Search NASA⌕ Search

SEARCH · Search NASA

Results for “scaled test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

PILOT-SCALE TESTING OF THE SUSPENSION OF MST, CST, AND SIMULATED SLUDGE SLURRIES IN A SLUDGE TANK

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank (i.e., Tank 41H) to house the process. Following strontium, actinide, and cesium removal, the concentrated solids will be transported to a sludge tank (i.e., monosodium titanate (MST)/sludge solids to Tank 42H or Tank 51H and crystalline silicotitanate (CST) to Tank 40H) for eventual transfer to the Defense Waste Processing Facility (DWPF). Savannah River National Laboratory (SRNL) is conducting pilot-scale mixing tests to determine the pump requirements for mixing MST, CST, and simulated sludge. The purpose of this pilot scale testing is to determine the pump requirements for mixing MST and CST with sludge in a sludge tank and to determine whether segregation of particles occurs during settling. Tank 40H and Tank 51H have four Quad Volute pumps; Tank 42H has four standard pumps. The pilot-scale tank is a 1/10.85 linear scaled model of Tank 40H. The tank diameter, tank liquid level, pump nozzle diameter, pump elevation, and cooling coil diameter are all 1/10.85 of their dimensions in Tank 40H. The pump locations correspond to the current locations in Tank 40H (Risers B2, H, B6, and G). The pumps are pilot-scale Quad Volute pumps. Additional settling tests were conducted in a 30 foot tall, 4 inch inner diameter clear column to investigate segregation of MST, CST, and simulated sludge particles during settling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PILOT SCALE TESTING OF MONOSODIUM TITANATE MIXING FOR THE SRS SMALL COLUMN ION EXCHANGE PROCESS - 11224

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and select actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank (i.e., Tank 41H) to house the process. Savannah River National Laboratory (SRNL) is conducting pilot-scale mixing tests to determine the pump requirements for suspending monosodium titanate (MST), crystalline silicotitanate (CST), and simulated sludge. The purpose of this pilot scale testing is to determine the requirements for the pumps to suspend the MST particles so that they can contact the strontium and actinides in the liquid and be removed from the tank. The pilot-scale tank is a 1/10.85 linear scaled model of SRS Tank 41H. The tank diameter, tank liquid level, pump nozzle diameter, pump elevation, and cooling coil diameter are all 1/10.85 of their dimensions in Tank 41H. The pump locations correspond to the proposed locations in Tank 41H by the SCIX program (Risers B5 and B2 for two pump configurations and Risers B5, B3, and B1 for three pump configurations). The conclusions from this work follow: (i) Neither two standard slurry pumps nor two quad volute slurry pumps will provide sufficient power to initially suspend MST in an SRS waste tank. (ii) Two Submersible Mixer Pumps (SMPs) will provide sufficient power to initially suspend MST in an SRS waste tank. However, the testing shows the required pump discharge velocity is close to the maximum discharge velocity of the pump (within 12%). (iii) Three SMPs will provide sufficient power to initially suspend MST in an SRS waste tank. The testing shows the required pump discharge velocity is 66% of the maximum discharge velocity of the pump. (iv) Three SMPs are needed to resuspend MST that has settled in a waste tank at nominal 45 C for four weeks. The testing shows the required pump discharge velocity is 77% of the maximum discharge velocity of the pump. Two SMPs are not sufficient to resuspend MST that settled under these conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intermediate Scale Test Platform Conceptual Design and Hybrid Resin Performance Evaluation Recommendations

Recent laboratory evaluations demonstrated that further testing of alternative hybrid resins is warranted for their potential use as part of the 200 West Area (200W) pump-and-treat (P&T) remedy. 200W P&T has been treating technetium (Tc) since 2012 and uranium (U) since 2015 via two separate ion exchange (IX) treatment units: a single treatment train (i.e., a three-vessel system) for the removal of uranium utilizing a gel strong base anion (SBA) exchange resin, Dowex 21K; and two parallel treatment trains for the removal technetium using a gel SBA resin, Purolite® A532E. While these resins have been removing these contaminants effectively, new hybrid resins can provide additional benefits of further optimizing the IX treatment unit capacities and addressing additional treatment needs (e.g., Cr(VI)) by removing multiple contaminants simultaneously and/or through specific design configurations. Some of these resins also demonstrated some level of removal for I-129 which would be significant for expansion of the P&T into the 200 East Area. This document provides design recommendations for an intermediate scale test platform (ISTP) to evaluate alternative hybrid IX resin performance under conditions approaching field scale and using 200W P&T process groundwater. Results from the ISTP will provide the technical basis required to inform alternative IX resin selection in future 200W P&T facility operations where the treatment of multiple contaminants of concern may be required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large-Scale Testing and High-Fidelity Simulation Capabilities at Sandia National Laboratories to Support Space Power and Propulsion

