James Webb Space Telescope - Applying Lessons Learned to I&T

The James Webb Space Telescope (JWST) is part of a new generation of spacecraft acquiring large data volumes from remote regions in space. To support a mission such as the JWST, it is imperative that lessons learned from the development of previous missions such as the Hubble Space Telescope and the Earth Observing System mission set be applied throughout the development and operational lifecycles. One example of a key lesson that should be applied is that core components, such as the command and telemetry system and the project database, should be developed early, used throughout development and testing, and evolved into the operational system. The purpose of applying lessons learned is to reap benefits in programmatic or technical parameters such as risk reduction, end product quality, cost efficiency, and schedule optimization. In the cited example, the early development and use of the operational command and telemetry system as well as the establishment of the intended operational database will allow these components to be used by the developers of various spacecraft components such that development, testing, and operations will all use the same core components. This will reduce risk through the elimination of transitions between development and operational components and improve end product quality by extending the verification of those components through continual use. This paper will discuss key lessons learned that have been or are being applied to the JWST Ground Segment integration and test program.

Johns, Alan↗

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems

In late fiscal year 2020, the Space Nuclear Propulsion (SNP) project began the process of formulating an investment strategy to support development of the technologies required for a high-power (megawatt-class) nuclear electric propulsion (NEP) system capable of performing human-scale missions. This activity was initiated concurrent with several high-level studies and assessments were either under way or had just concluded. Studies of human-scale Mars missions have been performed several times over the past two decades. One of the most recent studies examined opposition-class human Mars missions to occur in the late 2030s timeframe [1,2]. The mission architecture assumed a hybrid NEP/chem-propelled vehicle that used a high specific impulse (Isp) NEP-system and a liquid oxygen (LOx)-liquid methane high thrust chemical stage (two 110 kN (25 klbf) thrust, 365 s Isp engines) for maneuvers performed to enter and exit gravity wells. Trajectory analyses performed in this study showed that such a mission could be performed with 2-4 MWe directed into the electric propulsion system (operating for 20,000+ hours), with the large range representing different opposition-class Mars mission opportunities and permutations on the trajectory design, concept of operations, and technology choices. In 2020, the NASA Engineering and Safety Center (NESC) performed a study to evaluate the maturity of the different technologies required for nuclear propulsion systems [3]. The executive summary of this report provided the following top-level conclusions: • “The majority of critical technologies for… NEP/Chem… systems are relatively immature” • “TRLs [technology readiness levels] in the literature are often overestimated” • “The majority of critical technologies… for NEP/Chem… systems are at a relatively high level of advancement degree of difficulty (AD2 > 4) for maturation, requiring a dual development approach” • “The proper assessment of baseline TRL and AD2 values and the estimation of requirements and resources required for advancement have been consistent issues for NEP,” • “Non-advocate reviews should occur at the start of a technology program and at all key milestones.” In 2021, the National Academies of Science, Engineering, and Medicine (NASEM) issued a separate report [4] identifying the “primary technical and programmatic challenges, merits, and risks for maturing space nuclear propulsion technologies of interest to a future human Mars exploration mission.” That work contained several important findings, including: • “Developing a MWe-class NEP system for the baseline mission would require increasing power by orders of magnitude relative to NEP system flight- or ground-based technology demonstrations completed to date.” • “Subscale in-space flight testing of NEP systems cannot address many of the risks and potential failure modes associated with the baseline mission NEP system. With sufficient M&S [modeling & simulation] and ground testing, including modular subsystem tests at full scale and power, flight qualification requirements can be met by the cargo missions that will precede the first crewed mission to Mars. Fully integrated ground testing may not be required.” • “As a result of low and intermittent investment over the past several decades, it is unclear if even an aggressive program would be able to develop an NEP system capable of executing the baseline mission in 2039.” These efforts motivated the SNP project to investigate the technologies available for a megawatt-class high power nuclear electric propulsion system. That system is illustrated schematically in Figure 1 and is comprised of five separate top-level critical technology elements (CTEs). 1. Nuclear Reactor – Thermal power source for the system, utilizing high-assay low enriched uranium (HALEU) as the nuclear fuel. Reactor radiation shielding is also included in this CTE. 2. Power Conversion – Operates as a thermodynamic cycle, accepting nuclear reactor thermal power as an input and converting it to mechanical power. 3. Power Management and Distribution (PMAD) – Accepts as an input mechanical power from the power conversion system, which is used to generate electrical power. The PMAD system also distributes the generated electrical power to all other parts of the spacecraft, including the high-power EP system. The PMAD system may also perform duties such as isolation, fault detection, and power transformation/rectification for different spacecraft systems, including the thrusters. 4. Electric Propulsion (EP) – Accepts as an input electrical power, which is used to accelerate a propellant to high speeds to produce thrust. This system includes the power processing unit (PPU), which converts the power it receives to the correct current and voltage required by the thrusters, and the propellant storage and feed systems, which contain and meter the flow of propellant to the thrusters. 5. Thermal Management (Radiators/Heat Rejection) – The cold side of the thermodynamic power conversion cycle, accepts thermal power from the power conversion system and radiatively rejects that heat to space. In this paper, we describe the SNP project formulation and investment strategy that aims to accomplish the research and development required to advance the technology readiness for each CTE. The strategy relies heavily upon experimental testing supported by modeling and simulation to yield realistic assessments of the technologies, which in turn will be used to inform future NEP system-level design decisions and any potential technology downselects.

