Search NASA⌕ Search

SEARCH · Search NASA

Results for “project procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Computer tools for systems engineering at LaRC

The Systems Engineering Office (SEO) has been established to provide life cycle systems engineering support to Langley research Center projects. over the last two years, the computing market has been reviewed for tools which could enhance the effectiveness and efficiency of activities directed towards this mission. A group of interrelated applications have been procured, or are under development including a requirements management tool, a system design and simulation tool, and project and engineering data base. This paper will review the current configuration of these tools and provide information on future milestones and directions.

Walters, J. Milam↗

Auxiliary Propulsion Activities in Support of NASA's Exploration Initiative

The Space Launch Initiative (SLI) procurement mechanism NRA8-30 initiated the Auxiliary Propulsion System/Main Propulsion System (APS/MPS) Project in 2001 to address technology gaps and development risks for non-toxic and cryogenic propellants for auxiliary propulsion applications. These applications include reaction control and orbital maneuvering engines, and storage, pressure control, and transfer technologies associated with on-orbit maintenance of cryogens. The project has successfully evolved over several years in response to changing requirements for re-usable launch vehicle technologies, general launch technology improvements, and, most recently, exploration technologies. Lessons learned based on actual hardware performance have also played a part in the project evolution to focus now on those technologies deemed specifically relevant to the Exploration Initiative. Formal relevance reviews held in the spring of 2004 resulted in authority for continuation of the Auxiliary Propulsion Project through Fiscal Year 2005 (FY05), and provided for a direct reporting path to the Exploration Systems Mission Directorate. The tasks determined to be relevant under the project were: continuation of the development, fabrication, and delivery of three 870 lbf thrust prototype LOX/ethanol reaction control engines; the fabrication, assembly, engine integration and testing of the Auxiliary Propulsion Test Bed at White Sands Test Facility; and the completion of FY04 cryogenic fluid management component and subsystem development tasks (mass gauging, pressure control, and liquid acquisition elements). This paper presents an overview of those tasks, their scope, expectations, and results to-date as carried forward into the Exploration Initiative.

Best, Philip J.↗

STS/Spacelab payload utilization planning study: Executive summary

The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.

Source record↗

LIGO vacuum system study

A laser interferometer gravitational wave observatory (LIGO) is being developed with sensitivities which will have a high probability of detecting gravitational waves from astrophysical sources. A major component of LIGO is a total of 16 km of 1.2 m (48 inch) diameter tube at a pressure of less than 10 to the minus 8th power torr. It will be of 304L stainless steel procured directly from the steel mills with the initial hydrogen content specially reduced. Projections of the outgassing rates of hydrogen and of water vapor as a function of time are given and the uncertainties discussed. Based on these, a preliminary analysis of the vacuum system is presented.

Livas, Jeffrey C.↗

The advantages of cost plus award fee contracts

A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

Keathley, William C.↗

Tailoring a ConOps for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this paper is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services. This tailoring effort was performed as the authors final Masters Project in the Spring of 2016 for the Stevens Institute of Technology and modified for publication with INCOSE (Owens, 2016).

Knowledge↗

Systems engingeering for the Kepler Mission : a search for terrestrial planets

The Kepler mission will launch in 2007 and determine the distribution of earth-size planets (0.5 to 10 earth masses) in the habitable zones (HZs) of solar-like stars. The mission will monitor > 100,000 dwarf stars simultaneously for at least 4 years. Precision differential photometry will be used to detect the periodic signals of transiting planets. Kepler will also support asteroseismology by measuring the pressure-mode (p-mode) oscillations of selected stars. Key mission elements include a spacecraft bus and 0.95 meter, wide-field, CCD-based photometer injected into an earth-trailing heliocentric orbit by a 3-stage Delta II launch vehicle as well as a distributed Ground Segment and Follow-up Observing Program. The project is currently preparing for Preliminary Design Review (October 2004) and is proceeding with detailed design and procurement of long-lead components. In order to meet the unprecedented photometric precision requirement and to ensure a statistically significant result, the Kepler mission involves technical challenges in the areas of photometric noise and systematic error reduction, stability, and false-positive rejection. Programmatic and logistical challenges include the collaborative design, modeling, integration, test, and operation of a geographically and functionally distributed project. A very rigorous systems engineering program has evolved to address these challenges. This paper provides an overview of the Kepler systems engineering program, including some examples of our processes and techniques in areas such as requirements synthesis, validation & verification, system robustness design, and end-to-end performance modeling.

