Search NASA⌕ Search

SEARCH · Search NASA

Results for “schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Delivery-Risk-Aware Flexibility Scheduling and Dispatch for Aggregated Flexible Loads

Flexible loads like smart thermostats and water heaters can shift energy consumption and provide flexibility to the grid. However, this flexibility is dependent on occupant behavior and can lead to delivery risk, which causes utilities and grid operations to consider them as unreliable for purposes of grid operation. To date, they have not been well integrated into wholesale electricity markets or ancillary service offerings. With proper consideration of uncertainty and risk, these resources can be one of the most cost-effective sources of flexibility. This work uses stochastic optimization to quantify and bid flexibility from a fleet of flexible resources while considering their delivery risk.

DER↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

Modeling distributed energy resource aggregations in security constrained unit commitment and economic dispatch

The Federal Energy Regulatory Commission (FERC) recently issued Order 2222, which requires all wholesale electricity markets in the US to allow distributed energy resources (DERs) to participate in the market as aggregated resources. These DER aggregations may be composed of many individual resources that are offered and dispatched by the market as a single entity. We present here a model of a distributed energy resource aggregator (DERA) that is scheduled by a market operator’s security constrained unit commitment (SCUC) and security constrained economic dispatch (SCED). The DERA model includes constraints for battery energy storage systems (BESSs), demand response resources (DRRs), and a simple distributed energy resource (DER). This paper describes a model for each resource type and presents two methods for the DERA to generate market offer curves: a profit-maximizing optimization to compute cost curves and a direct cost algorithm to determine dispatch costs for each resource and combine into cost curves. Once all participating DERAs are scheduled in SCUC/SCED, the model is then modified to dispatch individual DERs to maximize profit or minimize schedule deviation of the DERAs. A simulation of a representative day illustrates the DERA offers, the scheduled generation, and the DERA dispatch. Findings show the potential for unavoidable schedule deviations due to internal DER constraints and due to economic incentives to deviate from the SCUC/SCED schedules. This highlights the importance of DERA offer construction on market efficiency and system reliability. Novel aspects of our approach include: (1) We consider the asymmetry of price incentives impacting DERAs from the wholesale market compared to those impacting consumers from the retail market, as imposed by current regulations and laws. (2) We model aggregate consumer response through statistically parameterizable utility functions rather than a potentially impractical approach of modeling each individual consumer. (3) We show how to use the DERA operational dispatch model to create offers into the wholesale electricity market. (4) We show how DERAs may fail to meet their scheduled dispatch because the market offer format may not permit them to fully express their operational features such as intertemporal costs and constraints to the market.

aggregations↗

Large-scale simulation-based parametric analysis of an optimal precooling strategy for demand flexibility in a commercial office building

Achieving success with grid-interactive efficient buildings (GEBs) is closely tied to the utilization of flexible loads. A valuable strategy involves the implementation of precooling techniques before high-demand events, such as peak hours, by adjusting zone air temperature setpoints. This leads to a reduction in thermal loads and peak electricity demand during these times, as the building’s thermal mass stores and subsequently releases thermal energy. However, the effectiveness of the pre-cooling optimization is highly contingent on specific conditions such as building thermal properties, weather conditions, utility rate structure, HVAC equipment sizing, etc. Therefore, investigating the impacts of these condition-specific factors is crucial, especially when considering precooling strategies that utilize thermal mass in commercial buildings. In this paper, we first devised a novel heuristic control approach that incorporates parameterized optimal precooling thermostat schedules to enhance demand flexibility in a commercial office building. Subsequently, we conducted a thorough performance evaluation of this control strategy. Here, the optimal thermostat schedule was parameterized using three optimization variables: the precooling start time, the precooling end time, and the precooling temperature setpoint. Utilizing the DOE medium-sized office building as the virtual testbed, we showed that the parameterized schedule effectively approximates model predictive control and requires drastically reduced computational overhead. In addition, we investigated the impact of different influencing factors on the optimal precooling strategy. These factors include building thermal mass, outdoor air conditions, and energy price profiles. Using high-performance computing, we simulated a total of 225 scenarios, consisting of three levels of thermal mass, five typical outdoor air temperature profiles, and fifteen time-of-use price plans. The results demonstrate that optimal thermostat scheduling could save substantial energy cost in medium-sized office buildings with heavy thermal mass but with some energy penalty. Although the potential for cost savings is lower in buildings with low and medium thermal mass, the energy penalty remains consistent in all three thermal mass scenarios. The study also highlights the need to account for zone diversity and recognize that a one-size-fits-all-zone setpoint schedule may not be suitable for all zones and can lead to unnecessary energy wastage. Furthermore, the results highlight that while outdoor air conditions play a role in cost and energy performance, the cooling load exerts a more immediate and substantial influence on cost savings in precooling strategies. Although cost savings are comparable under certain conditions with the same cooling load, observed deviations in energy penalty indicate potential disparities in the efficiency of the HVAC system during the load-shifting process. In addition, the duration of peak pricing and the ratio between peak and off-peak times exhibit clear correlations with cost savings and energy consumption, aligning with intuitive expectations. These findings offer valuable insights for optimizing precooling strategies in office buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Discerning the effect of various irradiation modes on the corrosion of Zircaloy-4

