Search NASA⌕ Search

SEARCH · Search NASA

Results for “regulatory process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Cost Efficient-by-Design Microreactors: Trade-offs between cost, technical, and regulatory factors

This research evaluates a cost reduction investigation through adoption of a functional containment approach on the microreactor system and structure. Trade-offs between microreactor system designs, fuels and reactor module sizes are evaluated based on performance-based and risk-informed design procedures. Cost savings are evaluated against trade-offs in the reliability of passive heat removal systems, reactivity control, and radioactive material containment. Results can inform the Microreactor Program and reactor designs on “sweet spots” for microreactors that are cost-efficient while meeting required safety limits.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Power of Priors: Improved Enrichment Safeguards

International safeguards currently rely on material accountancy to verify that declared nuclear material is present and unmodified. Although effective, material accountancy for large bulk facilities can be expensive to implement due to the high precision instrumentation required to meet regulatory targets. Process monitoring has long been considered to improve material accountancy. However, effective integration of process monitoring has been met with mixed results. Given the large successes in other domains, machine learning may present a solution for process monitoring integration. Past work has shown that unsupervised approaches struggle due to measurement error. Although not studied in depth for a safeguards context, supervised approaches often have poor generalization for unseen classes of data (e.g., unseen material loss patterns). This work shows that engineered datasets, when used for training, can improve the generalization of supervised approaches. Further, the underlying models needed to generate these datasets need only accurately model certain high importance features.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DOE SNF Packaging Demonstration Project: Worktable and Canister Loading Sleeve Design [Slides]

This presentation is a briefing for summer interns and others outside the project, to give them a summary of ongoing design activities. The DOE SNF Packaging Demonstration Project is an effort to develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed spent nuclear fuel (SNF) for road ready dry storage (RRDS). The project is to remotely load and seal two types of DOE-managed SNF from the CPP-603 facility into DOE Standard Canisters, place the sealed DOE Standard Canisters into commercial vendor over-canisters (equivalent to commercial MPCs), seal and place the over-canisters into commercial vendor storage overpacks, and place the storage system (over-canister and storage overpack) onto the CPP-2707 cask pad.

42 ENGINEERING↗

New Minimum Energy Performance Standard for Air Conditioners in Ecuador

This report provides technical assessment of a Minimum Energy Performance Standard (MEPS) Air Conditioner (AC) revision in Ecuador, and serves as the basis for stakeholder engagement as part of the regulatory development process to update the AC MEPS in Ecuador. This report can be used as guidance by policymakers in designing a well-founded, impactful MEPS program that is consistent with regional and international best practices and to highlight the energy, environmental, and economic benefits of the MEPS on users and the nation as a whole.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF– 24138

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drop Analysis of Department of Energy Standard Canister with Fort Saint Vrain SNF

DOE manages over 300 types of SNF, most of which are located at the INL site. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF at the INL site for ?road-ready dry storage?. ?Road-ready dry storage? is a SNF management concept where SNF is packaged into dry and sealed canisters, which are then placed in on-site storage in anticipation of later transportation. The forward-looking goal of the Demonstration is establishing the foundation for a large-scale road-ready dry storage program at the INL site. The Demonstration will first package Fort Saint Vrain SNF currently stored at INL into several DOE Standard Canisters. These Standard Canisters will then be loaded into another commercial transportation or storage containment system (e.g., storage cask or transportation package). The Standard Canister is a class of standardized canisters designed for containing the large variety of DOE-managed SNF during interim storage, transportation and/or disposal at a geological repository. One critical aspect of road-ready dry storage is the ability to license the DOE Standard Canisters and its associated transportation package to 10 CFR 71. Depending on the SNF and transportation strategy, the Standard Canisters may have to maintain structural integrity under normal conditions of transport and hypothetical accident scenarios (i.e., drop events). The Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs. However, no analysis has been completed to support the recent Demonstration. This analysis will consider the Ø0.5 m × 5.1 m Standard Canister under drop scenario(s) considered in previous INL tests and analyses, including the 9 m drop at 80 degree off vertical. However, this analysis will consider the more recent Fort Saint Vrain loading configurations proposed for the Demonstration. This analysis will performed using strain-based acceptance criteria established by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division 3. It will be compared to previous analyses and form the foundation of further formal calculations that will be used to support licensing efforts of the road-ready dry storage system at INL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