systems engineering↗

Laser light scattering instrument advanced technology development

The objective of this advanced technology development (ATD) project has been to provide sturdy, miniaturized laser light scattering (LLS) instrumentation for use in microgravity experiments. To do this, we assessed user requirements, explored the capabilities of existing and prospective laser light scattering hardware, and both coordinated and participated in the hardware and software advances needed for a flight hardware instrument. We have successfully breadboarded and evaluated an engineering version of a single-angle glove-box instrument which uses solid state detectors and lasers, along with fiber optics, for beam delivery and detection. Additionally, we have provided the specifications and written verification procedures necessary for procuring a miniature multi-angle LLS instrument which will be used by the flight hardware project which resulted from this work and from this project's interaction with the laser light scattering community.

Wallace, J. F.↗

RAT Requisition Approval Team - A L6S Initiative

L6S Project Description - Problem: The current cycle time for generating and approving Requisitions does not meet "Best-In-Class." . Scope: Only looking at the Florida Requisition Approval process for Orbiter (ORBF & ORBG) and Ground (GFAC) stocked items. This includes the time from when a requirement is generated by Logistics Planning and Supportability in Florida until it is approved and received by Procurement. Requisitions generated at other sites or for non stocked items will be out of scope of this Project

Hall, Valerie↗

Solution-Space Screening of a Hypersonic Endurance Demonstrator

This report documents a parametric sizing study performed to develop a program strategy for research and development and procurement of a feasible next-generation hypersonic air-breathing endurance demonstrator. Overall project focus has been on complementing technical and managerial decision-making during the earliest conceptual design phase towards minimization of operational, technical, and managerial risks.

Chudoba, Bernd↗

Issues in NASA program and project management. Special Report: 1993 conference

This volume is the seventh in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1993 Conference: perspectives in NASA program/project management; the best job in aerospace; improvements in project management at NASA; strategic planning...mapping the way to NASA's future; new NASA procurement initiatives; international cooperation; and industry, government and university partnership. A section on resources for NASA managers rounds out the publication.

Hoffman, ED↗

Mission Benefits of Gridded Ion and Hall Thruster Hybrid Propulsion Systems

The NASA In-Space Propulsion Technology (ISPT) Project Office has been developing the NEXT gridded ion thruster system and is planning to procure a low power Hall system. The new ion propulsion systems will join NSTAR as NASA's primary electric propulsion system options. Studies have been performed to show mission benefits of each of the stand alone systems. A hybrid ion propulsion system (IPS) can have the advantage of reduced cost, decreased flight time and greater science payload delivery over comparable homogeneous systems. This paper explores possible advantages of combining various thruster options for a single mission.

Dankanich, John W.↗

IGES, a key interface specification for CAD/CAM systems integration

The Initial Graphics Exchange Specification (IGES) program has focused the efforts of 52 companies on the development and documentation of a means of graphics data base exchange among present day CAD/CAM systems. The project's brief history has seen the evolution of the Specification into preliminary industrial usage marked by public demonstrations of vendor capability, mandatory requests in procurement actions, and a formalization into an American National Standard in September 1981. Recent events have demonstrated intersystem data exchange among seven vendor systems with a total of 30 vendors committing to offer IGES capability. A full range of documentation supports the IGES project and the recently approved IGES Version 2.0 of the Specification.

