Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

Offshore Testing Facility – Small Scale Turbine Testing and Development Final Technical Report

In July 2010 funding for an award was made available under contract DE-EE0004200 which is the focus of this report. Under this funding, The U.S. Department of Energy’s (USDOE) designated Florida Atlantic University’s (FAU) state of Florida marine renewable energy focused Center of Excellence for Ocean Energy Technology as the Southeast National Marine Renewable Energy Center (SNMREC). The award was advertised in 2008, when the USDOE Wind and Water Program issued a funding opportunity announcement (DE-PS36-08GO98030) to establish university-led National Marine Renewable Energy Centers (NMRECs). Although FAU was selected for this opportunity, funding did not become available until 2010 at which time three of the original five years of performance remained and scope was adjusted accordingly. This award was divided into two phases. The first phase focused on marine energy turbine system enhancement and research while the second phase aimed to advance offshore capabilities and testing opportunities for small-scale demonstration turbines. The project’s objective was to increase the nation’s capabilities, knowledge, and competitiveness with respect to ocean current energy technology. This project successfully achieved these goals by advancing marine energy technology testing opportunities and capabilities. This report details these accomplishments by phase and task. Descriptions include any relevant results, challenges, achievements, and outcomes. Additional intellectual products and publications are listed in the Appendix where detailed technical explanations can be found. Further, because this award designated SNMREC as a USDOE center, it challenges FAU to continue providing value for the marine energy sector in the long term. The direct accomplishments of this project, though noteworthy, are also the seeds for a greater partnership between the USDOE and FAU. SNMREC, leveraging its designation as an NMREC under this award, will expand these contributions for decades to come as a coordinated sustainable program that can serve the marine energy sector’s needs as they arise.

16 TIDAL AND WAVE POWER↗

Cooperative Support of the Fermilab Site’s Natural Areas and Related Programs (CRADA Final Report)

Under the prime contract with the Department of Energy, Fermi Research Alliance, LLC (FRA) is responsible for effective stewardship of the Fermi National Accelerator Laboratory (Fermilab) 6,800-acre site, to assure that Fermilab is renewed and enhanced to meet future mission needs. As the steward of the Fermilab site, FRA is responsible for maintaining the natural areas for the site (e.g., prairie restoration sites, woodlands, etc.), which are essential for protecting the health and safety of personnel working on or visiting the site, while supporting the scientific and educational missions of Fermilab. Fermilab Natural Areas (FNA) is a not-for-profit corporation organized and existing under the laws of the State of Illinois. FNA was founded in 2006 and incorporated in 2008 for the purposes of studying, conserving, and restoring the Fermilab Site’s natural areas in a manner consistent with the science mission of Fermilab and enhancing the awareness and visibility of the natural amenities of Fermilab to neighboring communities.

54 ENVIRONMENTAL SCIENCES↗

The Power and Energy Storage Systems Toolbox -- PSTess v.1.0

The Power and Energy Storage Systems Toolbox (PSTess) is a MATLAB-based computing package for dynamic simulation and analysis of utility-scale battery storage systems. This codebase is a fork of the Power Systems Toolbox Version 3.0, developed at Rensselaer Polytechnic Institute (RPI) and Cherry Tree Scientific Software. While PSTess shares a common lineage with PST, it is a substantially different application. As the name implies, the main distinguishing characteristic of PSTess is its ability to model inverter-based energy storage systems (ESS). The model that enables this is called ess.m, and it serves the dual role of representing ESS operational constraints and the generator/converter interface. With PSTess, the generator/converter interface is modeled as a controllable current source with the ability to modulate both active and reactive current. The model ess.m permits four-quadrant modulation, which allows it to represent a wide variety of inverter-based resources beyond energy storage when paired with an appropriate supplemental control model. Examples include utility-scale photovoltaic (PV) power plants, type 4 wind plants, and static synchronous compensators (STATCOM). This capability is especially useful for modeling hybrid plants that combine energy storage with renewable resources. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. SAND2021-8322 O

Elliott, RyanT.↗

Utility Energy Service Contract Guide

This guide serves as a key resource for acquisition teams developing utility energy service contracts (UESC) with an emphasis on using a task order to acquire energy management services under a General Services Administration areawide contract. The guide features a compilation of templates to assist your efforts from acquisition planning through awarding a task order for design and installation.