Sandia National Laboratories, as a Department of Energy, National Nuclear Security Agency, has major responsibility to ensure the safety and security needs of nuclear weapons. As such, with an experienced research staff, Sandia maintains a spectrum of modeling and simulation capabilities integrated with experimental and large-scale test capabilities. This expertise and these capabilities offer considerable resources for addressing issues of interest to the space power and propulsion communities. This paper presents Sandia's capability to perform thermal qualification (analysis, test, modeling and simulation) using a representative weapon system as an example demonstrating the potential to support NASA's Lunar Reactor System.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Recommendations for ground effects research for V/STOL and STOL aircraft and associated equipment for large scale testing

The current understanding of the effects of ground proximity on V/STOL and STOL aircraft is reviewd. Areas covered include (1) single jet suckdown in hover, (2) fountain effects on multijet configurations, (3) STOL ground effects including the effect of the ground vortex flow field, (4) downwash at the tail, and (5) hot gas ingestion in both hover and STOL operation. The equipment needed for large scale testing to extend the state of the art is reviewed and developments in three areas are recommended as follows: (1) improve methods for simulating the engine exhaust and inlet flows; (2) develop a model support system that can simulate realistic rates of climb and descent as well as steady height operation; and (3) develop a blowing BLC ground board as an alternative to a moving belt ground board to properly simulate the flow on the ground.

Kuhn, Richard E.↗

Engineering Scale Testing of Robotic Inspection Tools for Double Shell Tanks at Hanford - 18349

Waste found in the annulus of the AY-102 double-shell tank (DST) at Hanford has prompted the need for the development of inspection tools that are able to access confined spaces around and underneath the tanks. During the last year, Florida International University (FIU) has been developing inspection tools that are capable of accessing the tank floors through the air supply line, the air refractory channels and the drain lines. This effort has led to the development of a pneumatic pipe crawler and a miniature rover. In this paper, updates to the inspection tool designs and the full scale testing of both systems are presented. The tools provide visual feedback for the operator, carrying with them onboard cameras and light sources. The images are streamed back live via a tether, which also provides power to the devices. To increase the sensing capabilities of both tools, temperature, humidity and radiation sensor modules are being integrated onto the developed systems, and can be interchanged depending on the inspection objectives. The miniature rover measures 7 cm in length and 3.8 cm in width, and travels upside down on the bottom of the tank to avoid debris accumulated in the channels. The video is also being processed real-time to provide control of the unit semi-autonomously. The pipe crawler measures approximately 76 cm in length and 6.4 cm in diameter, and travels using pneumatic actuators that emulate the peristaltic movement contractions typical of worm type robots. A full-scale sectional mock-up of the DST foundation, refractory system and annulus is currently being developed as a test-bed for the testing of the inspection tools. The intention of the test-bed is to demonstrate the viability of using both inspection tools in configurations similar to the actual tank. The test-bed includes a 2.43 m wide section of both tank liners, refractory channels and concrete foundation with drain slots. The test-bed is designed to be modular so that various plate thicknesses can be easily utilized and different refractory configurations can be incorporated. Currently, the refractory channels are of the tree type structure with turns that are approximately 30 degrees. Both inspection tools were demonstrated in the mock-up facility. The miniature rover ran successfully through the drain slots from the annulus to central plenum and had no issues making the 90-degree turns. The peristaltic crawler was able to navigate through the 7.62 cm air supply line from the annulus to the central plenum. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Activity Waste Pretreatment System Bench-Scale Testing: Supporting Integrated Testing and Facility Safety Analyses - 17171

