Search NASA⌕ Search

SEARCH · Search NASA

Results for “risk assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Taking the Risk Out of Risk Assessment

The ability to understand risks and have the right strategies in place when risky events occur is essential in the workplace. More and more organizations are being confronted with concerns over how to measure their risks or what kind of risks they can take when certain events transpire that could have a negative impact. NASA is one organization that faces these challenges on a daily basis, as effective risk management is critical to the success of its missions especially the Space Shuttle missions. On July 29, 1996, former NASA Administrator Daniel Goldin charged NASA s Office of Safety and Mission Assurance with developing a probabilistic risk assessment (PRA) tool to support decisions on the funding of Space Shuttle upgrades. When issuing the directive, Goldin said, "Since I came to NASA [in 1992], we've spent billions of dollars on Shuttle upgrades without knowing how much they improve safety. I want a tool to help base upgrade decisions on risk." Work on the PRA tool began immediately. The resulting prototype, the Quantitative Risk Assessment System (QRAS) Version 1.0, was jointly developed by NASA s Marshall Space Flight Center, its Office of Safety and Mission Assurance, and researchers at the University of Maryland. QRAS software automatically expands the reliability logic models of systems to evaluate the probability of highly detrimental outcomes occurring in complex systems that are subject to potential accident scenarios. Even in its earliest forms, QRAS was used to begin PRA modeling of the Space Shuttle. In parallel, the development of QRAS continued, with the goal of making it a world-class tool, one that was especially suited to NASA s unique needs. From the beginning, an important conceptual goal in the development of QRAS was for it to help bridge the gap between the professional risk analyst and the design engineer. In the past, only the professional risk analyst could perform, modify, use, and perhaps even adequately understand PRA. NASA wanted to change this by developing a PRA tool that would be friendlier, more understandable, and more useful to the broader engineering community. This concept ultimately led to the look, feel, and functionality that QRAS has today.

Source record↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗

Towards a Rigorous Basis for Specific Operations Risk Assessment of UAS

The Specific Operations Risk Assessment (SORA) guidance represents the consensus of various national aviation authorities on a common process to identify, qualitatively assess, and manage the safety risk posed by unmanned aircraft systems (UAS), when preparing the safety case required for regulatory approval to conduct certain types of operations. As such, it can be considered a de facto standard, being increasingly adopted by various relevant stakeholders. This paper first gives an overview of the SORA process and associated methods, identifying a number of inconsistencies in risk identification and assessment, also discussing plausible strategies to close the associated gaps. Then, we give a well-founded basis for the applicable concepts, such as barrier integrity, assurance, and robustness, following which we present a preliminary and simple probabilistic formalization of the underpinning barrier-based safety model. We illustrate our overall approach through a worked example, also discussing how a Bayesian framework can facilitate extending and enhancing our initial formalization. We conclude with a discussion of the opportunities afforded by our approach, such as a well-founded basis for barrier selection, whilst addressing the associated challenges. The main objective of this work is to complement the current SORA guidance through a principled, mathematicallybased approach to risk assessment, particularly when it is applied to higher-risk operational concepts that warrant greater rigor in safety assessment and assurance.

Safety Cases↗

Nasa Conjunction Assessment Risk Analysis Updated Requirements Architecture

The NASA Conjunction Assessment Risk Analysis (CARA) program has been performing routine on-orbit satellite conjunction risk analysis for unmanned NASA spacecraft since 2005, and has developed a robust operations procedure and set of recommended best practices for operational conjunction assessment. However, a number of recent developments in Space Situational Awareness and commercial space operations conduct, such as the immanent deployment of much more sensitive space sensing systems and the launching of much larger satellite constellations, have begun to challenge these standard collision risk parameters and calculations. In response CARA has pursued a multi-year evaluation initiative to re-examine risk assessment algorithms and techniques, to develop needed improvements, and to assemble analysis-based operational requirements. This paper gives an overview of the principal parts of the Conjunction Assessment (CA) risk assessment process used at CARA, outlines the technical challenges that each part presents, surveys the possible solutions, and then indicates which particular solution is being recommended for NASA.

Newman, Lauri K.↗

RRFMC Drop Tester: Conduct of R&D Engineering System Risk Assessment

This report provides a documented risk assessment and subsequent determination of engineering rigor for the modification of the drop tester system inside of the Respirable Release Fraction Measurement Chamber (RRFMC) located in TA03-130. This risk assessment does not apply to the modification of the structural support system, containment barrier, pressure system, nor fluid system of the RRFMC, but only seeks to address the risk associated with the specific system used to raise and drop test articles.

