Search NASA⌕ Search

SEARCH · Search NASA

Results for “science instruments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

James Webb Space Telescope (JWST) Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryogenic Test Program and Results

In 2017, the James Webb Space Telescope Optical Telescope Element and Integrated Science Instrument Module (OTIS) underwent cryogenic optical testing at the Johnson Space Center. In this paper, we summarize the successful execution and results of this 100-day test, which was a major program milestone. We summarize the as-run test configuration and provide a top-level as-run timeline. We also provide the top-level functional, optical, thermal, and operational results from the test. We summarize the key technical issues encountered and the resolution of those issues. The results of the OTIS test indicate that the payload should be fully capable of delivering on JWST's exciting scientific potential.

Kimble, Randy A.↗

Off-Nominal Planning for the Cryogenic Vacuum Test of the JWST Optical Telescope Element/Integrated Science Instrument Module at JSC

The cryogenic thermal vacuum/thermal balance test of the James Webb Space Telescope (JWST) combined Optical Telescope Element (OTE)/Integrated Science Instrument Module (ISIM), known as the OTIS, at the Johnson Space Center (JSC) Chamber A in 2017 was likely the most complex test ever performed by NASA for an unmanned mission. The test of the combined flight Optical Telescope and ISIM elements was prefaced by years of modifications to chamber facilities, and included three extensive precursor tests of non-flight and flight hardware to establish safe and optimal test operational procedures. One critical part of the test preparation was planning for off-nominal events that could arise, including appropriate responses. In some cases, assurance of personnel and payload safety required modification of original test hardware and procedures which had to be validated before the final test could begin. This planning proved especially prescient for the OTIS test, as Hurricane Harvey struck the Houston area during the test in August 2017, and consequences for the precious payload could have been severe. This paper describes the extent of the thermal off-nominal planning undertaken for the OTIS test, including including safing for hurricanes, and some real-life effects of Hurricane Harvey on the test conduct. Documentation of the consequences and mitigations for these events are discussed. The importance of off-nominal planning for future thermal vacuum/thermal balance tests is illustrated.

Off-Nominal Planning↗

Aquarius's Instrument Science Data System (ISDS) Automated to Acquire, Process, Trend Data and Produce Radiometric System Assessment Reports

The Aquarius Radiometer, a subsystem of the Aquarius Instrument required a data acquisition ground system to support calibration and radiometer performance assessment. To support calibration and compose performance assessments, we developed an automated system which uploaded raw data to a ftp server and saved raw and processed data to a database. This paper details the overall functionalities of the Aquarius Instrument Science Data System (ISDS) and the individual electrical ground support equipment (EGSE) which produced data files that were infused into the ISDS. Real time EGSEs include an ICDS Simulator, Calibration GSE, Labview controlled power supply, and a chamber data acquisition system. ICDS Simulator serves as a test conductor primary workstation, collecting radiometer housekeeping (HK) and science data and passing commands and HK telemetry collection request to the radiometer. Calibration GSE (Radiometer Active Test Source) provides source choice from multiple targets for the radiometer external calibration. Power Supply GSE, controlled by labview, provides real time voltage and current monitoring of the radiometer. And finally the chamber data acquisition system produces data reflecting chamber vacuum pressure, thermistor temperatures, AVG and watts. Each GSE system produce text based data files every two to six minutes and automatically copies the data files to the Central Archiver PC. The Archiver PC stores the data files, schedules automated uploads of these files to an external FTP server, and accepts request to copy all data files to the ISDS for offline data processing and analysis. Aquarius Radiometer ISDS contains PHP and MATLab programs to parse, process and save all data to a MySQL database. Analysis tools (MATLab programs) in the ISDS system are capable of displaying radiometer science, telemetry and auxiliary data in near real time as well as performing data analysis and producing automated performance assessment reports of the Aquarius Radiometer.

Source record↗

Science Instruments for the Advanced X-Ray Astrophysics Facility (AXAF)