The Low Activity Waste Pretreatment System (LAWPS) is being designed to enable the direct feed of waste to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to be immobilized. Prior to construction of the LAWPS, pilot-scale integrated testing of the key unit operations (crossflow filtration, ion exchange using spherical resorcinol-formaldehyde (sRF) resin) will be conducted by a team led by Washington River Protection Solutions (WRPS) to increase the technology maturation level of the facility's critical technology elements. As a part of this effort, Pacific Northwest National Laboratory (PNNL) has conducted a series of tests to perform two major objectives: (1) support pilot-scale integrated testing of the LAWPS by supplying information or performance data in advance of operating the pilot-scale facility (1/9. scale); and (2) collect data needed to establish or confirm assumptions/approaches planned for implementation in the LAWPS safety basis. The first objective was focused in two technical areas: developing simulants that are representative of expected waste feed and can be produced at larger scales, and using these simulants in a bench-scale crossflow filter to establish expected solid-liquid separation performance. The crossflow filter was also used to observe the efficacy (with respect to filter production rate) of selected operational strategies. The second objective also included two technical areas: measuring the effect of sRF resin on hydrogen generation rate under irradiation, and demonstrating that the planned hydrogen management approach is effective and robust. The hydrogen management strategy involves fluidization of the sRF resin bed in the ion exchange columns and recirculating the liquid, a scenario that is planned for testing at full column height. The full height tests at PNNL also supported full-scale IX column testing conducted as part of the technology maturation plan. The experimental approaches used at PNNL in these four technical areas are summarized and selected key preliminary results are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large-Scale Test of Dynamic Correlation Processors: Implications for Correlation-Based Seismic Pipelines

Correlation detectors are of considerable interest to the seismic monitoring communities because they offer reduced detection thresholds and combine detection, location and identification functions into a single operation. They appear to be ideal for applications requiring screening of frequent repeating events. However, questions remain about how broadly empirical correlation methods are applicable. We describe the effectiveness of banks of correlation detectors in a system that combines traditional power detectors with correlation detectors in terms of efficiency, which we define to be the fraction of events detected by the correlators. This paper elaborates and extends the concept of a dynamic correlation detection framework – a system which autonomously creates correlation detectors from event waveforms detected by power detectors; and reports observed performance on a network of arrays in terms of efficiency. We performed a large scale test of dynamic correlation processors on an 11 terabyte global dataset using 25 arrays in the single frequency band 1-3 Hz. The system found over 3.2 million unique signals and produced 459,747 screened detections. A very satisfying result is that, on average, efficiency grows with time and, after nearly 16 years of operation, exceeds 47% for events observed over all distance ranges and approaches 70% for near regional and 90% for local events. This observation suggests that future pipeline architectures should make extensive use of correlation detectors, principally for decluttering observations of local and near-regional events. Our results also suggest that future operations based on correlation detection will require commodity large-scale computing infrastructure, since the numbers of correlators in an autonomous system can grow into the hundreds of thousands.

47 OTHER INSTRUMENTATION↗

In Situ Decommissioning Sensor Network, Meso-Scale Test Bed - Phase 3 Fluid Injection Test Summary Report

The DOE Office of Environmental management (DOE EM) faces the challenge of decommissioning thousands of excess nuclear facilities, many of which are highly contaminated. A number of these excess facilities are massive and robust concrete structures that are suitable for isolating the contained contamination for hundreds of years, and a permanent decommissioning end state option for these facilities is in situ decommissioning (ISD). The ISD option is feasible for a limited, but meaningful number of DOE contaminated facilities for which there is substantial incremental environmental, safety, and cost benefits versus alternate actions to demolish and excavate the entire facility and transport the rubble to a radioactive waste landfill. A general description of an ISD project encompasses an entombed facility; in some cases limited to the blow-grade portion of a facility. However, monitoring of the ISD structures is needed to demonstrate that the building retains its structural integrity and the contaminants remain entombed within the grout stabilization matrix. The DOE EM Office of Deactivation and Decommissioning and Facility Engineering (EM-13) Program Goal is to develop a monitoring system to demonstrate long-term performance of closed nuclear facilities using the ISD approach. The Savannah River National Laboratory (SRNL) has designed and implemented the In Situ Decommissioning Sensor Network, Meso-Scale Test Bed (ISDSN-MSTB) to address the feasibility of deploying a long-term monitoring system into an ISD closed nuclear facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PILOT-SCALE TEST RESULTS OF A THIN FILM EVAPORATOR SYSTEM FOR MANAGEMENT OF LIQUID HIGH-LEVEL WASTES AT THE HANFORD SITE WASHINGTON USA -11364

