the value of renewables as a hedge against rising and volatile fuel prices. Of particular importance for supporting renewable energy is the increasingly common requirement that utilities evaluate the potential costs and risks associated with future greenhouse gas regulations. Virtually all of the major Western utilities that prepare IRPs incorporated future carbon dioxide regulations in their analyses of alternative resource strategies in their most recent resource plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Data Interconnection Exploration

This project involves innovating the way the Quality Assurance organization at the Jet Propulsion Laboratory (JPL) tracks the receiving inspection of JPL Critical Items (JCI) procured from suppliers. The Quality Assurance organization uses a Microsoft Access based front-end to enter items into an inspection queue. The current design has grown to be much more than was expected when the inspection queue system was created in 2007. The goal is to migrate to a web based solution that will allow the handling of more data, multiple input interfaces, and customizable display options. This has been achieved by implementing a divided tables scheme, the use of ColdFusion programming language, and the usage of Web 2.0 technologies such as AJAX and jQuery. These updates will allow for future expansion as well as the standardization of inspection queues for the Quality Assurance organization. When engineers and scientists order flight hardware, they cannot use it straight away. After a spacecraft or a satellite has been launched, it will be impossible to repair; therefore, the parts used must be inspected to make sure they are operating correctly and within the required specifications. The task of inspecting these JPL Critical Items (JCI) falls on the Quality Assurance organization. One of the tools the receiving inspection group uses is a database to maintain a queue of inspections that need to be done and of inspections that have been completed. The current Access interface has worked well but increased amounts of data, multiple input interfaces, and changes to how data is handled have made it necessary to seek a new way of organizing items for inspection. In addition, the different inspection groups have recently been merged and each has different ways of keeping track of inspection information. The ultimate goal is for the new group to have one shared inspection queue and website. To achieve this goal, I have been working with Ian Luczon of Procurement Quality Assurance and 3 Myers Hawkins, another intern, to not only create the new queue for receiving inspection but also a central web portal for the newly combined inspection group.

flight hardware↗

Institutional and Policy Landscape for Solar-Plus-Storage Deployment by Electric Cooperatives

As co-location with battery storage has become a significant solar project-design trend across the United States, policies at all levels have started to adjust. Generally, these policies address battery storage development in major, urban markets, served by large investor-owned utilities (IOUs). Yet all kinds of utilities nationwide are seeking ways to tap into the fast-growing battery storage market, and they are all stakeholders in the federal, state, and local policies that impact the storage market's development. The electric cooperative sector, which includes some 830 distribution utilities and 63 generating and transmission (G&T) utilities across a mostly rural landscape, is no exception. It is impacted by federal, state, and local government policy requirements and incentives, as well as by policies that are controlled by the sector's own institutions. The objective of this paper is to identify and discuss the various policy and institutional factors that are relevant to the electric cooperative sector, and especially to local, distribution-level electric cooperatives (co-ops) that may be interested in procuring energy storage. Given this, the paper is largely written from the local co-op perspective. It also may be useful to wholesale G&T cooperatives. Other parties that may find the paper useful include storage developers, who are often unfamiliar with co-ops; local and state policymakers addressing policy options for this sector, and local renewable or storage stakeholders, who wish to understand the policy landscape affecting their local utility. Although co-op energy storage programs may tap customer-side batteries, this examination is focused on utility-side "front of the meter" projects and the policy issues they raise.

14 SOLAR ENERGY↗