Search NASA⌕ Search

SEARCH · Search NASA

Results for “racking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Flow dynamics and heat transfer in simplified battery energy storage systems with heated battery modules

Large-scale energy storage systems (ESSs) composed of batteries show promise in addressing current energy challenges, but dissipation of generated heat is important. Here, this paper focuses on buoyant convective flows in simplified ESS battery racks. Natural convection is not generally the primary cooling strategy but can be important in abnormal scenarios where there is module overheat or potentially thermal runaway. We use computational fluid dynamics to investigate the flow dynamics and heat transfer mechanisms in a simplified parameterized rack design. Despite its simplicity, this configuration produces many of the relevant features expected in real ESSs without details of module geometry or hardware, allowing broad conclusions independent of manufacture-specific designs. We start by providing visualizations of the flowfield and measurements of entrainment, heat flux, and pressure. To characterize the dependence on the system parameters, we develop an integral-scale analysis of the average temperature equation to highlight the dominant source terms. We use results from this analysis to derive a steady network model composed of simple algebraic expressions to provide first-order predictions of entrainment through the rack. The network model leads to a linear scaling of the Reynolds number based on convective mass flux with respect to the Grashof number based on the heat source. We deduce empirical relationships that relate the heat exchanged between modules using a surface-averaged Nusselt number as a function of the local Reynolds and Rayleigh numbers. Lastly, we investigate how space between the modules and rack in the spanwise direction creates flow bypass, resulting in different flow pathways.

Battery thermal management↗

Design and instrumentation for permanent magnet samples exposed to a radiation environment

This work is part of a larger program to study the effects of radiation on permanent magnets in an accelerator environment. In order to be sure that the permanent magnet samples are accurately placed, measured, and catalogued we have developed a system of sample racks, holders and measuring apparatuses. We have combined these holders and measurement racks with electronics to allow a single computer to catalogue the position and intensity of the magnet measurements. We outline the design of the apparatus, the collection software, and the methodology we will use to collect the data.

Accelerator Physics↗

Dissolver Off-gas Hot Operations Authorization (AFCI CETE Milestone Report)

The head-end processing of the Coupled-End-to-End (CETE) Demonstration includes fuel receipt, fuel disassembly, exposure of fuel (e.g., by segmenting the fuel pins), voloxidation of the fuel to separate tritium, and fuel dissolution. All of these processing steps with the exception of the dissolution step will be accomplished in the Irradiated Fuels Examination Laboratory (IFEL) (Building 3525). The final headend step will be performed in the Radiochemical Engineering Development Center (Building 7920). The primary purpose of the fuel dissolution step is to prepare the solid fuel for subsequent liquid separations steps. This is accomplished by dissolving the fuel solids using nitric acid. During the dissolution process gases are evolved. Oxides of nitrogen are the primary off-gas components generated by the reactions of nitric acid and the fuel oxides however, during the dissolution and sparging of the resulting solution, iodine, C-14 as carbon dioxide, xenon, and krypton gasses are also released to the off-gas stream. The Dissolver Off-gas treatment rack provides a means of trapping these volatile fission products and other gases via various trapping media. Specifically the rack will recover iodine on a solid sorbent bed, scrub NOx in a water/acid column, scrub CO{sub 2} in a caustic scrubber column, remove moisture with solid sorbent drier beds and recover Xe and Kr using solid absorbent beds. The primary purpose of this experimental rack and the off-gas rack associated with the voloxidation equipment located at IFEL is to close the material balances around the volatile gases and to provide an understanding of the impacts of specific processing conditions on the fractions of the volatile components released from the various head-end processing steps.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Directly connected heat exchanger tube section and coolant-cooled structure

A cooling apparatus for an electronics rack is provided which includes an air-to-liquid heat exchanger, one or more coolant-cooled structures and a tube. The heat exchanger, which is associated with the electronics rack and disposed to cool air passing through the rack, includes a plurality of distinct, coolant-carrying tube sections, each tube section having a coolant inlet and a coolant outlet, one of which is coupled in fluid communication with a coolant loop to facilitate flow of coolant through the tube section. The coolant-cooled structure(s) is in thermal contact with an electronic component(s) of the rack, and facilitates transfer of heat from the component(s) to the coolant. The tube connects in fluid communication one coolant-cooled structure and the other of the coolant inlet or outlet of the one tube section, and facilitates flow of coolant directly between that coolant-carrying tube section of the heat exchanger and the coolant-cooled structure.

