Prosumer-Based Distributed Autonomous Cyber-Physical Architecture for Ultra-reliable Green Electricity Internetworks

This project, the first of its kind, proposes a new architecture for decentralized management and control of future electricity grids with millions of decision-makers. These economically motivated decision-makers are called prosumers (producer-consumers). Prosumers can produce, consume, and/or store electricity and make strategic decisions enabled by communication networks. Prosumers can be as large as a utility or as small as an electric vehicle or a smart house with a home energy management system. The report first provides an impression of the functionality envisioned in prosumer-based smart grids and the philosophy behind their design. The architecture is intended to provide a platform for many possibilities in service definition and trading. The functionality of the architecture is identified by functional and non-functional requirements related to decentralized control and optimization. In this report, three key technologies are proposed for enabling distributed operation and control in prosumer-based smart grids. The first technology is a cyber-infrastructure model, which provides an underlying framework for distributed communication and computation in smart grids. The model is based on service-oriented computing paradigm and is compatible with the existing service-oriented technologies, used in enterprise computing, such as Web Services. However, it extends these technologies for handling the hard-to-predict real-time aspects of smart grids by introducing resource-aware service deployment and quality-of-service (QoS)-aware service monitoring phases. The second technology is a distributed frequency regulation (DFR) framework, which can ensure midterm frequency stability while avoiding inter-area oscillations and using a limited control effort. DFR can complement today’s Automatic Generation Control (AGC) systems by providing an advanced protocol for coordination between AGC systems of different prosumers. The main advantage of the DFR technology is that each frequency regulator only needs to communicate with its neighbors in the network. The efficacy of DFR is shown through simulations on real-world electric energy systems of different scale and complexity. The third technology introduced in this project is decentralized unit commitment (DUC) for heterogeneous prosumers. The DUC technology is a new scalable method for formulating and solving a distributed energy scheduling problem. The algorithm extends the alternating direction method of multipliers (ADMM) and includes several heuristics to mitigate oscillations and traps in local optimality that result from the nonconvexity of unit commitment. The main advantages of DUC is that it can solve the unit commitment problem for large-scale power systems of more than 3,000 nodes faster than the state-of-the-art, centralized methods, and that it is scalable to energy scheduling problems of prosumer systems of any size. In summary, this report illustrates that the distributed architecture for prosumer-based power grids is an enabler of transforming aging power grids into sustainable, resilient, reliable, and efficient smart grids with some desirable functionalities similar to the Internet.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Emergency Voltage Regulation in Power Systems via Ripple-Type Control: Preprint

With increasing penetration of volatile renewable generation and cyber-physical disruptions, ensuring safe operation of bulk power systems has become unprecedentedly challenging. Since communication and computational costs restrict centralized system dispatch to be called upon every few minutes; and purely local schemes are shown to be insufficient, distributed controls have been advocated for handling unanticipated system conditions in real time. However, the applicability of distributed control schemes is fundamentally limited by their need for widespread communication and model cognizance. In this con-text, we put forth a hybrid low-communication saturation-driven protocol for the coordination of control agents that are distributed over a physical system and are allowed to communicate with peers over a ‘hotline’ communication network. Under this protocol, when agents observe a constraint violation based on local measurements, they respond locally until their control resources saturate, in which case they send a beacon for assistance to peer agents. The scheme ensures that minor violations are efficiently mitigated via fast local controls, while severe violations may be handled by a collaboration of a relatively small set of agents. We evaluate the performance of this scheme via extensive numerical tests on the IEEE 14-bus test feeder, where agents act upon noisy measurements under diverse scenarios of random load variations and severe low/high voltage events.

distributed control↗

Securing Distributed Energy Resource Integration

The penetration of distributed energy resources (DER) is growing at much higher rates than predicted 20 years ago. Far from being used only in residential settings, DER are now installed on distribution and transmission circuits. In this position, they do not have the same properties as traditional generators and are more flexible in many cases. The growing penetration and range of uses for DER motivate the need to reliably and safely integrate them into the grid. Operators must be able to rely on them not only for normal operation, but also during abnormal conditions like black starts or adverse cyber scenarios. To that end, we study the communications, device interfaces, and potential consequences of DER operation under abnormal and adversarial conditions. The weaknesses of communications networks are studied based on the industrial protocols used, and the benefits of security features are examined. The device interfaces are found to be vulnerable to attack based on the requirements in the IEEE-1547 standard for DER interconnection and interoperability, which is expected to be adopted in the next ten years. In addition to exploring the requirements of the standard, we show that these vulnerabilities and others do exist and can be used maliciously in a modern storage system DER. Consequences of these vulnerabilities range from exacerbated grid instability, to simultaneous loss of large portions of DER penetration, to physical damage to inverters or DER themselves and other sensitive equipment. We tie these outcomes to specific attacker actions in an effort to give operators a better threat intelligence view that allows them to prioritize mitigations. Finally, we discuss mitigations that could prevent many of the adversarial scenarios described. Some solutions can be added to existing infrastructure, while others may require longer term planning for grid modernization with consideration for security.