Kurt A Polzin↗

Digital Prototyping Methods to Enable Product Development Analysis Cycle Compression in Aerospace Systems

Historically, the product development life cycle (spanning from origination of a systems concept to initial delivery or fielding) for large-scale aerospace systems is 10-25 years. Examples of recent programs exhibiting this timeline are the Space Shuttle (13 years), , International Space Station (18 years), NASA Hubble telescope (16 years), USAF F-35 Strike Fighter (22 years), Missile Defense Agency THAAD (21 years), USAF V-22 Osprey (26 years), USAF B-2 Spirt (19 years), US Army RAH-66 Comanche (22 years, cancelled prior to fielding), James Webb Space Telescope (25 years), Space Launch System (10 years). This list illustrates the challenges of developing and fielding a modern integrated multi-disciplinary aerospace system. These development timelines are often preceded by significant research and development programs and followed by multiple increments, blocks, or spirals to reach planned operational capability. In the modern era of aerospace system acquisition, there is significant pressure to reduce system development timelines to meet system objectives and enable competitiveness in the current industry and landscape. Across the aerospace industry, a range of rapid acquisition and prototyping programs are seeking to achieve system development within timelines considerably less than 10 years. Notably, in September of 2019, NASA issued a solicitation for the development and demonstration of a Human Landing System (HLS) to deliver humans to the lunar surface by 2024 (5 years) and for the development and demonstration of a more sustainable HLS by 2026 (7 years). Lengthy product development cycle timelines are a product of multiple factors ranging from programmatic, sociological, technical, and systems engineering issues. New approaches in systems engineering provide new ways to enable these compressed development timelines. These approaches employ expanded application of advanced systems engineering methods and cross-cutting digital tools to accelerate system development, utilizing digital prototyping to connect maturing sub-system or component technologies into system or system-of-systems hardware prototypes. Approaches such as the use of system integrating physics relationships to reduce the number of design analysis cycle iterations and state analysis modeling to reduce necessary software testing (and improving coverage of system execution scenarios) represent steps forward in reducing the engineering time needed to field new systems. In addition to cost, schedule and performance benefits, expanded digital exploration and demonstration reduce risk in live system test and demonstration. This incremental demonstration approach, where digital prototyping and demonstration leads and informs full system test and demonstration, could be more important for space applications because of the increased difficulty of test and demonstration of space systems and architectures. The Advanced Concepts Office (ACO) at Marshall Space Flight Center merges traditional multi-disciplinary concept definition methods with modern, cross-cutting systems engineering concepts to enable iterative design and analysis of space architectures and systems through coordinated, strategic management of human capital, technical processes, and technology. This paper provides an overview of that approach, including recent examples and a strategic path forward to enabling continued reduction of aerospace system product development life cycles.