Using proton irradiation, this study investigates the individual influence of several factors on the corrosion kinetics of Zircaloy-4 in a hydrogenated water environment simulating a Pressurized Water Reactor (PWR). Using both simultaneous irradiation-corrosion and autoclave corrosion, we separately examine: (i) the effect of pre-irradiation on modifying the structure of the material, (ii) the impact of irradiation on creating defects in the growing oxide layer during corrosion, and (iii) the influence of irradiation on increasing the corrosion potential through radiolysis during corrosion. To replicate neutron-irradiated microstructure, two proton pre-irradiation schedules were employed: Schedule 1 (isothermal irradiation at 350 °C to 5 dpa) to simulate high-temperature PWR conditions, and Schedule 2 (two-step process: irradiation to 2.5 dpa at -10 °C followed by 2.5 dpa at 350 °C) to simulate lower temperature PWR and Boiling Water Reactor (BWR) conditions. Long-term autoclave corrosion testing over 360 days at 320 °C revealed no significant difference between unirradiated samples and those pre-irradiated according to either schedule, with all samples exhibiting sub-cubic kinetics within the pre-transition regime. Irradiated samples underwent Simultaneous Irradiation Corrosion (SIC) tests, corroding in 320 °C water while being irradiated with protons. Corrosion was found to accelerate in all SIC-tested samples relative to autoclave conditions, with the greatest increase observed in non-pre-irradiated samples. Pre-irradiation with either schedule resulted in a slower corrosion rate compared to non-pre-irradiated regions under SIC conditions. The degree of radiolysis observed in the SIC tests surpassed typical PWR conditions, approaching levels found in BWRs. Radiolysis products were identified as the primary contributors to accelerated corrosion, corroborated by radiolysis bar tests. Furthermore, these findings underscore the intricate interactions between irradiation, corrosion, and water chemistry in determining Zircaloy-4 corrosion kinetics within nuclear reactor environments.

Pressurized Water Reactor↗

Ice storage model-predictive control in an office building with PV: scenario, error and sensitivity analysis

Thermal energy storage (TES) can enable more building-sited renewable electricity generation and lower utility bill costs for buildings owners and occupants, especially when there are high demand and variable time-of-use (TOU) charges. A model predictive control (MPC) strategy can offer additional savings over a schedule-based control with added complexity and reliance on forecasts. Here, this study examines savings for medium office buildings with chiller plants in three locations with building-installed solar photovoltaics (PV) to understand the impact of MPC. Control setpoints are fixed by a schedule-based control or optimized by nonlinear MPC. These control setpoints are actuated within EnergyPlus building models to simulate the utility cost of the chiller plant. NLP solutions can be unstable or unrealistic, but our results show that by regularizing the NLP, the solutions can be reasonably followed by the building model. MPC models make simplifications that lead to errors once the controller is participating in and changing the operation of the building. These errors average 9 % across the cases, showing that the most important parts of the system are represented. The no-thermal load costs are computed to show that the optimization can in some cases achieve both the minimum TOU and minimum monthly demand costs by demand management while reducing TOU energy costs by energy arbitrage. The MPC saves 35–66 % in the annual chiller plant operating costs, which is an additional savings above the schedule by 1–33 %. PV and TES are complementary and mostly independent, but a load with PV often results in better performance for the schedule. Our case study and sensitivity analysis show the importance of modeling and optimization for complex rates, but also the circumstances wherein a simpler strategy achieves the same performance with less potential for error.