42 ENGINEERING↗

Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

Due to the urgency around climate change and associated goals for clean energy transition, and Battelle Energy Alliance's (BEA) and Idaho National Laboratory's (INL) role as the nation's nuclear energy laboratory, numerous stakeholders have asked for BEA’s thoughts and recommendations to reduce the time and costs associated with licensing new reactors at the U.S. Nuclear Regulatory Commission (NRC). As an M&O contractor for an FFRDC, BEA is a long-term partner with the Government in seeking to achieve clean energy goals, yet has a level of independence needed to appropriately evaluate this topic. The views herein are informed by extensive BEA experience supporting nuclear energy endeavors including ongoing discussions with current and former regulators, applicants, and licensees. With this background in mind, the United States benefits from having an agency such as the NRC, which is viewed internationally as the leader in nuclear safety licensing and regulation. Nonetheless, while acknowledging the important nuclear safety role satisfied by the NRC, it is apparent that one of the most significant time and resource intensive activities for new reactor developers is the NRC licensing process. The time and cost to obtain NRC licenses add significant financial stress for new reactor projects and may result in abandonment of projects or failure to even begin new projects. The challenge is particularly acute for advanced reactors which may raise unique or new regulatory questions and may be smaller in size, resulting in a much higher proportional impact from regulatory and cost challenges. This situation presents a particularly troublesome risk for the nation given the urgency in which utilities are working to transition to clean, non-carbon-emitting energy sources like nuclear energy. Reforms to the NRC licensing process have the potential to greatly increase certainty and support the successful progress of new reactors. The NRC can retain its world-class nuclear safety reputation while becoming a world leader for regulatory efficiency and a critical enabler to the clean energy transition. This report describes potential NRC reforms, focusing on those with a statutory connection. Recognizing the potential tradeoffs with any proposed changes, the report attempts to highlight those considerations in the analysis of the reforms. The recommendations are presented as a set of options for consideration. Unless noted, they are independent options, offering stakeholders the option to select a subset for further consideration. Although difficult to calculate precise time improvements for some of the changes, the reforms have the potential for substantial improvements, perhaps even by a factor of two.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) capabilities are generally characterized as either open-loop or closed-loop. The U.S. Department of Energy (DOE) defines open-loop PSH as “continuously connected to a naturally flowing water feature,” and closed-loop PSH as “not continuously connected to a naturally flowing water feature.” All the PSH projects constructed in the United States to date are open-loop, so the potential environmental effects of closed-loop systems are not as well documented as the effects of open-loop systems. To address this knowledge gap, the DOE Water Power Technologies Office, under its HydroWIRES Initiative, has prepared this report to: (1) compare the potential environmental effects of open-loop PSH projects with those of closed-loop PSH projects; (2) describe how these effects are being avoided, minimized, or mitigated at existing projects in other countries and proposed projects in the United States; and (3) discuss the relative significance of the environmental issues. The report begins with a brief introduction on the current status of PSH development in the United States. Next, the report describes the current Federal Energy Regulatory Commission (FERC) hydropower licensing process, emphasizing some recent regulatory changes that affect closed-loop PSH development. The report then provides a summary comparison of the environmental effects of constructing and operating open-loop and closed-loop PSH systems and discusses the relative significance of those issues. This comparison and discussion are based on the results of a literature review and a review of FERC licensing records. The literature review includes journal articles, technical reports, and presentations on the environmental effects of PSH systems. It includes literature from the United States as well as countries where closed-loop PSH projects have been constructed. The FERC records review examines the FERC licensing record (e.g., National Environmental Policy Act documents and license orders) to identify the environmental effects anticipated and mitigation measures proposed for six of the closed-loop PSH projects currently licensed or permitted in the United States. For comparison, the FERC records review also discusses the environmental effects and mitigation measures for four open-loop PSH projects proposed or currently operating in the United States. The comparison of effects between open-loop and closed-loop projects is relative; that is, it characterizes the impacts of each project type as generally lower or higher than another project type. The comparison reflects general trends among project types because there are sometimes exceptions to the examples cited. The comparison is based on both spatial (location) and temporal (duration) factors and reflects both the severity and likelihood of effects. The report concludes that the environmental effects of closed-loop PSH projects are generally lower (i.e., more localized and of shorter duration) than those of open-loop PSH projects because they are located “off-stream,” minimizing aquatic and terrestrial impacts, and often have greater siting flexibility than open-loop PSH projects. For certain closed-loop project designs, however, impacts to groundwater may be higher relative to open-loop projects and should be considered in any environmental review.