Michael D Watson↗

2019 Wireless Test Bed Range Manual

Idaho National Laboratory (INL), Next Generation Wireless Test Bed (NGWTB) program, is part of the Critical Infrastructure Protection (CIP) initiative. Our nation’s reliance on wireless and Internet technology is rapidly evolving as more corporations and government agencies, employees, and handheld devices include mobile connectivity for both voice and data. The competitive advantage offered by a mobile workforce is leading many corporations to make wireless integration and convergence a top business priority. Similarly, military systems worldwide are rapidly embracing next-generation commercial technologies to accelerate network-centric capabilities and provide enhanced situational awareness. While handheld devices such as laptops, BlackBerrys, and cell phones once had limited mobility and range, they are rapidly incorporating new and multiple protocols such as Bluetooth, Wi-Fi, Satellite, and broadband cellular (3G/4G) on a single platform to increase their effectiveness and agility. Worldwide there is exponential growth in public Wi-Fi and/or Satellite connectivity access nodes, and 3G/4G cellular continues to evolve and expand the range and speed of these devices. Additionally, critical infrastructure networks, previously isolated or connected with dedicated wireline circuits, are incorporating Zigbee for wireless sensor networks, wireless LANs for maintenance functions, and cellular or Internet based backhaul to manage control centers. Yet with all the build-up surrounding wireless technology, few understand the complexities surrounding wireless protocols and security, the risks of converged network infrastructures, need for interoperability of communication systems, or mitigation measures to safely use and improve new technologies in both commercial and military environments. With no single vendor source for all the telecommunications equipment needed for wireless infrastructure upgrades, and no one entity providing end-to-end testing or independent validation, the INL's NGWTB program fulfills a niche for facilitating integrated testing of multiple technologies, across multiple wireless domains, of next generation wireless telecommunications systems. NGWTB engineers and technicians have constructed and operate domain infrastructure in the Wireless Personal Area Network (WPAN), Wireless Local Area Network (WLAN), Wireless Metropolitan Area Networks (WMAN), and Wireless Wide Area Networks (WWAN). Advantages that make the INL's NGWTB the place to conduct project and programmatic testing include: • NTIA Experimental Station authority • Geographically isolated and low-noise radio frequency (RF) test areas located on a 890 sm DOE reservation • Access to isolated high-speed LAN and FOT networks The rollout of next-generation networks will involve deploying new technologies at every level including new: handsets, frequencies, antenna arrays, cell configurations that are optimized for both data and voice, massive upgrade of cell controllers’ “land-line” phone links from low bandwidth connections to higher capacity fiber or wireless backhaul, and integration of voice switching and Internet/data network protocols (Voice-Over-IP, Web phones). These systems are expected to greatly transform our nation's communications infrastructure and the types of services it provides.

2G↗

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A lowcost, portable, and end-to-end photovoltaic-system test appropriate for NASA's new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metalhalide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, highfidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility. At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendor's panellevel data and periodic inspection, the method ensures system integrity from Integration and Test (I&T) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

power systems↗

Low-cost, Risk-Reduction Testing of Class D Spacecraft Photovoltaic Systems

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A low-cost, portable, and end-to-end photovoltaic-system test appropriate for NASAs new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metal-halide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, high-fidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility.At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendors panel-level data and periodic inspection, the method ensures system integrity from Integration and Test (IT) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

photovoltaic↗

NASA’s Space Launch System: Exploration Mission-1 Hardware Nears Completion

The Space Launch System (SLS) Program completed several significant production milestones in 2018 for the launch vehicle’s first mission (Fig. 1) and is poised for greater accomplishments in 2019. With manufacturing and hardware installation finished, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The upper stage, the Interim Cryogenic Propulsion Stage (ICPS), and the Orion Stage Adapter (OSA), where 13 6U CubeSats will ride to deep space on EM-1, were completed and delivered to Exploration Ground Systems at KSC in 2017 and 2018, respectively. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗

Results From the John Glenn Biomedical Engineering Consortium. A Success Story for NASA and Northeast Ohio

The John Glenn Biomedical Engineering Consortium was established by NASA in 2002 to formulate and implement an integrated, interdisciplinary research program to address risks faced by astronauts during long-duration space missions. The consortium is comprised of a preeminent team of Northeast Ohio institutions that include Case Western Reserve University, the Cleveland Clinic, University Hospitals Case Medical Center, The National Center for Space Exploration Research, and the NASA Glenn Research Center. The John Glenn Biomedical Engineering Consortium research is focused on fluid physics and sensor technology that addresses the critical risks to crew health, safety, and performance. Effectively utilizing the unique skills, capabilities and facilities of the consortium members is also of prime importance. Research efforts were initiated with a general call for proposals to the consortium members. The top proposals were selected for funding through a rigorous, peer review process. The review included participation from NASA's Johnson Space Center, which has programmatic responsibility for NASA's Human Research Program. The projects range in scope from delivery of prototype hardware to applied research that enables future development of advanced technology devices. All of the projects selected for funding have been completed and the results are summarized. Because of the success of the consortium, the member institutions have extended the original agreement to continue this highly effective research collaboration through 2011.

Nall, Marsha M.↗

Assessment of Survey Results from Advanced Reactor Industry Domain Experts on Nonlinear Soil-Structure Interaction Analysis Software Verification and Validation

The seismic load case has a significant impact on the design and cost of nuclear power plants. Given the need to substantially reduce cost, advanced reactor designers are looking to leverage numerical tools that enable seismic analysis of an integrated vessel/support/structure/soil system. Modern nonlinear analysis tools provide a solution, capturing dynamic coupling between components (including soil-structure interaction (SSI)) concurrent with nonlinear behavior in one or more parts of the system. Although these methods have a rich history of technical development and implementation, software quality assurance (SQA) following nuclear industry standards remains a significant burden for those wishing to adopt such methods for advanced reactor design and licensing. To reduce the SQA burden, this project will develop the guidance for SQA verification and validation (V&V) of coupled nonlinear SSI analysis tools, to include a test matrix of software features and test problems to support commercial grade dedication (CGD). The guidance is intended to be technology-neutral: supporting designers of all advanced reactors. To maximize the value of the project to reactor designers, the project team performed focused surveys of and interviews with advanced reactor designers. Additionally, the project surveyed members of the broader industry involved in reactor design and licensing. The aggregated industry feedback consists of written survey responses, live polling responses, focused interviews, and informal feedback provided after outreach presentations, collectively referred to as “survey results”. Herein, the survey results are reported, reviewed, and assessed to inform follow-on project activities. The survey results confirmed the familiarity of the industry with the coupled nonlinear SSI analysis. They also affirm the project need based upon the expressed intent to (1) incorporate nonlinear features and (2) pursue the coupled nonlinear SSI analysis to reduce seismic demands and construction costs. All reactor designers indicated their intent to incorporate two or more nonlinear features, and all reactor designer respondents opined that the coupled nonlinear SSI analysis would allow for the optimization of the reactor design and construction. However, the programmatic challenges, whether real or perceived, present a significant barrier to reactor designers. The barrier most commonly identified by the reactor designer population was regulatory risk, with 70% citing this as a reason not to pursue the approach. The perceived regulatory risk identified by the reactor designers underscores the importance of regulator engagement and dialogue in this project. Additionally, half of the reactor designers identified cost and lack of guidance as a deterrent. The survey results also provide insights to tailor specific aspects of the guidance document and test matrix. The project plans to prepare both a formal referenceable guidance document and a collaborative, web-based test matrix and problem set. The project will focus on more complete test problem definitions for the prioritized nonlinear features over shallower problem descriptions for a larger set of features. The nonlinearities prioritized as high based upon survey feedback include fluid-structure interaction and seismic isolation and energy dissipation devices. The nonlinearities prioritized as intermediate include nonlinear geomaterials, nonlinear concrete, nonlinear steel, and interface/contact nonlinearity. Deep embedment and the associated nonlinear phenomena are assigned the lowest priority based upon survey feedback.