42 ENGINEERING↗

Risk Assessment Considerations for Underground Hydrogen Storage in Depleted Gas Reservoirs

Underground hydrogen storage (UHS) in depleted reservoirs presents a promising solution for large-scale energy storage as hydrogen demand grows. As the UHS industry emerges, robust risk assessments are critical to ensuring safe operation of the storage facilities and minimizing the risk of accidents. This work explores risk assessment protocols for underground natural gas storage (UGS) in depleted reservoirs and identifies key considerations for repurposing these facilities for UHS. By examining the differences in physical and chemical properties between hydrogen and natural gas, this work highlights new and modified hazards that merits a reevaluation of traditional natural gas risk assessment practices. This investigation synthesizes insights from previous literature reviews and interviews with UGS industry experts and operators to identify key areas for adapting risk assessment methodologies for hydrogen. The insights gleaned from expert interviews indicate that existing risk assessment standards are non-prescriptive, leading to diverse company-specific risk assessment methodologies requiring substantial additions to become practical. Due to a lack of concrete risk assessment requirements, experience, and relevant data, this uncertainty is expected to be magnified considerably when considering hydrogen. This study identifies several areas for potential modification of existing risk assessment practices that could be considered by those developing standards or performing risk assessments for UHS. Specifically, risk assessments may be improved by including risks unique to hydrogen in existing standards, changing the magnitude of different risk factors in existing risk assessment protocols, and improving methods of data collection and communication across the industry to address large areas of uncertainty.

08 HYDROGEN↗

Data requirements for improving the Quantitative Risk Assessment of liquid hydrogen storage systems

Quantitative Risk Assessment (QRA) supports the development of risk-informed safety codes and standards which are employed to enable the safe deployment of hydrogen technologies essential to decarbonize the transportation sector. System reliability data is a necessary input for rigorous QRA. Here, the lack of reliability data for bulk liquid hydrogen (LH 2 ) storage systems located on site at fueling stations limits the use of QRAs. In turn, this hinders the ability to develop the necessary safety codes and standards that enable worldwide deployment of these stations. Through a QRA-based analysis of a LH 2 storage system, this work focuses on identifying relevant scenario and probability data currently available and ascertaining future data collection requirements regarding risks specific to liquid hydrogen releases. The work developed consists of the analysis of a general bulk LH 2 storage system design located at a hydrogen fueling station. Failure Mode and Effect Analysis (FMEA) and traditional QRA modeling tools such as Event Sequence Diagrams (ESD) and Fault Tree Analysis (FTA) are employed to identify, rank, and model risk scenarios related to the release of LH 2 . Based on this analysis, scenario and reliability data needs to add LH 2 -related components to QRA are identified with the purpose of improving the future safety and risk assessment of these systems.

08 HYDROGEN↗

Quantitative risk assessment system (QRAS)

A quantitative risk assessment system (QRAS) builds a risk model of a system for which risk of failure is being assessed, then analyzes the risk of the system corresponding to the risk model. The QRAS performs sensitivity analysis of the risk model by altering fundamental components and quantifications built into the risk model, then re-analyzes the risk of the system using the modifications. More particularly, the risk model is built by building a hierarchy, creating a mission timeline, quantifying failure modes, and building/editing event sequence diagrams. Multiplicities, dependencies, and redundancies of the system are included in the risk model. For analysis runs, a fixed baseline is first constructed and stored. This baseline contains the lowest level scenarios, preserved in event tree structure. The analysis runs, at any level of the hierarchy and below, access this baseline for risk quantitative computation as well as ranking of particular risks. A standalone Tool Box capability exists, allowing the user to store application programs within QRAS.

Weinstock, Robert M↗

Dynamic probabilistic risk assessment for electric grid cybersecurity

Electric grid cybersecurity risk has become a significant concern of industries and governments. This paper proposes a dynamic probabilistic risk assessment method for electric grid cybersecurity risk analysis. The proposed method helps reduce the reliance on expert judgment, capture a broad range of components and system dynamics, and model the interactions between various contributing entities (e.g., attacker, operator). In addition, the scenarios with multiple events, such as the occurrence of both cyberattacks and failures of physical components, the occurrence of both cyberattacks and operators’ (in)correct reactions, are considered and analyzed. Further, for each cyberattack scenario, Monte Carlo simulations are used to obtain possible sequences of the system's evolution under study and then derive risk estimates. As an application of the proposed method, the risk assessment method serves as the basis of risk-informed defense resource allocation to improve electric grid cybersecurity. The proposed method is verified using the IEEE 14-bus system by evaluating different security resource allocations for selected cyberattack scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA Conjunction Assessment Risk Analysis (CARA) Updated Requirements Architecture