Cali, Peter [National Renewable Energy Laboratory ↗

Voluntary Renewable Energy Procurement Programs in Regulated Utility Markets

Multinational corporations are increasingly purchasing renewable energy (RE) to fulfill international commitments, reduce supply chain emissions, limit environmental impact, and secure stable and affordable electricity. The potential scale of global corporate RE purchasing has been estimated to be nearly 100 GW and growing; however, many markets still lack supportive enabling environments for corporations to access RE through on-site project development or private sector transactions. Even where allowed by law, on-site generation may be insufficient due to space and technical constraints, introducing additional challenges. Utility green pricing and utility green tariff programs backed by renewable energy certificates (RECs), referred to as utility green procurement programs (GPPs) in this report, offer powerful market-based solutions to utilities, regulators, and policymakers to provide corporate and other consumers with RE product options while generating revenue to support RE development. As RE markets expand around the globe, GPPs have proven to be effective mechanisms in market regimes, ranging from fully integrated state-owned utilities to broadly liberalized power markets. GPPs utilize RECs, which are a type of energy attribute certificate and closely resemble guarantees of origin, to track and ultimately monetize RE attributes that corporations and other buyers must procure to demonstrate progress against their RE commitments and make public claims of RE use. Time-tested and transparent REC accounting mechanisms provide market confidence, while at the same time offering flexibility to utilities, regulators, and customers for a range of applications. RECs are used in all types of electricity market structures, as indicated in Figure 1, but REC-based program designs and supporting components differ depending on the type of market. Liberalized markets allow for customers to contract directly with generators for electricity and RECs, while traditionally regulated markets with vertically integrated utility structures may have greater restrictions on generation asset ownership and electricity sales. RE markets can be further defined as being either mandatory or voluntary. Mandatory markets require suppliers to deliver specified amounts of RE to grid customers, such as under a renewable portfolio standard (RPS), while voluntary markets involve no legal mandates, but demand is driven by self-imposed customer goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Opportunities for installed combined heat and power (CHP) to increase grid flexibility in the U.S.

Increasing use of renewable energy requires sufficient grid flexibility to address uncertainty and variability in electricity generation. Previous studies suggest that combined heat and power (CHP) systems may support grid flexibility but they do not consider operating hours. In this paper, we used CHP operating data and determined annual and monthly availability of the installed CHP capacity from various sectors (e.g., utility, independent power producer, commercial, and industrial) in all seven U.S. independent system operators (ISOs) and regional transmission organizations (RTOs). Also, we estimated hourly CHP availability installed in five facility types (i.e., hospitals, universities, hotels, offices, and manufacturing) in the state of New York. The results show that regardless of ISO/RTO, sector, or season, more than 40% of the installed CHP capacity (0.7–8.7 GW) was not fully utilized in 2019; the results are similar for 2018. This available CHP capacity accounted for up to 9% of the ISO/RTO's peak electric demand, which may yield cost savings up to $16 billion by avoiding installation costs of new natural gas combustion or combined-cycle turbines. To exploit the available CHP capacity to enhance grid flexibility, we recommend different policy implications including flexible contract lengths between CHP owners and grid operators, improved market designs, and simplified interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Marine Energy Commercialization Review: Evaluation of the Transition From Public to Private Capital

The mission of the U.S. Department of Energy's Water Power Technologies Office (WPTO) is to advance marine energy technologies through research, testing, and commercialization. This paper explores the barriers and potential solutions for marine energy commercialization by evaluating publicly available literature, feedback from public and private actors, and historical WPTO actions. A key finding is the absence of standardized metrics to measure marine energy commercialization progress and the lack of targeted success goals. This paper aims to define those metrics, informed by public and private goals and the challenges developers experience, and to further evaluate targets offered by public funders and private capital providers. Recommendations to address barriers in marine energy commercialization include enhancing public-private communication, refining commercialization requirements, leveraging technology transfer programs, and exploring novel funding mechanisms like green bonds and contracts for difference. Addressing these challenges through proposed adjustments could facilitate the transition of marine energy technologies from public funding to sustainable private investment, ultimately advancing their commercialization.