A modular, transportable evaporator system, using thin film evaporative technology, is planned for deployment at the Hanford radioactive waste storage tank complex. This technology, herein referred to as a wiped film evaporator (WFE), will be located at grade level above an underground storage tank to receive pumped liquids, concentrate the liquid stream from 1.1 specific gravity to approximately 1.4 and then return the concentrated solution back into the tank. Water is removed by evaporation at an internal heated drum surface exposed to high vacuum. The condensed water stream will be shipped to the site effluent treatment facility for final disposal. This operation provides significant risk mitigation to failure of the aging 242-A Evaporator facility; the only operating evaporative system at Hanford maximizing waste storage. This technology is being implemented through a development and deployment project by the tank farm operating contractor, Washington River Protection Solutions (WRPS), for the Office of River Protection/Department of Energy (ORPIDOE), through Columbia Energy and Environmental Services, Inc. (Columbia Energy). The project will finalize technology maturity and install a system at one of the double-shell tank farms. This paper summarizes results of a pilot-scale test program conducted during calendar year 2010 as part of the ongoing technology maturation development scope for the WFE.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗

Near-Tank Treatment of Hanford Tank Waste: Pilot-Scale Testing - 12107

In order to reduce the number of high level waste canisters that will have to be produced by the Hanford Tank Waste Treatment and Immobilization Plant, supplemental waste treatment technologies are being investigated. One such technology is the Near-Tank Treatment System, which uses continuous sludge leaching, filtration, and ion exchange to process the waste in a simple, compact system. The Near Tank Treatment System is ideally suited for handling Hanford tanks with large amounts of boehmite, a difficult aluminum phase to dissolve. A pilot-scale Near Tank Treatment System was constructed and tested with a boehmite and iron oxyhydroxide waste simulant to evaluate the robustness and effectiveness of the system. The data from the pilot-scale tests were also used to assess scale-up from previously performed bench-scale tests. It should be noted that any work involving the use of simulated HLW has inherent limitations. For this work, every attempt was made to ensure that the simulant mimicked the actual waste performance as closely as possible. However, there are always limitations in the ability to The NTTS Demonstration Test established that all the subsystems could be operated concurrently to process the waste simulant. The NTTS had a stable performance during the Demonstration Test that required very little external manipulation once a steady state was achieved. The CSL demonstrated effectively 90% dissolution of the hard to leach boehmite phase. The cross flow filtration system was able to deliver decontaminated salt solution to the NTCR system. The NTCR system exceeded the design basis by providing effluent below the detection limit beyond the design basis required time. The NTTS system was successfully demonstrated and has shown that leaching and decontamination of the subsequent permeate can be readily achieved using relatively small footprint equipment in an at tank application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

1:50 Scale Testing of Three Floating Wind Turbines at MARIN and Numerical Model Validation Against Test Data

The primary goal of the basin model test program discussed herein is to properly scale and accurately capture physical data of the rigid body motions, accelerations and loads for different floating wind turbine platform technologies. The intended use for this data is for performing comparisons with predictions from various aero-hydro-servo-elastic floating wind turbine simulators for calibration and validation. Of particular interest is validating the floating offshore wind turbine simulation capabilities of NREL’s FAST open-source simulation tool. Once the validation process is complete, coupled simulators such as FAST can be used with a much greater degree of confidence in design processes for commercial development of floating offshore wind turbines. The test program subsequently described in this report was performed at MARIN (Maritime Research Institute Netherlands) in Wageningen, the Netherlands. The models considered consisted of the horizontal axis, NREL 5 MW Reference Wind Turbine (Jonkman et al., 2009) with a flexible tower affixed atop three distinct platforms: a tension leg platform (TLP), a spar-buoy modeled after the OC3 Hywind (Jonkman, 2010) and a semi-submersible. The three generic platform designs were intended to cover the spectrum of currently investigated concepts, each based on proven floating offshore structure technology. The models were tested under Froude scale wind and wave loads. The high-quality wind environments, unique to these tests, were realized in the offshore basin via a novel wind machine which exhibits negligible swirl and low turbulence intensity in the flow field. Recorded data from the floating wind turbine models included rotor torque and position, tower top and base forces and moments, mooring line tensions, six-axis platform motions and accelerations at key locations on the nacelle, tower, and platform. A large number of tests were performed ranging from simple free-decay tests to complex operating conditions with irregular sea states and dynamic winds.