42 ENGINEERING↗

Information technology equipment cooling system

According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

42 ENGINEERING↗

Directly connected heat exchanger tube section and coolant-cooled structure

A method is provided for fabricating a cooling apparatus for cooling an electronics rack, which includes an air-to-liquid heat exchanger, one or more coolant-cooled structures, and a tube. The heat exchanger is associated with the electronics rack and disposed to cool air passing through the rack, includes a plurality of coolant-carrying tube sections, each tube section having a coolant inlet and outlet, one of which is coupled in fluid communication with a coolant loop to facilitate flow of coolant through the tube section. The coolant-cooled structure(s) is in thermal contact with an electronic component(s) of the rack, and facilitates transfer of heat from the component(s) to the coolant. The tube connects in fluid communication one coolant-cooled structure and the other of the coolant inlet or outlet of the one tube section, and facilitates flow of coolant directly between that coolant-carrying tube section of the heat exchanger and the coolant-cooled structure.

42 ENGINEERING↗

Sensor Network Demonstration for In Situ Decommissioning - 13332

Florida International University's (FIU's) Applied Research Center is currently supporting the Department of Energy's (DOE) Environmental Management Office of D and D and Facility Engineering program. FIU is supporting DOE's initiative to improve safety, reduce technical risks, and limit uncertainty within D and D operations by identifying technologies suitable to meet specific facility D and D requirements, assessing the readiness of those technologies for field deployment, and conducting feasibility studies and large scale demonstrations of promising technologies. During FY11, FIU collaborated with Savannah River National Laboratory in the development of an experimental test site for the demonstration of multiple sensor systems for potential use in the in situ decommissioning process. In situ decommissioning is a process in which the above ground portion of a facility is dismantled and removed, and the underground portion is filled with a cementious material such as grout. In such a scenario, the question remains on how to effectively monitor the structural health of the grout (cracking, flexing, and sinking), as well as track possible migration of contaminants within and out of the grouted monolith. The right types of sensors can aid personnel in better understanding the conditions within the entombed structure. Without sensors embedded in and around the monolith, it will be very difficult to estimate structural integrity and contaminant transport. Yet, to fully utilize the appropriate sensors and the provided data, their performance and reliability must be evaluated outside a laboratory setting. To this end, a large scale experimental setup and demonstration was conducted at FIU. In order to evaluate a large suite of sensor systems, FIU personnel designed and purchased a pre-cast concrete open-top cube, which served as a mock-up of an in situ DOE decommissioned facility. The inside of the cube measures 10 ft x 10 ft x 8 ft. In order to ensure that the individual sensors would be immobilized during the grout pouring activities, a set of nine sensor racks were designed. The 270 sensors provided by Idaho National Laboratory (INL), Mississippi State University (MSU), University of Houston (UH), and University of South Carolina (USC) were secured to these racks based on predetermined locations. Once sensor racks were installed inside the test cube, connected and debugged, approximately 32 cubic yards of special grout material was used to entomb the sensors. MSU provided and demonstrated four types of fiber loop ring-down (FLR) sensors for detection of water, temperature, cracks, and movement of fluids. INL provided and demonstrated time differenced 3D electrical resistivity tomography (ERT), advanced tensiometers for moisture content, and thermocouples for temperature measurements. University of Houston provided smart aggregate (SA) sensors, which detect crack severity and water presence. An additional UH sensor system demonstrated was a Fiber Bragg Grating (FBG) fiber optic system measuring strain, presence of water, and temperature. USC provided a system which measured acoustic emissions during cracking, as well as temperature and pH sensors. All systems were connected to a Sensor Remote Access System (SRAS) data networking and collection system designed, developed and provided by FIU. The purpose of SRAS was to collect and allow download of the raw sensor data from all the sensor system, as well as allow upload of the processed data and any analysis reports and graphs. All this information was made available to the research teams via the Deactivation and Decommissioning Knowledge Management and Information Tool (D and D KM-IT). As a current research effort, FIU is performing an energy analysis, and transferring several sensor systems to a Photovoltaic (PV) System to continuously monitor energy consumption parameters and overall power demands. Also, One final component of this research is focusing on developing an integrated data network to capture, log and analyze sensor system data in near real time from a single interface. FIU personnel and DOE Fellows monitored the progress and condition of the sensors for a period of six months. During this time, the sensors recorded data pertaining to strain, compression, temperature, crack detection, moisture presence, fluid mobility, shock resistance, monolith movement, and electrical resistivity. In addition, FIU regularly observed the curing process of the grout and documented the cube condition via the nine racks of sensors. The sensors held up throughout the curing process, withstood the natural elements for six months, and monitored the integrity of the grout. The large scale experiment and demonstration conducted at FIU was the first of its kind to demonstrate the feasibility of state of the art sensors for in situ decommissioning applications. These efforts successfully measured the durability, performance, and precision of the sensors in question as well as monitored and recorded the curing process of the selected grout material under natural environmental conditions. The current energy analysis work is resulting in data on the constraints placed by some of the sensor systems on a power network that requires high reliability and low losses. In addition, a sensor system demonstration has determined that it is feasible to develop an integrated data network where data can be accessed in near real-time from all systems, thereby allowing for larger-scale integrated system testing to be performed. Information collected during the execution of this research project will aid decision makers in the identification of sensors to be used in nuclear facilities selected for in situ decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ION Work Reduction Opportunity Realization Demonstration