25 ENERGY STORAGE↗

Cybersecurity Assessments on Emulated DER Communication Networks

An increasing number of public utility commissions are adopting Distributed Energy Resource (DER) interconnection standards which require photovoltaic (PV) inverters, energy storage systems, and other DER to include interoperable grid-support functionality. The recently updated national standard, IEEE 1547-2018, requires all DER to include a Sun Spec Modbus, IEEE 2030.5, or IEEE 1815 communication interface in order to provide local and bulk power system services. Those communication protocols and associated information models will ensure system interoperability for PV and storage systems, but these new utility-to-DER communication networks must be deployed with sufficient cybersecurity to protect the U.S. power system and other critical infrastructure reliant on dependable power. Unlike bulk generators, DER are commonly connected to grid operators via public internet channels. These DER networks are exposed to a large attack surface that may leverage sophisticated techniques and infrastructure developed on IT systems, including remote exploits and distributed attacks. Although DER make up a growing portion of the national generation mix, they have limited processing capabilities and do not typically support modern security features such as encryption or authentication. In this work, Sandia National Laboratories constructed simulated DER communication net- works with a range of security features in order to study the security posture of different communication approaches. The experimental test environment was created in a Sandia-developed co-simulation platform, called SCEPTRE, which emulated Sun Spec-compliant DER equipment, the utility DER management system, communication network, and distribution power system. Adversary-based assessments were conducted and a quantitative scoring criteria was applied to evaluate the resilience of various architectures against cyber attacks and to measure the systemic impact during such attacks. The team found that network segmentation, encryption, and moving target defense improved the security of these networks and would be recommended for utility, aggregator, and local DER networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Overview and Commentary on Applying the Coordinated Vulnerability Disclosure Process to Photovoltaic System Devices

The rapid expansion of photovoltaic (PV) systems, particularly inverters, has introduced new cybersecurity challenges that threaten both local operations as well as the broader electrical grid’s stability. PV inverters, integrated into critical energy infrastructure are potential targets for cyber attacks due to vulnerabilities in firmware, remote access systems, and communication protocols. The Coordinated Vulnerability Disclosure (CVD) process, as defined by the Cybersecurity and Infrastructure Security Agency (CISA), provides a framework for identifying, reporting, and addressing these vulnerabilities in a transparent and collaborative manner. This report outlines the CVD process as it applies to PV systems, detailing the roles of key stakeholders, such as manufacturers, grid operators, and security researchers. The report also highlights specific challenges in managing vulnerabilities for new and legacy PV systems, which includes those introduced by insecure communications and third-party supply chain components. By adhering to the CVD process, the PV industry can mitigate cybersecurity risks, ensure regulatory compliance, and maintain consumer trust, while safeguarding the operational resilience of the energy grid. Ultimately, the effective coordination of vulnerability management is crucial for securing the future of PV systems within the critical electric grid infrastructure landscape.

14 SOLAR ENERGY↗

Cybersecurity of Networked Microgrids: Challenges Potential Solutions and Future Directions

Networked microgrids are clusters of geographically-close, islanded microgrids that can function as a single, aggregate island. This flexibility enables customer-level resilience and reliability improvements during extreme event outages and also reduces utility costs during normal grid operations. To achieve this cohesive operation, microgrid controllers and external connections (including advanced communication protocols, protocol translators, and/or internet connection) are needed. However, these advancements also increase the vulnerability landscape of networked microgrids, and significant consequences could arise during networked operation, increasing cascading impact. To address these issues, this report seeks to understand the unique components, functions, and communications within networked microgrids and what cybersecurity solutions can be implemented and what solutions need to be developed. A literature review of microgrid cybersecurity research is provided and a gap analysis of what is additionally needed for securing networked microgrids is performed. Relevant cyber hygiene and best practices to implement are provided, as well as ideas on how cybersecurity can be integrated into networked microgrid design. Lastly, future directions of networked microgrid cybersecurity R&D are provided to inform next steps.

24 POWER TRANSMISSION AND DISTRIBUTION↗

File I/O for MPI Applications in Redundant Execution Scenarios

As multi-petascale and exa-scale high-performance computing (HPC) systems inevitably have to deal with a number of resilience challenges, such as a significant growth in component count and smaller circuit sizes with lower circuit voltages, redundancy may offer an acceptable level of resilience that traditional fault tolerance techniques, such as checkpoint/restart, do not. Although redundancy in HPC is quite controversial due to the associated cost for redundant components, the constantly increasing number of cores-per-processor is tilting this cost calculation toward a system design where computation, such as for redundancy, is much cheaper and communication, needed for checkpoint/restart, is much more expensive. Recent research and development activities in redundancy for Message Passing Interface (MPI) applications focused on availability/reliability models and replication algorithms. This paper takes a first step toward solving an open research problem associated with running a parallel application redundantly, which is file I/O under redundancy. The approach intercepts file I/O calls made by a redundant application to employ coordination protocols that execute file I/O operations in a redundancy-oblivious fashion when accessing a node-local file system, or in a redundancy-aware fashion when accessing a shared networked file system. A proof-of concept prototype is presented and a number of coordination protocols are described and evaluated. The results show the performance impact for redundantly accessing a shared networked file system, but also demonstrate the capability to regain performance by utilizing MPI communication between replicas and parallel file I/O.