13 HYDRO ENERGY↗

The Costs and Feasibility of Floating Offshore Wind Energy in the O'ahu Region

The State of Hawai'i has set a target to achieve a 100% Renewable Portfolio Standard (RPS) by 2045, and is well suited to become the first state to achieve this goal due to its relatively small load, high electricity prices, heavy reliance on imported fossil fuels, and favorable conditions for wind and solar. The Bureau of Ocean Energy Management contracted NREL to conduct a cost and feasibility study to provide information to decision makers on Hawai'i about the viability of floating offshore wind to be a part of the 100% RPS. We used NREL's Offshore Regional Cost Analyzer (ORCA) spatial cost model to evaluate the Levelized Cost of Energy (LCOE) in the region surrounding O'ahu as this is the island with the highest energy demand. The ORCA results showed that LCOE could range from around $\$$83 MWh to $\$$194 MWh for commercial operation dates in 2019 but has the potential to decrease to $\$$48 MWh - $\$$109 MWh by 2032 due to maturing global supply chains, increasing turbine rating, and new technological innovations. These costs are expected to be competitive with global floating wind costs in the early 2030s. The strong wind resource, proximity to infrastructure on land, and benign metocean conditions can potentially compensate for the logistical complexities of installing projects in Hawai'i far from mainland supply chains if sufficient investments are made to develop ports, grid infrastructure, and workforce on O'ahu to support the construction and operation of offshore wind projects. In addition to the cost results, this report also discusses the likely technologies that would comprise floating wind projects near O'ahu, the existing infrastructure available to projects, unique conditions facing offshore wind in the region such as exposure to hurricanes and limits on allowable export cable capacity, newly developed wind resource data sets for the region, and local stakeholder perspectives on offshore wind.

17 WIND ENERGY↗

Hawai‘i National Marine Renewable Energy Center (HINMREC)

The Hawaii National Marine Renewable Energy Center (HINMREC) was established to facilitate the commercialization of wave energy converter (WEC) devices, and to accelerate development and testing of Ocean Thermal Energy Conversion (OTEC) technologies. Housed at the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii (UH), this program started with execution of the contract between the US Department of Energy (DOE) and UH in March 2009, and activities ran through the end of the project in September 2019. The DOE tasked HINMREC with facilitating and accelerating the build-out of the Navy’s Wave Energy Test Site (WETS), the nation’s first grid-connected open water wave energy conversion test facility, located off Marine Corps Base Hawaii (MCBH) in Kaneohe, on the island of Oahu. WETS was expanded from an existing test berth at 30m water depth to include test berths at 60m and 80m water depths. In recognition of the high costs associated with at-sea testing and evaluation of WEC devices, it was deemed imperative that HINMREC seek ways to reduce costs to developers by providing key research support to these early-stage technologies. WETS and HINMREC’s support allowed development of wave energy technology by providing a testing infrastructure that allows technology developers to test, demonstrate and evaluate their WEC devices, and generate data in order to advance WEC designs toward commercial readiness. HINMREC’s roles have included support in the establishment of the full site, including of wave resource characterization and site survey, followed by the essential roles of independent WEC device power performance assessment and environmental monitoring in support of deployed pre-commercial WECs. This DOE-funded work transitioned effectively to continue Navy-funded tasks for OTEC development, and activities at WETS, now under Naval Facilities Engineering Command (NAVFAC) funding. A secondary objective in the establishment of HINMREC was to assist the private sector in moving OTEC systems beyond proof-of-concept to pre-commercialization, primarily focused on system and component engineering, and local and global investigations into the potential environmental impacts of OTEC systems. HINMREC was tasked with maintaining high-resolution models of ocean thermal resources and the potential sustainable power output of OTEC systems. Ongoing tests begun previously under Navy funding at the OTEC Heat Exchangers (HXs) Test Facility at the Natural Energy Laboratory of Hawaii Authority (NELHA), in Kona on Hawaii Island, have been continued to identify cost-effective aluminum alloys for use in OTEC systems operating in the corrosive marine environment.