14 SOLAR ENERGY↗

Dynamical logical qubits in the Bacon-Shor code

The Bacon-Shor code is a quantum error correcting subsystem code composed of weight-2 check operators that admits a single logical qubit, and has distance 𝑑 on a 𝑑×𝑑 square lattice. We show that when viewed as a Floquet code, by choosing an appropriate measurement schedule of the check operators, it can additionally host several dynamical logical qubits. Specifically, we identify a period-4 measurement schedule of the check operators that preserves logical information between the instantaneous stabilizer groups. Such a schedule not only measures the usual stabilizers of the Bacon-Shor code, but also measures and promotes gauge operators of the parent subsystem code to additional temporary stabilizers that protect the dynamical logical qubits against errors. We show that the code distance of these Floquet-Bacon-Shor codes scales as Θ⁢(𝑑/√𝑘) on an 𝑛=𝑑×𝑑 lattice with 𝑘 dynamical logical qubits, along with the logical qubit of the parent subsystem code. Unlike the usual Bacon-Shor code, the Floquet-Bacon-Shor code family introduced here can therefore saturate the subsystem bound 𝑘⁢𝑑=𝑂⁡(𝑛). Moreover, several errors are shown to be self-corrected purely by the measurement schedule itself. This work provides insights into the design space for dynamical codes and expands the known approaches for constructing Floquet codes.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Enhanced Power Grid Maintenance Planning and Quantum-Inspired Combinatorial Prospects

Efficient and reliable scheduling of maintenance for power generation and transmission infrastructure is essential for minimizing operational costs and ensuring grid stability. This paper introduces an integrated optimization framework for coordinated maintenance scheduling of generators and transmission lines under resource and reliability constraints. The model minimizes a composite cost function including maintenance and generation costs, as well as penalties for delayed maintenance, while satisfying N−1 security constraints, operational limits, and crew availability. Case studies on the IEEE 300-bus test system demonstrate the effectiveness of the proposed approach in producing feasible and cost-effective maintenance schedules. To address scalability and combinatorial complexity, the model is mapped into a Quadratic Unconstrained Binary Optimization (QUBO) problem, enabling exploration of solution approaches based on Quantum Imaginary Time Evolution (QITE). While the QUBO reformulation provides a foundation for future quantum-inspired optimization, this study focuses primarily on the development and demonstration of the classical optimization framework and illustrates the potential applicability of QITE in large-scale maintenance scheduling.

Chen, Yang [ORNL] (ORCID:0000000271693874)↗

GreenThrift: Optimizing Carbon and Cost for Flexible Residential Loads

Reducing buildings’ carbon emissions is an important sustainability challenge. While scheduling flexible building loads has been previously used for a variety of grid and energy optimizations, carbon footprint reduction using such flexible loads poses new challenges since such methods need to balance both energy and carbon costs while also reducing user inconvenience from delaying such loads. This paper highlights the potential conflict between electricity prices and carbon emissions and the resulting trade-offs in carbon-aware and cost-aware load scheduling. To address this trade-off, we propose GreenThrift, a home automation system that leverages the scheduling capabilities of smart appliances and knowledge of future carbon intensity and cost to reduce both the carbon emissions and costs of flexible energy loads. At the heart of GreenThrift is an optimization technique that automatically computes schedules based on user configurations and preferences. We evaluate the effectiveness of GreenThrift using real-world carbon intensity data, electricity prices, and load traces from multiple locations and across different scenarios and objectives. Our results show that GreenThrift can replicate the offline optimal and retains 97% of the savings when optimizing the carbon emissions. Moreover, we show how GreenThrift can balance the conflict between carbon and cost and retain 95.3% and 85.5% of the potential carbon and cost savings, respectively.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Frontier Job-Centric Telemetry Dataset