The NASA Conjunction Assessment Risk Analysis (CARA) program has been performing routine on-orbit satellite conjunction risk analysis for unmanned NASA spacecraft since 2005, and has developed a robust operations procedure and set of recommended best practices for operational conjunction assessment. However, a number of recent developments in Space Situational Awareness and commercial space operations conduct, such as the immanent deployment of much more sensitive space sensing systems and the launching of much larger satellite constellations, have begun to challenge these standard collision risk parameters and calculations. In response CARA has pursued a multi-year evaluation initiative to re-examine risk assessment algorithms and techniques, to develop needed improvements, and to assemble analysis-based operational requirements. This paper gives an overview of the principal parts of the Conjunction Assessment (CA) risk assessment process used at CARA, outlines the technical challenges that each part presents, surveys the possible solutions, and then indicates which particular solution is being recommended for NASA.

Newman, L. K.↗

Single Integrated Flux Files to Account for Spacecraft Attitude Motion in Meteoroid Risk Assessments Using the NASA MEM3 and Bumper Codes

Spacecraft meteoroid risk assessments can be performed using NASA’s Meteoroid Engineering Model 3 (MEM3) and the Bumper risk assessment code. The MEM3 meteoroid flux is highly directional in heliocentric space. To represent the directionality, MEM3 outputs the flux in commonly used coordinate frames. For example, if a spacecraft attitude is fixed in the orbital tangential frame, a single Bumper run using the MEM3 flux file in the body-fixed frame can be performed. Cases exist in which the spacecraft does not remain fixed in one of these frames during a mission. This could be handled by performing a series of Bumper runs at points along the trajectory. For each trajectory point, the spacecraft has to be rotated into the frame in which the MEM3 flux file is defined. Another option presented here is to generate a single integrated flux (SIF) file. A SIF file is an average over a trajectory of the time varying MEM3 flux files rotated from their native frame into the spacecraft bus frame. A SIF file enables accounting for spacecraft rotation (coupled with flux variation over the trajectory) in a single Bumper run. An example of an application of SIF files is the meteoroid risk assessment for the Mars Sample Return (MSR) campaign Capture Containment and Return System (CCRS). This report discusses how SIF files were generated for the CCRS risk assessment and presents metrics on the accuracy of the impinging fluence that is generated when using the files. The results show a maximum difference per element in a finite element model within 1 percent for seven of the eight examined cases, with the outlier being less than 2 percent. The results also show that the maximum standard deviation of differences across all elements is within 0.275 percent. The maximum difference in the total fluence across all the elements is 0.0463 percent. The maximum difference in the mean fluence across all the elements is 0.0407 percent.

Meteoroids↗

NASA Human System Risk Assessment Process

NASA utilizes an evidence based system to perform risk assessments for the human system for spaceflight missions. The center of this process is the multi-disciplinary Human System Risk Board (HSRB). The HSRB is chartered from the Chief Health and Medical Officer (OCHMO) at NASA Headquarters. The HSRB reviews all human system risks via an established comprehensive risk and configuration management plan based on a project management approach. The HSRB facilitates the integration of human research (terrestrial and spaceflight), medical operations, occupational surveillance, systems engineering and many other disciplines in a comprehensive review of human system risks. The HSRB considers all factors that influence human risk. These factors include pre-mission considerations such as screening criteria, training, age, sex, and physiological condition. In mission factors such as available countermeasures, mission duration and location and post mission factors such as time to return to baseline (reconditioning), post mission health screening, and available treatments. All of the factors influence the total risk assessment for each human risk. The HSRB performed a comprehensive review of all potential inflight medical conditions and events and over the course of several reviews consolidated the number of human system risks to 30, where the greatest emphasis is placed for investing program dollars for risk mitigation. The HSRB considers all available evidence from human research and, medical operations and occupational surveillance in assessing the risks for appropriate mitigation and future work. All applicable DRMs (low earth orbit for 6 and 12 months, deep space for 30 days and 1 year, a lunar mission for 1 year, and a planetary mission for 3 years) are considered as human system risks are modified by the hazards associated with space flight such as microgravity, exposure to radiation, distance from the earth, isolation and a closed environment. Each risk has a summary two-page assessment representing the state of knowledge/evidence of that risk, available risk mitigations, traceability to the Space Flight Human System Standards (SFHSS) and program requirements, and future work required. These data then can drive coordinated budgets across the Human Research Program, the International Space Station, Crew Health and Safety and Advanced Exploration System budgets to provide the most economical and timely mitigations. The risk assessments were completed for the 6 DRMs and serve as the baseline for which subsequent research and technology development and crew health care portfolios can be assessed. The HSRB reviews each risk at least annually or when new evidence/information is available that adds to the body of evidence. The current status of each risk can be reported to program management for operations, budget reviews and general oversight of the human system risk management program.

