Search NASA⌕ Search

SEARCH · Search NASA

Results for “risks”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Utility of Terrestrial Cardiovascular Disease Data in Astronaut Radiation Risk Assessment – A Case Study Showing Increased Risk with Clonal Hematopoiesis of Indeterminate Potential

Cardiovascular disease (CVD) is associated with high doses of radiation and is are cognized health risk for astronauts on multiple or long duration exploration missions to the Moon or Mars. Currently, radiation risk assessment is based on background population disease rates and does not consider individual risk factors that may modify analysis, especially at lower radiation doses.

Zarana S Patel↗

Carbon/graphite fiber risk analysis and assessment study: An assessment of the risk to Douglas commercial transport aircraft

The potential hazard to electrical and electronic devices should there be a release of free carbon fibers due to an aircraft crash and fire was assessed. Exposure and equipment sensitivity data were compiled for a risk analysis. Results are presented in the following areas: DC-9/DC-10 electrical/electronic component characterization; DC-9 and DC-10 fiber transfer functions; potential for transport aircraft equipment exposure to carbon fibers; and equipment vulnerability assessment. Results reflect only a negligible increase in risk for the DC-9 and DC-10 fleets either now or projected to 1993.

Schjelderup, H. C.↗

Experiences using Visualization Techniques to Present Requirements, Risks to Them, and Options for Risk Mitigation

For several years we have been employing a risk-based decision process to guide development and application of advanced technologies, and for research and technology portfolio planning. The process is supported by custom software, in which visualization plays an important role. During requirements gathering, visualization is used to help scrutinize the status (completeness, extent) of the information. During decision making based on the gathered information, visualization is used to help decisionmakers understand the space of options and their consequences. In this paper we summarize the visualization capabilities that we have employed, indicating when and how they have proven useful.

requirements↗

2nd Generation RLV Risk Reduction Definition Program: Pratt & Whitney Propulsion Risk Reduction Requirements Program (TA-3 & TA-4)

This is the final report and addresses all of the work performed on this program. Specifically, it covers vehicle architecture background, definition of six baseline engine cycles, reliability baseline (space shuttle main engine QRAS), and component level reliability/performance/cost for the six baseline cycles, and selection of 3 cycles for further study. This report further addresses technology improvement selection and component level reliability/performance/cost for the three cycles selected for further study, as well as risk reduction plans, and recommendation for future studies.

Matlock, Steve↗

Integration of an Evidence Base into a Probabilistic Risk Assessment Model. The Integrated Medical Model Database: An Organized Evidence Base for Assessing In-Flight Crew Health Risk and System Design

This slide presentation reviews the Integrated Medical Model (IMM) database, which is an organized evidence base for assessing in-flight crew health risk. The database is a relational database accessible to many people. The database quantifies the model inputs by a ranking based on the highest value of the data as Level of Evidence (LOE) and the quality of evidence (QOE) score that provides an assessment of the evidence base for each medical condition. The IMM evidence base has already been able to provide invaluable information for designers, and for other uses.

Saile, Lynn↗

Probabilistic Risk Assessment for Bone Fracture - Bone Fracture Risk Module (BFxRM)

This presentation summarizes the concepts, development, and application of NASA's Bone Fracture Risk Module (BFxRM). The overview includes an assessmnet of strenghts and limitations of the BFxRM and proposes a numebr of discussion questions to the panel regarding future development avenues for this simulation system.

Monte Carlo Method↗