Comprehensive analysis of high-performance computing (HPC) systems requires linking workload execution to system behavior. This kind of analysis is vital for diagnosing performance issues, managing capacity, detecting anomalous workloads, and understanding how applications interact with system hardware. This job-centric telemetry dataset unifies scheduler job records with node-level measurements, enabling direct association between workloads and their corresponding power, thermal, and performance characteristics. It contains sanitized, scheduler related metadata for 152,400 individual jobs that ran on the Frontier supercomputer and ended on selected days throughout 2024 and 2025, a subpopulation of ~6.8% of the total number of allocated jobs with non-zero run time on the system over that same period. Each is linked with files that contain telemetry time series records of the power utilization and temperature behavior of its allocated nodes and their processors during the run time of the job. Where available, a portion of the job files also contain network performance time series. Jobs are sampled from select days that reflect normal levels of user activity and possess job size distributions with large numbers of leadership class jobs (>20% of Frontier nodes). Jobs in this dataset attempt to best represent successful user workflows.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-Use Savings Shapes Measure Documentation: Thermostat Control for Load Shedding in Large Offices

This documentation focuses on a single End-Use Savings Shape measure - thermostat control for load shedding. The thermostat control for load shedding measure applies heating and cooling temperature setpoint offsets for reducing the heating and cooling load during peak window. The measure takes daily peak load schedule inputs generated by the method "Dispatch Schedule Generation" described in the "Supplemental Documentation: Dispatch Schedule Generation for Demand Flexibility Measures" to determine the start and end times of the peak window, and then adjusts the thermostat cooling and/or heating setpoints by an offset value from original schedules during the peak window to reduce the HVAC or whole building daily peak load. The measure is flexible and allows users to adjust the heating and cooling offset values respectively, but for this study, the adjustment for heating and cooling setpoints are set to -2 degrees Celsius and +2 degrees Celsius by default. The measure provides options of adding rebound control period (default 2 hours) after peak windows for the setpoints to be ramped back to default values, to prevent the system from generating higher peak demand with step changes of setpoints in post-peak periods . This measure is applicable t o large offices equipped with electric HVAC system (either electric cooling only or both electric heating and cooling), which account for approximately 8.72% of the ComStock floor area. The thermostat control for load shedding measure demonstrates 2-5% daily peak demand reduction and 0.068% total site energy savings (3 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-Use Savings Shapes Measure Documentation: Thermostat Control for Load Shifting in Large Offices

This documentation focuses on a single end-use savings shape measure - thermostat control for load shifting. The thermostat control for load shifting measure applies heating and cooling temperature setpoint adjustment for pre-conditioning before the peak window. The measure takes daily peak load schedule inputs generated by the method "Dispatch Schedule Generation" described in the "Supplemental Documentation: Dispatch Schedule Generation for Demand Flexibility Measures" to determine the start time of the peak window, and then adjusts the thermostat cooling or heating setpoints by a specified offset value from original schedules to precool or preheat the space , for a specified length of time before the start of peak window, and thus shifts load in the peak window to the pre-conditioning period. The measure is flexible and allows users to adjust the heating and cooling offset values and length of pre-conditioning period, but for this study, the load shifting strategy is applied as pre-cooling only (adjusting only cooling setpoints). The default adjustment for cooling setpoints is set to -1 degrees Celsius , and the default duration of pre-cooling is 1 hour. This measure is applicable to large offices equipped with electric HVAC system, which account for approximately 8.72% of the ComStock floor area. The thermostat control for load shifting measure demonstrates -1% daily peak demand reduction and 0% total site energy savings (0 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

MARVEL Technical Overview: Breakdown of cost and scope growth through 90% Final Design