The purpose of this research was to realize one of the advanced training work reduction opportunities first presented in the Idaho National Laboratory (INL) report, “Process for Significant Nuclear Work Function Innovation Based on Integrated Operations Concepts” (INL/EXT-21-64134) [1], with a nuclear power plant (NPP) research partner. Researchers modernized two trainings: (1) an accredited instructor-led training (ILT) overview course on Westinghouse DS 480-volt (V) circuit breakers to a multimedia-focused computer-based-training (CBT) learning module, and (2) an on-demand chaptered video on how to properly rack and un-rack a Westinghouse DS 480-V circuit breaker. These modernized work products were developed and implemented in a manner consistent with the industry guidelines found in Institution of Nuclear Power Operations (INPO) Teaching and Learning 23-001 [2]. Researchers calculated that the modernized accredited training course reduced the time necessary to prepare and deliver the training material by a factor of 8:1. The amount of time learners spend in class could be reduced by this same factor. In other words, if a course took 8 hours to deliver a class, the new CBT instruction would take just over 1 hour. The researchers noted that the requirement for any practicum training by the learners with the instructor(s) would remain in place. But through interviews with new and experienced learners, the researchers discovered that the confidence of these learners in performing the racking and un-racking of the circuit breaker improved as a result of using the new modernized CBT process. Additionally, the learners who tested the modernized work products enjoyed the modernized CBT and the learning video significantly more than current in-class learning methods. These are encouraging results for the nuclear industry, as this modernization of training can be applied to other classes and is scalable across the industry. In line with the Integrated Operations for Nuclear (ION) model, positive workload analysis supports the investment of resources in modernizing NPP training processes and infrastructure. Implementation of the advanced training technologies in this report is likely to result in substantive long-term workload benefits to instructors and learners and result in hard-dollar savings on contractor spends. Additionally, investment in these modernized training processes will result in improved learner proficiency. The results of this research can be applied to additional operator, technical, and general training topics to provide additional workload and learning benefits in addition to what was explored.