The AXAF program has undergone major changes since the Announcement of Opportunity was extended by NASA Headquarters in 1983. The Science Instruments (SI's) for AXAF have also experienced several design changes since they were competitively selected in 1985. Moreover, two separate complementary missions are now being baselined for AXAF; one is designated AXAF-I for imaging and will include the high precision Wolter type I optics, and the other is called AXAF-S for spectroscopy. The resulting less-costly AXAF will still be superior to any previous x-ray observatories. Both missions continue to be managed. AXAF-I contains two focal plane SI's, the High Resolution Camera (HRC), and the AXAF Charge-Coupled Device (CCD) imaging spectrometer (ACIS), as well as the High-Energy Transmission Grating Spectrometer (HETGS) and the Low-Energy Transmission Grating Spectrometer (LETGS). Optics/Cryogenics Division (BECD). AXAF-S features only one focal plane SI, the X-Ray Spectrometer (XRS). The grazing incidence mirrors for this mission are mainly to provide a large collecting area and to concentrate these x-ray photons onto the XRS detector. Precise focusing, although preferred, is of secondary importance. Nested conical foil mirrors are currently baselined; however, replicated imaging optics are being evaluated for collecting efficiency and cost. AXAF-S is scheduled to be launched in late 1999. It has been designated as an MSFC in-house project. In addition to overall management, MSFC is fully responsible for the design, development, integration, and test of the complete AXAF-S observatory, including the XRS which will be furnished by the Goddard Space Flight Center (GSFC). Together, AXAF-I and AXAF-S constitute the third of NASA's series of Great Observatories, joining the Hubble space telescope (HST) and the Gamma-Ray Observatory (GRO) which are already operational. The develop- ment, launch, and operation of the Space InfraRed Telescope Facility (SIRTF) will follow later to complete the Great Observatory series. This paper summarizes the impact these changes have had on the SI's.

Carl E Winkler↗

Optical Manufacturing and Testing Requirements Identified by the NASA Science Instruments, Observatories and Sensor Systems Technology Assessment

In August 2010, the NASA Office of Chief Technologist (OCT) commissioned an assessment of 15 different technology areas of importance to the future of NASA. Technology assessment #8 (TA8) was Science Instruments, Observatories and Sensor Systems (SIOSS). SIOSS assess the needs for optical technology ranging from detectors to lasers, x-ray mirrors to microwave antenna, in-situ spectrographs for on-surface planetary sample characterization to large space telescopes. The needs assessment looked across the entirety of NASA and not just the Science Mission Directorate. This paper reviews the optical manufacturing and testing technologies identified by SIOSS which require development in order to enable future NASA high priority missions.

Stahl, H. Philip↗

Summary of the NASA Science Instrument, Observatories and Sensor Systems (SIOSS) Technology Assessment Roadmap

In August 2010, the NASA Office of Chief Technologist (OCT) commissioned an assessment of 15 different technology areas of importance to the future of NASA. Technology Assessment #8 (TA8) was Science Instruments, Observatories and Sensor Systems (SIOSS). SIOSS assessed the needs for optical technology ranging from detectors to lasers, x-ray mirrors to microwave antenna, in-situ spectrographs for on-surface planetary sample characterization to large space telescopes. This needs assessment looked across the entirety of NASA and not just the Science Mission Directorate. This paper summarizes the SIOSS findings and recommendations.

Stahl, H. Philip↗

Prevention of damage to the science instruments of Mariner-Mars '71 spacecraft due to accidental viewing of the sun during sun-acquisition following exit from earth shadow.

It is pointed out that severe damage could result to the shutters of several science instruments if the sun were to appear in or sweep across the field of view at any time during the mission to Mars in 1971. The problem of accidental viewing of the sun following exit from the earth's shadow is probabilistic and rather difficult to resolve. The studies conducted show that typical probabilities of TV-A viewing the sun are on the order of 0.1%.

Mukhopadhyay, A. K.↗

The JWST Science Instrument Payload: Mission Context and Status

The James Webb Space Telescope (JWST) is the scientific successor to the Hubble Space Telescope. It is a cryogenic infrared space observatory with a 25 sq m aperture (6 m class) telescope that will achieve diffraction limited angular resolution at a wavelength of 2 microns. The science instrument payload includes four passively cooled near-infrared instruments providing broad- and narrow-band imagery, coronography, as well as multi-object and integral-field spectroscopy over the 0.6 < lambda < 5.0 microns spectrum. An actively cooled mid-infrared instrument provides broad-band imagery, coronography, and integral-field spectroscopy over the 5.0 < lambda < 29 microns spectrum. The JWST is being developed by NASA, in partnership with the European and Canadian Space Agencies, as a general user facility with science observations to be proposed by the international astronomical community in a manner similar to the Hubble Space Telescope. Technology development and mission design are complete. Construction, integration and verification testing is underway in all areas of the program. The JWST is on schedule for launch during 2018.