17 WIND ENERGY↗

Results of Large-Scale Testing on Effects of Anti-Foam Agent on Gas Retention and Release

The U.S. Department of Energy (DOE) Office of River Protection’s Waste Treatment Plant (WTP) will process and treat radioactive waste that is stored in tanks at the Hanford Site. The waste treatment process in the pretreatment facility will mix both Newtonian and non-Newtonian slurries in large process tanks. Process vessels mixing non-Newtonian slurries will use pulse jet mixers (PJMs), air sparging, and recirculation pumps. An anti-foam agent (AFA) will be added to the process streams to prevent surface foaming, but may also increase gas holdup and retention within the slurry. The work described in this report addresses gas retention and release in simulants with AFA through testing and analytical studies. Gas holdup and release tests were conducted in a 1/4-scale replica of the lag storage vessel operated in the Pacific Northwest National Laboratory (PNNL) Applied Process Engineering Laboratory using a kaolin/bentonite clay and AZ-101 HLW chemical simulant with non-Newtonian rheological properties representative of actual waste slurries. Additional tests were performed in a small-scale mixing vessel in the PNNL Physical Sciences Building using liquids and slurries representing major components of typical WTP waste streams. Analytical studies were directed at discovering how the effect of AFA might depend on gas composition and predicting the effect of AFA on gas retention and release in the full-scale plant, including the effects of mass transfer to the sparge air. The work at PNNL was part of a larger program that included tests conducted at Savannah River National Laboratory (SRNL) that is being reported separately. SRNL conducted gas holdup tests in a small-scale mixing vessel using the AZ-101 high-level waste (HLW) chemical simulant to investigate the effects of different AFAs, their components, and of adding noble metals. Full-scale, single-sparger mass transfer tests were also conducted at SRNL in water and AZ-101 HLW simulant to provide data for PNNL’s WTP gas retention and release modeling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FULL SCALE TESTING TECHNOLOGY MATURATION OF A THIN FILM EVAPORATOR FOR HIGH-LEVEL LIQUID WASTE MANAGEMENT AT HANFORD - 12125

Simulant testing of a full-scale thin-film evaporator system was conducted in 2011 for technology development at the Hanford tank farms. Test results met objectives of water removal rate, effluent quality, and operational evaluation. Dilute tank waste simulant, representing a typical double-shell tank supernatant liquid layer, was concentrated from a 1.1 specific gravity to approximately 1.5 using a 4.6 m{sup 2} (50 ft{sup 2}) heated transfer area Rototherm{reg_sign} evaporator from Artisan Industries. The condensed evaporator vapor stream was collected and sampled validating efficient separation of the water. An overall decontamination factor of 1.2E+06 was achieved demonstrating excellent retention of key radioactive species within the concentrated liquid stream. The evaporator system was supported by a modular steam supply, chiller, and control computer systems which would be typically implemented at the tank farms. Operation of these support systems demonstrated successful integration while identifying areas for efficiency improvement. Overall testing effort increased the maturation of this technology to support final deployment design and continued project implementation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full-Scale Tests of Metal Propellers at High Tip Speeds

This report describes tests of 10 full-scale metal propellers of several thickness ratios at various tip speeds up to 1,350 feet per second. The results indicate no loss of efficiency up to tip speeds of approximately 1,000 feet per second. Above this tip speed the loss is at a rate of about 10 per cent per 100 feet per second increase relative to the efficiency at the lower speeds for propellers of pitch diameter ratios 0.3 to 0.4. Propellers having sections of small thickness ratio can be run at slightly higher speeds than thick ones before beginning to lose efficiency.

Wood, Donald H↗

Full-scale testing, production and cost analysis data for the advanced composite stabilizer for Boeing 737 aircraft. Volume 1: Technical summary

The full scale ground test, ground vibration test, and flight tests conducted to demonstrate a composite structure stabilizer for the Boeing 737 aircraft and obtain FAA certification are described. Detail tools, assembly tools, and overall production are discussed. Cost analyses aspects covered include production costs, composite material usage factors, and cost comparisons.

Aniversario, R. B.↗