16 TIDAL AND WAVE POWER↗

Nontechnical Barriers to Geothermal Development

Geothermal energy presents a significant opportunity for the United States (US). The US has the largest known geothermal resource in the world, with over 31 GW of conventional geothermal (i.e., hydrothermal) potential. Despite this, the development of geothermal power plants has lagged other renewable resources. Though some of the gaps stem from technical barriers numerous non-technical barriers are preventing geothermal energy from reaching its full potential. The gaps include a need to reduce the cost impacts of seismic risk, environmental risk, exploration, drilling and permitting cost risk, and reduced summer capacity on plant profitability. This report identifies pathways to overcome these barriers. We find that geothermal energy could increase its market presence by acting as a complement to lower cost renewables, providing flexible or baseload power in low carbon scenarios. We also outline several contractual and operational strategies (including the use of hybrid systems) that plant operators can pursue to improve the value of their resource, such as multi part remuneration mechanisms that guarantee revenue (e.g., availability payments or a Contract for Differences approach) or resource risk hedging approaches (e.g., shaped market products and portfolio resource approaches).

15 GEOTHERMAL ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Unlocking Energy Efficiency: Debunking Myths on the Road to Decarbonization

Energy efficiency is widely recognized as the foundational and most critical strategy for decarbonizing the manufacturing sector. Misconceptions surrounding energy efficiency measures often hinder their widespread adoption. This article aims to debunk five common myths and provides data and resources to help implement efficiency projects faster and more effectively to achieve greater decarbonization. First, the article challenges the myth that organizations have exhausted all possible energy efficiency opportunities by achieving voluntary energy intensity goals or energy performance certification. Second, it also addresses the misconceptions that efficiency projects are capital-intensive, require many qualified specialists, and have long investment return periods. By presenting real-world case studies and referencing commonly found efficiency opportunities, the article illustrates that energy-savings opportunities are ubiquitous. Organizations can use various contracting mechanisms as well as financial and technical resources from utility companies and government programs to lessen their burden. The notion that efficiency measures can be implemented solely in proprietorship facilities is dispelled. This article emphasizes the importance of green leases and explains that aligning decarbonization goals between the lessor and lessee can help drive savings for both parties. Finally, using unbundled renewable energy certificates as the sole pathway to decarbonization is strongly discouraged. By debunking these prevalent myths, this article aims to foster a deeper understanding of energy efficiency’s potential as a cornerstone of decarbonization efforts and to embrace it as a critical pathway toward a sustainable future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PACT Center: Perovskite PV Accelerator for Commercializing Technologies (Final Technical Report)

The Perovskite PV Accelerator for Commercializing Technologies (PACT) center was established in July 2021 as a national resource to accelerate the commercialization of perovskite photovoltaic (PV) technology in the United States. Since its inception, PACT has been led by Sandia National Laboratories (Sandia) in partnership with the National Laboratory of the Rockies (NLR), formerly known as NREL. From FY20-FY23, Los Alamos National Laboratory (LANL), CFV Labs, Black & Veatch (B&V), and the Electric Power Research Institute (EPRI) were part of the project team. LANL brought expertise in perovskite PV device designs and processing, CFV Labs (now GroundWork Renewables) provided initial indoor and outdoor measurement hardware technology, B&V led the initial effort on perovskite PV bankability, and EPRI worked on reviewing testing standards, identifying commercialization gaps, and helping to run PACT’s Industry Advisory Board, a group including representatives from commercial testing labs, independent engineering firms, insurance companies, state regulators, and electric utilities. To source perovskite PV module samples, PACT contracted with the University of North Carolina (UNC), the University of Toledo, the University of Washington, and SLAC/Stanford University to provide a steady stream of research-grade perovskite mini modules, enabling protocol development in advance of commercial module availability. The project period ran from July 1, 2021, through December 31, 2025, including a No Cost Extension. Starting in FY25, the project was continued as a Core Capability in the Lab Call portfolio and continues at a reduced budget with only Sandia and NLR as funded recipients. Notably, starting in FY25 PACT expanded its scope beyond MHP modules to accept all emerging PV mini module technologies for testing, including organic PV (OPV) and all-thin-film tandems, with the aim of supporting commercialization across the broader emerging PV ecosystem. With this change in scope the program was renamed the PV Accelerator for Commercializing Technologies, dropping perovskite from the name.