42 ENGINEERING↗

Standards development for modules in high temperature micro-environments

Photovoltaic (PV) module qualification standards, IEC 61215 and IEC 61730, were designed to apply to “general open-air climates” and IEC 61730 specifically indicated applicability of ambient air temperature of 40°C. Additionally, these standards provided allowances for so-called “open rack mounted PV modules” without a clear definition of “open-rack.” These implied restrictions and allowances meant that hotter climates or thermally restrictive installation methods may not be covered by these often customer-mandated certification standards. This is particularly salient for the significant growth regions of the Middle East and India that would be expected to operate at significantly higher temperatures. The applicability of these documents raised issues over the definition of “open rack” and the fact that the geographic location is just as important as the mounting configuration in assessing the impact of the micro-environment of a PV module. This work summarizes the scientific background for IEC Technical Specification 63126:2020 ED1, titled “Guidelines for qualifying PV modules components and materials for operation at high temperatures.” This standard was recently published by the IEC and is the first step in a systematic effort to rework these standards to address the question of temperature more directly. Instead of specifying a mounting condition, we specify different suites of tests suitable for a system (PV module, mounting style, and location) defined by the 98th percentile cell temperature. With a defined temperature regime to work from, this allowed us to use existing literature research combined with additional modeling work to determine, which tests would need to be modified. This resulted in suggested changes to material thermal indices, thermal cycling temperatures, hot spot testing, ultraviolet testing, and bypass diode testing among other tests and characteristics described in this study.

14 SOLAR ENERGY↗

Examination of entrainment, combustibility, and heat transfer due to cell venting inside simplified battery energy storage enclosures

Battery energy storage systems (ESS) assembled of modules containing lithium-ion batteries can pose fire and explosion hazards during thermal runaway because vented gases may accumulate, combust, or escape enclosures. Here, we propose a prototypical configuration composed of the main components of an ESS rack, where modules are represented as rectangles within an enclosure and vent gas is injected steadily through the top of a module. This idealized geometry allows for exploration of how rack-level characteristics can influence smaller single-cell or module-level scales. Through this geometry, we conduct numerical simulations to understand how variations in the vent velocity, temperature, and vertical location affect entrainment rates, fraction of uncombusted fuel, rich-gas coverage, and heat flux to other modules. At lower vent velocities and vertical positions, buoyancy drives enough entrainment and mixing to react with most of the vent gases on the converging plenum. As jet momentum increases and/or buoyancy decreases via higher vent position in the rack, vent gases can propagate into and burn in the divergence plenum. Heat flux to the impinged module scales strongly with vent momentum and temperature, while heat transfer to upper modules peaks when flames in the diverging plenum reach the surface and declines when combustion is suppressed.

Computational fluid dynamics↗

Designing Topology-Aware Collective Communication Algorithms for Large Scale InfiniBand Clusters: Case Studies with Scatter and Gather

Modern high performance computing systems are being increasingly deployed in a hierarchical fashion with multi-core computing platforms forming the base of the hierarchy. These systems are usually comprised of multiple racks, with each rack consisting of a finite number of chassis, with each chassis having multiple compute nodes or blades, based on multi-core architectures. The networks are also hierarchical with multiple levels of switches. Message exchange operations between processes that belong to different racks involve multiple hops across different switches and this directly affects the performance of collective operations. In this paper, we take on the challenges involved in detecting the topology of large scale InfiniBand clusters and leveraging this knowledge to design efficient topology-aware algorithms for collective operations. We also propose a communication model to analyze the communication costs involved in collective operations on large scale supercomputing systems. We have analyzed the performance characteristics of two collectives, MPI_Gather and MPI_Scatter on such systems and we have proposed topology-aware algorithms for these operations. Our experimental results have shown that the proposed algorithms can improve the performance of these collective operations by almost 54% at the micro-benchmark level.