13 HYDRO ENERGY↗

Engaging the Regulatory Community to Aid Environmental Consenting/Permitting Processes for Marine Renewable Energy

Regulators involved in consenting/permitting marine renewable energy (MRE) have faced multiple challenges due to relatively new, unfamiliar technologies and uncertainty surrounding potential environmental impacts. This has resulted in slow progress for the MRE industry, including long consenting timeframes and extensive and expensive monitoring requirements, which increase financial risk for investors. OES-Environmental has surveyed regulators internationally to understand their key knowledge gaps and perspectives to support the development of the MRE industry. From the results of these surveys a data transferability process and a risk retirement pathway have been developed to assess consenting and monitoring requirements in proportion to risk. A tool for discovering existing data sets by using an online matrix has been developed, along with training materials, regulatory guidance documents, and a strategic outreach plan to engage regulators and advisers. his engagement and the application of these products should lead to a better understanding of the environmental effects of marine energy, and more efficient consenting processes.

16 TIDAL AND WAVE POWER↗

Three-Dimensional Coculture Of Human Small-Intestine Cells

Complex three-dimensional masses of normal human epithelial and mesenchymal small-intestine cells cocultured in process involving specially designed bioreactors. Useful as tissued models for studies of growth, regulatory, and differentiation processes in normal intestinal tissues; diseases of small intestine; and interactions between cells of small intestine and viruses causing disease both in small intestine and elsewhere in body. Process used to produce other tissue models, leading to advances in understanding of growth and differentiation in developing organisms, of renewal of tissue, and of treatment of myriad of clinical conditions. Prior articles describing design and use of rotating-wall culture vessels include "Growing And Assembling Cells Into Tissues" (MSC-21559), "High-Aspect-Ratio Rotating Cell-Culture Vessel" (MSC-21662), and "In Vitro, Matrix-Free Formation Of Solid Tumor Spheroids" (MSC-21843).

Wolf, David↗

Energy Storage Siting and Permitting Outreach Workshop Report

On March 24th, 2026, under the sponsorship of the U.S. Department of Energy’s Office of Electricity, Pacific Northwest National Laboratory (PNNL) staff hosted the Energy Storage Siting & Permitting Outreach Workshop at PNNL’s Grid Storage Launchpad (GSL) facility in Richland, Washington. The workshop convened a cohort of state and regional stakeholders from across the country to build a shared understanding of energy storage technologies, regulatory frameworks, and best practices for engaging in the permitting process. Participants left with a deeper understanding of energy storage technologies, grid uses and benefits, interconnection and regulatory processes, battery safety standards and risk management, and local engagement strategies and approaches. The workshop concluded with a guided tour of the GSL for hands-on exposure to energy storage research and development. The workshop had 17 external participants. The attendees represented a range of backgrounds, including state and local governments, nonprofits or other local organizations, project developers, and utility stakeholders.

Battery Energy Storage↗

Ecological connectivity and in-kind mitigation in a regulatory decision framework: A case study with an amphibian habitat specialist