42 ENGINEERING↗

Integrated Commercial Carbon Capture and Storage (CCS) Prefeasibility Study at Rock Springs Uplift, Wyoming (Final Report)

To establish the potential of safe, long-term commercial-scale carbon capture & storage (CCS) in southwestern Wyoming, the University of Wyoming formed a CCS coordination team (CCT) to complete a Phase I CarbonSAFE pre-feasibility study adjacent to the region’s largest coal-fired power plant, the Jim Bridger Plant (JBP). The study’s primary objective was to evaluate the potential of storing 50+ million metric tons of anthropogenic carbon dioxide (CO 2 ) in stacked reservoirs over a period of 25 years. In addition, this integrated study evaluated related aspects of carbon capture utilization & storage (CCUS) at the study site, including: (1) the CO 2 character of post-combustion flue gas from JBP and the technical capacity for retrofitting proven commercial-scale CO 2 capture technology relative to CO 2 source character and technological constraints; (2) utilization of the existing CO 2 pipeline network in the immediate vicinity of JBP for enhanced oil recovery (CO 2 -EOR) and utilizing that network as part of a regional hub for CO 2 storage from other anthropogenic sources; (3) assessment of the challenges and benefits of meeting all of CarbonSAFE programmatic Phase I goals relative to Wyoming’s carbon management regulatory framework; and (4) assessment of the community and environmental factors that may impact CCS at JBP. With respect to storage, we analyzed the potential of stacked Mesozoic reservoirs at the study site, focusing on the Entrada and Nugget sandstones. The reservoir response to injection simulations varied greatly between formations, though they both were capable of CO 2 storage. The Entrada Sandstone is relative thin (~40’) and heterogeneous; storage using one injection and production well was limited to 1.2 Mt over 25 years at the study site. The Nugget Sandstone is much thicker (> 400’) and generally homogeneous; storage using one injection and production well approached 15.0 Mt over 25 years; this scenario suggests that the storage potential in the Nugget Sandstone is close to the estimated P90 calculation of 9.6 Mt/mi 2 as models indicate a storage potential of 8.3 Mt/mi 2 at saturation. Both reservoirs’ storage capacity benefited greatly from coupling an injection well with an offset production well; total storage capacity increased and reservoir pressure stayed below critical thresholds. This indicates that implementing a pressure management strategy at the study site would optimize storage and decrease risk. Seals associated with the targeted reservoirs were shown to be capable of retaining the potential storage volumes, and the site benefits from multiple seal redundancies (i.e. > 7,000’ of seal formations). Furthermore, assessment of different reservoir variables (e.g., fluid composition, pressure, etc.) indicates all reservoirs at the study site are isolated. Storage assessments from Mesozoic reservoirs were coupled with simulations from the site’s Paleozoic reservoirs (the Weber Sandstone and Madison Limestone), which were the focus of previous study. The fully integrated stacked reservoir pre-feasibility studies suggest that the Nugget and Madison formations alone could safely store 50 million metric tons of CO 2 within the study site. Furthermore, both formations are true saline reservoirs near JBP, making them ideal target reservoirs for CO 2 sequestration. Analysis of Wyoming’s laws and regulations confirm that the State has a favorable policy environment for CCS/CCUS. The project’s economic models estimated that the following revenues collectively are sufficient to finance the project over its lifespan if CO 2 utilization is coupled with CCS via the following strategies: (1) sales of CO 2 for EOR (approximately $69 million/year); (2) use of CO 2 tax credits such as amended §45Q and §48A (approximately $484 million total); and (3) sales of low-carbon electricity and marketable carbon offset/credits into carbon-constrained markets (approximately $11-$17 million/year) to West Coast consumers. These revenue estimates are broadly consistent with other studies that concluded arbitrage in JBP retail electricity sales between California and Wyoming could help to support the cost of deploying CCS at JBP. The models also indicate that maintaining a successful business case for long-term CCS -- wherein associated capture, transportation and operational costs are fully addressed at JBP -- is reliant on numerous external factors that complicate predictions. This study suggests that this site meets the CarbonSAFE program’s requirements of being able to feasibly store 50+ million metric tons of CO 2 over 25 years within the site’s stacked reservoirs, especially if coupled with pressure management strategies. This study suggests that the Nugget Sandstone and the Madison Limestone are two of the best reservoirs in the State with respect to overall storage capacity. In addition, the site’s proximity to existing CO 2 transportation networks, CO 2 -EOR opportunities, ability to sell to markets that value low-carbon electricity, Wyoming’s existing carbon regulatory framework, and a public that is well-educated with respect to energy markets and issues collectively increase the potential for implementing commercial-scale CCS adjacent to the JBP. With respect to the available technical and non-technical site data, and the reservoir quality at the study site, we suggest that this site is capable of moving directly into Phase III of the CarbonSAFE program.