97 MATHEMATICS AND COMPUTING↗

Economizer Based Data Center Liquid Cooling with Advanced Metal Interfaces. Final Technical Report

A new chiller-less data center liquid cooling system utilizing the outside air environment has been shown to achieve up to 90% reduction in cooling energy compared to traditional chiller based data center cooling systems. The system removes heat from Volume servers inside a Sealed Rack and transports the heat using a liquid loop to an Outdoor Heat Exchanger which rejects the heat to the outdoor ambient environment. The servers in the rack are cooled using a hybrid cooling system by removing the majority of the heat generated by the processors and memory by direct thermal conduction using coldplates and the heat generated by the remaining components using forced air convection to an air- to- liquid heat exchanger inside the Sealed Rack. The anticipated benefits of such energy-centric configurations are significant energy savings at the data center level. When compared to a traditional 10 MW data center, which typically uses 25% of its total data center energy consumption for cooling this technology could potentially enable a cost savings of up to $800,000-$2,200,000/year (assuming electricity costs of 4 to 11 cents per kilowatt-hour) through the reduction in electrical energy usage.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EERE Showcase Event (Solar Decathlon 2015)

The goal of the Orange County Great Park Corporation (Great Park) is to successfully host the U.S. Department of Energy Solar Decathlon 2015. In furtherance of that goal, tasks to be performed within the current reporting period include the following: Task 1.0 Arrange Site Team Visits for January 2015 The Great Park arranged appropriate meeting space for the site team visits over a three-day period, January 8, 2015 through January 10, 2015. Instead of a meeting in Hanger 244, the DOE requested a different meeting space. The working team met in the Operations offices on January 8th. The student teams were welcomed at the City of Irvine’s Lakeview Senior Center on January 9th, and came back on January 10th for breakout sessions. Task 2.0 Outreach Activities The following outreach activities related to the U.S. Department of Energy Solar Decathlon 2015 occurred during and prior to the event: • Promoted the return of the Solar Decathlon 2015 on the City’s website. (cityofirvine.org) • Promoted the return of the Solar Decathlon 2015 through the City’s and Great Park’s social media channels, including Facebook and Twitter. (facebook.com/cityofirvine, facebook.com/orangecountygreatpark, twitter.com/City_of_Irvine, twitter.com/ocgreatpark) • Promoted the return of the Solar Decathlon 2015 and student visit through a City Council Announcement. • Worked to set-up meetings between the U.S. Department of Energy team and potential donors/key stakeholders in Irvine. • Began ICTV filming and coverage of the Solar Decathlon 2015 teams. This includes student team interviews, interview with Richard King and b-roll footage. • Facilitated an interview with Sarah Farrar and the Orange County Register during the recent student visit in January • Information in May was provided to Irvine Unified School District and Tustin Unified School District promoting the three Education Days that the DOE will host during the event. More DOE information is due in August, which will be forwarded to the school districts that will provide important information for school tours. • A promotional ICTV video has been sent through the Irvine Chamber of Commerce and to dozens of businesses in Irvine promoting the Solar Decathlon 2015 and inviting attendance. • Cover story of Fall Inside Irvine magazine detailed teams competing in Solar Decathlon. Magazine goes to more than 100,000 Irvine residences. • Produced public service announcement with KPCC radio to air 9/28-10/16. Outreach also included a web banner on the station’s website. • Full-page advertisements in special sections of the Orange County Register, including UCI 50th Anniversary magazine that went to over 1 million readers of the Register, the Riverside Press Enterprise and the L.A. Times; Best of Orange County magazine; and Solar Decathlon special section. • Full-page ad in Urban Land magazine Sept./Oct. issue. • Produced ad for Irvine Global Village Festival brochure (tens of thousands in attendance at event.) • Ten posters displayed at Irvine Company properties throughout the City, including the Irvine Spectrum Center. • Rack cards promoting Solar Decathlon displayed at Irvine Spectrum Center, Discovery Science Center, Orange County Farm Bureau (at farmers markets) and at City facilities. • Tote bags promoting Solar Decathlon filled with magnets and rack cards on the event distributed at Irvine Global Village Festival, Great Park farmers market and UCI Festival of Discovery; some 8,000 bags handed out. • E-blast from City of Irvine Community Services Department included information on Solar Decathlon. (List contains 51,000 recipients.) • E-blast to Irvine Co. mailing list sent out 9/30. Web banner posted at shopirvinespectrumcenter.com. • E-blast sent to Orange County Register mailing list on 10/6. • Web banner posted on Orange County Register’s homepage. • E-blast sent by Irvine Chamber of Commerce on 10/9. • E-blast using City’s GovDelivery to 2,100 on 10/12. • Produced additional ads for the Orange County Register to fulfill the in-kind agreement between the DOE and the Register: Friday, Oct. 9, Local front page strip ad; Saturday, Oct. 10, half-page Home & Garden section ad; Sunday, Oct. 11, full page Local section ad; Wednesday, Oct. 14, ½ page Main or Local ad; Friday, Oct. 16, full Local or Main section ad; Saturday, Oct. 17, half-page Home & Garden section ad; Sunday Oct. 18, full page Local or Main ad. • Produced two additional Register ads promoting final days of the event: Full page Main or Local ad for Thursday, Oct. 15 and full page ad in Irvine World News weekly publication. • Produced separate press releases on Solar Decathlon, Volunteer Effort, Children’s Activities Area and Final Days. • Produced and distributed Children’s Activities Days rack cards. • Continued to promote the event on the City’s webpage, Great Park webpage and social media channels. • ICTV produced the “Solar Decathlon Minute” videos, which were posted on the City’s YouTube channel and the solardecathlon.gov website. • Four-minute video promoting Solar Decathlon shown on iShuttles in the City in weeks leading up to event. • Promoted a “Business Day” to local businesses in which businesses could sign up for tour led by Solar Decathlon docents. • Access Irvine Special Event Button running 9/28-10/18/15. • Access Irvine Push Notification on 10/15/15. • Facebook ad boost 10/13-10/18.