Ecological connectivity is critical to the survival and long-term viability of populations but is often overlooked in regulatory frameworks. We integrated landscape-level processes into a mitigation strategy for impacts to aquatic resources on the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) in eastern Tennessee. Wetlands on the ORR, which contain significant breeding populations of the imperiled four-toed salamander (Hemidactylium scutatum) and tubercled rein orchid (Platanthera flava var. herbiola), will be impacted by construction of an environmental waste disposal facility under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Here, we used a modified Kepner-Tregoe decision analysis to select general mitigation options that balanced regulatory requirements and interest group perspectives. We emphasized habitat connectivity through models that prioritized an area's importance to natural area connectivity (centrality) and maintenance of population structure for an affected habitat specialist (four-toed salamanders). We also emphasized in-kind mitigation through the preservation and enhancement of ecologically similar resources and the translocation and establishment of a new subpopulation of four-toed salamanders elsewhere on the ORR. We ultimately released over 500 juvenile salamanders that originated from the impacted site into the chosen mitigation wetlands. By doing so under the constraints of a time-sensitive CERCLA remediation effort and exceeding its substantive requirements, this work underscores feasibility. Ecological connectivity and the conservation of species that are not afforded explicit regulatory processes can be effectively and efficiently integrated into environmental decision-making and land use planning.

54 ENVIRONMENTAL SCIENCES↗

Policy Reforms to Unleash Domestic Critical Minerals Mining and Processing

The United States faces growing strategic and economic risks due to its limited ability to mine, process, and refine the minerals required for national defense, energy systems, advanced manufacturing, and emerging technologies. Although the country possesses significant geological resources, development has been slowed by long and unpredictable permitting timelines, fragmented regulatory responsibilities, limited midstream processing capacity, and a shrinking technical workforce. These structural barriers have created supply chain vulnerabilities that constrain industrial growth and reduce national resilience. This report presents a comprehensive set of reforms intended to modernize the nation’s approach to critical minerals. The recommendations address federal permitting, environmental review processes, the legal framework governing mining activities, interagency coordination, domestic processing and refining capacity, and the education and workforce systems needed to support long term industry development. The analysis emphasizes practical steps to shorten project timelines, improve regulatory clarity, expand processing infrastructure, enable recovery from both conventional and nontraditional sources, and update outdated requirements that hinder the development of essential materials. Taken together, the recommended reforms would strengthen domestic supply chains, improve investment certainty, and reduce dependence on external minerals and processing infrastructure. By aligning policy, regulatory frameworks, and workforce capabilities with national needs, the United States can build a more resilient and secure critical minerals ecosystem that supports long term economic competitiveness and technological leadership.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Advanced Facility Design and AI/ML Enabled Safeguards to Establish Secure, Economical Recycling of Fast Reactor Fuels (Final Scientific/Technical Report)

The project, "Advanced Facility Design and AI/ML Enabled Safeguards to Establish Secure, Economical Recycling of Fast Reactor Fuels," represents a significant advancement in nuclear fuel recycling technology. It integrates cutting-edge multimodal sensor fusion, machine learning (ML), and digital twin (DT) technologies to address challenges in material safeguarding, process optimization, and regulatory compliance for pyroprocessing facilities. This research has significantly enhanced the understanding of pyrochemical fuel recycling processes by developing innovative tools and methodologies. The Multimodal Safeguards Monitoring Unit (MSMU) combines electroanalytical techniques, Raman spectroscopy, and differential thermal analysis (DTA) to enable high-fidelity, near-real-time material accountancy measurements. Machine learning techniques, such as Long Short-Term Memory (LSTM) autoencoders, are utilized to detect anomalies in material balances and sensor data, improving the reliability of safeguards monitoring. Additionally, digital twin technology has been established to provide real-time system-level monitoring and diagnostics, integrating physics-based models with sensor data to optimize process safety and efficiency.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Geothermal Interagency Collaboration Task Force: Summary of Findings

This report summarizes the findings of the Geothermal Interagency Collaboration Task Force (Task Force) and associated stakeholder forums and Tribal listening sessions. The Task Force included federal agencies and state agencies in California and Nevada with a nexus to geothermal regulatory and permitting approvals. The Task Force met twice over the course of 2022 to discuss current geothermal regulatory and permitting challenges and strategies for improved coordination and permit processing. In addition, the project team held four forums/listening sessions in 2022 with geothermal industry representatives, environmental non-governmental organizations, and Tribes to gain additional insight and perspective on the geothermal regulatory process and managing potential cultural and natural resource conflicts that may arise during geothermal development.

15 GEOTHERMAL ENERGY↗