cryogenic infrared space observatory↗

High-Speed On-Board Data Processing for Science Instruments

A new development of on-board data processing platform has been in progress at NASA Langley Research Center since April, 2012, and the overall review of such work is presented in this paper. The project is called High-Speed On-Board Data Processing for Science Instruments (HOPS) and focuses on a high-speed scalable data processing platform for three particular National Research Council's Decadal Survey missions such as Active Sensing of CO2 Emissions over Nights, Days, and Seasons (ASCENDS), Aerosol-Cloud-Ecosystems (ACE), and Doppler Aerosol Wind Lidar (DAWN) 3-D Winds. HOPS utilizes advanced general purpose computing with Field Programmable Gate Array (FPGA) based algorithm implementation techniques. The significance of HOPS is to enable high speed on-board data processing for current and future science missions with its reconfigurable and scalable data processing platform. A single HOPS processing board is expected to provide approximately 66 times faster data processing speed for ASCENDS, more than 70% reduction in both power and weight, and about two orders of cost reduction compared to the state-of-the-art (SOA) on-board data processing system. Such benchmark predictions are based on the data when HOPS was originally proposed in August, 2011. The details of these improvement measures are also presented. The two facets of HOPS development are identifying the most computationally intensive algorithm segments of each mission and implementing them in a FPGA-based data processing board. A general introduction of such facets is also the purpose of this paper.

Beyon, Jeffrey Y.↗

Structural Safety of a Hubble Space Telescope Science Instrument

This paper gives an overview of safety requirements related to structural design and verificationof payloads to be launched and/or retrieved by the Space Shuttle. To demonstrate the generalapproach used to implement these requirements in the development of a typical Shuttle payload, theWide Field/Planetary Camera II, a second generation science instrument currently being developed bythe Jet Propulsion Laboratory (JPL) for the Hubble Space Telescope is used as an example. Inaddition to verification of strength and dynamic characteristics, special emphasis is placed upon thefracture control implementation process, including parts classification and fracture controlacceptability.

Lou, M. C.↗

James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test at GSFC

JWST ISIM has entered into its system-level testing program at NASA Goddard Space Flight Center (GSFC). In December 2013, ISIM successfully completed the first in a series of three cryo-vacuum tests, which included two flight science instruments. Since then, there have been full-fledged efforts towards the CV2 test scheduled to finish at the end of 2014. The complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. In order to satisfy the program requirements, GSFC had to develop unique structural and thermal hardware to test ISIM. Most noteworthy is a helium shroud structure and cooling system built in order to achieve operational temperatures below 20K (-253C). This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) communicates the performance and challenges of the SES during the first ISIM test, and (3) summarizes the action plan to improve the system prior to the next test.

Thermal Vacuum Cryo Testing Chamber↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part I: Thermal Architecture

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the mutiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

OTIS↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part II: Thermal Analysis

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

Testing↗

Advanced X-ray Astrophysics Facility (AXAF) science instrumentation

AXAF is to be equipped with a high performance X-ray telescope for the conduction of detailed astrophysics research. The observatory is to be serviced by the Space Station or the Shuttle, depending on capabilities during the AXAF operational period. The AXAF is to utilize the wavelength band from 1.2 A to 120 A. Attention is given to the AXAF science team, the AXAF observatory characteristics, the AXAF science instrument definition program, the Advanced Charge Coupled Device (CCD) Imaging Spectrometer (ACIS), the High Resolution Camera (HRC), the Bragg Crystal Spectrometer (BCS), the X-ray Spectrometer (XRS), the transmission gratings, and the program schedule.

Dailey, C. C.↗

Development and Optimization of Kinematic Mounts for NIRCam: a JWST Science Instrument

Finite element analysis was vital to the design and optimization of the kinematic mounts for the Near Infrared Camera (NIRCam) instrument The design had to meet dueling structural requirements driven by 12G launch loads, a survivability of bulk cool down from room temperature to 22 K, minimum first mode of 50 Hz and mass allocation constraints. Additionally the design has to meet stability and Integrated Science Instrument Module (ISIM) interfaces when cooled to 22K.

Young, Daniel↗

Focus determination for the James Webb Space Telescope Science Instruments: A Survey of Methods

The James Webb Space Telescope (JWST) is a segmented deployable telescope that will require on-orbit alignment using the Near Infrared Camera as a wavefront sensor. The telescope will be aligned by adjusting seven degrees of freedom on each of 18 primary mirror segments and five degrees of freedom on the secondary mirror to optimize the performance of the telescope and camera at a wavelength of 2 microns. With the completion of these adjustments, the telescope focus is set and the optical performance of each of the other science instruments should then be optimal without making further telescope focus adjustments for each individual instrument. This alignment approach requires confocality of the instruments after integration and alignment to the composite metering structure, which will be verified during instrument level testing at Goddard Space Flight Center with a telescope optical simulator. In this paper, we present the results from a study of several analytical approaches to determine the focus for each instrument. The goal of the study is to compare the accuracies obtained for each method, and to select the most feasible for use during optical testing.

Davila, Pamela S.↗