14 SOLAR ENERGY↗

Lithium-Ion UPS Battery Research and Commentary

Lithium-ion batteries are increasingly prevalent in a variety of devices both small and large. The high level of stored energy in UPS battery racks is closely scrutinized because sudden, uncontrolled release of chemical and electrical energy could be an ignition source. With this in mind, lithium-ion battery safety is the subject of several testing standards, including UL 1642, UL 1973, and UL 9540A.The motivation for this research and commentary is the potential installation of lithium-ion batteries in a Vertiv UPS assembly for one of the buildings on the ORNL campus. The battery modules Vertiv uses are compliant with abuse survival testing, demonstrating that cells and modules are rugged. The modules are further compliant with fire propagation requirements – in the event a failure does produce a fire, it doesn’t spread. Beyond these, the rack level assemblies Vertiv sources comply with UL requirements to contain a fire within the rack.This three-tiered approach to battery safety suggests Vertiv’s lithium-ion UPS battery racks can reasonably be considered for use in a facility with appropriate fire protection provisions and an informed emergency response team.

25 ENERGY STORAGE↗

Next Generation Integrated PV Products Cost and Workflow Analysis (Final Report)

Residential photovoltaic (PV) costs have fallen consistently for over a decade (Ardani et al. 2018). DOE has subsequently developed a new residential PV cost target for 2030 of $0.05/kilowatt hour (SETO 2023). Ardani et al. (2018) conclude that integrated roofing and PV (RIPV) products may be key to achieving the residential target for both new construction and retrofit residential PV. In RIPV, the PV product is incorporated into or replaces the roofing material. RIPV systems can use conventional crystalline or thin-film technologies, may be aesthetically attractive alternatives to traditional racked and mounted PV systems, and may increase building property values (Cook et al. 2023). These products also have the potential to provide customer acquisition, labor, and equipment cost savings over traditional, racked and mounted residential rooftop PV and several companies have recently introduced integrated roofing and PV (RIPV) products (Cook et al. 2023). In 2022, Tesla was the market leader, representing 94% of RIPV capacity installed in 2022 through its Solar Roof offering, while GAF Energy and its Timberline Solar product was second capturing 3% (Feldman et al. 2023). In this project, NREL analyzed three research questions: (1) How do current RIPV products compare to racked and mounted PV in terms of costs, install times and processes? (2) How are RIPV products installed and are there opportunities for cost savings? (3) What are the key barriers to expanding market opportunities for integrating solar and roofing products? In this project, we explored residential RIPV cost reduction opportunities by analyzing installation processes. Our study documented residential RIPV installations at two reroofing sites (20.52 kilowatts) and the equivalent of nine new construction sites (71.75 kW) in California through a methodology known as time and motion study. We also conducted 15 interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration.