Francisco, D.↗

Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation. Volume 5: Auxiliary shuttle risk analyses

Volume 5 is Appendix C, Auxiliary Shuttle Risk Analyses, and contains the following reports: Probabilistic Risk Assessment of Space Shuttle Phase 1 - Space Shuttle Catastrophic Failure Frequency Final Report; Risk Analysis Applied to the Space Shuttle Main Engine - Demonstration Project for the Main Combustion Chamber Risk Assessment; An Investigation of the Risk Implications of Space Shuttle Solid Rocket Booster Chamber Pressure Excursions; Safety of the Thermal Protection System of the Space Shuttle Orbiter - Quantitative Analysis and Organizational Factors; Space Shuttle Main Propulsion Pressurization System Probabilistic Risk Assessment, Final Report; and Space Shuttle Probabilistic Risk Assessment Proof-of-Concept Study - Auxiliary Power Unit and Hydraulic Power Unit Analysis Report.

Fragola, Joseph R.↗

Risk Assessment Metrics for NASA Fission Reactor Applications

Risk assessment is an important part of many NASA activities. In August 2019, the White House issued NSPM-20, which defines acceptable levels of risk for nuclear launches, but does not prescribe the particular methodologies or metrics that are to be used for comparison to the defined acceptance criteria. There are a variety of metrics that are possible and can be readily generated by a probabilistic risk assessment (PRA). This paper will explore alternative metrics that can be provided, along with some discussion of their characteristics and important factors to consider during a space fission reactor risk analysis.

Probabilistic Risk Assessment↗

Probabilistic Risk Assessment: A Bibliography

Probabilistic risk analysis is an integration of failure modes and effects analysis (FMEA), fault tree analysis and other techniques to assess the potential for failure and to find ways to reduce risk. This bibliography references 160 documents in the NASA STI Database that contain the major concepts, probabilistic risk assessment, risk and probability theory, in the basic index or major subject terms, An abstract is included with most citations, followed by the applicable subject terms.

Source record↗

Overview and Recommendations for Cyber Risk Assessment in Nuclear Power Plants

Digital instrumentation and control (I&C) systems are being deployed in nuclear power plants (NPPs) for both existing and advanced reactor designs. As I&C systems become more digitized to allow features like near autonomous control and remote operation, they introduce greater cyber risk to NPPs. Cyberattacks targeting industrial control systems (ICSs) are growing in both qualities and capabilities, which indicates that cybersecurity needs to be an integral part of risk assessment in the industry. Although there are some risk assessment methods in traditional information technology (IT) cybersecurity, the differences between IT and ICS cybersecurity make it infeasible to apply these risk assessment methods directly to ICSs. Some research has focused on risk assessment methods for ICSs, but few studies focus on applications to NPPs. Ideal risk frameworks for the nuclear industry are dynamic and account for system dependencies; this survey review focuses on such risk assessment methods both in and outside the nuclear field. In this article, the major challenges in cybersecurity risk assessment research are pointed out, and further research suggestions and considerations for cyber risk assessment in I&C systems are identified.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Event-modeled Risk Assessment Using Linked Diagrams

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at INL for researching the capabilities of dynamic PRA (Probabilistic Risk Assessment). In order to promote the effective use of dynamic PRA by the general community, EMRALD focuses on the following key aspects: Simplifying the modeling process by providing a structure that corresponds to traditional PRA modeling methods Providing a user interface (UI) that makes it easy for the user to model and visualize complex interactions Allowing the user to couple with other analysis applications such as physics based simulations. This includes one-way communication for most applications and two-way loose coupling for customizable applications Providing the sequence and timing of events that lead to the specified outcomes when calculating results Traditional aspects of components with basic events, fault trees, and event trees are all captured in a dynamic framework of state diagrams, which are displayed.

Prescott, SteveR↗