01 COAL, LIGNITE, AND PEAT↗

The role of small missions in planetary and lunar exploration

The Space Studies Board of the National Research Council charged its Committee on Planetary and Lunar Exploration (COMPLEX) to (1) examine the degree to which small missions, such as those fitting within the constraints of the Discovery program, can achieve priority objectives in the lunar and planetary sciences; (2) determine those characteristics, such as level of risk, flight rate, target mix, university involvement, technology development, management structure and procedures, and so on, that could allow a successful program; (3) assess issues, such as instrument selection, mission operations, data analysis, and data archiving, to ensure the greatest scientific return from a particular mission, given a rapid deployment schedule and a tightly constrained budget; and (4) review past programmatic attempts to establish small planetary science mission lines, including the Planetary Observers and Planetary Explorers, and consider the impact management practices have had on such programs. A series of small missions presents the planetary science community with the opportunity to expand the scope of its activities and to develop the potential and inventiveness of its members in ways not possible within the confines of large, traditional programs. COMPLEX also realized that a program of small planetary missions was, in and of itself, incapable of meeting all of the prime objectives contained in its report 'An Integrated Strategy for the Planetary Sciences: 1995-2010.' Recommendations are provided for the small planetary missions to fulfill their promise.

Source record↗

The TPS Advanced Development Project for CEV

The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design, certification testing, procurement, and integration of the CEV TPS.