14 SOLAR ENERGY↗

TANK 241-AN-102 MULTI-PROBE CORROSION MONITORING SYSTEM PROJECT LESSONS LEARNED

During 2007 and 2008, a new Multi-Probe Corrosion Monitoring System (MPCMS) was designed and fabricated for use in double-shell tank 241-AN-102. The system was successfully installed in the tank on May 1, 2008. The 241-AN-102 MPCMS consists of one 'fixed' in-tank probe containing primary and secondary reference electrodes, tank material electrodes, Electrical Resistance (ER) sensors, and stressed and unstressed corrosion coupons. In addition to the fixed probe, the 241-AN-102 MPCMS also contains four standalone coupon racks, or 'removable' probes. Each rack contains stressed and unstressed coupons made of American Society of Testing and Materials A537 CL1 steel, heat-treated to closely match the chemical and mechanical characteristics of the 241-AN-102 tank wall. These coupon racks can be removed periodically to facilitate examination of the attached coupons for corrosion damage. Along the way to successful system deployment and operation, the system design, fabrication, and testing activities presented a number of challenges. This document discusses these challenges and lessons learned, which when applied to future efforts, should improve overall project efficiency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar panel field array support system and apparatus and method for construction use

A combined PV panel assembly jig and forklift transport pallet is used to assemble PV panels for transport to a field array from a protected manufacturing environment. The panels are assembled to have adhesively applied rails for transport by a robotic drone on a ground-support rack and are pre-wired. The PV panel assembly jig holds, protects, and aligns the PV panels in an upside down position, opposite to their operational position, for ease of wiring in order to decrease the manual labor required in the field. Once the pallet is transported to the load station at the end of a row of solar panel racks in the field array, a robotic loader lifts the upside down PV panels from the combined PV panel assembly jig and forklift transport pallet in an arcing overhead motion that lifts, tilts, and deposits the PV panels in an upright position at the loading station of a railed rack support as ground-mounted in a solar panel field array.

14 SOLAR ENERGY↗

Quantification of reactivity margin in BWR spent fuel pools

Boiling water reactor (BWR) spent fuel pool (SFP) criticality safety analyses typically use the in-core k{sub inf} criterion methodology to demonstrate margin to safety. This method models all the fuel in the SFP with a limiting lattice design at a peak reactivity just above a specific in-core k{sub inf} limit. To bound all the fuel in the pool and future fuel with reasonable margin, these limits are often set conservatively high compared to the peak reactivities of actual BWR bundle designs. When current regulatory expectations are met for the quantification of bias and uncertainty adders to the criticality analyses, some results are quantified that are close to the 0.95 in-rack reactivity limit required by 10CFR50.68. The small margins being calculated in the criticality safety analyses have resulted in concerns that SFPs have less margin to safety than was present in the past; however, inherent in the peak reactivity in-core k{sub inf} criterion methodology used to assess these margins is a very conservative model of the fuel. While it is known that all the fuel in a BWR SFP is typically burned well past its peak reactivity exposure, it has been unknown how much reactivity margin could be quantified if bundles were modeled more realistically by accounting for their actual discharge exposure profiles, operational void fractions, control histories, and depletion fuel temperatures. In this study, fuel bundles were depleted to their explicit nodal discharge exposure while accounting for actual operational conditions defined by GEH/GNF's core simulator code, PANACEA. The use of these depleted isotopics in the criticality safety analysis is commonly referred to as taking 'burn-up credit' in the analysis. This paper provides a quantification of the reactivity margin available from burn-up credit in two currently operating BWR spent fuel pools. The evaluation demonstrates that many of the bundles in these storage configurations are significantly below the in-rack reactivity limit, even with the necessary bias and uncertainty adders included. The utilization of BWR burnup credit appears to be an attractive solution to consider when evaluating options for reduced neutron absorber credit or for quantifying additional margin to the regulatory in-rack k{sub eff} limit. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