99 GENERAL AND MISCELLANEOUS↗

Quantum Networks for Resilient Power Grids: Theory and Simulated Evaluation

Quantum networks are considered the future of secure communication in the coming quantum era. Yet there lack significant efforts on developing practical quantum networks for power grids. Here, in this paper, we establish a quantum network-based power grid (QNetGrid) framework and develops a real-time, reliable, flexible, programmable, and cost-effective QNetGrid software testbed containing repeater-based quantum communication, quantum routing, real software-defined networking (SDN) switches, and real-time networked microgrids (NMs) operations. It makes the following contributions: 1) a repeater and routing based quantum network simulator (QNSim) is developed, 2) repeaters with and without quantum memories are respectively simulated in QNSim, 3) different routing scenarios in QNetGrid are investigated, 4) a real-time QNetGrid software testbed is built in RTDS incorporating QNSim and real SDN switches, and 5) various test cases are designed, and experimental results produced with the QNetGrid testbed provide valuable insights for building quantum networks in power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

HIDES: Hybrid Intrusion Detector for Energy Systems

The establishment of a resilient electric grid accompanied by a secure communications network is an ongoing battle as advanced persistent threats continue to exploit existing vulnerabilities in legacy supervisory control and data acquisition system (SCADA) infrastructure. Traditional intrusion detection systems (IDSs) lack consistent performance because of the continuously evolving attack surface of SCADA systems. These shortcomings can be overcome by integrating logical system behavior, protocol-specific knowledge, and data-based learning to develop a comprehensive IDS solution. In this paper, we present a Hybrid Intrusion Detector for Energy Systems by integrating a network-based IDS, state-of-the-art machine learning-based IDS, and model-based IDS to detect unknown and stealthy cyberattacks targeting the SCADA networks. The proposed IDS uses synchrophasor measurements and cyber logs to learn patterns of different scenarios based on spatiotemporal behaviors of power systems. As a proof of concept, we implement and validate the proposed IDS by leveraging resources available at the National Renewable Energy Laboratory's Energy Systems Integration Facility test bed. Experimental results show promising performance in detecting cyberattacks while providing realtime visualization of power system measurements and cyber logs.

machine-learning intrusion detection system↗

Reliability of emergency and standby diesel generators: Impact on energy resiliency solutions

Emergency diesel generators are the most common form of backup power for critical loads when the grid fails and are most often deployed as stand-alone generators (<2000 kW) tied to individual buildings for hospitals, emergency services, military bases, ports, airports, industries, and commercial facilities. Understanding the finite reliability of emergency diesel generators during continuous operation is critical for energy planners, managers, and end-users. A new analysis of two large non-public emergency diesel generator operational data sets shows that commonly used reliability metrics are inadequate to predict the performance during a grid outage. Additional metrics addressing the likelihood of an emergency diesel generator to be available at the time an outage starts, successfully start and carry load, and constantly run for the duration of the outage are needed to predict the continuous run-time reliability of emergency diesel generators during a grid outage. This is the first analysis of the reliability of modern generators that follow standard maintenance protocols commonly used for backup power and these new metrics are shown to be dependent on the level of emergency diesel generator maintenance with values that can vary by more than an order of magnitude. Even using the new metrics for well-maintained emergency diesel generators, the analysis shows that the single emergency diesel generators configurations are only 80% likely to provide power for the duration of a two-week grid outage.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Device Access Abstractions for Resilient Information Architecture Platform for Smart Grid

An open application platform distributes the intelligence and control capability to local endpoints (or nodes) reducing total network traffic, improving speed of local actions by avoiding latency, and improving reliability by reducing dependencies on numerous devices and communication interfaces. The platform must be multi-tasking and able to host multiple applications running simultaneously. Given such a system, the core functions of power grid control systems include grid state determination, low level control, fault intelligence and reconfiguration, outage intelligence, power quality measurement, remote asset monitoring, configuration management, power and energy management (including local distributed energy resources, such as wind, solar and energy storage) can be eventually distributed. However, making this move requires extensive regression testing of systems to prove out new technologies, such as phasor measurement units (PMU). Additionally, as the complexity of the systems increase with the inclusion of new functionality (especially at the distribution and consumer levels), hidden coupling issues becomes a challenge with possible N-way interactions known and not known by device and application developers. Therefore, it is very important to provide core abstractions that ensure uniform operational semantics across such interactions. Here in this paper, we describe the pattern for abstracting device interactions we have developed for the RIAPS platform in the context of a microgrid control application we have developed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