Reuther, James↗

Los Alamos National Laboratory Ten-Year Site Plan FY 2016

The Los Alamos National Laboratory will continue to face a significant challenge over the next 25 years in balancing near-term needs while transforming the infrastructure to ensure long-term viability. The 2014 Los Alamos National Laboratory Strategic Plan emphasized that infrastructure must be modernized and maintained to fulfill diverse, complex, and evolving missions in a period of fl at or decreasing budgets. The large number of existing facilities will continue to age while safety, security, sustainability and compliance requirements will likely increase. The Laboratory must also continue to act as an environmental steward, reduce environmental risk, and improve sustainability. This plan identifies strategies that will enable the Laboratory to provide a flexible, responsive infrastructure within available resources. At the end of the 25 year period, the Laboratory will have achieved the following: New facilities construction and enduring facilities reinvestment to support critical capabilities; Improved energy efficiency and long-term sustainability practices; Modernized utility infrastructure to support future programmatic needs; Legacy cleanup and long-term environmental stewardship goals; Footprint reduction and nuclear infrastructure consolidation. Even in the face of new and significant pressures, the Laboratory will continue to take substantial steps to streamline operations, modernize the infrastructure, and fulfill its vision of being the premier national security science laboratory. The fiscal year (FY) 2016 Ten-Year Site Plan (TYSP) is consistent with previous TYSPs and incorporates updated information in accordance with National Nuclear Security Administration (NNSA) guidance. The TYSP is a vital planning component to meet the NNSA commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory’s missions and workforce. Emphasizing the Laboratory’s core capabilities, this TYSP reflects the Laboratory’s role as a prominent contributor to NNSA missions through its programs and campaigns.

99 GENERAL AND MISCELLANEOUS↗

X-43D Conceptual Design and Feasibility Study

NASA s Next Generation Launch Technology (NGLT) Program, in conjunction with the office of the Director of Defense Research and Engineering (DDR&E), developed an integrated hypersonic technology demonstration roadmap. This roadmap is an integral part of the National Aerospace Initiative (NAI), a multi-year, multi-agency cooperative effort to invest in and develop, among other things, hypersonic technologies. This roadmap contains key ground and flight demonstrations required along the path to developing a reusable hypersonic space access system. One of the key flight demonstrations required for systems that will operate in the high Mach number regime is the X-43D. As currently conceived, the X-43D is a Mach 15 flight test vehicle that incorporates a hydrogen-fueled scramjet engine. The purpose of the X-43D is to gather high Mach number flight environment and engine operability information which is difficult, if not impossible, to gather on the ground. During 2003, the NGLT Future Hypersonic Flight Demonstration Office initiated a feasibility study on the X-43D. The objective of the study was to develop a baseline conceptual design, assess its performance, and identify the key technical issues. The study also produced a baseline program plan, schedule, and cost, along with a list of key programmatic risks.

Johnson, Donald B.↗

In Space Assembled Telescope (ISAT) Study Preliminary Findings

“When is it advantageous to assemble telescopes in space rather than deploying them from launch vehicle fairings”? This question forms the crux of the objectives of a NASA study we have been conducting in collaboration with colleagues from different NASA centers, industry and academia. In this study, we have engaged a broad cross section of experts from the various fields of optics engineering, that is, telescope design and instrument design, structure and thermal engineering, robotics, launch system engineering, orbital mechanics, integration and testing, astrophysics, and NASA programmatics among others. Initial efforts began with a quick review of the current state of art of the component technologies that contribute towards an in-space assembled telescope. Then, leveraging the collective expertise of the diverse group of experts, we formulated a reference telescope design and attempted to develop a baseline approach to modularize the telescope into components amenable for robotic assembly. The group identified different trades associated with modularization and also developed a set of criteria to discern between the different options as revealed by the trades. Based on the modularization of the telescope, we will assess the impact of various launch vehicles, orbits for assembly and operation, robotic systems and operational approaches, and other related variables. From this, a concept to assemble the reference telescope in space from modular components will be developed. Based on this concept, and definition of the modules, we will develop a mission lifecycle plan for an assembled telescope over different phases of preliminary design, detailed design, assembly-test-and-integration, and in space operations. The mission lifecycle plan will be used to evaluate cost and risk implications of in-space assembly toward answering our fundamental question of the advantages, if any, of assembling a telescope in space as compared to self-deployment. In this paper, we summarize the objectives of the study, a review of the status of the underlying component technologies, a description of the methodology, including three different multi-day technical interchange meetings (TIMs), summary of findings from the TIMs and other related activities. In addition, a detailed description of the various factors that impact in-space assembly, their interplay and criteria for discerning among them, a preliminary description of the life cycle plan, including the test and integration plan, and initial observations on cost and risk implications will be included in the paper.