Smith, B. M.↗

An assessment of the government liquid hydrogen requirements for the 1995-2005 time frame

The results of government study of long range liquid hydrogen (LH2) requirements for the time period of 1995 through the year 2005 are presented. To assure an adequate supply of LH2 is available in support of various programs, it is imperative a long range projection of LH2 requirements be developed and maintained. This information is vital in planning for necessary procurement actions and assuring adequate industry lead time to acquiring the necessary production and distribution capabilities. The Advanced Launch System and High-Altitude Long-Endurance programs may represent the predominant government needs for LH2 in the long range. The assembled data clearly indicates a need for KSC (Kennedy Space Center) constant program/project surveillance. Also clear is the need for KSC to monitor industry's plans for LH2 plant production and distribution expansion.

Bain, Addison↗

The BBC network radio time and frequency standard and its role in the provision of the Greenwich time signal

The British Broadcasting Corporation (BBC) has broadcast the Greenwich Time Signal (GTS) on its networks since 1924. Up to February 1990 this signal was generated by the Royal Greenwich Observatory (RGO) in England. The BBC was informed that the RGO was moving its location to Cambridge and might not be able to continue to provide the Greenwich Time Service. The BBC in its role of a public service broadcaster believed that a long tradition of providing a time signal to its listeners should be upheld, and as such decided to seek alternative methods of provision. In parallel with this activity, an in-house requirement arose to re-engineer time switch equipment and provide new facilities for digital audio projects. As both requirements have a common engineering core, a decision was taken to design and procure a Time and Frequency Standard that could generate the Greenwich Time Signal to the same specification adhered to by the RGO, and provide additional time and frequency facilities. The concept of time and time/frequency dissemination as used in a broadcast network is discussed, as well as the details of an engineering solution to the requirements of BBC Network Radio.

Mcilroy, Jim J.↗

Remote sensing procurement package: A technical guide for state and local governments

The guide provides the tools and techniques for procuring remote sensing products and services. It is written for administrators, procurement officials and line agency staff who are directly involved in identifying information needs; defining remote sensing project requirements; soliciting and evaluating contract responses and negotiating, awarding, and administering contracts.

Source record↗

Closed Environment Air Revitalization System Based on Metal Organic Framework Adsorbents

This project utilized a systems engineering methodology to develop a vacuum swing adsorption system with full Labview automated control. The project was successful and provided students with an introduction to systems engineering and air revitalization. Specifically, two stainless steel adsorption beds were custom designed and manufactured and a sequence of computer controlled valves were used to deliver CO 2 laden, humid air, to the adsorbent where the CO 2 was removed from the air stream. Runs were completed using 13X zeolite and bed timing and switching was controlled by the computer based on the data output of a CO 2 detector. Adsorption runs using the MOF have not been completed upon the writing of this report; however, the MOF material is currently being synthesized and the runs will be completed upon receipt of the material. A follow up meeting with NASA has been tentatively planned to discuss the output of these experiments. Consistent with systems engineering practice, an end of project assessment of the class was conducted with the students and several items were realized. Specifically, the short period of performance of this grant makes it necessary to maintain a narrowly focused scope on the project such that multiple experiments after systems development (T&E) need to be limited to ensure timely completion of the proposed tasks. Also, procurement of parts may need to be moved forward in time to allow for delivery delays, and it may be necessary to request SDR, PDR, and CDR dates from NASA that are ahead of the NASA anticipated schedule. These types of lessons provided valuable to both the PI and the students and ultimately illustrate the necessity of proper systems engineering schedule risk assessment. The class met the objectives of the project and provided an introduction to systems engineering to undergraduate students. As a metric of that success, the lead engineer of the undergraduate design team acquired a job with an aerospace defense contractor, which he attributed to his knowledge of systems engineering concepts that were acquired via the X-Hab class.

T. Grant Glover↗