This report presents a breakdown of cost and scope growth for the Microreactor Applications Research Validation and Evaluation (MARVEL) project through the design phase, and includes observations, lessons learned, and the results from an independent project assessment. It presents the status and history of the project. Technology maturity is considered in high-level, qualitative comparison to other microreactor design efforts. Its purpose is to record MARVEL’s evolution and lessons learned from the planning and design phases through completion of 90% final design. Analyses included a detailed review of project cost, schedule, and periodic project reports and management documents. The Primary Coolant Apparatus Test (PCAT) is specifically highlighted. It was concluded that MARVEL would have benefited from more extensive planning early in the project to better define cost and schedule to provide more certainty in the total project cost and delivery date. Modest cost and schedule improvements may have been possible, but compared qualitatively, MARVEL’s total cost and schedule performance are consistent with that of other efforts currently underway. Better planning would have provided more certainty, improved risk mitigations, and potentially eliminated delays due to funding shortfalls. A recommended path forward is presented that addresses recommendations in the independent project assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ComStock Measure Documentation: Lighting Control for Load Shedding

This report describes the modeling methodology for a single end-use savings shape measure - lighting control for load shedding - and briefly introduces key results. The lighting control for load shedding measure applies lighting dimming control to reduce the lighting load during the building's electricity peak window every weekday. The measure takes daily peak load schedule inputs generated by the method "Dispatch Schedule Generation" described in the "Supplemental Documentation: Dispatch Schedule Generation for Demand Flexibility Measures" to determine the start and end times of the predicted peak window, and then adjusts the lighting dimming level by a percentage reduction from the original schedules during the peak window to reduce the peak demand. The measure is applicable to (large, medium and small) offices, warehouses, and primary and secondary schools, which correspond to approximately 68% of the stock floor area of commercial buildings in ComStock analysis. The measure demonstrates 2%-7% daily peak demand reduction performance for applicable buildings, and 0.43% total site energy savings (0 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ComStock Measure Documentation: Thermostat and Lighting Control for Load Shedding

This report describes the modeling methodology for an upgrade package of two end-use savings shape measures - Thermostat Control for Load Shedding and Lighting Control for Load Shedding - and briefly introduces key results. The package combines thermostat control for load shedding and lighting control for load shedding measures to reduce the HVAC and lighting load during the building's electricity peak window every weekday. The measure takes daily peak load schedule inputs generated by the method "Dispatch Schedule Generation" described in the "Supplemental Documentation: Dispatch Schedule Generation for Demand Flexibility Measures" to determine the start and end times of the predicted peak window, and then relaxes the thermostat setpoints and dims the lighting level from the original schedules during the peak window to reduce the peak demand. The measure is applicable to (large, medium and small) offices, warehouses, and primary and secondary schools, which correspond to approximately 68% of the stock floor area of commercial buildings in ComStock analysis. The measure demonstrates 3%-10% daily peak demand reduction performance for applicable buildings, and 0.97% total site energy savings (0 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ComStock Measure Documentation: Thermostat and Lighting Control for Load Shedding + Photovoltaics With 40% Rooftop Coverage

This report describes the modeling methodology for an upgrade package of two end-use savings shape measures - Thermostat Control for Load Shedding and Lighting Control for Load Shedding - and briefly introduces key results. The package combines thermostat control for load shedding, lighting control for load shedding, and PV with 40% rooftop coverage measures to reduce the net building load during the building's electricity peak window every weekday. The measure takes daily peak load schedule inputs generated by the method "Dispatch Schedule Generation" described in the "Supplemental Documentation: Dispatch Schedule Generation for Demand Flexibility Measures" to determine the start and end times of the predicted peak window, and then relaxes the thermostat setpoints and dims the lighting level from the original schedules during the peak window to reduce the peak demand, while applying the fixed rooftop PV application for onsite electricity generation. The measure is applicable to (large, medium and small) offices, warehouses, and primary and secondary schools, which correspond to approximately 68% of the stock floor area of commercial buildings in ComStock analysis. The measure demonstrates 5%-15% daily peak demand reduction performance for applicable buildings, and around 1% total site energy savings (0 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

14 SOLAR ENERGY↗