Mukherjee, Rudranarayan↗

Identifying and Closing Medical Capability Gaps for Human Spaceflight Missions Beyond Low Earth Orbit

BACKGROUND: Features of human space missions beyond low Earth orbit such as increasing distance from Earth, lack of real-time communication, and limited or no evacuation or resupply capability are expected to drive an increase in medical risk and require crews to operate in an increasingly autonomous fashion. A diverse set of stakeholders at NASA are seeking to fund the development of concepts of operations, medical requirements, and medical capabilities for such missions. However, a systematic approach to identification of current medical capability gaps and a strategic framework to gap closure is needed. OVERVIEW: The Exploration Medical Integrated Product Team (XMIPT) has developed a list of nine high-level medical capability gaps and associated activities required for gap closure. The list was derived based on inputs from subject matter experts at NASA including flight surgeons, other clinical providers, as well as operational and research communities regarding medical capabilities required to support human missions to the Moon and the Mars surface. Responses were reviewed and distilled to identify common themes across capabilities. To ensure alignment with established human system risks, the gap list was further refined based on inputs from NASA’s Human System Risk Board. Relevant medical gap closure activities outside of those funded by the XMIPT were identified through solicitation of inputs from Elements of NASA’s Human Research Program (particularly Exploration Medical Capability), the broader medical operations community, and other stakeholders. This medical capability gap list is reviewed and updated regularly as new information becomes available or new stakeholders are identified. DISCUSSION: The medical capability gap list has matured to include a large group of NASA stakeholders and development activities. This has enabled articulation of priorities to funding entities and programmatic stakeholders, while serving as an accessible resource summarizing gap closure activities, relevant programmatic infusion points, and opportunities for collaboration between stakeholders. This presentation will provide an overview of the nine NASA medical capability gaps and their associated gap closure activities.

Moriah Thompson↗

Having a Come-Apart: Lessons Learned from Additively Manufactured Hardware Failures

NASA has been engaged with additively manufactured (AM) process and component development since the 2000’s. AM offers various technical advantages, such as enhanced hardware design complexity, part consolidation, and processing of novel alloys in addition to programmatic advantages for reduction in processing time and cost. The focus of much of the AM development at NASA has been to mature the various processes, characterize material properties, develop standards, produce demonstrator parts, and integrate AM hardware in liquid rocket engines. These aspects have been demonstrated through process and design iterations using a methodical characterization, test-fail-fix cycles, as well as application and dissemination of lessons learned. In addition to these fundamental demonstrations of the AM process and hardware development, alloys that provide performance advantages in the high temperature and high-pressure environments have been matured for use in rocket engines. These environments are challenging for any alloy and any design, and the AM process is required to fully meet the intended design requirements. The importance of proper AM process was made evident in the failure of a Laser Powder Bed Fusion (L-PBF) copper-alloy combustion chamber during a hot-fire test due to a degraded material quality resulted from an AM process issue. The hot-fire test aimed to demonstrate high duty cycle under a risk-tolerant development project, where consequences of component failure would be minimal. However, the unintentional component failure emphasized the necessity of robust material characterization and rigorous process control procedures for the safe use of AM components in critical applications. In part, such concerns motivate the AM certification approach that NASA has recently adopted in NASA-STD-6030 “Additive Manufacturing Requirements for Spaceflight Systems”. This presentation provides an overview of the previously mentioned failure, a discussion on the evaluation of the failed chamber and supplemental chambers produced at the same time, a representative material samples that included intentional build witness lines, and a summary of the key results and recommendations from the evaluations. NASA continues to approach AM processes and designs with a level of risk and acceptance of failures that is appropriate for the project objectives, with the overall goal of safe implementation of AM technology and transferring AM technology into commercial space applications. The objective of this presentation is to provide awareness to the community working critical and non-critical AM components and the lessons learned on proper implementation of AM.

Additive Manufacturing↗