Search NASASearch

SEARCH · Search NASA

Results for “semiconductors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

61 records · Page 4

Understanding Photovoltage Deficits in Electrochemically Grown Tin Sulfide (SnS) Thin-Film Photovoltaic Devices

Tin­(II) sulfide (SnS) is an earth-abundant semiconductor with a direct optical bandgap of ca. 1.1 eV, which makes it a promising absorber material for thin-film photovoltaic (PV) devices. However, existing devices have significant photovoltage deficits, which may be related to the anisotropic structure of the layered Herzenbergite SnS crystal structure. Here, we explore electrochemical deposition as a near room temperature path to oriented SnS crystal films on Mo and FTO substrates and employ vibrating Kelvin probe surface photovoltage (SPV) spectroscopy and J–V measurements to identify conversion losses in them. According to grazing-incidence X-ray diffraction and SEM, the SnS films consist of crystalline microplates with preferred orientation in the [111] and [001] directions. The bare SnS films produce only small and irreversible surface photovoltage signals, due charge trapping and recombination at the SnS surfaces, but addition of a CdS buffer layer lowers the charge recombination rate by 2 orders of magnitude and increases both the photovoltage and its reversibility due to the formation of a p-SnS/n-CdS junction. According to SPV, the FTO/SnS back interface (but not the Mo/SnS interface) forms a detrimental p–n junction that hinders hole transfer. Additional shunting through the relatively open microcrystal SnS layers and a lower conductivity of the FTO substrate explain the low power conversion efficiencies of the final devices (0.18 and 0.10% for the Mo and FTO substrates). Altogether, this work establishes a low-temperature path for the fabrication of crystalline SnS film-based solar cells and identifies the bottlenecks that limit high photoconversion efficiency.

deposition

Scattering theory of frequency-entangled biphoton states facilitated by cavity polaritons

The use of quantum light to probe exciton properties in semiconductor and molecular nanostructures typically occurs in the low-intensity regime. A substantial enhancement of exciton-photon coupling can be achieved with photonic cavities, where excitons hybridize with cavity modes to form polariton states. Here, to provide a theoretical framework for interpreting emerging experimental efforts in this direction, we develop a scattering theory describing the interaction of frequency-entangled photon pairs with cavity polariton and bipolariton states under various coupling regimes. Employing the Tavis-Cummings model in combination with our scattering approach, we present a quantitative analysis of how the interaction of the entangled photon pair with the polariton or bipolariton modifies its joint spectral amplitude (JSA). Specifically, we examine the effects of the cavity-mode steady-state population, exciton-cavity coupling strength, and different forms of the input photon JSA. Our results show that the entanglement entropy of the scattered photons is highly sensitive to the interplay between the input JSA and the spectral line shapes of the polariton resonances, emphasizing the cavity filtering effects. We suggest that biphoton-scattering quantum light spectroscopy best serves as a sensitive probe of polariton and bipolariton states in the photon-vacuum cavity state. Our approach is not only robust to various regimes of cavity-exciton coupling, but also amenable to extensions beyond the Tavis-Cummings model, enabling the representation of a broad class of molecular systems and solid state quantum materials.

36 MATERIALS SCIENCE

Semi-Transparent Perovskite Solar Cells in a Stacked Tandem Module: Cooperative Research and Development Final Report, CRADA Number CRD-19-00810

This project seeks to develop device design, materials composition, and processing tools and parameters to fabricate semi-transparent perovskite solar cells and modules for application in stand-alone products or added to other solar cells in a mechanically stacked tandem configuration. This technology presents significant advanced manufacturing challenges and opportunities in getting to scale, including development of perovskite inks, scalable perovskite and heterojunction deposition and annealing processes, heterojunction composition, transparent electrode composition and deposition process, anti-reflection layer composition and deposition process, and cell to module integration processes. Modification 5: The proposed project seeks to develop device design, materials composition, and processing tools and parameters to fabricate semi-transparent perovskite solar cells and modules for application in stand-alone products or added to other solar cells in a mechanically-stacked tandem configuration. This technology presents significant advanced manufacturing challenges and opportunities in getting to scale, including development of perovskite inks, scalable perovskite and heterojunction deposition and annealing processes, heterojunction composition, transparent electrode composition and deposition process, passivation layers including in module scribes, anti-reflection layer composition and deposition process, and cell to module integration processes. Advanced metrology and characterization will be performed on perovskite films, cells and module. Furthermore, we will examine module or materials recycling for circular economy considerations. Modifcation 6: Gigahertz frequency microwave pump-probe spectroscopies are highly sensitive to thin film semiconductor photoconductivity of individual and stacks of layers that comprise perovskite solar cells. As such, these techniques will be used to qualify reproducibility and quality correlations during the manufacturing process. Modification 7: Mechanical adhesion of top contacts within perovskite modules significantly impacts the durability of the module when exposed to accelerated degradation testing. The adhesion between the perovskite/transport layer interface and the transport layer/top contact interface are both very sensitive small changes in processing. ALD processing conditions of the transport layer will be tuned to optimize the mechanical adhesion within the perovskite module stack.

14 SOLAR ENERGY

Interleaved bond frustration in a triangular lattice antiferromagnet

Frustration of long-range order via lattice geometry amplifies fluctuations and generates ground states that are highly sensitive to perturbations. Traditionally, geometric frustration is used to engineer unconventional magnetic states; however, the charge degree of freedom and bond order can be similarly frustrated. Finding materials that host both frustrated magnetic and bond networks holds promise for engineering structural and magnetic states with the potential of coupling to one another via either magnetic or strain fields. Here we identify an unusual instance of this coexistence in the triangular lattice antiferromagnets LnCd 3 P 3 (Ln = lanthanides). These compounds feature two-dimensional planes of unique trigonal planar CdP 3 units with an underlying bond instability that is frustrated via emergent kagome ice correlations. This bond instability is interleaved in between layers of frustrated magnetic moments. Furthermore, our results establish LnCd 3 P 3 as a rare materials class in which frustrated magnetism is embedded within a dopable semiconductor with a frustrated bond order instability.

Gomez Alvarado, S. J. [University of California, S

Block-Type Antiferromagnetism in Single Chain Quasi-One-Dimensional K 3 ⁢Fe 2 ⁢Se 4

One-dimensional (1D) structures provide a unique platform to study the correlated quantum interactions and phase transitions such as unconventional magnetism and superconducting states. Here, we report that iron chalcogenide K 3 ⁢Fe 2 ⁢Se 4 exhibits an unusual block-type canted antiferromagnetic (AFM) order with a clear single chain quasi-1D structure, which is structurally different from the two-leg ladder BaFe 2 ⁢Se 3 , through both experimental measurements and density matrix renormalization group (DMRG) calculations. The narrow bandgap semiconductor K 3 ⁢Fe 2 ⁢Se 4 has a quasi-1D edge-shared FeSe4 tetrahedra chain structure and orders antiferromagnetically below 110 K. The magnetic moments couple antiferromagnetically along the quasi-1D chain direction of the 𝑏 axis and form an up-down-down-up (↑−↓−↓−↑)–like spin structure with a commensurate propagation vector 𝒌=⁢(0,0,0), where block-type spin ↑−↑ or ↓−↓ coupling are between the longer Fe-Fe bonds of the quasi-1D chain. DMRG results show that block antiferromagnetic state is stable in K 3 ⁢Fe 2 ⁢Se 4 and reveal that the block-ordered arrangement of Fe 2.5+ ions spins arise from the competition between ferromagnetic and AFM interaction in the presence of strong electronic correlation. Our research results not only report the discovery of a clear block-type canted antiferromagnetic structure in a real quasi-1D chain material but also provide a theoretical approach to understand the block-type antiferromagnetism in quasi-1D iron chalcogenides.

antiferromagnetism

Aliovalent gallium dopants remove Ti 3+ defects and improve photocatalytic and photoelectrochemical water oxidation properties of LaTiO 2 N

LaTiO 2 N is a promising semiconductor for the water splitting reaction due to its 2.1 eV band gap and stability against corrosion. However, its solar energy conversion is limited by Ti 3+ recombination defects introduced during ammonolysis. Here we show for the first time that Ti 3+ defects in LaTiO 2 N can be suppressed with incorporation of 2, 5, and 10% aliovalent gallium (Ga 3+ ) dopants during synthesis via the layered La 2 Ti 2 O 7 intermediate. Electron paramagnetic resonance (EPR) spectroscopy on the solid powders confirms a reduction in the Ti 3+ donor density from 2.97 × 10 17 cm −3 for the non-doped material to ∼6.24 × 10 16 cm −3 for 5% Ga-doped LaTiO 2 N. The remaining Ti 3+ defects are concentrated near the LaTiO 2 N surface, according to X-ray photoelectron spectroscopy. The defect reduction shifts the optical absorption edge from 2.02 to 2.09 eV and eliminates a broad absorption band at 1050 nm from the optical absorption spectra. It also removes a 1.0–1.7 eV sub-band gap photovoltage signal from surface photovoltage spectra. This suggests that empty Ti 3+ d-orbitals are located 1.0–1.7 eV above the LaTiO 2 N valence band edge. Removing these recombination states with increasing Ga 3+ content enhances the photoconversion efficiency of LaTiO 2 N during water oxidation. The optimized 2 wt% CoO x -loaded 5% Ga-doped LaTi O2 N material has a 16% AQE (400 nm) for O 2 production from aqueous silver nitrate solution and a ∼2.1 mA cm −2 water oxidation photocurrent at 1.23 V under 100 mW cm −2 Xe arc lamp illumination. The water oxidation photocurrent is stable during a 50 min test, and the Faraday efficiency for O 2 generation is 97%, confirming short-term corrosion stability of LaTiO 2 N. Altogether, these results provide a better understanding of the distribution, concentration, and impact of Ti 3+ defects on the optical, photovoltage, and photoelectrochemical properties of LaTiO 2 N. In combination with other defect control strategies, aliovalent Ga 3+ doping can help bring the solar energy conversion efficiency of LaTiO 2 N closer to the theoretical limit.

Wang, Li [University of California, Davis, CA (Uni

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI